Dona Ana County, N.M., funds by State, Department of
Listing $43,109,747.18 in stimulus funds from State, Department of for Dona Ana
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
Don Kelly Construction, Inc. | $18,456,744 |
Construction of Upper Rio Grande Flood Control Project. (URGFCP) Rehabilitation Improvements for Canutillo Levee System from Vado Bridge to Borderland Brigde.
This spending item is part of a $19,314,445 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
LAKESHORE ENGINEERING SERVICES, INC. | $7,730,628 |
Rehabiliation for the Rio Grande Canalization Protective Levve System, Mesilla Levee Segment - Phase 1, Dona Ana County, NM.
This spending item is part of a $26,167,084 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
Don Kelly Construction, Inc. | $5,352,117 |
Construction of the Upper Rio Grande Flood Control Project. Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System. Hatch Levee System, from Hatch Siphon to Bignell Arroyo
This spending item is part of a $5,642,817 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/29/2009 |
BRISTON CONSTRUCTION, LLC | $5,092,576 |
Complete the construction for Upper Rio Grande Flood Control Project (URGFCP), rehabilitation for the Rio Grande Canalization Protective Levee System-Mesilla Levee Segment-Phase II, Mesilla, Dona Ana county, NM.
This spending item is part of a $13,744,568 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/03/2010 |
DEL MONT CONSULTANTS INC | $932,413 |
Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/28/2009 |
MILESTONE EXCAVATION INC | $857,701 |
Construction of Upper Rio Grande Flood Control Project. (URGFCP) Rehabilitation Improvements for Canutillo Levee System from Vado Bridge to Borderland Brigde.
This spending item is part of a $19,314,445 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |
TETRA TECH, INC. | $662,655 |
As part of TAS 19-1079 (RECOVERY: CONSTRUCTION MANAGEMENT SERVICES FOR THE MESILLA LEVEE SEGMENTS - PHASE 1) Construction management/assistance services during the rehabilitation of approximately 30 miles of levees located in the lower Rio Grande Valley
This spending item is part of a $673,370 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 1/21/2010 |
S L I Engineering, Inc | $618,080 |
Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/28/2009 |
S L I ENGINEERING, INC | $618,080 |
Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,285,848 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/28/2009 |
URS GROUP, INC. | $577,377 | RECOVERY - Construction Management and Inspection of Levee Rehabilitation of HW1 (Hatch Siphon to Bignell Arroyo). TAS::19 1079 790::TAS | U.S. and Mexico International Boundary and Water Commission | 2/09/2010 |
TETRA TECH, INC. | $459,150 |
As part of TAS:19 1079-RECOVERY - CONSTRUCTION MANAGEMENT SERVICES FOR THE REHABILITATION IMPROVEMENTS FOR MESILLA PHASE II PROTECTIVE LEVEE SYSTEMTAS Tetra Tech will provide Construction Management Services for Rehabilitation Improvements for Mesilla Pha
This spending item is part of a $570,585 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/09/2010 |
FRANK X. SPENCER AND ASSOCIATES, INC. | $408,452 |
Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/28/2009 |
FRANK X. SPENCER AND ASSOCIATES, INC. | $408,452 |
Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,285,848 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 8/28/2009 |
MILESTONE EXCAVATION INC | $290,701 |
Construction of the Upper Rio Grande Flood Control Project. Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System. Hatch Levee System, from Hatch Siphon to Bignell Arroyo
This spending item is part of a $5,642,817 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/29/2009 |
ZIA ENGINEERING & ENVIRONMENTAL CONSULTANTS, L.L.C. | $111,435 |
As part of TAS:19 1079-RECOVERY - CONSTRUCTION MANAGEMENT SERVICES FOR THE REHABILITATION IMPROVEMENTS FOR MESILLA PHASE II PROTECTIVE LEVEE SYSTEMTAS Tetra Tech will provide Construction Management Services for Rehabilitation Improvements for Mesilla Pha
This spending item is part of a $570,585 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/09/2010 |
BOHANNAN-HUSTON, INC. | $91,000 |
Redesign of Courchesne Reach and NEMEXAS Reach.
This spending item is part of a $1,178,046 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/17/2010 |
RABA-KISTNER CONSULTANTS, INC | $86,227 |
Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
This spending item is part of a $7,621,082 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/22/2009 |
RABA-KISTNER CONSULTANTS, INC | $74,251 |
Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
This spending item is part of a $7,585,918 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/22/2009 |
BOHANNAN-HUSTON, INC. | $68,950 |
Feasibility study and conceptual design at Paisano Phase II Reach located within the Upper Rio Grande Flood Control System Retrification Project in El Paso, Texas.
This spending item is part of a $849,417 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/10/2010 |
BOHANNAN-HUSTON, INC. | $65,296 |
Hydraulic and hydrological design for earthen levee near El Paso, Texas.
This spending item is part of a $1,423,013 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/17/2010 |
DEL MONT CONSULTANTS INC | $56,668 |
Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
This spending item is part of a $7,621,082 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/22/2009 |
DEL MONT CONSULTANTS INC | $40,415 |
Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
This spending item is part of a $7,585,918 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/22/2009 |
ZIA ENGINEERING & ENVIRONMENTAL CONSULTANTS, L.L.C. | $39,668 |
As part of TAS 19-1079 - RECOVERY - DESIGN OF REHAB IMPROVEMENTS FOR THE EAST LEVEE VADO SEGMENT, PS&E for Vado Segment encroaching on Railroad R/W within the Rio Grande Canalization Flood Control Project, NM
This spending item is part of a $605,269 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/17/2010 |
ZIA ENGINEERING & ENVIRONMENTAL CONSULTANTS, L.L.C. | $10,715 |
As part of TAS 19-1079 (RECOVERY: CONSTRUCTION MANAGEMENT SERVICES FOR THE MESILLA LEVEE SEGMENTS - PHASE 1) Construction management/assistance services during the rehabilitation of approximately 30 miles of levees located in the lower Rio Grande Valley
This spending item is part of a $673,370 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 1/21/2010 |