Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Dona Ana County, N.M., funds by State, Department of

Listing $43,109,747.18 in stimulus funds from State, Department of for Dona Ana

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
Don Kelly Construction, Inc. $18,456,744 Construction of Upper Rio Grande Flood Control Project. (URGFCP) Rehabilitation Improvements for Canutillo Levee System from Vado Bridge to Borderland Brigde.
This spending item is part of a $19,314,445 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
LAKESHORE ENGINEERING SERVICES, INC. $7,730,628 Rehabiliation for the Rio Grande Canalization Protective Levve System, Mesilla Levee Segment - Phase 1, Dona Ana County, NM.
This spending item is part of a $26,167,084 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
Don Kelly Construction, Inc. $5,352,117 Construction of the Upper Rio Grande Flood Control Project. Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System. Hatch Levee System, from Hatch Siphon to Bignell Arroyo
This spending item is part of a $5,642,817 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/29/2009
BRISTON CONSTRUCTION, LLC $5,092,576 Complete the construction for Upper Rio Grande Flood Control Project (URGFCP), rehabilitation for the Rio Grande Canalization Protective Levee System-Mesilla Levee Segment-Phase II, Mesilla, Dona Ana county, NM.
This spending item is part of a $13,744,568 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/03/2010
DEL MONT CONSULTANTS INC $932,413 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
MILESTONE EXCAVATION INC $857,701 Construction of Upper Rio Grande Flood Control Project. (URGFCP) Rehabilitation Improvements for Canutillo Levee System from Vado Bridge to Borderland Brigde.
This spending item is part of a $19,314,445 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
TETRA TECH, INC. $662,655 As part of TAS 19-1079 (RECOVERY: CONSTRUCTION MANAGEMENT SERVICES FOR THE MESILLA LEVEE SEGMENTS - PHASE 1) Construction management/assistance services during the rehabilitation of approximately 30 miles of levees located in the lower Rio Grande Valley
This spending item is part of a $673,370 allocation. See details
U.S. and Mexico International Boundary and Water Commission 1/21/2010
S L I Engineering, Inc $618,080 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
S L I ENGINEERING, INC $618,080 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,285,848 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
URS GROUP, INC. $577,377 RECOVERY - Construction Management and Inspection of Levee Rehabilitation of HW1 (Hatch Siphon to Bignell Arroyo). TAS::19 1079 790::TAS U.S. and Mexico International Boundary and Water Commission 2/09/2010
TETRA TECH, INC. $459,150 As part of TAS:19 1079-RECOVERY - CONSTRUCTION MANAGEMENT SERVICES FOR THE REHABILITATION IMPROVEMENTS FOR MESILLA PHASE II PROTECTIVE LEVEE SYSTEMTAS Tetra Tech will provide Construction Management Services for Rehabilitation Improvements for Mesilla Pha
This spending item is part of a $570,585 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/09/2010
FRANK X. SPENCER AND ASSOCIATES, INC. $408,452 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
FRANK X. SPENCER AND ASSOCIATES, INC. $408,452 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,285,848 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
MILESTONE EXCAVATION INC $290,701 Construction of the Upper Rio Grande Flood Control Project. Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System. Hatch Levee System, from Hatch Siphon to Bignell Arroyo
This spending item is part of a $5,642,817 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/29/2009
ZIA ENGINEERING & ENVIRONMENTAL CONSULTANTS, L.L.C. $111,435 As part of TAS:19 1079-RECOVERY - CONSTRUCTION MANAGEMENT SERVICES FOR THE REHABILITATION IMPROVEMENTS FOR MESILLA PHASE II PROTECTIVE LEVEE SYSTEMTAS Tetra Tech will provide Construction Management Services for Rehabilitation Improvements for Mesilla Pha
This spending item is part of a $570,585 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/09/2010
BOHANNAN-HUSTON, INC. $91,000 Redesign of Courchesne Reach and NEMEXAS Reach.
This spending item is part of a $1,178,046 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/17/2010
RABA-KISTNER CONSULTANTS, INC $86,227 Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
This spending item is part of a $7,621,082 allocation. See details
U.S. and Mexico International Boundary and Water Commission 6/22/2009
RABA-KISTNER CONSULTANTS, INC $74,251 Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
This spending item is part of a $7,585,918 allocation. See details
U.S. and Mexico International Boundary and Water Commission 6/22/2009
BOHANNAN-HUSTON, INC. $68,950 Feasibility study and conceptual design at Paisano Phase II Reach located within the Upper Rio Grande Flood Control System Retrification Project in El Paso, Texas.
This spending item is part of a $849,417 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/10/2010
BOHANNAN-HUSTON, INC. $65,296 Hydraulic and hydrological design for earthen levee near El Paso, Texas.
This spending item is part of a $1,423,013 allocation. See details
U.S. and Mexico International Boundary and Water Commission 6/17/2010
DEL MONT CONSULTANTS INC $56,668 Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
This spending item is part of a $7,621,082 allocation. See details
U.S. and Mexico International Boundary and Water Commission 6/22/2009
DEL MONT CONSULTANTS INC $40,415 Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
This spending item is part of a $7,585,918 allocation. See details
U.S. and Mexico International Boundary and Water Commission 6/22/2009
ZIA ENGINEERING & ENVIRONMENTAL CONSULTANTS, L.L.C. $39,668 As part of TAS 19-1079 - RECOVERY - DESIGN OF REHAB IMPROVEMENTS FOR THE EAST LEVEE VADO SEGMENT, PS&E for Vado Segment encroaching on Railroad R/W within the Rio Grande Canalization Flood Control Project, NM
This spending item is part of a $605,269 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/17/2010
ZIA ENGINEERING & ENVIRONMENTAL CONSULTANTS, L.L.C. $10,715 As part of TAS 19-1079 (RECOVERY: CONSTRUCTION MANAGEMENT SERVICES FOR THE MESILLA LEVEE SEGMENTS - PHASE 1) Construction management/assistance services during the rehabilitation of approximately 30 miles of levees located in the lower Rio Grande Valley
This spending item is part of a $673,370 allocation. See details
U.S. and Mexico International Boundary and Water Commission 1/21/2010