Craven County, N.C., funds by Navy, Department of
Listing $1,101,618.31 in stimulus funds from Navy, Department of for Craven
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SIMMONS TECHNICAL SERVICES, INC. | $328,733 |
ARRA PROJECT NUMBER P126, 5288806 INSTALL ENERGY EFFICIENT STREET/AREA LIGHTING, MCAS CHERRY POINT NC. The general intent of this project is to replace Metal Halide and High Pressure Sodium street lights and lighting fixtures with new LED fixtures. The
This spending item is part of a $360,266 allocation.
See details
|
Navy, Department of | 8/03/2010 |
R & W CONSTRUCTION CO | $293,467 |
Project includes design and construction of a solar pool heating system at the Combat Training Pool, Building 289. This system is to be the primary means of heating the pool water, with the existing steam heating system to be used as supplemental heating
This spending item is part of a $373,654 allocation.
See details
|
Navy, Department of | 7/01/2009 |
SOUTHERN ARCHITECTURAL HARDWARE, INC. | $237,242 |
Complete renovation of two barracks facilities. Existing facilities will be upgraded to current Unified Facility Criteria and IBC codes. Improved buildings will provide better living conditions for Marines and improved working conditions for civilian empl
This spending item is part of a $7,547,665 allocation.
See details
|
Navy, Department of | 6/29/2009 |
BRINN GLASS AND MIRROR, INC. | $66,906 |
ARRA, HVAC/Mechanical.Electrical/Roofingand Windows. Interior and Exterior Repairs to Building AS3905 & AS4106
This spending item is part of a $4,392,589 allocation.
See details
|
Navy, Department of | 7/13/2009 |
CIESZKO CONSTRUCTION COMPANY INCORPORATED | $63,550 |
Repair HVAC/Mechanical/Electrical/Roofs and Windows Various Admin Facs: Interior/Exterior Repairs to Building 417
This spending item is part of a $4,263,822 allocation.
See details
|
Navy, Department of | 6/26/2009 |
RMF ENGINEERING, INC. | $43,775 |
Project includes design and construction of a solar pool heating system at the Combat Training Pool, Building 289. This system is to be the primary means of heating the pool water, with the existing steam heating system to be used as supplemental heating
This spending item is part of a $373,654 allocation.
See details
|
Navy, Department of | 7/01/2009 |
Parker Roofing, Inc. | $36,412 |
Project includes design and construction of a solar pool heating system at the Combat Training Pool, Building 289. This system is to be the primary means of heating the pool water, with the existing steam heating system to be used as supplemental heating
This spending item is part of a $373,654 allocation.
See details
|
Navy, Department of | 7/01/2009 |
INTERNATIONAL PUBLIC WORKS, LLC | $31,533 |
ARRA PROJECT NUMBER P126, 5288806 INSTALL ENERGY EFFICIENT STREET/AREA LIGHTING, MCAS CHERRY POINT NC. The general intent of this project is to replace Metal Halide and High Pressure Sodium street lights and lighting fixtures with new LED fixtures. The
This spending item is part of a $360,266 allocation.
See details
|
Navy, Department of | 8/03/2010 |