Sargent County, N.D., funds by Interior, Department of
Listing $482,670.43 in stimulus funds from Interior, Department of for Sargent
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
POWER PLUS ELECTRIC, L.L.C. | $156,998 |
Provide all equipment, labor and materials to install a new geothermal heating and cooling system for Quarters 124. New geothermal hydronic heating system for the Fire Cache and 20KW field mounted Photovoltaic System (PV)
This spending item is part of a $321,641 allocation.
See details
|
U.S. Fish and Wildlife Service | 5/13/2010 |
Power Plus Electric | $153,850 |
Provide all equipment, labor and mateials to install a 20KW pole mounted PV system for visitor center.
This spending item is part of a $212,590 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/13/2010 |
MCS ENVIRONMENTAL, INC. | $138,342 |
Provide all equipment, labor and materials to install a new geothermal heating and cooling system for Quarters 124. New geothermal hydronic heating system for the Fire Cache and 20KW field mounted Photovoltaic System (PV)
This spending item is part of a $321,641 allocation.
See details
|
U.S. Fish and Wildlife Service | 5/13/2010 |
Falk Ground Source Technologies, Inc. | $26,301 |
Provide all equipment, labor and materials to install a new geothermal heating and cooling system for Quarters 124. New geothermal hydronic heating system for the Fire Cache and 20KW field mounted Photovoltaic System (PV)
This spending item is part of a $321,641 allocation.
See details
|
U.S. Fish and Wildlife Service | 5/13/2010 |
PAUL'S ELECTRIC, INC. | $7,179 | Materials and labor to complete the following work: MAIN SHOP: Remove 4 existing metal halide fixtures and install 4 6-lamp high-bay T-8 flxtures. Move existing fixtures that are still working to other parts of shop to replace non-working ones. FIRE CA | U.S. Fish and Wildlife Service | 12/15/2009 |