Stark County, Ohio, funds by U.S. Army Corps of Engineers
Listing $2,057,112.49 in stimulus funds from U.S. Army Corps of Engineers for Stark
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
Q.B.S., INC. | $587,926 |
Remove and install Culvert Valves
This spending item is part of a $3,592,080 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
WORTHINGTON PRODUCTS LLC | $254,610 | O&M - LOG AND DEBRIS BOOMS FOR WILLAMETTE VALLEY PROJECT | U.S. Army Corps of Engineers - civil program financing only | 9/21/2009 |
WORTHINGTON PRODUCTS LLC | $254,610 | SUPPLY AND DELIVERY OF FLOATING LOG AND DEBRIS AND DAM SAFETY BARRIERS. | U.S. Army Corps of Engineers - civil program financing only | 9/21/2009 |
WORTHINGTON PRODUCTS LLC | $192,940 | SUPPLY AND INSTALLATION OF UPSTREAM AND DOWNSTREAM SAFETY/SECURITY BARRIERS ARE CLARENCE CANNON DAM aka MARK TWAIN LAKE. | U.S. Army Corps of Engineers - civil program financing only | 6/23/2009 |
NUTTING, H C COMPANY, THE (INC) | $127,301 |
As part of TAS 96-3135-LEVEE CERTIFICATION, MASSILLON LEVEE, OHIO-Contractor must review as-built information and collect supplemental data to meet the certification requirements outlines in 44 CFR 65.10 and detailed in National Flood Insurance Program fo
This spending item is part of a $499,997 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/29/2009 |
WORTHINGTON PRODUCTS LLC | $119,888 | Supply and Delivery of new log and debris booms to replace aging existing wooden log boom line. | U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
MCTECH CORP. | $116,543 | As a part of the recreation program, Construct rop rap sections of dam for erosion control-Beach City to reduce future maintenance cowts and the risk of failure. (Project Code 12070), Beach City | U.S. Army Corps of Engineers - civil program financing only | 5/19/2010 |
LYNDCO INC | $105,459 |
As part of the recreation program to maintain recreational facilities-paving of downstream access road and main access road to Beach City Dam, Beach City, Ohio (prj 12070) Beach City OH
This spending item is part of a $194,663 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 4/14/2010 |
WORTHINGTON PRODUCTS LLC | $54,684 | Supply and Delivery of new log and debris booms to replace aging existing wooden log boom line. | U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
WORTHINGTON PRODUCTS LLC | $48,880 | Supply of Dam Safety barriers for Carlyle Lake Dam | U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
Q.B.S., INC. | $47,859 |
Asphalt repair and paving
This spending item is part of a $382,821 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/15/2009 |
OHIO GRATINGS, INC. | $38,682 | Aluminum grating | U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
WORTHINGTON PRODUCTS LLC | $27,531 | O&M - PROVIDE LOG BOOMS FOR CONTROLLING SURFACE DEBRIS AT WESTVILLE DAM AND EAST BRIMFIELD ALEK, WA | U.S. Army Corps of Engineers - civil program financing only | 8/13/2009 |
WORTHINGTON PRODUCTS LLC | $27,531 | Supply of waterway barriers for debris control and dam safety at East Brimfield Lake and Westville Lake | U.S. Army Corps of Engineers - civil program financing only | 8/13/2009 |
WORTHINGTON PRODUCTS LLC | $14,888 | Supply of Dam Safety barriers for Hop Brook Lake | U.S. Army Corps of Engineers - civil program financing only | 6/25/2009 |
WORTHINGTON PRODUCTS LLC | $11,896 | TUTTLE CREEK LAKE - CONTROL TOWER BUOY MATERIALS | U.S. Army Corps of Engineers - civil program financing only | 10/19/2009 |
WORTHINGTON PRODUCTS LLC | $10,940 | O&M - PROVIDE PRE-MANUFACTUERD HIGH VISIBILITY ORANGE BOOM LINE FOR THE W. KERR SCOTT RESERVOIR. | U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
WORTHINGTON PRODUCTS LLC | $10,940 | SUPPLY AND DELIVERY OF FLOATING LOG AND DEBRIS AND DAM SAFETY BARRIERS. | U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
WORTHINGTON PRODUCTS LLC | $4,004 | O&M WATERWAY BARRIERS FOR BEECH FORK LAKE | U.S. Army Corps of Engineers - civil program financing only | 8/16/2009 |