Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Stark County, Ohio, funds by U.S. Army Corps of Engineers

Listing $2,057,112.49 in stimulus funds from U.S. Army Corps of Engineers for Stark

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
Q.B.S., INC. $587,926 Remove and install Culvert Valves
This spending item is part of a $3,592,080 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/28/2009
WORTHINGTON PRODUCTS LLC $254,610 O&M - LOG AND DEBRIS BOOMS FOR WILLAMETTE VALLEY PROJECT U.S. Army Corps of Engineers - civil program financing only 9/21/2009
WORTHINGTON PRODUCTS LLC $254,610 SUPPLY AND DELIVERY OF FLOATING LOG AND DEBRIS AND DAM SAFETY BARRIERS. U.S. Army Corps of Engineers - civil program financing only 9/21/2009
WORTHINGTON PRODUCTS LLC $192,940 SUPPLY AND INSTALLATION OF UPSTREAM AND DOWNSTREAM SAFETY/SECURITY BARRIERS ARE CLARENCE CANNON DAM aka MARK TWAIN LAKE. U.S. Army Corps of Engineers - civil program financing only 6/23/2009
NUTTING, H C COMPANY, THE (INC) $127,301 As part of TAS 96-3135-LEVEE CERTIFICATION, MASSILLON LEVEE, OHIO-Contractor must review as-built information and collect supplemental data to meet the certification requirements outlines in 44 CFR 65.10 and detailed in National Flood Insurance Program fo
This spending item is part of a $499,997 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 7/29/2009
WORTHINGTON PRODUCTS LLC $119,888 Supply and Delivery of new log and debris booms to replace aging existing wooden log boom line. U.S. Army Corps of Engineers - civil program financing only 6/30/2009
MCTECH CORP. $116,543 As a part of the recreation program, Construct rop rap sections of dam for erosion control-Beach City to reduce future maintenance cowts and the risk of failure. (Project Code 12070), Beach City U.S. Army Corps of Engineers - civil program financing only 5/19/2010
LYNDCO INC $105,459 As part of the recreation program to maintain recreational facilities-paving of downstream access road and main access road to Beach City Dam, Beach City, Ohio (prj 12070) Beach City OH
This spending item is part of a $194,663 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 4/14/2010
WORTHINGTON PRODUCTS LLC $54,684 Supply and Delivery of new log and debris booms to replace aging existing wooden log boom line. U.S. Army Corps of Engineers - civil program financing only 6/30/2009
WORTHINGTON PRODUCTS LLC $48,880 Supply of Dam Safety barriers for Carlyle Lake Dam U.S. Army Corps of Engineers - civil program financing only 8/27/2009
Q.B.S., INC. $47,859 Asphalt repair and paving
This spending item is part of a $382,821 allocation. See details
U.S. Army Corps of Engineers - civil program financing only 9/15/2009
OHIO GRATINGS, INC. $38,682 Aluminum grating U.S. Army Corps of Engineers - civil program financing only 8/27/2009
WORTHINGTON PRODUCTS LLC $27,531 O&M - PROVIDE LOG BOOMS FOR CONTROLLING SURFACE DEBRIS AT WESTVILLE DAM AND EAST BRIMFIELD ALEK, WA U.S. Army Corps of Engineers - civil program financing only 8/13/2009
WORTHINGTON PRODUCTS LLC $27,531 Supply of waterway barriers for debris control and dam safety at East Brimfield Lake and Westville Lake U.S. Army Corps of Engineers - civil program financing only 8/13/2009
WORTHINGTON PRODUCTS LLC $14,888 Supply of Dam Safety barriers for Hop Brook Lake U.S. Army Corps of Engineers - civil program financing only 6/25/2009
WORTHINGTON PRODUCTS LLC $11,896 TUTTLE CREEK LAKE - CONTROL TOWER BUOY MATERIALS U.S. Army Corps of Engineers - civil program financing only 10/19/2009
WORTHINGTON PRODUCTS LLC $10,940 O&M - PROVIDE PRE-MANUFACTUERD HIGH VISIBILITY ORANGE BOOM LINE FOR THE W. KERR SCOTT RESERVOIR. U.S. Army Corps of Engineers - civil program financing only 9/23/2009
WORTHINGTON PRODUCTS LLC $10,940 SUPPLY AND DELIVERY OF FLOATING LOG AND DEBRIS AND DAM SAFETY BARRIERS. U.S. Army Corps of Engineers - civil program financing only 9/23/2009
WORTHINGTON PRODUCTS LLC $4,004 O&M WATERWAY BARRIERS FOR BEECH FORK LAKE U.S. Army Corps of Engineers - civil program financing only 8/16/2009