Lane County, Ore., funds by U.S. Army Corps of Engineers
Listing $10,804,298.95 in stimulus funds from U.S. Army Corps of Engineers for Lane
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
PHILADELPHIA GEAR CORPORATION | $2,414,576 | Recovery Project #322634 Refurbish Spillway Gear Boxes, to Include Complete Inspection and Report, Cleaning, Reinstallation and Testing. | U.S. Army Corps of Engineers - civil program financing only | 4/16/2010 |
FORCE 1 CONSTRUCTION GROUP, INC. | $1,635,661 | The Cougar Regulating Outlet slide gates are comprised of two service gates, and two emergency gates. The gates are controlled with a hydraulic power system rated at 1800 psi. The system currently experiences vibration/pulsing during gate operation, as we | U.S. Army Corps of Engineers - civil program financing only | 1/06/2010 |
NATT MCDOUGALL COMPANY, THE | $1,367,910 |
Cougar Fish Trap and Haul Facility Diversion Tunnel repairs including scaling and removing of loose rock, shotcreting the gate chamber, electrical upgrades including removal and replacing of all lighting and HVAC improvements to tunnel ventilation system
This spending item is part of a $1,535,694 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
DOYON PROJECT SERVICES LLC | $1,113,571 |
Ecosystem Restoration Project for the design and construction of upgrades to Delta Ponds in Eugene, OR, including new fish passage via culvert crossing under main road, new creek with crossing in the existing bike trail and wilderness park.
This spending item is part of a $1,794,095 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/07/2009 |
SAYBR CONTRACTORS, INC. | $912,818 | Design of new hydraulic system for the Blue River Regulating Outlet Gates; Installation of new hydraulic system for the River Dam Regulating Outlet Gates; Refurbish hydraulic cylindes; Miscellaneous parts & materials | U.S. Army Corps of Engineers - civil program financing only | 9/11/2009 |
BIG J CONSTRUCTION, INC. | $666,542 | Furnish and install wire ropes and install wear plates at Hills Creek Dam, Oakridge, OR. | U.S. Army Corps of Engineers - civil program financing only | 4/27/2010 |
KNIGHT CONST. & SUPPLY, INC. | $539,752 | Recovery Project # 322610, Fall Creek Spillway Gate Trunnion Rehabilitation and Hoist Rope Replacement and Lookout Point Spillway Gate Hoist Rope Replacement | U.S. Army Corps of Engineers - civil program financing only | 5/25/2010 |
LANE COUNCIL OF GOVERNMENTS | $375,000 | The ARRA funding provides for services to assist the U.S. Army Corps of Engineers and the local project sponsors in completing the Feasibility Report for the Cedar Creek and Amazon Creek priority planning areas and associated Programmatic Environmental As | U.S. Army Corps of Engineers - civil program financing only | 8/20/2009 |
THOMAS/WRIGHT INC | $338,339 | Recovery Project #133730. QA Inspector of Civil Works/Fish Project at Bonneville Lock and Dam and John Day Dam. | U.S. Army Corps of Engineers - civil program financing only | 11/12/2009 |
TETRA TECH, INC. | $279,762 |
Ecosystem Restoration Project for the design and construction of upgrades to Delta Ponds in Eugene, OR, including new fish passage via culvert crossing under main road, new creek with crossing in the existing bike trail and wilderness park.
This spending item is part of a $1,794,095 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/07/2009 |
EUGENE SAND & GRAVEL | $212,248 |
Ecosystem Restoration Project for the design and construction of upgrades to Delta Ponds in Eugene, OR, including new fish passage via culvert crossing under main road, new creek with crossing in the existing bike trail and wilderness park.
This spending item is part of a $1,794,095 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/07/2009 |
FULL CIRCLE PROPERTY MANAGEMENT, INC. | $186,748 | Janitorial services for South Willamette Valley Project | U.S. Army Corps of Engineers - civil program financing only | 8/06/2009 |
THOMAS/WRIGHT INC | $157,765 | Provide QA Inspector Civil Works and Senior Construction Engineer for the Summer Lake and Tule Lake projects. Provide QA Inspector Civil Works and Senior Construction Engineer for the Springfield Millrace project. Provide QA Inspector Civil Works for th | U.S. Army Corps of Engineers - civil program financing only | 1/08/2009 |
FORCE 1 CONSTRUCTION GROUP, INC. | $98,170 | Replace the fish hopper hoist and trolley brakes and to replace one of the mechanical float switches with an electronic pressure transducer | U.S. Army Corps of Engineers - civil program financing only | 5/04/2010 |
EC COMPANY | $94,123 |
Cougar Fish Trap and Haul Facility Diversion Tunnel repairs including scaling and removing of loose rock, shotcreting the gate chamber, electrical upgrades including removal and replacing of all lighting and HVAC improvements to tunnel ventilation system
This spending item is part of a $1,535,694 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
THOMAS/WRIGHT INC | $79,925 | Provide QA Inspectors, Senior Construction Engineer, and Engineering Tech services. | U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
Swearengin Family Enterprises | $51,060 |
Ecosystem Restoration Project for the design and construction of upgrades to Delta Ponds in Eugene, OR, including new fish passage via culvert crossing under main road, new creek with crossing in the existing bike trail and wilderness park.
This spending item is part of a $1,794,095 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/07/2009 |
FORSLUND CONSTRUCTION INC | $40,190 |
Ecosystem Restoration Project for the design and construction of upgrades to Delta Ponds in Eugene, OR, including new fish passage via culvert crossing under main road, new creek with crossing in the existing bike trail and wilderness park.
This spending item is part of a $1,794,095 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/07/2009 |
G & L EXTERIORS INC | $40,139 | REMOVE AND INSTALL SIDING ON BATHROOM/SHOWER AT CAMPSITE | U.S. Army Corps of Engineers - civil program financing only | 1/05/2010 |
EUGENE SAND CONSTRUCTION, INC. | $37,475 |
Ecosystem Restoration Project for the design and construction of upgrades to Delta Ponds in Eugene, OR, including new fish passage via culvert crossing under main road, new creek with crossing in the existing bike trail and wilderness park.
This spending item is part of a $1,794,095 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/07/2009 |
PORTLAND MECHANICAL CONSTRUCTION, INC. | $37,036 |
Cougar Fish Trap and Haul Facility Diversion Tunnel repairs including scaling and removing of loose rock, shotcreting the gate chamber, electrical upgrades including removal and replacing of all lighting and HVAC improvements to tunnel ventilation system
This spending item is part of a $1,535,694 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
CONSTRUCTION SOLUTIONS, INC. | $36,625 |
Cougar Fish Trap and Haul Facility Diversion Tunnel repairs including scaling and removing of loose rock, shotcreting the gate chamber, electrical upgrades including removal and replacing of all lighting and HVAC improvements to tunnel ventilation system
This spending item is part of a $1,535,694 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
FISH AND WILDLIFE, OREGON DEPARTMENT OF | $20,000 | The US Army Corps of Engineers (Corps) contracts with the Oregon Department of Fish and Wildlife (ODFW) to raise Chinook salmon and steelhead to mitigate lost habitat due to construction of flood control reservoirs in the Willamette River drainage. This | U.S. Army Corps of Engineers - civil program financing only | 1/31/2010 |
FISH AND WILDLIFE, OREGON DEPARTMENT OF | $20,000 | The US Army Corps of Engineers (Corps) contracts with the Oregon Department of Fish and Wildlife (ODFW) to raise Chinook salmon and steelhead to mitigate lost habitat due to construction of flood control reservoirs in the Willamette River drainage. This | U.S. Army Corps of Engineers - civil program financing only | 1/31/2010 |
AGRICULTURE, OREGON DEPARTMENT OF | $9,000 | The Willamette Valley Projects and the Oregon Department of Agriculture are engaged in cooperative efforts with multiple partners to minimize the damage to natural and social values caused by noxious weeds. In the context of these efforts, Corps' envrion | U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
AGRICULTURE, OREGON DEPARTMENT OF | $9,000 | The Willamette Valley Projects and the Oregon Department of Agriculture are engaged in cooperative efforts with multiple partners to minimize the damage to natural and social values caused by noxious weeds. In the context of these efforts, Corps' envrion | U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
SALIX ASSOC | $7,800 |
Forest habitat assessments for Fall Creek Project, Willamette Valley Projects
This spending item is part of a $19,785 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 1/04/2010 |
CARSON OIL CO., INC. | $7,399 | DELIVERY OF CHEVRON AGMA COMPOUNDED GEAR OIL | U.S. Army Corps of Engineers - civil program financing only | 6/28/2010 |
STONE ECOSURVEYS LLC | $6,960 |
Forest habitat assessments for Fall Creek Project, Willamette Valley Projects
This spending item is part of a $19,785 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 1/04/2010 |
K D L INVESTMENT CO. | $6,680 | Moved furniture out of offices; removed old Carpet and disposed of. Installed 911.43 square feet of Groundworks III/Style #79710 Carpet Tile and moved furniture back to the offices. | U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
James P Reed | $2,025 |
Forest habitat assessments for Fall Creek Project, Willamette Valley Projects
This spending item is part of a $19,785 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 1/04/2010 |