Linn County, Ore., funds by U.S. Army Corps of Engineers
Listing $7,514,433.32 in stimulus funds from U.S. Army Corps of Engineers for Linn
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
JUST BUCKET EXCAVATING, INC. | $2,566,773 | Sheepy Lake Waterfowl Habitat Restoration. Construction of a floating island. | U.S. Army Corps of Engineers - civil program financing only | 7/17/2009 |
JUST BUCKET EXCAVATING, INC. | $2,200,813 | John Day Dam Paving of Recreational Sites | U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
JUST BUCKET EXCAVATING, INC. | $1,279,175 | Project Number 114785-Restoration Project that includes replacement of the diversion culverts and sluice gates to gorrie creek and the installation of fish screens; placing fill material to reduce bank slope and channel width between F street bridge and t | U.S. Army Corps of Engineers - civil program financing only | 4/16/2010 |
JUST BUCKET EXCAVATING, INC. | $938,000 | This modification provides for construction of an additional 0.5 acre island at Gold Dike Lake and for making repairs to existing access roads and construction of a temporary haul road at the Summer Lake Wildlife Area in south central Oregon. This change | U.S. Army Corps of Engineers - civil program financing only | 7/27/2009 |
RITE WAY ELECTRIC INC | $203,718 |
ARRA Recovery Project#330610 Timberline Lodge Water System Improvements. The Timberline Pump House has been in service for 50 years housing and protecting all pumping equipment that serves the lodge and ski facilities. Due to the aging that comes from su
This spending item is part of a $533,152 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/03/2010 |
JUST BUCKET EXCAVATING, INC. | $178,047 |
ARRA Recovery Project#330610 Timberline Lodge Water System Improvements. The Timberline Pump House has been in service for 50 years housing and protecting all pumping equipment that serves the lodge and ski facilities. Due to the aging that comes from su
This spending item is part of a $533,152 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/03/2010 |
SCHNAUZER CONSTRUCTION INC | $112,004 | 675 GALLON DIESEL FUEL TANK RPLACEMENT | U.S. Army Corps of Engineers - civil program financing only | 8/26/2010 |
UNIQUE CLEANING SERVICE, INC. | $17,426 | Janitorial, policing of grounds, and campground services for Foster Lake and Green Peter Lake | U.S. Army Corps of Engineers - civil program financing only | 8/04/2009 |
BEST POTS INC | $10,715 | Rental and Service of Portable Restrooms & Vaults | U.S. Army Corps of Engineers - civil program financing only | 1/17/2010 |
K&d Engineering Inc | $7,762 |
ARRA Recovery Project#330610 Timberline Lodge Water System Improvements. The Timberline Pump House has been in service for 50 years housing and protecting all pumping equipment that serves the lodge and ski facilities. Due to the aging that comes from su
This spending item is part of a $533,152 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/03/2010 |