Multnomah County, Ore., funds by U.S. Army Corps of Engineers
Listing $19,724,773.93 in stimulus funds from U.S. Army Corps of Engineers for Multnomah
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
PORT OF PORTLAND | $2,591,690 | Dredge a channel from the mouth of Cowlitz River a distance of approximately 3,200G??, 400' wide, at elevation -24'. The material removed from the river was placed in Kelso, Washington at the Wasser-Winter site. This project is intended to help prevent fl | U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
HDR ENGINEERING, INC. | $2,514,697 |
PERIODIC INSPECTIONS OF 79 LEVEE SYSTEMS TO VERIFY PROPER MAINTENANCE, EVALUATE OPERATIONAL ADEQUACY AND STRUCTURAL STABILITY, REVIEW DESIGN CRITERIA TO IDENTIFY CHANGES IN CURRENT DESIGN STANDARDS, IDENTIFY FEATURES TO MONITOR OVER TIME AND IMPROVE THE
This spending item is part of a $2,880,937 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/28/2009 |
I N C A & CH2M HILL JOINT VENTURE | $2,282,191 | TAS::96 3135::TAS Recovery Project #::324170::RP#Periodic Levee Inspections periodic inspection of 59 levees located throughout Oregon and Washington including Federal and Non-Federal, Active and Inactive levees | U.S. Army Corps of Engineers - civil program financing only | 1/22/2010 |
I N C A & CH2M HILL JOINT VENTURE | $2,282,191 | Perform levee safety Periodic Inspections on the levee systems indicated in the summary. | U.S. Army Corps of Engineers - civil program financing only | 1/22/2010 |
I N C A & CH2M HILL JOINT VENTURE | $1,099,526 |
Plans & Specifications for the improvement of the Washington shore entrance Bonneville Dam
This spending item is part of a $1,411,471 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/07/2009 |
HDR ENGINEERING, INC. | $1,046,776 |
TAS::96::3135:: TAS Spillway gate hydraulic Steel Structires inspections and analysis at six projects in Willamette Valley (Blue River, Cougar, Fern Ridge, Detroit, Fall Creek, Lookout Point).
This spending item is part of a $1,073,986 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/20/2009 |
I N C A & CH2M HILL JOINT VENTURE | $580,679 | TAS::96 3133::TAS Lower Willamette River Ecosystem restoration general investigation feasibility study/draft Programmatic Environmental Impact Statement (PEIS) | U.S. Army Corps of Engineers - civil program financing only | 8/14/2009 |
AMERICAN CONSTRUCTION CO., INC. | $530,038 | North Coast Mechanical Maintenance Dredging of the Westport Slough River Mile 0+28 to 0+36 approximately 30,000 cubic yards | U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
I N C A & CH2M HILL JOINT VENTURE | $448,572 | RECOVERY PROJECT#:322628 DEVELOPMENT OF PLANS AND SPECIFICATIONS FOR REPAIR OF THE NAVLOCK CORNER ARMOR AND UPSTREAM GUIDEWALL HDPE RUB RAILS AND REHABILITATION OF THE ADULT LADDER FISHWAY SLUICE GATES, OPERATIONS AND CONTROL SYSTEM FOR THE BONNEVILLE LOC | U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
DAVID C. SMITH & ASSOCIATES, INC. | $404,061 |
Photogrammetric mapping, digital orthophotography, land surveying, LiDAR data collection, and bathymetric surveying
This spending item is part of a $500,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/24/2009 |
I N C A & CH2M HILL JOINT VENTURE | $372,303 | TAS::96 3135::TAS RECOVERYPROJECT#::322573 ARC FLASH HAZARD ASSESSMENT AND POWER SYSTEM ANALYSIS, WILLAMETTE VALLEY PROJECTS: BLUE RIVER, PN 322573; COTTAGE GROVE PN 322575; DORENA PN 322609; FALL CREEK PN 322610; FERN RIDGE PN 322615; COUGAR PN 322629; A | U.S. Army Corps of Engineers - civil program financing only | 11/20/2009 |
I N C A & CH2M HILL JOINT VENTURE | $372,303 | RECOVERY PROJECT#::322573 ARC FLASH HAZARD ASSESSMENT AND POWER SYSTEM ANALYSIS, WILLAMETTE VALLEY PROJECTS: BLUE RIVER, PN 322573; COTTAGE GROVE PN 322575; DORENA PN 322609; FALL CREEK PN 322610; FERN RIDGE PN 322615; COUGAR PN 322629; AND FOSTER/GREEN P | U.S. Army Corps of Engineers - civil program financing only | 11/20/2009 |
CORNFORTH CONSULTANTS, INC. | $366,240 |
PERIODIC INSPECTIONS OF 79 LEVEE SYSTEMS TO VERIFY PROPER MAINTENANCE, EVALUATE OPERATIONAL ADEQUACY AND STRUCTURAL STABILITY, REVIEW DESIGN CRITERIA TO IDENTIFY CHANGES IN CURRENT DESIGN STANDARDS, IDENTIFY FEATURES TO MONITOR OVER TIME AND IMPROVE THE
This spending item is part of a $2,880,937 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/28/2009 |
DAVID C. SMITH & ASSOCIATES, INC. | $316,732 |
Photogrammetric mapping, ditigal orthophotography, land surveying, GIS Data processing, and bathymetric surveying
This spending item is part of a $379,005 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
FORMATIONS INC | $314,880 | Design, fabricate and Install exhibits for4 the Gavins Point Dam Power Plant lobby and the Garrison Dam Power Plant lobby | U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
BITTNER-SHEN CONSULTING ENGINEERS, INC. | $286,969 | TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10286::RP# PROJECT TITLE: 10286 TECHNICAL SERVICE OF AN EXPERT-NEUTRAL, TO REVIEW, INSPECT, ANALYZE, ADVISE AND EVALUATE AN ISSUE THAT MAY RESULT IN A CLAIM OR LITIGATION ARISING OUT OF DEFICIENCY DISCOV | U.S. Army Corps of Engineers - civil program financing only | 9/30/2010 |
HDR ENGINEERING, INC. | $273,618 | Plans and Specifications for Replacement of Headgate Machinery at Philpott Dam and Powerhouse | U.S. Army Corps of Engineers - civil program financing only | 1/21/2010 |
FORMATIONS INC | $270,751 | Update graphics for National Great Rivers Museum Order number 0002 $243,824.85 Order number 0003 $26,925.70 | U.S. Army Corps of Engineers - civil program financing only | 8/11/2009 |
I N C A & CH2M HILL JOINT VENTURE | $250,095 | PROJECT NUMBER 323884 WILLAMETTE RIVER DAMAGE ASSESSMENT AND MAINTENANCE REPAIR RECONNAISSANCE FOR 18 REVETMENT SITES INCLUDING A REVIEW OF DAMAGES, REPAIR OPTIONS, A COST ESTIMATE FOR RECOMMENDED REPAIRS AND RECOMMENDED MAINTENANCE ACTIONS. | U.S. Army Corps of Engineers - civil program financing only | 12/22/2009 |
FORMATIONS INC | $243,825 | RECOVERY PROJECT NUMBER 322852 - Design Fabricate and Install Multiple Interpretive Panels and Mounting Structures for the USACE. Design and print multiple trail brochures. Design and Fabricate pop-up traveling display. | U.S. Army Corps of Engineers - civil program financing only | 8/04/2009 |
CONTRACT FLOORING & INTERIORS, INC | $238,400 |
Recover Project # 330610RP#This requirement is for the replacement of the emergency generator and flooring at the WY'East Day Lodge, located in the Mt Hood National Forest near historic Timberline Lodge. Work consists of replacing the existing 125KW Eme
This spending item is part of a $495,964 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/08/2010 |
FORMATIONS INC | $218,970 | RECOVERY PROJECT NUMBER 322852, ST. LOUIS DESTRICT EXHIBITS, CRITICAL SIGNS AND WAYSIDE PANEL EXHIBITS - The Contractor shall furnish all necessary personnel, materials, equipment and related services as necessary to research, design, fabricate, test, del | U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
HDR ENGINEERING, INC. | $212,710 | Prepartion of technical specifications in support of the design/build contract for Wyeth Fishing Treaty Access Site and Stanley Rock Dock Repair | U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
INCA/CH2M HILL JV | $197,505 | Bonneville Navigation Lock control system replacement plans & specifications | U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
E2 CONSULTING ENGINEERS, INC. | $173,669 | Columbia River Channel Improvement Technical Support to Include Collation, Analysis and Evaluation of Data and Information | U.S. Army Corps of Engineers - civil program financing only | 1/15/2010 |
MINISTER & GLAESER SURVEYING, INC | $168,332 |
Furnish equipment, supplies, facilities, and personnel to provide the requested surveys and gage maintenance for Crest Gage surverys in Oregon and Washington counties.
This spending item is part of a $222,297 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
FORMATIONS INC | $159,944 | RECOVER PROJECT NUMBER 322852 ST. LOUIS DISTRICT EXHIBITS - The Contractor shall furnish all necessary personnel, materials, equipment and related services and necessary to research, design, fabricate, test, deliver, install and make operative a series of | U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
SYBRANT CONSTRUCTION, LLC | $151,872 |
Recover Project # 330610RP#This requirement is for the replacement of the emergency generator and flooring at the WY'East Day Lodge, located in the Mt Hood National Forest near historic Timberline Lodge. Work consists of replacing the existing 125KW Eme
This spending item is part of a $495,964 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/08/2010 |
I N C A & CH2M HILL JOINT VENTURE | $120,824 | Provide bid phase and engineering during construction (EDC) support tasks for the Springfield Millrace Sec. 206. | U.S. Army Corps of Engineers - civil program financing only | 9/26/2009 |
I N C A & CH2M HILL JOINT VENTURE | $120,824 | TAS::96 3134::TAS Recovery Project #114785::RP Cap Springfield Millrace Sec 206. The contractor shall provide resolution and guidance on design related issues, review ship drawing and submittal reviews | U.S. Army Corps of Engineers - civil program financing only | 9/26/2009 |
HDR/CDM, A JOINT VENTURE | $102,275 | Project Number 104763: Provide design and construction related services during review and construction of the Santa Maria River Levee-Reach 3 project | U.S. Army Corps of Engineers - civil program financing only | 8/19/2010 |
I N C A & CH2M HILL JOINT VENTURE | $95,086 | Roof replacement and pump house study Mt. Hood National Forest | U.S. Army Corps of Engineers - civil program financing only | 3/25/2010 |
ALCANTAR & ASSOCIATES LLC | $89,937 |
ARRA Recovery Project#330610 Timberline Lodge Water System Improvements. The Timberline Pump House has been in service for 50 years housing and protecting all pumping equipment that serves the lodge and ski facilities. Due to the aging that comes from su
This spending item is part of a $533,152 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/03/2010 |
PAPE' MATERIAL HANDLING, INC. | $88,351 | One each T320 Bobcat Track Loader Part# M0039. | U.S. Army Corps of Engineers - civil program financing only | 9/08/2009 |
HDR ENGINEERING, INC. | $79,990 | Nehalem River Flood Modeling for the City of Veronia, OR | U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
DAVID EVANS AND ASSOCIATES, INC. | $63,807 |
Photogrammetric mapping, digital orthophotography, land surveying, LiDAR data collection, and bathymetric surveying
This spending item is part of a $135,120 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
HDR ENGINEERING, INC. | $53,965 |
Furnish equipment, supplies, facilities, and personnel to provide the requested surveys and gage maintenance for Crest Gage surverys in Oregon and Washington counties.
This spending item is part of a $222,297 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
Barrs & Genauer Construction, Inc. | $53,687 |
ARRA Recovery Project#330610 Timberline Lodge Water System Improvements. The Timberline Pump House has been in service for 50 years housing and protecting all pumping equipment that serves the lodge and ski facilities. Due to the aging that comes from su
This spending item is part of a $533,152 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/03/2010 |
HDR ENGINEERING, INC. | $49,176 |
Conduct a feasibility study on the ecosystem restoration needs and opportunities within the tidal reaches of Abernathy Creek. The purpose of the feasibility study is to investigate and recommend appropriate solutions, through conceptual analysis, providi
This spending item is part of a $75,706 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 2/19/2010 |
INCA/CH2M HILL JV | $47,811 | Levee Periodic Inspections Workshop | U.S. Army Corps of Engineers - civil program financing only | 8/14/2009 |
HDR ENGINEERING, INC. | $44,753 | Perform levee safety Periodic Inspections (PI) on the levee systems. The purpose of the PI is to verify proper operation and maintenance, evaluate operational adequacy and structural stability, review design criteria to identify changes in current design | U.S. Army Corps of Engineers - civil program financing only | 8/14/2009 |
DAVID EVANS AND ASSOCIATES, INC. | $38,456 |
Photogrammetric mapping, digital orthophotography, land surveying, LiDAR data collection, and bathymetric surveying
This spending item is part of a $500,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/24/2009 |
DAVID EVANS AND ASSOCIATES, INC. | $38,456 |
Photogrammetric mapping, ditigal orthophotography, land surveying, GIS Data processing, and bathymetric surveying
This spending item is part of a $379,005 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
FORMATIONS INC | $37,761 | Design Fabricate and Install Multiple Interpretive Panels and Mounting Structures for the USACE | U.S. Army Corps of Engineers - civil program financing only | 6/29/2009 |
DAVID C. SMITH & ASSOCIATES, INC. | $36,683 |
Photogrammetric mapping, digital orthophotography, land surveying, LiDAR data collection, and bathymetric surveying
This spending item is part of a $135,120 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
BIOANALYSTS, INC. | $31,747 |
TAS::96 3135::TAS RECOVERYPROJECT#::323889 COMPLETION OF LCR PILE DIKE EVALUATION. STRUCTURAL AND HYDRAULIC ANALYSIS OF THE COLUMBIA RIVER PILE DIKES. THE STUDY EXTENDS FROM THE MOUTH OF THE COLUMBIA RIVER MILE (CRM)3 TO CRM 138, NEAR BONNEVILLE. CONTRACT
This spending item is part of a $673,863 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/11/2010 |
Skala | $27,210 |
TAS::96::3135:: TAS Spillway gate hydraulic Steel Structires inspections and analysis at six projects in Willamette Valley (Blue River, Cougar, Fern Ridge, Detroit, Fall Creek, Lookout Point).
This spending item is part of a $1,073,986 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/20/2009 |
FORMATIONS INC | $26,926 | RECOVERY PROJECT NUMBER 322852, ST. LOUIS EXHIBITS - Furnish all necessary personnel, materials, equipment and related services as necessary to research, design, fabricate, test deliver, install and make operative a series of indoor and outdoor exhibit pa | U.S. Army Corps of Engineers - civil program financing only | 8/12/2009 |
MINISTER & GLAESER SURVEYING, INC | $26,530 |
Conduct a feasibility study on the ecosystem restoration needs and opportunities within the tidal reaches of Abernathy Creek. The purpose of the feasibility study is to investigate and recommend appropriate solutions, through conceptual analysis, providi
This spending item is part of a $75,706 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 2/19/2010 |
OSBORN CONSULTING, INC. | $25,765 |
TAS::96 3135::TAS RECOVERYPROJECT#::323889 COMPLETION OF LCR PILE DIKE EVALUATION. STRUCTURAL AND HYDRAULIC ANALYSIS OF THE COLUMBIA RIVER PILE DIKES. THE STUDY EXTENDS FROM THE MOUTH OF THE COLUMBIA RIVER MILE (CRM)3 TO CRM 138, NEAR BONNEVILLE. CONTRACT
This spending item is part of a $673,863 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/11/2010 |
BERGMAN PHOTOGRAPHIC SERVICES INC | $12,166 |
Photogrammetric mapping, ditigal orthophotography, land surveying, GIS Data processing, and bathymetric surveying
This spending item is part of a $379,005 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
BERGMAN PHOTOGRAPHIC SERVICES INC | $12,166 |
Photogrammetric mapping, digital orthophotography, land surveying, LiDAR data collection, and bathymetric surveying
This spending item is part of a $500,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/24/2009 |
Statewide Land Surveying Inc | $9,412 |
Photogrammetric mapping, ditigal orthophotography, land surveying, GIS Data processing, and bathymetric surveying
This spending item is part of a $379,005 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
STATEWIDE LAND SURVEYING INC | $9,412 |
Photogrammetric mapping, digital orthophotography, land surveying, LiDAR data collection, and bathymetric surveying
This spending item is part of a $500,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/24/2009 |
STEVENS WATER MONITORING SYSTEMS INC | $8,415 | V2th Antennas Elevation Mounts | U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
CARLSON TESTING INC | $3,645 | Concrete inspections, compressive strength testing | U.S. Army Corps of Engineers - civil program financing only | 8/19/2010 |