Umatilla County, Ore., funds by U.S. Army Corps of Engineers
Listing $1,599,407.44 in stimulus funds from U.S. Army Corps of Engineers for Umatilla
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
EDERER, LLC | $1,439,174 | arra project #137652 Uprate two cranes at the McNary lock and dam located on the Columbia River. | U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION | $88,545 | Recovery Project #122882::RP#10 Umatilla Tribe Fishing Treaty Oral History Report. | U.S. Army Corps of Engineers - civil program financing only | 8/27/2010 |
C X T INCORPORATED | $52,782 | Pre-fabricated concrete toilet buildings for use at U.S. Army Corps of Engineers recreatonal areas near McNary Dam, Umatilla, OR. | U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
INTERNATIONAL RESOURCE MANAGEMENT, INC. | $10,098 | McNary Lock and Dam in Umatilla, Oregon is using ARRA funds to ship and dispose of 51 tons of contaminated sand blast grit. As part of the Hazardous and Universal waste disposal regulations require a Large Quantity Generator (LQG) to ship hazardous waste | U.S. Army Corps of Engineers - civil program financing only | 8/04/2010 |
WALLA WALLA FENCE | $8,788 | Baseball Field Fence and Installation | U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
DIX CORPORATION | $20 |
DIX Corporation will rehabiliate four spillway gates and guide slots. The rehabilitation includes, but is not limited to replacing the seals, seal bars and fasteners, as well as reubilding the gate wheels, rehabilitating the gate latching mechanism, rehab
This spending item is part of a $243,920 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |