Allegheny County, Pa., funds by U.S. Army Corps of Engineers
Listing $51,546,060.09 in stimulus funds from U.S. Army Corps of Engineers for Allegheny
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
TRUMBULL CORPORATION | $27,182,577 | Recovery Project#::71458::RP# Emsworth Locks and Dam, Ohio River, PA Back Channel Scour Protection and Left Abutment Stabilization | U.S. Army Corps of Engineers - civil program financing only | 4/01/2010 |
HOHL INDUSTRIAL SERVICES, INC. | $4,474,981 | AS PART OF BERLIN CREST GATE REHAB. RECOVERY PROJECT# 1400 RP# GATES 3 AND 4 REHAB PAINTING TESTING HOIST CHAINS, PULLEYS, POCKET WHEELS, EPOXY FLOOR OVERLAY AND REFURBISH HOIST MACHINERY ON GATES 1,2,3,AND 4, JET RING #1 REPAIRS AT THE BERLIN DAM IN BERL | U.S. Army Corps of Engineers - civil program financing only | 7/10/2009 |
MONGIOVI & SONS EXCAVATING INC | $3,960,874 | In order to assist the American public to better understand how the particular contract fits into a larger context the award description shall begin with these words 'As a part of the construction on the Pine Hollow Stream Removal Section 219 Project in K | U.S. Army Corps of Engineers - civil program financing only | 7/20/2010 |
SHAKA, INC. | $3,496,858 | TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::10400::RP# CONCRETE REPAIRS, MAHONING DAM, MAHONING CREEK, ARMSTRONG COUNTY, PENNSYLVANIA | U.S. Army Corps of Engineers - civil program financing only | 1/26/2010 |
BRAYMAN CONSTRUCTION CORPORATION | $3,310,576 | TAS::96 3134::TAS EMSWORTH LOCKS AND DAM, BACK CHANNEL ABUTMENT STABILIZATION, OHIO RIVER, PENNSYLVANIA. | U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
W. G. TOMKO, INCORPORATED | $1,349,700 |
As part of the construction on the Potato Garden Phase II A in Findlay Township, PA this award includes construction of 16 diameter ductile iron water line with associated excavation, backfill, pavement milling and placement of superpave asphalt pavement.
This spending item is part of a $1,756,598 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/21/2009 |
INDEPENDENT ENTERPRISES, INC. | $1,238,429 |
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::114019::RP# Sewer Line Rehabilitation at Homestead Run, Munhall, PA
This spending item is part of a $2,391,509 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/06/2010 |
SPINIELLO COMPANIES | $1,153,080 |
TAS::96 3134::TAS ARRA::YES::ARRA RECOVERYPROJECT#::114019::RP# Sewer Line Rehabilitation at Homestead Run, Munhall, PA
This spending item is part of a $2,391,509 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/06/2010 |
JOSEPH B. FAY CO. | $878,117 | DAM AND SCOUR REPAIR LOCK AND DAM #5 ALLEGHENY COUNTY, FREEPORT, PA | U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
GANNETT FLEMING, INC. | $537,000 |
South Central Pennsylvania Envrionmental Infrastructure (Section 313) - ARRA Engineering and construction relative to the LTMJSA Phase 2 Wastewater Capital Improvement Project. This project includes sewer extension to areas to relieve malfuncting on-lot systems and small treatment plants. This projoject will also expand the LTMJSA... Show more
This spending item is part of a $1,550,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/24/2009 |
SHAKA, INC. | $478,338 | TAS::96 3135::TAS RECOVERYPROJECT#::230::RP# IDIQ CONSTRUCTION CONTRACTS FOR THE PITTSBURGH DISTRICT - NEW MAINTENANCE BUILDING AT LOCK 5 ALLEGHENY RIVER, FREEPORT, PA | U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
ABCON, INC. | $404,038 |
As part of the construction on the Potato Garden Phase II A in Findlay Township, PA this award includes construction of 16 diameter ductile iron water line with associated excavation, backfill, pavement milling and placement of superpave asphalt pavement.
This spending item is part of a $1,756,598 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/21/2009 |
BERGMANN ASSOCIATES INC | $292,000 | Architecture-Engineering Support Services During Construction of the Upper Guard Wall at Charleroi Locks and Dam | U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
W. G. TOMKO, INCORPORATED | $275,440 |
Recovery Project::127504::RP#Sewer Remediation Storm Sewer Lines Manhole Rehab Security Grates at Sheraden Park Section 219 Project
This spending item is part of a $354,774 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/28/2010 |
TITO CONSTRUCTION COMPANY INC. | $241,398 | REROOFING PROJECTS AT ALLEGHENY RIVER LOCK AND DAM 4 & 5, CONEMAUGH RIVER LAKE AND MAHONING LAKE | U.S. Army Corps of Engineers - civil program financing only | 9/11/2009 |
AEROSTAR ENVIRONMENTAL SERVICES, INC. | $220,088 | Environmental Site Assessment related to Upper Ohio Navigation Study | U.S. Army Corps of Engineers - civil program financing only | 6/19/2009 |
MACK MECHANICAL, INC. | $205,700 |
TAS::96 3135::TAS Reroofing projects at Braddock Lock & Dam, Hildebrand Lock & Dam, and Point Marion Lock & Dam. Projects located in Pennsylvania and West Virginia
This spending item is part of a $271,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
TESTAMERICA LABORATORIES, INC. | $197,588 |
The purpose of this project is to evaluate the quality of dredged material from the Federal navigation channels in Norfolk, Virginia region (Thimble Shoal Channel, Atlantic Ocean Channel, and Norfolk Harbor Channel Reaches) with respect to available place
This spending item is part of a $664,453 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
A & A CONSULTANTS, INC. | $196,182 | As a part of construction on the Charleroi Lock and Dam project, A&A supplied supplemental inspection staffing to the USACE. | U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
ADVANCED INTEGRATION GROUP, INC. | $175,390 | Robert Kerr Lock & Dam Automation Equipment | U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
RHEA ENGINEERS & CONSULTANTS, INC. | $125,938 | Recovery Project #::010423::RP# Upper Ohio Navigation Study, PA Upper Ohio Navigation Study, Pennsylvania Lock Modernization Impact and Mitigation Analyses | U.S. Army Corps of Engineers - civil program financing only | 7/12/2010 |
TESTAMERICA LABORATORIES, INC. | $116,404 |
The purpose of this project is to evaluate the quality of dredged material from the Federal navigation channels in Mobile Harbor, Alabama with respect to available placement options (upland placement, open water placement, and ocean placement). The proje
This spending item is part of a $447,140 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
NICHOLSON CONSTRUCTION COMPANY | $115,317 |
Furnish all equipment, labor, layouts of work features, and supervision necessary for Sutton Well Cleanout, Sutton Lake, Sutton, WV.
This spending item is part of a $490,873 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/13/2009 |
URS GROUP, INC. | $113,959 | Recovery Project #::11740:: RP # Line Item 0001 Project Schedulerline Item 0002 Travel. URS will provide Scheduling Services. | U.S. Army Corps of Engineers - civil program financing only | 6/01/2010 |
AEROSTAR ENVIRONMENTAL SERVICES, INC. | $112,290 | Environmental Site Assessment and Plan formulation and evaluation related to Upper Ohio Ecosystem | U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
GROUND TECHNOLOGY, INC | $100,000 | RECOVERYPROJECT#::71458::RP# SUPPORT DURING CONSTRUCTION OF THE EMSWORTHBACK CHANNEL LEFT ABUTMENT STABILIZATION. | U.S. Army Corps of Engineers - civil program financing only | 5/04/2010 |
RHEA ENGINEERS & CONSULTANTS, INC. | $96,915 | TAS::96 3134::TAS ARRA::Yes::ARRA RecoveryProject#::184705::RP# Professional Engineering Services-Ecosystem-Sheraden Park Section 206 Aquatic Ecosystem Restoration Project, Pittsburgh, PA | U.S. Army Corps of Engineers - civil program financing only | 2/17/2010 |
NICHOLSON CONSTRUCTION COMPANY | $88,062 |
Provide all supplies, material, labor and supervision necessary for Sutton Dam Drain Rehabilitation, Sutton, West Virginia.
This spending item is part of a $260,681 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/06/2010 |
ABCON, INC. | $79,334 |
Recovery Project::127504::RP#Sewer Remediation Storm Sewer Lines Manhole Rehab Security Grates at Sheraden Park Section 219 Project
This spending item is part of a $354,774 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/28/2010 |
TITO CONSTRUCTION COMPANY INC. | $72,169 | Mahoning Creek Lake Guardrail and Handrail Replacement New Bethlehem, PA | U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
Hausler Roofing Inc | $65,300 |
TAS::96 3135::TAS Reroofing projects at Braddock Lock & Dam, Hildebrand Lock & Dam, and Point Marion Lock & Dam. Projects located in Pennsylvania and West Virginia
This spending item is part of a $271,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
RHEA ENGINEERS & CONSULTANTS, INC. | $63,772 | As a part of the engineering design on the Pine Hollow Stream Removal, Storm Water Separation Project in Allegheny County Pennsylvania, a geotechnical exploration was performed along Pine Hollow Road and Singer Avenue near McKees Rock. The project includ | U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
NICHOLSON CONSTRUCTION COMPANY | $60,000 |
Provide labor, material, supplies, and supervision necessary toperform drainage lengthening at Sutton Dam, Sutton, WV.
This spending item is part of a $221,043 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 7/05/2009 |
MICROSEEPS INC | $35,235 |
Performing remediation and monitoring of contaminated groundwater at the Monitor Devices Inc./Intercuits Superfund site located in Wall Township, NJ.
This spending item is part of a $3,000,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/03/2009 |
COSMOS TECHNOLOGIES INC. | $19,500 | Provide geological support for Bluestone Dame Safety Assurance project, Hinton, WV | U.S. Army Corps of Engineers - civil program financing only | 3/19/2010 |
TIGG CORPORATION | $4,621 |
As part of the Environmental Protection Agency Hazardous Substance Superfund, Recovery Act, this work is Groundwater Treatment Plant Construction and Remediation for Price's Pit Landfill Remediation, Pleasantville, New Jersey
This spending item is part of a $15,806,663 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 4/15/2010 |
Industrial Appraisal Company Inc | $3,795 |
South Central Pennsylvania Envrionmental Infrastructure (Section 313) - ARRA Engineering and construction relative to the LTMJSA Phase 2 Wastewater Capital Improvement Project. This project includes sewer extension to areas to relieve malfuncting on-lot systems and small treatment plants. This projoject will also expand the LTMJSA... Show more
This spending item is part of a $1,550,000 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/24/2009 |
METRO FENCE CO., INC. | $2,860 |
As part of the construction on the Potato Garden Phase II A in Findlay Township, PA this award includes construction of 16 diameter ductile iron water line with associated excavation, backfill, pavement milling and placement of superpave asphalt pavement.
This spending item is part of a $1,756,598 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/21/2009 |
PANNIER CORPORATION, THE | $1,424 | Creation of educational signage for the fish passage project at Cape Fear Lock and Dam 1. The project number for this award is 002640. | U.S. Army Corps of Engineers - civil program financing only | 9/21/2010 |
VEOLIA ES SOLID WASTE OF PA, INC | $809 |
Grounds maintenance and janitorial Services
This spending item is part of a $27,224 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/04/2009 |
CABRERA SERVICES INC. | $0 | As part of 96-3137 (Formerly Utilized Sites Remedial Action Program) on the construction of and remediation requirement in Armstrong County, Pennsylvania to remediate trenches 3 and 9 at the Shallow Land Disposal Site. | U.S. Army Corps of Engineers - civil program financing only | 3/31/2010 |