Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
HUNTINGTON & GUERRY ELECTRIC CO. | $546,085 |
As a part of the Hartwell Lake project #007380 at Hartwell, GA, design and install station svc switchgear and perform turnkey replacement of the switchgear
This spending item is part of a $1,743,815 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
HUNTINGTON & GUERRY ELECTRIC CO. | $436,201 |
As a part of the Hartwell Lake project #007380 at Hartwell, GA, design and install motor control; perform turnkey replacement of the motor control equipment
This spending item is part of a $1,061,090 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
HUNTINGTON & GUERRY ELECTRIC CO. | $111,000 |
As a part of the St. Stephens Power Plant project #074354 at St. Stephens, SC, repair/replace excitation system
This spending item is part of a $1,449,629 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
HUNTINGTON & GUERRY ELECTRIC CO. | $93,726 |
As a part of the Hartwell Lake project #007380 at Hartwell, GA, design and install station svc switchgear and perform turnkey replacement of the switchgear
This spending item is part of a $1,743,815 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
EDWIN A ROEHL JR | $55,000 |
Title: Chloride Modeling for Savannah Harbor Expansion Project. Description: The USGS and ERDC are monitoring the upper Savannah River and Estuary for flow, conductivity (salinity), temperature, and chloride. The data collection started in July 2009 and