Yankton County, S.D., funds by U.S. Army Corps of Engineers
Listing $3,118,562.98 in stimulus funds from U.S. Army Corps of Engineers for Yankton
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
EISENBRAUN AND ASSOCIATES, INC. | $735,199 | As part of Construction for project for Services to provide Bathymetric Surveys for Portions of Mississippi River Pools 2, 5, 6, 10, 11, and 12. The Contractor shall produce hydrographic surveys in select areas of these pools to fulfill the mission of com | U.S. Army Corps of Engineers - civil program financing only | 12/22/2009 |
EISENBRAUN AND ASSOCIATES, INC. | $696,537 |
As part of Construction for project for Services to perform Bathymetric Surveys for Portions of Mississippi River Pools 3, 5a, 14, 15, 16, 17, and 19 and the Starved Rock and Marseilles Pools on the Illinois Waterway. The Contractor shall produce hydrogr
This spending item is part of a $701,945 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/24/2009 |
EISENBRAUN AND ASSOCIATES, INC. | $590,599 |
This project consists of furnishing all services, labor, plant, equipment, materials and transportation necessary to acquire and process boundary surveys and recorded plats meeting state code and county recording requirements for eight sites in the Oahe D
This spending item is part of a $662,597 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/29/2009 |
ALLTECH ENGINEERING CORP. | $553,250 |
ARRA PROJECT #6440, Gavins Point Dam, Intake Gate Rehab, Yankton, SD.
This spending item is part of a $901,532 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
EISENBRAUN AND ASSOCIATES, INC. | $305,288 | This project consists of furnishing all services, labor, plant, equipment, materials and transportation necessary to acquire and process boundary surveys and recorded plats meeting state code and county recording requirements for three sites in the Big Be | U.S. Army Corps of Engineers - civil program financing only | 6/08/2009 |
EISENBRAUN AND ASSOCIATES, INC. | $112,098 | This project requires the over bank and hydrographic surveys of four different lakes including Cottonwood Springs near Hot Springs, SD, and Wehrspann, Cunningham and Standing Bear Lakes in Omaha, NE. | U.S. Army Corps of Engineers - civil program financing only | 7/08/2009 |
EISENBRAUN AND ASSOCIATES, INC. | $85,207 |
Lewis & Clark Lake Headwaters Aggradation Evaluation. The closure of Gavins Point Dam on the Missouri River at river mile 811 (RM 811) occurred in 1955 to form Lewis and Clark Lake. Significant delta deposits have formed in the headwaters of Lewis and Cla
This spending item is part of a $352,437 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/26/2009 |
BOW CREEK METAL, INC | $27,656 | Replace relief well flumes at Gavins Point project | U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
POWER CLEAN INC | $12,728 | SPILL CONTAINMENT SUPPLIES | U.S. Army Corps of Engineers - civil program financing only | 8/12/2009 |