Bexar County, Texas, funds by State, Department of
Listing $2,892,575.03 in stimulus funds from State, Department of for Bexar
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
RABA-KISTNER CONSULTANTS, INC | $1,436,661 |
Civil Redesign of North Floodway North and South Levees from FM 1425 in Hidalgo County, Texas, East 27 Miles to the End of Levee, including Geotechnical Investigation and Surveying Services.
This spending item is part of a $4,071,347 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/16/2010 |
RABA-KISTNER CONSULTANTS, INC | $508,532 |
Geotechnical investigation, analysis and civil design for earthen levee rehabilitation.
This spending item is part of a $1,536,600 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/16/2010 |
RABA-KISTNER CONSULTANTS, INC | $502,899 |
Redesign of Courchesne Reach and NEMEXAS Reach.
This spending item is part of a $1,178,046 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/17/2010 |
RABA-KISTNER CONSULTANTS, INC | $286,855 |
Hydraulic and hydrological design for earthen levee near El Paso, Texas.
This spending item is part of a $1,423,013 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/17/2010 |
RABA-KISTNER CONSULTANTS, INC | $119,818 |
Feasibility study and conceptual design at Paisano Phase II Reach located within the Upper Rio Grande Flood Control System Retrification Project in El Paso, Texas.
This spending item is part of a $849,417 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 9/10/2010 |
RABA-KISTNER CONSULTANTS, INC | $37,810 |
Rehabiliation for the Rio Grande Canalization Protective Levve System, Mesilla Levee Segment - Phase 1, Dona Ana County, NM.
This spending item is part of a $26,167,084 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 12/30/2009 |