Dallas County, Texas, funds by U.S. Army Corps of Engineers
Listing $6,804,214.25 in stimulus funds from U.S. Army Corps of Engineers for Dallas
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SMR CONSTRUCTION INC. | $2,470,864 | Embankment Stabilization and Slide Repairs at Joe Pool Dam, Texas | U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
URS GROUP, INC. | $985,308 | Archaeological data recovery, pedestrian survey to identify previously recorded archaeological sites, artifact analysis, C-14 Accelerated Mass Spectrum Dating, geophysical survey. | U.S. Army Corps of Engineers - civil program financing only | 11/16/2009 |
HUITT - ZOLLARS, INC. | $637,593 | Task Order 65-OMA-STIMULUS (ARRA) Repair and Renovation - Project scoping & RFP Development. This TO was awarded under an existing Indefinite Delivery Indefinite Quantity contract. TO was awarded on August 13, 2009 | U.S. Army Corps of Engineers - civil program financing only | 8/13/2009 |
SIGNATURE CONTRACTING SERVICES, L.L.C. | $418,896 |
Construction Channel Improvement Project, Mission Reach, Phase 2a, San Antonio, Texas.
This spending item is part of a $23,534,095 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 12/21/2009 |
JOHNSON CONTROLS, INC. | $402,066 |
Child Care Facility, Long Beach CA Two distinct projects within the VeteranG??s Affairs Medical Center Long Beach. Project 600-08-135 is the upgrade and remodel of the Child Care Facility, includes remodeling the existing child care area (2,920 square f
This spending item is part of a $2,923,180 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/27/2009 |
ESTES, INC. | $242,250 | Furnish and deliver Aquathol Superk for Tenn-Tom waterway. | U.S. Army Corps of Engineers - civil program financing only | 6/25/2010 |
HDR ARCHITECTURE INC, | $241,541 |
Develop functional assessment models for wetland resources present in Texas within the Fort Worth and Tulsa districts; and stream resources present in Texas within the Fort Worth and Tulsa districts. The objective is to prepare two functional assessment
This spending item is part of a $304,905 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
PARTNERS BUSINESS CONSULTING | $177,752 | ARRA Support for reporting FY10 information through 30 Sep 2010 | U.S. Army Corps of Engineers - civil program financing only | 6/23/2010 |
ANCHOR GROUP INC, THE | $177,673 |
DESIGN/BUILD LAND PORT OF ENTRY AT AMISTAD DAM TEXAS IN SUPPORT OF THE DEPARTMENT OF HOMELAND SECURITY AND CUSTOMS AND BORDER PROTECTION
This spending item is part of a $8,567,996 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/15/2010 |
PARTNERS BUSINESS CONSULTING GROUP, INC. | $174,994 | assistance with ARRA reporting information through 14 Jan 2012 | U.S. Army Corps of Engineers - civil program financing only | 9/23/2011 |
PARTNERS BUSINESS CONSULTING | $137,440 | Provide reporting of recovery work to include daily reports, workload analysis, staff assistace, and auto-generation of data. | U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
Professional Service Co | $116,837 |
SCOPE OF WORK: Contractor shall furnish all labor, materials, tools, and equipment to renovate the existing septic systems at Lavonia Park, East Fork Park, Clear Lake Park, Mallard Park, Lakeland Park and Caddo Park, Lavon Lake, Wylie, TX. All installati
This spending item is part of a $1,563,018 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/04/2010 |
HALFF ASSOCIATES, INC. | $115,754 |
As part of TAS: 96-3135, the requirement involves the development of input data files which will facilitate the daily real-time water management of DeQueen Lake. The combined product of the input files, developed via this scope of work, and the HEC progr
This spending item is part of a $160,796 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 8/20/2009 |
FFD ASSET ACQUISITION, LLC | $99,029 |
SCOPE OF WORK: Contractor shall furnish all labor, materials, tools, and equipment to construct new woven and barbed wire fence on various types of terrain at locations referenced above and as shown on the attached drawings. The contractor shall not remov
This spending item is part of a $214,647 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 1/04/2010 |
FFD ASSET ACQUISITION, LLC | $99,029 |
SCOPE OF WORK: Contractor shall furnish all labor, materials, tools, and equipment to construct new woven and barbed wire fence on various types of terrain at locations referenced above and as shown on the attached drawings. The contractor shall not remov
This spending item is part of a $214,647 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 3/12/2010 |
PLAYWELL GROUP, INC., THE | $85,606 |
SCOPE OF WORK: The Contractor to supply all tools, labor, equipment and materials to demolish eight (8) picnic sites at south day use area and install ten (10) picnic sites at low water boat ramp in Murrell Park, Grapevine Lake, Texas. The demolition work
This spending item is part of a $195,669 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 3/12/2010 |
Roderick Lee Electrical Contractors, Inc. | $75,646 |
SCOPE OF WORK: Contractor shall furnish all labor, materials, tools, and equipment to renovate the existing septic systems at Lavonia Park, East Fork Park, Clear Lake Park, Mallard Park, Lakeland Park and Caddo Park, Lavon Lake, Wylie, TX. All installati
This spending item is part of a $1,563,018 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/04/2010 |
SWCA, INCORPORATED | $32,220 |
Develop functional assessment models for wetland resources present in Texas within the Fort Worth and Tulsa districts; and stream resources present in Texas within the Fort Worth and Tulsa districts. The objective is to prepare two functional assessment
This spending item is part of a $304,905 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
INTEGRATED ENVIRONMENTAL SOLUTIONS INC | $31,143 |
Develop functional assessment models for wetland resources present in Texas within the Fort Worth and Tulsa districts; and stream resources present in Texas within the Fort Worth and Tulsa districts. The objective is to prepare two functional assessment
This spending item is part of a $304,905 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
HALFF ASSOCIATES, INC. | $26,893 |
This Scope of Work (SOW) shall include the completion of topographic maps, and geotechnical testing for eight new locations of Land Ports of Entry (LPOE). The LPOEs included in this SOW are: Amistad Dam, TX; Forest City, ME; Hannah, ND; Pinecreek, MN
This spending item is part of a $890,115 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 6/09/2010 |
JONES-BLAIR COMPANY | $22,748 | ARRA 09: PAINTING SUPPLIES FOR PAINT ETR PROJECTS DOING PAINTING REHAB: PAINT TAPE, ROLLERS, FRAMES, PANS, LIBERS, BRUSHES, EXTENSION POLES, SCRAPERS, DROP CLOTHS, PAILS, BUCKETS, TYVEK SUITS, MASKS, PAINT GRATES, ETC FOB: Destination PURCHASE REQUEST NUM | U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
DOUGHERTY SPRAGUE ENVIRONMENTAL, INC. | $11,097 | As part of the Ft. Worth District Corps of Engineers Environmental Mission and in conjunction with the Environmental Protection Agency, the city of Kilgore requested a Targeted Brownfields Assessment for a five acre property located on Tract 12 of Mary Va | U.S. Army Corps of Engineers - civil program financing only | 3/31/2010 |
Hanson Pipe & Precast, Inc. | $9,144 |
Project #104781: began as a continuing clause contract with an allocated funding of 9.9 million dollars. The total cost of the project to date is over 32 million. Without the ARRA funding the project would not have been able to continue and probably wou
This spending item is part of a $19,387,307 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 4/01/2010 |
S.D.W. ENTERPRISES, INCORPORATED | $8,490 | KAWASAKI MULE | U.S. Army Corps of Engineers - civil program financing only | 7/22/2009 |
Hanson Pipe & Precast, Inc. | $4,200 |
Project #: 104781 consists of the construction of a 460 MGD (million gallons per day) In-plant Secondary Effluent Pump Station. Related key element of this IPSEPS include: approach channels, wet well, appurtenances, 84' diameter force mains (piping syst
This spending item is part of a $24,825,295 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/20/2010 |