Recovery Tracker

How Much Stimulus Funding is Going to Your County?

El Paso County, Texas, funds by State, Department of

Listing $18,985,134.85 in stimulus funds from State, Department of for El Paso

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
ULTIMATE CONCRETE, L.L.C. $9,206,404 Sunland Park Levee improvements consist of 1) raising the top-of-the levee elevation, 2) providing seepage control structures as required, and 3) rehabilitationg existing pipeline/culvert structures and appurtenances located within the levees by modifying
This spending item is part of a $9,249,622 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/10/2010
TETRA TECH, INC. $1,391,459 Weekly project meetings have been held every Wednesday morning, Coordination of flight permits, survey teams and flight crews for beginning of acquisition, Creation of Tiling Scheme for project AOI, Coordination with USGS and IBWC to determine common area
This spending item is part of a $4,041,171 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/17/2010
MARTINEZ BROS. CONTRACTORS, LLC $879,195 The project requires the construction of the Canal Structure Improvements Project, of the US International Boundary & Water Commission, in accordance with Contract Documents U.S. and Mexico International Boundary and Water Commission 8/13/2010
URS GROUP, INC. $877,472 Implementation of a Document Management System and Web Services using ArcServer and Database Software to process and visualize data for the USIBWC.
This spending item is part of a $1,324,619 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/16/2010
TETRA TECH, INC. $731,665 As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES FOR CANUTILLO AND SUNLAND PARK LEVEE SEGMENTS) -The Sunland Park Canutillo Levee Segment is located in Dona Ana County, NM and El Paso County, Texas. Work covered under the construction contract co U.S. and Mexico International Boundary and Water Commission 9/08/2010
URS GROUP, INC. $660,649 Feasibility study and conceptual design at Paisano Phase II Reach located within the Upper Rio Grande Flood Control System Retrification Project in El Paso, Texas.
This spending item is part of a $849,417 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/10/2010
URS GROUP, INC. $622,379 RECOVERY - Construction Management Services during construction of Canutillo Levee. TAS::19 1079 790::TAS Construction management and inspection of levee rehabilitation. U.S. and Mexico International Boundary and Water Commission 2/09/2010
URS GROUP, INC. $584,147 Redesign of Courchesne Reach and NEMEXAS Reach.
This spending item is part of a $1,178,046 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/17/2010
RODS SURVEYING, INC. $502,091 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
TETRA TECH, INC. $484,048 As part of TAS 19-1079 - RECOVERY - DESIGN OF REHAB IMPROVEMENTS FOR THE EAST LEVEE VADO SEGMENT, PS&E for Vado Segment encroaching on Railroad R/W within the Rio Grande Canalization Flood Control Project, NM
This spending item is part of a $605,269 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/17/2010
MIRATEK CORP $447,147 Implementation of a Document Management System and Web Services using ArcServer and Database Software to process and visualize data for the USIBWC.
This spending item is part of a $1,324,619 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/16/2010
RABA-KISTNER CONSULTANTS, INC $382,649 Scope of work including providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil strength paramet
This spending item is part of a $612,066 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/23/2009
GPSuelos y Control de Calidad, S.A. de C.V. $280,000 Recovery - GIS, Collection of Cross Sections for H/H Modeling. TAS: 19 1079
This spending item is part of a $536,245 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/13/2010
MWH AMERICAS, INC. $256,245 Recovery - GIS, Collection of Cross Sections for H/H Modeling. TAS: 19 1079
This spending item is part of a $536,245 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/13/2010
RODS SURVEYING INC $247,790 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,285,848 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
TERRACON CONSULTANTS, INC. $243,265 Scope of work includes providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $1,454,915 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/17/2009
TERRACON CONSULTANTS, INC. $243,265 Scope of work includes providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $1,515,509 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/17/2009
TETRA TECH, INC. $216,782 As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES DURING THE CONSTRUCTION OF THE RIVERSIDE WASTEWAY I, UPPER RIO GRANDE FLOOD CONTROL PROJECT)-The proposed project is located in City of El Paso, El Paso County, Texas, on the south corner of Rio Bos
This spending item is part of a $298,354 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/27/2010
FRANK X. SPENCER AND ASSOCIATES, INC. $178,842 Geotechnical investigation, analysis and civil design for earthen levee rehabilitation.
This spending item is part of a $1,536,600 allocation. See details
U.S. and Mexico International Boundary and Water Commission 6/16/2010
ARCHANA USA, INC. $137,000 Rehabiliation for the Rio Grande Canalization Protective Levve System, Mesilla Levee Segment - Phase 1, Dona Ana County, NM.
This spending item is part of a $26,167,084 allocation. See details
U.S. and Mexico International Boundary and Water Commission 12/30/2009
ZIA ENGINEERING & ENVIRONMENTAL CONSULTANTS, L.L.C. $81,572 As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES DURING THE CONSTRUCTION OF THE RIVERSIDE WASTEWAY I, UPPER RIO GRANDE FLOOD CONTROL PROJECT)-The proposed project is located in City of El Paso, El Paso County, Texas, on the south corner of Rio Bos
This spending item is part of a $298,354 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/27/2010
RABA-KISTNER CONSULTANTS, INC $81,554 As part of TAS 19-1079 - RECOVERY - DESIGN OF REHAB IMPROVEMENTS FOR THE EAST LEVEE VADO SEGMENT, PS&E for Vado Segment encroaching on Railroad R/W within the Rio Grande Canalization Flood Control Project, NM
This spending item is part of a $605,269 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/17/2010
Rods Aerial Mapping, LLC $76,987 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,285,848 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
Rods Aerial Mapping, LLC $76,987 Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
This spending item is part of a $2,306,453 allocation. See details
U.S. and Mexico International Boundary and Water Commission 8/28/2009
Rodriguez A Trucking $43,218 Sunland Park Levee improvements consist of 1) raising the top-of-the levee elevation, 2) providing seepage control structures as required, and 3) rehabilitationg existing pipeline/culvert structures and appurtenances located within the levees by modifying
This spending item is part of a $9,249,622 allocation. See details
U.S. and Mexico International Boundary and Water Commission 9/10/2010
BIRNBAUM, LEONARD G AND CO LLP $37,608 Review of ARRA activity by the International Boundary and Water Commission, U.S. and Mexico. State, Department of 8/29/2009
FRANK X. SPENCER AND ASSOCIATES, INC. $14,717 Scope of work including providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil strength paramet
This spending item is part of a $612,066 allocation. See details
U.S. and Mexico International Boundary and Water Commission 4/23/2009