Harris County, Texas, funds by State, Department of
Listing $15,429,678.60 in stimulus funds from State, Department of for Harris
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
S & B INFRASTRUCTURE, LTD | $7,478,187 |
Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
This spending item is part of a $7,621,082 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/22/2009 |
S & B INFRASTRUCTURE, LTD | $7,471,252 |
Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
This spending item is part of a $7,585,918 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 6/22/2009 |
Rods Aerial Mapping, LLC | $240,120 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,883,015 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |
Rods Aerial Mapping, LLC | $240,120 |
Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
This spending item is part of a $10,965,315 allocation.
See details
|
U.S. and Mexico International Boundary and Water Commission | 4/02/2009 |