Norfolk County, Va., funds by U.S. Army Corps of Engineers
Listing $12,841,927.55 in stimulus funds from U.S. Army Corps of Engineers for Norfolk
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
AMERICAN BRIDGE COMPANY | $6,366,101 | Design and Build approximately 800 feet of waterfront bulkhead and fendering system at the NOAA Marine Operations Center. This contract will enable NOAA to moor the Thomas Jefferson ship at the NOAA Facility along with the other smaller NOAA boats. This c | U.S. Army Corps of Engineers - civil program financing only | 9/27/2010 |
3001, INC. | $2,907,546 | Navigation and Coastal Databank to support Geospatial Information Systems Operations at various United States Army Corps of Engineers Coastal Districts, Phase Two | U.S. Army Corps of Engineers - civil program financing only | 10/23/2009 |
SOUTHWIND CONSTRUCTION CORP. | $1,615,015 | Maintenance Dredging, Hoskins Creek, Queens Creek and Winter Harbor | U.S. Army Corps of Engineers - civil program financing only | 7/29/2009 |
COTTRELL CONTRACTING CORPORATION | $999,950 | Cottrell Contracting will perform dredging of the Lynnhaven Inlet, VA including the Entrance Channel, Turning Basin and Broad Bay Station. | U.S. Army Corps of Engineers - civil program financing only | 8/12/2009 |
HAMMER LGC, INC. | $257,879 | Handrail installation and Boardwalk Repairs, Fort Norfolk, VA | U.S. Army Corps of Engineers - civil program financing only | 8/12/2009 |
SOUTHWIND CONSTRUCTION CORP. | $217,147 | Maintenance Dredging, Broad Creek | U.S. Army Corps of Engineers - civil program financing only | 11/16/2009 |
LOGISTICS SUPPORT INCORPORATED | $104,246 | The purpose of this effort is to provide the necessary level of administrative, professional, and technical support required to facilitate the overall objectives of the Norfolk District U S. Army Corps of Engineers and its members/detachments/units. The p | U.S. Army Corps of Engineers - civil program financing only | 5/21/2009 |
LOGISTICS SUPPORT INCORPORATED | $77,188 | Provide one Deckhand for patrol boats and construction vessels for the US Army Corps of Engineers, Norfolk District, VA. Provide one Deckhand until the labor hours within the scope of this contract are consumed. Provide service to all deck assignments in | U.S. Army Corps of Engineers - civil program financing only | 5/21/2009 |
LOGISTICS SUPPORT INCORPORATED | $76,476 | Provide a vessel operator for floating plants ranging in length from 17 feet to 104 feet to include skiffs, patrol vessels, survey vessels, and a derrick boat. The vessel operator is responsible for ensuring the vessel is properly readied to depart the do | U.S. Army Corps of Engineers - civil program financing only | 5/21/2009 |
LOGISTICS SUPPORT INCORPORATED | $61,043 | The purpose of this effort is to provide the necessary level of administrative, professional, and technical support required to facilitate the overall objectives of the Norfolk District U S. Army Corps of Engineers and its members/detachments/units. The p | U.S. Army Corps of Engineers - civil program financing only | 6/01/2009 |
HURRICANE FENCE CO. | $49,629 |
(0002) Hydro seeding of approximately 300+ acres along with the installation of approximately seven miles of silt fence at the Craney Island Facility. (0002-03) To demolish and re-install 1650lf of security fence w/ vinyl coating and vinyl privacy slats
This spending item is part of a $945,251 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 5/18/2009 |
HURRICANE FENCE CO | $37,944 |
To demolish and re-install 1650lf of security fence w/ vinyl coating and vinyl privacy slats around the perimeter of the Craney Island Facility. In addition there is also the repair of a 3'H galvanized fence that was damaged during a past storm and the in
This spending item is part of a $55,454 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
POLU KAI SERVICES, LLC | $37,657 | This modification (P00005) inclused all cost and time associated with the delays in award of alternate bid item 0007 Fixed TimberPier and Floating Piers with Gangway and relocation of the wooden pier approximately five (5) feet in the northerly direction | U.S. Army Corps of Engineers - civil program financing only | 6/16/2011 |
MANAGEMENT CONSULTING, INC. | $26,706 | ADMINISTRATIVE DATA ANALYST SERVICES FOR THE REGULATORY OFFICE OF THE USACE NORFOLK. | U.S. Army Corps of Engineers - civil program financing only | 3/12/2010 |
HURRICANE FENCE CO | $7,400 |
Modification due to unforseen conditions to include trenching and installation of fence with the the necessary backfill.
This spending item is part of a $9,150 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 11/03/2009 |