Virginia Beach County, Va., funds by Interior, Department of
Listing $3,887,261.32 in stimulus funds from Interior, Department of for Virginia Beach
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
BURGESS & NIPLE, INC | $1,180,532 | New Admin Bldg for Wing Bee function | U.S. Fish and Wildlife Service | 12/23/2009 |
BURGESS & NIPLE, INC | $715,864 | Renovation of four facilities at Patuxent Refuge | U.S. Fish and Wildlife Service | 3/15/2010 |
BURGESS & NIPLE, INC | $669,543 | The project is the renovation of Merriam Hall at Patuxent Refuge from a histroic laboratory facility into an office. | U.S. Fish and Wildlife Service | 3/29/2010 |
TTR, L.L.C. | $617,796 | Rehabilitation of the Rightmeyer House for the United States Department of the Interior, Fish and Wildlife Service, Back Bay National Wildlife Refuge, Virginia Beach, Virginia. Work shall include converting a residential house to offices and visitors cent | U.S. Fish and Wildlife Service | 6/24/2009 |
BURGESS & NIPLE, INC | $316,861 | Renovation of Snowden Hall, a historic residence at Patuxent Refuge | U.S. Fish and Wildlife Service | 3/15/2010 |
RIESBECK CONTRACTING, INC | $90,097 | Work consists of adding (2) two new vestibules to the existing facility. Minor site demolition will be required to facilitate positive drainage from the existing building and construction of the new entry structures. Careful coordination of work is necess | U.S. Fish and Wildlife Service | 5/28/2010 |
BURGESS & NIPLE, INC | $75,498 | Geothermal design for visitor center at Blackwater Refuge in Cambridge, MD | U.S. Fish and Wildlife Service | 2/09/2010 |
BURGESS & NIPLE, INC | $43,914 | Evaluate suitability of geothermal heating and cooling sytsem based on life cycle cost analysis. Generate construction documents for new geothermal heating and cooling system for visitor's center. | U.S. Fish and Wildlife Service | 9/09/2009 |
BURGESS & NIPLE, INC | $35,117 | Project entailed providing construction administration support for the installation of a new geothermal system at Prime Hook Refuge | U.S. Fish and Wildlife Service | 8/11/2010 |
BURGESS & NIPLE, INC | $35,117 | Construction adminimstation services for Prime Hook geothermal | U.S. Fish and Wildlife Service | 8/11/2010 |
BURGESS & NIPLE, INC | $32,383 | Design new geothermal heating and cooling system for visitors center. | U.S. Fish and Wildlife Service | 10/15/2009 |
STEELMASTER BUILDINGS, LLC | $27,881 |
Design, fabrication, and erection of a 1,200 s.f. open sided pre-engineered metal building to be utilized for equipment storage at Matamuskeet National Wildlife Refuge
This spending item is part of a $97,796 allocation.
See details
|
U.S. Fish and Wildlife Service | 11/19/2009 |
BURGESS & NIPLE, INC | $26,785 | Construct Visitor Facility airlock foyers | U.S. Fish and Wildlife Service | 10/28/2009 |
BURGESS & NIPLE, INC | $16,240 | Alternative energy system evaluation, to include building geothermal heating and cooling, solar-photovoltaic and wind generation, solar thermal, and lighting modifications. | U.S. Fish and Wildlife Service | 8/12/2009 |
ATLANTIC AIR CORPORATION | $3,634 | Ice machine/dispenser last qtr. No Sales this Quarter | U.S. Fish and Wildlife Service | 9/18/2009 |