Cowlitz County, Wash., funds by Interior, Department of
Listing $1,176,477.86 in stimulus funds from Interior, Department of for Cowlitz
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ALLEN BRADBURY CONSTRUCTION LLC | $298,517 |
Initial award is for performing the scope visit only. The Mod 0001 issued 12/22/09 includes the construction for replacing the hatchery roof. MOD 0002 dated 3/31/10 is to demolish the Sand Feeder Shed. MOD 0003 changes delivery date only.
This spending item is part of a $562,468 allocation.
See details
|
U.S. Fish and Wildlife Service | 11/23/2009 |
ANC RESEARCH & DEVELOPMENT, LLC | $245,552 | The mission of the Abernathy Fish Technology Center is to provide leadership in the scientifically based management of national fishery resources through development of new concepts and techniques to solve specific problems in aquatic restoration and reco | U.S. Fish and Wildlife Service | 12/23/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $164,850 | ABERNATHY FISH TECH CENTER REHAB WATER METER SYSTEM | U.S. Fish and Wildlife Service | 12/24/2009 |
CHG BUILDING SYSTEMS, INC | $159,259 |
Initial award is for performing the scope visit only. The Mod 0001 issued 12/22/09 includes the construction for replacing the hatchery roof. MOD 0002 dated 3/31/10 is to demolish the Sand Feeder Shed. MOD 0003 changes delivery date only.
This spending item is part of a $562,468 allocation.
See details
|
U.S. Fish and Wildlife Service | 11/23/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $127,316 | ABERNATHY FISH TECH CENTER EARTHEN SETTLING BASIN | U.S. Fish and Wildlife Service | 12/29/2009 |
MASTER CRAFT ELECTRIC, INC. | $104,692 |
Initial award is for performing the scope visit only. The Mod 0001 issued 12/22/09 includes the construction for replacing the hatchery roof. MOD 0002 dated 3/31/10 is to demolish the Sand Feeder Shed. MOD 0003 changes delivery date only.
This spending item is part of a $562,468 allocation.
See details
|
U.S. Fish and Wildlife Service | 11/23/2009 |
HDR ENGINEERING, INC. | $58,043 | Perform the following services for the construction of waste water outfall from the Nippo Paper Industries (NPI) paper mill's water treatment plan: on-site inspections; special inspections; administration of the construction contract; office services; an | National Park Service | 7/08/2010 |
FIVE RIVERS CONSTRUCTION, INC. | $18,250 |
Design, Fabricate ad Install an new Electro-Anthesia Unit at Lt White Salmon Fish Hatchery. Deliverables include an EA-1000A systems, A refurbished Basket system and interial buidling improvements - Electrical and mechanical to support the new system.
This spending item is part of a $99,999 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/23/2010 |