Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Jefferson County, Wash., funds by Interior, Department of

Listing $801,671.00 in stimulus funds from Interior, Department of for Jefferson

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
BURTON CONSTRUCTION, INC. $536,971 Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation. See details
U.S. Fish and Wildlife Service 3/12/2010
SLOAN'S ENTERPRISE OF AMBOY, LLC $64,494 This project is to repair the raceway headbox and walkway Deck at the Quilcene National Fish Hatchery (NFH). The concrete headbox structure, which serves nine 8' x 80'raceways, is severely deteriorated. Metal channels that provide support to the concret
This spending item is part of a $105,139 allocation. See details
U.S. Fish and Wildlife Service 9/25/2009
NORTHERN MANAGEMENT SERVICES, INC. $48,274 This project involves the removal of accumulated sediments from the hatchery?s settling ponds. Prior to removing the accumulated sediments, these sediments are to be tested for the presence of toxic substances. If no toxic substances are detected, the s
This spending item is part of a $82,024 allocation. See details
U.S. Fish and Wildlife Service 11/25/2009
Power Trip Energy Co $38,662 Provide all supervision, labor, materials, tools equipment and transportation necessary to replace cedar shake and standing seam metal roofing on eleven structures, one with the supply and installation of a photovoltaic system on one of the eleven structu
This spending item is part of a $242,820 allocation. See details
National Park Service 5/01/2010
Marugg Farms $33,750 This project involves the removal of accumulated sediments from the hatchery?s settling ponds. Prior to removing the accumulated sediments, these sediments are to be tested for the presence of toxic substances. If no toxic substances are detected, the s
This spending item is part of a $82,024 allocation. See details
U.S. Fish and Wildlife Service 11/25/2009
NORTHERN MANAGEMENT SERVICES, INC. $33,145 This project is to repair the raceway headbox and walkway Deck at the Quilcene National Fish Hatchery (NFH). The concrete headbox structure, which serves nine 8' x 80'raceways, is severely deteriorated. Metal channels that provide support to the concret
This spending item is part of a $105,139 allocation. See details
U.S. Fish and Wildlife Service 9/25/2009
SMITH-ROOT, INC. $18,000 ELECTRIC WEIR REPAIR AT THE QUILCENE NATIONAL FISH HATCHERY PER AT SOW. U.S. Fish and Wildlife Service 9/18/2009
Tracy's Insulation $12,622 Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation. See details
U.S. Fish and Wildlife Service 3/12/2010
MWH AMERICAS, INC. $7,500 This project is to repair the raceway headbox and walkway Deck at the Quilcene National Fish Hatchery (NFH). The concrete headbox structure, which serves nine 8' x 80'raceways, is severely deteriorated. Metal channels that provide support to the concret
This spending item is part of a $105,139 allocation. See details
U.S. Fish and Wildlife Service 9/25/2009
ALARM CENTER, INC. $5,410 Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation. See details
U.S. Fish and Wildlife Service 3/12/2010
Schatz Services Unlimited Inc. $1,905 Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation. See details
U.S. Fish and Wildlife Service 3/12/2010
Dynamics Northwest, Inc. $939 Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation. See details
U.S. Fish and Wildlife Service 3/12/2010