Jefferson County, Wash., funds by Interior, Department of
Listing $801,671.00 in stimulus funds from Interior, Department of for Jefferson
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
BURTON CONSTRUCTION, INC. | $536,971 |
Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/12/2010 |
SLOAN'S ENTERPRISE OF AMBOY, LLC | $64,494 |
This project is to repair the raceway headbox and walkway Deck at the Quilcene National Fish Hatchery (NFH). The concrete headbox structure, which serves nine 8' x 80'raceways, is severely deteriorated. Metal channels that provide support to the concret
This spending item is part of a $105,139 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/25/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $48,274 |
This project involves the removal of accumulated sediments from the hatchery?s settling ponds. Prior to removing the accumulated sediments, these sediments are to be tested for the presence of toxic substances. If no toxic substances are detected, the s
This spending item is part of a $82,024 allocation.
See details
|
U.S. Fish and Wildlife Service | 11/25/2009 |
Power Trip Energy Co | $38,662 |
Provide all supervision, labor, materials, tools equipment and transportation necessary to replace cedar shake and standing seam metal roofing on eleven structures, one with the supply and installation of a photovoltaic system on one of the eleven structu
This spending item is part of a $242,820 allocation.
See details
|
National Park Service | 5/01/2010 |
Marugg Farms | $33,750 |
This project involves the removal of accumulated sediments from the hatchery?s settling ponds. Prior to removing the accumulated sediments, these sediments are to be tested for the presence of toxic substances. If no toxic substances are detected, the s
This spending item is part of a $82,024 allocation.
See details
|
U.S. Fish and Wildlife Service | 11/25/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $33,145 |
This project is to repair the raceway headbox and walkway Deck at the Quilcene National Fish Hatchery (NFH). The concrete headbox structure, which serves nine 8' x 80'raceways, is severely deteriorated. Metal channels that provide support to the concret
This spending item is part of a $105,139 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/25/2009 |
SMITH-ROOT, INC. | $18,000 | ELECTRIC WEIR REPAIR AT THE QUILCENE NATIONAL FISH HATCHERY PER AT SOW. | U.S. Fish and Wildlife Service | 9/18/2009 |
Tracy's Insulation | $12,622 |
Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/12/2010 |
MWH AMERICAS, INC. | $7,500 |
This project is to repair the raceway headbox and walkway Deck at the Quilcene National Fish Hatchery (NFH). The concrete headbox structure, which serves nine 8' x 80'raceways, is severely deteriorated. Metal channels that provide support to the concret
This spending item is part of a $105,139 allocation.
See details
|
U.S. Fish and Wildlife Service | 9/25/2009 |
ALARM CENTER, INC. | $5,410 |
Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/12/2010 |
Schatz Services Unlimited Inc. | $1,905 |
Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/12/2010 |
Dynamics Northwest, Inc. | $939 |
Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA
This spending item is part of a $607,549 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/12/2010 |