Walla Walla County, Wash., funds by U.S. Army Corps of Engineers
Listing $4,068,574.00 in stimulus funds from U.S. Army Corps of Engineers for Walla Walla
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
FOWLER GENERAL CONSTRUCTION, INC. | $1,072,938 | Ice Harbor Charbonneau and Fishhook Parks Electrical Upgrade | U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
EXTREME COATINGS, INC. | $1,005,511 | Charbonneau Park Water Treatment Facility - Construction Project | U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
ANDERSON PERRY & ASSOCIATES, INCORPORATED | $639,262 | As part of an Engineering effort on the National Levee Inspection Program, ARRA funds are being used to inspect levees in the Walla Walla District. This work is for a consultant to perform the inspections and prepare periodic inspection reports. | U.S. Army Corps of Engineers - civil program financing only | 11/30/2009 |
EHS-INTERNATIONAL, INC. | $329,196 | Recommendation Regarding Collection History and Native American and Cultural Affiliation Documentation for Human Remains and Funerary Objects in Walla Walla District Collections. This fulfills Native American Graves Protection and Repatriation Act (NAGPRA | U.S. Army Corps of Engineers - civil program financing only | 1/13/2010 |
GRANITE NORTHWEST, INC. | $299,229 |
Road Repair / Paving @ Ice Harbor Dam - on North Shore Access, BST 5929 SY; sealing cracks 5540 SY; pavement repair 100 SF; pavement markings 600 LF, life jacket graphic. Charbonneau Park - BSF 17,894 SY; sealing cracks 15,900 LF; pavement repair 40 SF; p
This spending item is part of a $437,724 allocation.
See details
|
U.S. Army Corps of Engineers - civil program financing only | 9/22/2009 |
CATES & ERB, INC. | $181,913 | As a part of a construction effort at Ice Harbor Charbonneau Park, ARRA funds are being used to construct a wetland to process the waste water fenerated from the Park's newly constructed water treatment facility. The construction work is being performed b | U.S. Army Corps of Engineers - civil program financing only | 4/23/2010 |
COLUMBIA RURAL ELECTRIC ASSOCIATION INC. | $103,702 | ELECTRIC UTILITY CONNECTION CHARGES. | U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
ANDERSON PERRY & ASSOCIATES, INCORPORATED | $81,596 | Charbonneau Park Potable Water System Upgrade - Engineering During Construction | U.S. Army Corps of Engineers - civil program financing only | 9/27/2009 |
ANDERSON PERRY & ASSOCIATES, INC. | $81,596 | As part of an Engineering design effort on the Charbonneau Park Recreational area potable water project, ARRA funds are being used for construction assistance by the Engineer of record during construction of the new water filtration system. | U.S. Army Corps of Engineers - civil program financing only | 9/27/2009 |
SHANNON & WILSON, INC. | $69,654 | As a part of a DSAC interim risk reduction plan effort at Lucky Peak Dam, ARRA funds are being used to assess the dam's safety. The geotechnical engineering work is being performed by Shannon-Wilson, Inc. in Seattle, WA under the direction of the US Corps | U.S. Army Corps of Engineers - civil program financing only | 7/27/2009 |
ANDERSON PERRY & ASSOCIATES, INCORPORATED | $43,117 | Charbonneau Park Water System - Final Design Upgrades | U.S. Army Corps of Engineers - civil program financing only | 8/14/2009 |
ANDERSON PERRY & ASSOCIATES, INC. | $43,117 | Charbonneau Park Water System Final Design upgrades | U.S. Army Corps of Engineers - civil program financing only | 8/14/2009 |
JOHNSON, HARRY PLUMBING & EXCAVATION INC | $32,250 | Demolition of existing restrooms at Swallows boatramp. greenbelt ramp and chestnut beach rec. area | U.S. Army Corps of Engineers - civil program financing only | 9/11/2009 |
R. J. THOMAS MANUFACTURING COMPANY, INC. | $26,018 | FURNISH & DELIVER PICNIC TABLES to Burbank, WA | U.S. Army Corps of Engineers - civil program financing only | 8/04/2009 |
ASM AFFILIATES INC | $24,646 | Archaeology Monitoring of ground disturbance for Charbonneau and Fishhook Park during scheduled electrical systems upgrad work, Ice Harbor Project. | U.S. Army Corps of Engineers - civil program financing only | 12/16/2009 |
ANDERSON PERRY & ASSOCIATES, INC. | $12,035 | Levee Inspection Workshop | U.S. Army Corps of Engineers - civil program financing only | 8/05/2009 |
ANDERSON PERRY & ASSOCIATES, INCORPORATED | $12,034 | Levee Inspection Workshop - Training Workshop | U.S. Army Corps of Engineers - civil program financing only | 8/06/2009 |
ROGERS SURVEYING INC | $10,760 | Charbonneau Potable Water System - Topographic survey | U.S. Army Corps of Engineers - civil program financing only | 6/23/2009 |