Browse All Approved Stimulus Highway Projects
Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
| State | County | Project Number | Project Description | Improvement Type | ARRA Funds Obligated |
|---|---|---|---|---|---|
| NEBRASKA | DOUGLAS, LANCASTER, STATEWIDE | STWD093 | Preliminary Engineering | Other | $997,500 |
| NEVADA | CLARK | 932002 | Overlay Plantmix Bituminous Surface | Pavement Improvement | $8,839,236 |
| NEVADA | CARSON CITY, LYON | 32071 | Continuation of Rail Line for Historic Rail Road | Transportation Enhancements | $2,757,000 |
| NEVADA | HUMBOLDT | 289001 | Cold in Place Recycle | Pavement Improvement | $1,011,170 |
| NEVADA | STATEWIDE | 318013 | Overlay Plantmix Bituminous Surface | Pavement Improvement | $14,016,262 |
| NEVADA | PERSHING | 802052 | Overlay Plantmix Bituminous Surface | Pavement Improvement | $12,349,915 |
| NEVADA | LANDER | 803059 | Overlay Plantmix Bituminous Surface | Pavement Improvement | $2,587,040 |
| NEVADA | HUMBOLDT | 13019 | Cold in Place Recycle | Pavement Improvement | $1,588,585 |
| NEVADA | ELKO | 935006 | Overlay Plantmix Bituminous Surface | Pavement Improvement | $10,645,650 |
| NEVADA | ELKO | 935007 | Construct a Wildlife Overpass | New Bridge Construction | $2,372,433 |
| NEVADA | CLARK | 951041 | Construct a Visitor Center | Other | $575,000 |
| NEVADA | CLARK | 952055 | Various landscaping and aesthetic proejct on US95 in Clark County, NV. | Transportation Enhancements | $6,450,944 |
| NEVADA | NYE | 952056 | Overlay Plantmix Bituminous Surface | Pavement Improvement | $3,010,930 |
| NEVADA | HUMBOLDT | 956007 | Cold in Place Recycle | Pavement Improvement | $1,191,458 |
| NEVADA | HUMBOLDT | 956008 | Cold in Place Recycle | Pavement Improvement | $3,256,353 |
| NEW HAMPSHIRE | MERRIMACK | A000342 | KING ST SIDEWALK CONNECTOR: CONSTRUCT SIDEWALKS ALONG NORTH MAIN ST FORM EXISTING SIDEWALK TO INTERSECTION OF US 3/4 & FROM US 3/4 INTERSECTION TO RIVER RD CONNECTING WITH EXISTING SIDEWALK ON KING ST | Transportation Enhancements | $484,050 |
| NEW HAMPSHIRE | ROCKINGHAM | A000127 | EXIT 3 AREA, NB MAINLINE CONSTRUCTION FROM SALEM TOWN LINE TO MILE MARKER 6.3, INCLUDING INTERIM TRANSITIONS, AND APPROXIMATELY 3700 I.f. OF SB MAINLINE RECONSTRUCTION NORTH OF EXIT 3 (WINDHAM) | New Construction | $27,135,146 |
| NEW HAMPSHIRE | HILLSBOROUGH | A000258 | WIDEN FE EVERETT TURNPIKE | Pavement Widening | $10,365,671 |
| NEW HAMPSHIRE | HILLSBOROUGH | A000341 | VILLAGE PEDESTRIAN IMPROVEMENTS: RECONSTRUCT APPROX. 2,800' OF ROADSIDE IN THE VILLAGE TO RESTORE DEFINITION OF PEDESTRIAN ACCESS BY WAY OF SIDEWALKS AND CROSSWALKS. RECONSTRUCT SIDEWALKS, DELINEATI | Transportation Enhancements | $617,600 |
| NEW HAMPSHIRE | HILLSBOROUGH | A000095 | CONSTRUCT 4,000 LF OF 5' WIDE BITUMINOUS SIDEWALK ON ONE SIDE & CONSTRUCT 4000 LF OF 4' WIDE BITUMINOUS & BICYCLE LANE ON ONE SIDE: LOCATED ON THE EAST SIDE OF NH 102 BETWEEN EVERGREEN DRIVE AND MEGAN | Transportation Enhancements | $357,000 |
| NEW HAMPSHIRE | BELKNAP | A000349 | LACONIA - OPECHEE - WINNISQUAM (WOW) TRAIL PHASE 1 - CONSTRUCT 7040' (Segments 7-10) SHARED USE PATH FOR BICYCLES & PEDESTRIANS IN RAILROAD CORRIDOR FROM MAIN ST (Laconia) TO ELM ST (Lakeport) (Phase | Transportation Enhancements | $560,900 |
| NEW HAMPSHIRE | HILLSBOROUGH | A000390 | EARTHWORK CONTRACT WEST OF THE MERRIMACK RIVER | New Construction | $8,523,588 |
| NEW HAMPSHIRE | HILLSBOROUGH | A000566 | ALBUQUERQUE AVENUE TRAIL COMPLETION: CONSTRUCT 0.85 MILES AND 0.95 MILES OF PEDESTRIAN BIKEWAY ADJACENT TO ALBUQUERQUE AVENUE (TE Program) [06-26TE][ARRA] | Transportation Enhancements | $462,525 |
| NEW HAMPSHIRE | ROCKINGHAM | A000620 | 3 1/2" PAVEMENT OVERLAY FROM EXIT 6 IN EPPING TO SQUAMSCOTT RIVER BRIDGE IN EXETER | Pavement Improvement | $7,817,109 |
| NEW HAMPSHIRE | STATEWIDE | A000837 | EXIT 12A NORTH TO EXIT 13, MICROSURFACING OF TW ONLY (7.3 MILES) | Pavement Improvement | $1,129,625 |
| NEW HAMPSHIRE | STATEWIDE | A000876 | RESURFACING & OTHER RELATED WORK (BET-RES*581) [ARRA] | Pavement Improvement | $3,129,935 |
| NEW HAMPSHIRE | MERRIMACK | A000839 | EXIT 14 NORTH TO EXIT 17, 1.5" TW INLAY WITH 1.5" FULL WIDTH OVERLAY (6.1 MILES) [Parents = IPPP*3927, BRPPI 6601 AND GRR 785] [ARRA] | Pavement Improvement | $5,356,186 |
| NEW HAMPSHIRE | STATEWIDE | A000840 | EXIT 19 NORTH TO EXIT 22, LEVEL .5" AND 1" OVERLAY (3.5 MILES) [PARENT = IPPP*3927 & BRPPI*6601] [ARRA] | Pavement Improvement | $2,188,626 |
| NEW HAMPSHIRE | GRAFTON | A000841 | I-93 NB AND SB; PAVEMENT REHABILITATION FROM EXIT 27 NORTH TO EXIT 28 (3.1 MILES) PARENT= IPPP*3927 & BRPPI*6601] [ARRA] | Pavement Improvement | $908,540 |
| NEW HAMPSHIRE | ROCKINGHAM | A000842 | PORTSMOUTH TRAFFIC CIRCLE TO HIGH LEVEL BRIDGE, LEVEL AND 1.5" OVERLAY (1.6 MILES) [PARENT = IPPP*3927] [ARRA] | Pavement Improvement | $3,470,149 |
| NEW HAMPSHIRE | GRAFTON | A000843 | EXIT 30 TO EXIT 32, 2" FULL WIDTH INLAY (5.4 MILES) [PARENT = IPPP*3927 & BRPPI 6601] [ARRA] | Pavement Improvement | $8,082,360 |
| NEW HAMPSHIRE | STATEWIDE | A000845 | EXIT 23 NORTH TO EXIT 24, 1" OVERLAY WITH .5" LEVEL (6.1 MILES) [PARENT = IPPP*3927] [ARRA] | Pavement Improvement | $3,924,108 |
| NEW HAMPSHIRE | MERRIMACK | A000846 | EXIT 11 NORTH TO EXIT 12A, 1.5" FULL WIDTH INLAY (4.9 MILES) | Pavement Improvement | $5,315,917 |
| NEW HAMPSHIRE | STATEWIDE | A000871 | DISTRICT 1: RESURFACING & OTHER RELATED WORK | Pavement Improvement | $3,309,050 |
| NEW HAMPSHIRE | STATEWIDE | A000872 | DISTRICT 2: RESURFACING & OTHER RELATED WORK | Pavement Improvement | $3,212,580 |
| NEW HAMPSHIRE | STATEWIDE | A000873 | DISTRICT 3: RESURFACING & OTHER RELATED WORK | Pavement Improvement | $3,127,940 |
| NEW HAMPSHIRE | STATEWIDE | A000874 | RESURFACING & OTHER RELATED WORK (BET-RES*581) [ARRA] | Pavement Improvement | $2,765,000 |
| NEW HAMPSHIRE | STATEWIDE | A000875 | RESURFACING & OTHER RELATED WORK (BET-RES*581) [ARRA] | Pavement Improvement | $3,131,447 |
| NEW HAMPSHIRE | MERRIMACK | A000838 | NORTH MAIN STREET EAST TO NH9, MICROSURFACING OF TW ONLY (4.9 MILES) [Parent = IPPP*3927] [ARRA] | Pavement Improvement | $817,740 |
| NEW JERSEY | CAPE MAY | 7109 | This project replaces the two bascule bridges located closest to Somers Point and Ocean City at Ship Channel and Beach Thorofare, respectively, with high level fixed span (55` clearance) bridges & eli | Bridge Replacement | $70,000,000 |
| NEW JERSEY | ATLANTIC | 16157 | Project provides for milling and resurfacing within exiting pavement limits. | Pavement Improvement | $2,339,513 |
| NEW JERSEY | CAMDEN | 16158 | Drainage project including the construction of inlets, pipes, detention basins and outfalls. In addition, milling and resurfacing of Rt 30 is included in the project scope of work to address the wet | Pavement Improvement | $14,830,877 |
| NEW JERSEY | OCEAN | 19110 | The project involves deck repair, curb repair and applying deck overlay system on the entire deck of Rt.72 Over Manhawkin Bay bridge. | Bridge Improvement | $6,937,485 |
| NEW JERSEY | MIDDLESEX | 29163 | Final design work for bridge deck replacement | Other | $1,231,167 |
| NEW JERSEY | HUNTERDON | 31124 | The project involves roadway & drainage improvements on Route 29 in West Amwell Township & City of Lambertville. The proposed Smart Solutions scope includes pavement resurfacing, profile and cross-sl | Pavement Improvement | $2,689,584 |
| NEW JERSEY | HUNTERDON | 31125 | ROUTE 29 WEST AMWELL TOWNSHIP DRAINAGE (SHEET FLOW) | Other | $168,405 |
| NEW JERSEY | HUDSON | 33274 | This project will paint two Route 1&9 Truck movable bridges over the Hackensack and Passaic Rivers. | Pavement Improvement | $30,563,320 |
| NEW JERSEY | MERCER | 33277 | Milling and resurfacing of pavement to extend the usable life of the highway. Existing underclearances will be maintained. Drainage work will be limited to resetting of existing facilities. | Pavement Improvement | $4,664,536 |
| NEW JERSEY | MIDDLESEX | 34109 | Replace the bridge decks of Rt 440 NB over Ramp WI and Ramp WK over CR 514. Both bridges are within the interchange of RT 440, CR 514 and NJTA exit 10. | Pavement Improvement | $5,909,780 |
| NEW JERSEY | MIDDLESEX | 34110 | Final design work for bridge deck replacement | Other | $1,015,247 |