Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
| State | County | Project Number | Project Description | Improvement Type | ARRA Funds Obligated |
|---|---|---|---|---|---|
| NORTH DAKOTA | GRAND FORKS | 6986087 | APPROX. 0.06 MILES OF Traffic Signal | Pavement Improvement | $409,480 |
| NORTH DAKOTA | GRAND FORKS | 6986090 | APPROX. 2.42 MILES OF Seal Coat | Pavement Improvement | $258,000 |
| NORTH DAKOTA | GRAND FORKS | 6986091 | APPROX. 1.56 MILES OF Seal Coat | Pavement Improvement | $57,000 |
| NORTH DAKOTA | GRAND FORKS | 6986092 | APPROX. 0.73 MILES OF Seal Coat | Pavement Improvement | $42,600 |
| NORTH DAKOTA | GRAND FORKS | 6986093 | APPROX. 0.48 MILES OF Seal Coat | Pavement Improvement | $28,000 |
| NORTH DAKOTA | GRAND FORKS | 6986096 | APPROX. 1.06 MILES OF Concrete Panel Replacement, Mill & Overlay, 3" | Pavement Improvement | $244,479 |
| NORTH DAKOTA | GRAND FORKS | 6986099 | APPROX. 1.96 MILES OF Concrete Panel Replacement | Pavement Improvement | $570,000 |
| NORTH DAKOTA | MCKENZIE | 7023027 | APPROX. 16.4088 MILES OF Hot Bit Pave | Pavement Improvement | $4,119,484 |
| NORTH DAKOTA | MCKENZIE | 7023029 | APPROX. 19.2917 MILES OF Thin Overlay | Pavement Improvement | $2,666,789 |
| NORTH DAKOTA | WILLIAMS | 7804034 | APPROX. 28.8011 MILES OF Thin Overlay | Pavement Improvement | $4,568,080 |
| NORTH DAKOTA | WILLIAMS | 7993030 | APPROX. 0.487 MILES OF Mill & Overlay, Install ADA Ramps, Replace Driveways and Alley Returns, Replace Asphalt at 9th Ave Intersection | Pavement Improvement | $240,000 |
| NORTH DAKOTA | WILLIAMS | 7993031 | APPROX. 0.33 MILES OF Mill & Overlay, Sidewalks, driveways & curbramps | Pavement Improvement | $108,686 |
| NORTH DAKOTA | WILLIAMS | 7993032 | APPROX. 0.675 MILES OF Mill & Overlay, Sidewalks, driveways & curbramps | Pavement Improvement | $260,000 |
| NORTH DAKOTA | WILLIAMS | 7993033 | APPROX. 0.7 MILES OF Mill & Overlay, Replace asphalt Valley Gutters with concrete | Pavement Improvement | $210,000 |
| NORTH DAKOTA | CASS | 8010034 | APPROX. 1.54 MILES OF Mill & Overlay | Pavement Improvement | $495,000 |
| NORTH DAKOTA | RICHLAND | 8029099 | APPROX. 21.5657 MILES OF CPR | Pavement Improvement | $1,429,478 |
| NORTH DAKOTA | RICHLAND | 8029104 | APPROX. 21.5629 MILES OF CPR | Pavement Improvement | $1,624,872 |
| NORTH DAKOTA | CASS | 8984116 | APPROX. 1.487 MILES OF Mill & Overlay | Pavement Improvement | $362,500 |
| NORTH DAKOTA | CASS | 8984118 | APPROX. 1.94 MILES OF Overlay, Concrete Pavement Repair | Pavement Improvement | $380,000 |
| NORTH DAKOTA | CASS | 8984119 | APPROX. 10.075 MILES OF Pavement Marking | Pavement Improvement | $400,000 |
| NORTH DAKOTA | RICHLAND | 8991021 | APPROX. 0.658 MILES OF CPR, Spall repairs, Panel repairs, & Misc | Pavement Improvement | $102,000 |
| NORTH DAKOTA | RICHLAND | 8991022 | APPROX. 0.34 MILES OF CPR, Spall repairs, Panel repairs, & Misc | Pavement Improvement | $41,000 |
| NORTH DAKOTA | RICHLAND | 8991023 | APPROX. 0.698 MILES OF CPR, Spall repairs, Panel repairs, & Misc | Pavement Improvement | $56,000 |
| NORTH DAKOTA | RICHLAND | 8991024 | APPROX. 0.747 MILES OF Cracks sealing, Patching, & Seal Coat | Pavement Improvement | $62,000 |
| NORTH DAKOTA | RICHLAND | 8991025 | APPROX. 1.69 MILES OF Seal Coat, Restriping | Pavement Improvement | $152,000 |
| NORTH DAKOTA | CASS | 8992031 | APPROX. 5.24 MILES OF Mill & Overlay | Pavement Improvement | $1,226,294 |
| NORTH DAKOTA | RICHLAND | 8991027 | APPROX. 0.435 MILES OF Mill & Overlay - 2"-3", Patching | Pavement Improvement | $119,400 |
| NORTH DAKOTA | RICHLAND | 8991028 | APPROX. 0.794 MILES OF Patching, Mill & Overlay, < 2" | Pavement Improvement | $106,984 |
| NORTH DAKOTA | RICHLAND | 8991026 | APPROX. 0.487 MILES OF Mill & Overlay | Pavement Improvement | $171,000 |
| OHIO | LUCAS | E031995 | Priority system preventive maintenance project on LUC-75 from North Cove bridge to Cecilia, perform necessary related work. (No warranty) | Pavement Improvement | $1,286,250 |
| OHIO | CRAWFORD | E032086 | 2-LANE RESURFACINGBridge Work entered 10/17/06Major 2 Funds (1,382,085) approved 12/15/08 Aric Morse email | Pavement Improvement | $3,855,150 |
| OHIO | SUMMIT | E032369 | RECONSTRUCTION OF 15TH STREET BRIDGE OVER ABC RAILROAD IN BARBERTON AND PROFILE IMPROVEMENT. | Other | $10,000 |
| OHIO | JACKSON | E035110 | To maintain and preserve the pavement by making the necessary repairs and by overlaying the existing pavement with asphalt concrete. Urban Paving. FY2009Stimulus. | Pavement Improvement | $9,500,000 |
| OHIO | CLERMONT | E035574 | District Wide Bridge Repair project. | Bridge Improvement | $1,334,490 |
| OHIO | PREBLE | E035896 | Plane and pave portions of SR 732 in Preble County. Also to resurface Eaton Oxford Road, C-29, in from of the Morning Sun Outpost. | Pavement Improvement | $2,478,290 |
| OHIO | LICKING | E036406 | Resurfacing with related work. Mill 2" and fill 1-3/4" Inter and 1-1/2" surface; include work on ramps where appropriate/joint repair as necessary, include mill/fill of shoulders | Pavement Improvement | $6,210,000 |
| OHIO | JACKSON | E036464 | To maintain and preserve the existing pavement by making necessary repairs and by overlaying the existing pavement with asphalt concrete. | Pavement Improvement | $1,758,750 |
| OHIO | MIAMI | E040008 | PLANE AND RESURFACE THE EXISTING ROADWAY WITH ASPHALT CONCRETE AND OTHER ROADWAY RELATED ITEMS. | Pavement Improvement | $1,800,000 |
| OHIO | ATHENS | E040367 | Two-Lane Resurfacing Project. Ath 356 0.00-4.77. Includes ATH 682 5.96-7.75 And VIN 356 0.00-5.97. | Pavement Improvement | $803,850 |
| OHIO | TUSCARAWAS | E040567 | Replace existing bridge constructed in 1906 with a new multi-span multi-beam bridge, with sidewalks and pedestrian railing on both structure facias, on the existing hroizontal alignment and an improve | Transportation Enhancements | $160,944 |
| OHIO | HANCOCK | E040571 | Minor Rehabilitation Of IR75, Grind And Pave From North Of The CR109 Jct. To The Wood County Line. | Pavement Improvement | $1,128,069 |
| OHIO | HARDIN | E040577 | Resurfacing on SR37 and SR53. Includes resurfacing in the Village of Forrest. | Pavement Improvement | $291,000 |
| OHIO | LORAIN | E040597 | Replace 2 structures: LOR-18-0313 - 133' structure over West Branch of the Black River, and LOR-18-0486 - 133' structure over Charlemont Creek. | Bridge Replacement | $1,000,000 |
| OHIO | MUSKINGUM | E050443 | Resurfacing with related work Mill 2" and fill 1-3/4" Inter and 1-1/2" surface; joint repair as necessary | Pavement Improvement | $2,998,548 |
| OHIO | MERCER | E050631 | BRIDGE PAINTING. | Bridge Improvement | $199,500 |
| OHIO | HOCKING | E050633 | Two-lane resurfacing project using and asphalt overlay. HOC 180 7.52-16.27. | Pavement Improvement | $1,100,000 |
| OHIO | PICKAWAY | E051164 | BRIDGE REHABILITATION; 5 LOCATIONS.PIC-3.26 L/R over Congo Creek. PIC-3.68 L/R over Scippo Creek. PIC-23-7.98 L/R over Penn Central RR. PIC-23-8.76 over US-22. PIC-23-8.98 L/R over Hargus CreekPE | Bridge Improvement | $10,000,000 |
| OHIO | STARK | E051227 | Construct bicycle/pedestrian bridge at Deer Creek Dam spill way | Transportation Enhancements | $611,485 |
| OHIO | FRANKLIN | E051293 | FRA-71-1756. COLUMBUS. US40 OVER IR71.REPLACE BARRIER WALL AND VANDAL FENCE; BACKWALL REPAIR; ADD CURB RAMP.(FRA-71-17.02B structure was deleted from this PID, Columbus paved deck with asphalt on pavi | Bridge Improvement | $740,250 |
| OHIO | MONTGOMERY | E051298 | ROADWAY RECONSTRUCTION TO 5 LANES.(This project was originally programmed as MOT-CR99-22.34) | Pavement Improvement | $126,392 |