Browse All Approved Stimulus Highway Projects
Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
| State | County | Project Number | Project Description | Improvement Type | ARRA Funds Obligated |
|---|---|---|---|---|---|
| OHIO | SENECA | E060167 | REPLACE BRIDGE; PERFORM NECESSARY RELATED WORK. | Bridge Replacement | $1,575,119 |
| OHIO | TUSCARAWAS | E060275 | Construct New Full Interchange With CR80 , Minor Relocation Of Existing Frontage Road. High Priority Max 7.1M. | Bridge Improvement | $4,777,745 |
| OHIO | HURON | E060304 | Replace structurally deficient single span steel pony truss structure over the West Branch of the Huron River in the Village of Plymouth. The existing structure has a span of 42 feet and was built in | Bridge Replacement | $210,000 |
| OHIO | HANCOCK | E060317 | Add turn lanes on the north and west approaches of the intersection. | Safety/Traffic Management | $546,100 |
| OHIO | CRAWFORD | E060342 | full reconstruction of Sandusky Ave. in the City of Bucyrus between Charles Ave. and the Sandusky River Bridge. the length is approximately 2,700 feet or 0.51 miles. the facility utilizes one lane of | Pavement Improvement | $5,201,570 |
| OHIO | BELMONT | E060378 | general system resurfacing | Pavement Improvement | $692,630 |
| OHIO | PERRY | E060540 | Resurfacing with related work on a portion of US 22 in Perry County | Pavement Improvement | $1,548,481 |
| OHIO | LICKING | E060550 | Rehab bridges & superstucture, SFN's 4502434 & 6001025, on US 40 in Lic & Muskingum Counties | Bridge Improvement | $340,410 |
| OHIO | PUTNAM | E060605 | 2-Lane resurfacing on SR189, SR190 and SR694. Mill 1.5" and pave 1.5" with asphalt. | Pavement Improvement | $958,437 |
| OHIO | AUGLAIZE | E060946 | RESURFACE THE EXISTING ROADWAY WITH ASPHALT CONCRETE. | Pavement Improvement | $476,000 |
| OHIO | SHELBY | E060967 | Resurface The Existing Roadway With Asphalt Concrete. | Pavement Improvement | $1,260,000 |
| OHIO | HIGHLAND | E070048 | It is proposed to overlay the existing roadway w/concrete asphalt in order to preserve and maintain the highway. | Pavement Improvement | $549,730 |
| OHIO | LAWRENCE | E070064 | Replace Existing Deficient Bridge On Sr 217 Over Dick Creek And All Necessary Appraoch Work. 94-A | Bridge Replacement | $372,750 |
| OHIO | SCIOTO | E070067 | To Replace The Existing Structure On Usr 52 Over Gas Hollow With A New Structure & All Necessary Approach Work. 1993 "B" Bridge Program. | Bridge Replacement | $759,470 |
| OHIO | GEAUGA | E070129 | Resurfacing from US-422 to SR-168 in Troy and Burton Twps. | Pavement Improvement | $1,233,750 |
| OHIO | MUSKINGUM | E070130 | Resurfacing with related work on SR 60 | Pavement Improvement | $1,532,000 |
| OHIO | CLERMONT | E070273 | RESURFACE PORTIONS OF SR 232 IN CLERMONT COUNTY. | Pavement Improvement | $664,520 |
| OHIO | BELMONT | E070284 | general system- resurfacing - B8- Low Vol. OL (1 3/4") w/ chip seal and 2% full depth repairs: includes work at ODNR Brush Creek Wildlife area (TR 289) which was previously carried in PID 84891 | Pavement Improvement | $3,213,560 |
| OHIO | BELMONT | E070294 | Bridge Deck replacement | Bridge Improvement | $226,563 |
| OHIO | BELMONT | E070304 | 2 general system - poor performing pavements1 general system - minor rehab | Pavement Improvement | $841,960 |
| OHIO | ASHLAND | E070379 | REHABILITATE DEFICIENT 160' STRUCTURE OVER CLAREMONT AVEcoordinate with resurfacing PID:82298 RIC US 0042 16.37Stimulus Estimate 1,069,058 (cbrown 02/25/09)** Selected Stimulus project ** | Bridge Improvement | $1,216,228 |
| OHIO | CLERMONT | E070407 | Replace Bridge No. CLE-276-0104, SFN: 1304658. Bridge Carries SR 276 Over Kain Run. | Pavement Improvement | $354,570 |
| OHIO | CLINTON | E070412 | Replace Culvert No. CLI-124-0003 And Culvert No. CLI-350-1421 | Pavement Improvement | $283,500 |
| OHIO | BUTLER | E070422 | Minor rehabilitation on BUT US 27, US 127, and SR 122. | Pavement Improvement | $3,015,242 |
| OHIO | MAHONING | E070634 | Replace bridge railing. add decorative bridge lighting. Repair sandstone fascia brick on substructure. Upgrade bridge approach drainage, paint structural steel and add approach sidwalk to bridge and a | Transportation Enhancements | $400,000 |
| OHIO | GEAUGA | E070642 | Washington Street (A&B) resurfacing project. | Pavement Improvement | $500,000 |
| OHIO | GEAUGA | E070646 | Wilson Mills Road (A-C) resurfacing project. | Pavement Improvement | $750,000 |
| OHIO | CHAMPAIGN | E070751 | Resurface The Existing Roadway With Asphalt Concrete. | Pavement Improvement | $445,310 |
| OHIO | MEDINA | E070780 | resurface existing pavement and add paved shoulders to provide a new pavement surface and preserve the pavement structure | Pavement Improvement | $776,663 |
| OHIO | DARKE | E070781 | RESURFACE THE EXISTING ROADWAY WITH ASPHALT CONCRETE. | Pavement Improvement | $510,000 |
| OHIO | MEDINA | E070785 | resurface existing pavement and add paved shoulders to provide a new pavement surface and preserve the pavement structure | Pavement Improvement | $557,211 |
| OHIO | LOGAN | E070856 | Replace structure over the Great Miami River.PE and RW under PID #19740, LOG-274-4.78; on 04/30/07, CO split into two projects for bid letting--PID #19740, LOG-274-3.19 & PID #82785, LOG-274-4.78 | Bridge Replacement | $856,200 |
| OHIO | DARKE | E070933 | Resurfacing the existing roadway with Asphalt Concrete. | Pavement Improvement | $1,103,020 |
| OHIO | GUERNSEY | E070951 | 3" mill & fill with 1-3/4" intermediate and 1-1/4" surface and associated additional work on a portion of Interstate Route 77 in Guernsey County | Pavement Improvement | $1,604,000 |
| OHIO | PERRY | E070959 | Replace the deck and paint the structure on the SR 93 bridge | Bridge Improvement | $1,188,410 |
| OHIO | MAHONING | E071098 | Minor rehabilitatio/resurfacing.Additional resurfacing on US-62 and SR-170.On South Ave. (US 62) from Williamson to Woodland. | Pavement Improvement | $926,000 |
| OHIO | STARK | E071109 | Reconstruct & Rehab Of SR153 With New Curb And Gutters. Sidewalk Pavement Widening West Of California And Signals At California | Other | $330,000 |
| OHIO | SUMMIT | E071111 | Subsurface investigation of embankment slope failure along IR-271, southwest of Boston Heights in Summit County. | Pavement Improvement | $788,799 |
| OHIO | MAHONING | E080099 | Deck replacement, widening, and painting of two structures. | Bridge Improvement | $2,378,250 |
| OHIO | MEDINA | E080129 | REPLACE DEFICIENT 68' STRUCTURE (9.88) OVER RUDD CREEK** Selected Stimulus project ** | Bridge Replacement | $391,433 |
| OHIO | LORAIN | E080130 | REPLACE DEFICIENT 38' STRUCTURE OVER CARPENTER DITCH** Selected Stimulus project ** | Bridge Replacement | $427,996 |
| OHIO | MIAMI | E080519 | CONSTRUCT A MISSING LINK ON THE RIVER CORRIDOR BIKEWAY IN MIAMI COUNTY. PE AND SOME RW UNDER PID 77342. | Transportation Enhancements | $263,276 |
| OHIO | STARK | E080527 | Minor rehabilitation with bridge work.Centerline rumble strips from 23.94 (Neimans Avenue) to 25.88 (Mapleton Street) and from 26.93 (Rosehill Street) to 29.86 (Wynngate Street)Culvert replacements at | Pavement Improvement | $3,102,000 |
| OHIO | SHELBY | E080582 | Replace deficient (9-ft x 5-ft) bridge-type concrete culvert with a 4-sided precast concrete box. | Pavement Improvement | $146,678 |
| OHIO | COLUMBIANA | E080586 | general system resurfacing | Pavement Improvement | $1,196,180 |
| OHIO | CARROLL | E080587 | general system resurfacing. ARRA ODOT Tracking ID is 5985. | Pavement Improvement | $1,486,660 |
| OHIO | CARROLL | E080588 | general system resurfacing | Pavement Improvement | $523,950 |
| OHIO | COLUMBIANA | E080657 | Replace Box Beam bridge with steel beam superstructure. | Bridge Improvement | $672,000 |
| OHIO | WAYNE | E080696 | REHABILITATE 282' STRUCTURE OVER IR71Stimulus Estimate 1,696,927 (cbrown 02/13/09) | Bridge Replacement | $1,503,000 |
| OHIO | ERIE | E080699 | REPLACE TWIN 10 FT CMP ARCH OVER OLD WOMANS CREEK** Selected Stimulus project ** | Pavement Improvement | $321,491 |