Alabama • AL-07 Congressional District

Get Adobe Flash player

Total # Projects: 16
Total # Contracts: 12
Total $ Projects: $33,059,845
Total $ Contracts: $28,969,981

Congressmembers

Other Congressional Districts

Project $
AL-01 $15,313,914
AL-02 $43,073,630
AL-03 $95,540,260
AL-04 $73,751,549
AL-05 $57,000,655
AL-06 $89,927,933
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for AL-07. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
RESURFACE SR-7 (US-11) FROM GREENE COUNTY LINE TO JUST SOUTH OF WARRIOR RIVER BRIDGE AT FOSTERS AND HOLLY SPRINGS ROAD FROM SR-7 (US-11) TO JUST SOUTH OF THE I-20/59 INTERCHANGE (Federal ID: 0007519) S.T. BUNN CONST. CO. INC. Tuscaloosa Pavement Improvement $4,415,517
PLANING, PAVEMENT WIDENING AND RESURFACING SR-7 (US-11) FROM NORTH OF CR-208 (GREENETRACK RD.) TO TUSCALOOSA COUNTY LINE. FY2009 PHASE 2 (Federal ID: 0007520) S.T. BUNN CONST. CO. INC. Greene Pavement Improvement $3,357,073
RESURFACING AND TRAFFIC STRIPE ON SR-10 FROM SR-28 TO SR-41, FY2009 PHASE 2; (Federal ID: 0010520) SOUTHWEST AL CONST., LLC Wilcox Pavement Improvement $640,000
WIDENING, RESURFACING & TRAFFIC STRIPE ON SR-17 FROM 1.3 MILES SOUTH CR-18 TO 0.7 MILES NORTH OF CR-28 (Federal ID: 0017525) MOBILE ASPHALT CO., LLC Choctaw Pavement Improvement $1,145,181
RESURFACING & TRAFFIC STRIPE ON SR-17 FROM 0.7 MI NORTH OF CR-28 TO NORTH OF SOUTH BUTLER CITY LIMITS (Federal ID: 0017526) MOBILE ASPHALT CO., LLC Choctaw Pavement Improvement $1,127,799
FY 2010 PHASE 1, PLANING AND RESURFACING ON SR-17 FROM SR-28 TO CR-24 (Federal ID: 0017530) S.T. BUNN CONST. CO. INC. Sumter Pavement Improvement $2,709,873
RESURFACE & 2' WIDENING ON SR-22 FROM SR-5 TO SR-219 (FY2010 PHASE1) (Federal ID: 0022509) ASPHALT CONTRACTORS, INC. Dallas Pavement Improvement $8,094,353
PLANING, PAVEMENT WIDENING AND RESURFACING SR-25 FROM CR-29 TO BIBB COUNTY LINE, FY2009 PHASE 2 (Federal ID: 0025520) APAC MID-SOUTH, INC. Hale Pavement Improvement $1,603,367
WIDEN SR-69 FROM SR-13 (US-43) TO HALE COUNTY LINE (Federal ID: 0069521) ASPHALT CONTRACTORS, INC. Marengo Pavement Improvement $690,475
2 FT. SAFETY WIDENING, RESURFACE, AND CULVERT EXTENSION ON SR-69 FROM MARENGO/HALE COUNTY LINE TO SR-8 (US-80), FY2009 PHASE 2; (Federal ID: 0069525) ASPHALT CONTRACTORS, INC. Hale Pavement Improvement $483,257
RESURFACE & TRAFFIC STRIPE SR-69 FROM SR-13 (US-43) TO HALE COUNTY LINE (Federal ID: 0069529) ASPHALT CONTRACTORS, INC. Marengo Pavement Improvement $2,753,727
PLANING, PAVEMENT WIDENING AND RESURFACING SR-175 FROM SR-14 NEAR HEIBERGER TO SR-5, FY2009 PHASE 2 (Federal ID: 0175500) ASPHALT CONTRACTORS, INC. Perry Pavement Improvement $1,949,359
RESURFACE CR-12 FROM 2.25 MILES EAST OF SR-183 TO SR-5 - PCP 53-91-08 (Federal ID: 5303200) No Contractor Perry Pavement Improvement $265,000
RESURFACE CR-27 FROM MISSISSIPPI STATE LINE TO CR-2 & CR-2 FROM CR-27 TO SR-7 (US-11), INCLUDES CULVERT EXTENSIONS SCP 60-79-06 (Federal ID: 6020200) No Contractor Sumter Pavement Improvement $265,000
CR-18 (JEFFERSON AV) FR 50TH STREET TO CR-65 (40TH STREET) (PHASE I) (Federal ID: 7045601) No Contractor Jefferson Pavement Improvement $2,921,593
CR-126 (TARRANT-HUFFMAN RD) ADD LANES FROM TREADWELL RD TO EAST BRIARMONT DR (PHASE 1) (Federal ID: 7229601) No Contractor Jefferson Pavement Widening $3,706,164