California • CA-34 Congressional District
Top 10 Largest Contracts
Total # Projects: | 35 |
Total # Contracts: | 4 |
Total $ Projects: | $53,413,714 |
Total $ Contracts: | $3,004,000 |
Congressmembers
- Sen. Barbara Boxer (D) See Campaign Finances
- Sen. Dianne Feinstein (D) See Campaign Finances
- Rep. Lucille Roybal-Allard (D) See Campaign Finances
Other Congressional Districts
Project $ | |
---|---|
CA-01 | $31,850,728 |
CA-02 | $99,050,558 |
CA-03 | $25,212,824 |
CA-04 | $98,285,136 |
CA-05 | $5,836,013 |
CA-06 | $16,307,410 |
CA-07 | $14,603,000 |
CA-08 | $10,928,000 |
CA-09 | $26,023,494 |
CA-10 | $20,480,000 |
CA-11 | $36,600,605 |
CA-12 | $19,192,220 |
CA-13 | $12,181,000 |
CA-14 | $16,797,500 |
CA-15 | $9,791,000 |
CA-16 | $16,036,000 |
CA-17 | $23,238,255 |
CA-18 | $48,419,552 |
CA-19 | $34,298,005 |
CA-20 | $17,801,181 |
CA-21 | $28,355,982 |
CA-22 | $30,077,408 |
CA-23 | $21,888,769 |
CA-24 | $22,557,511 |
CA-25 | $45,344,019 |
CA-26 | $4,779,000 |
CA-27 | $19,853,000 |
CA-28 | $0 |
CA-29 | $9,792,500 |
CA-30 | $10,960,206 |
CA-31 | $0 |
CA-32 | $0 |
CA-32 | $17,215,361 |
CA-33 | $0 |
CA-35 | $16,523,706 |
CA-36 | $6,819,000 |
CA-37 | $18,233,609 |
CA-38 | $15,441,431 |
CA-39 | $12,105,387 |
CA-40 | $9,425,479 |
CA-41 | $13,212,828 |
CA-42 | $15,325,321 |
CA-43 | $128,116,032 |
CA-44 | $7,994,800 |
CA-45 | $57,578,012 |
CA-46 | $6,751,971 |
CA-47 | $6,792,704 |
CA-48 | $21,517,050 |
CA-49 | $109,245,664 |
CA-50 | $12,543,450 |
CA-51 | $85,414,053 |
CA-52 | $0 |
CA-53 | $4,002,427 |
Show/hide all |
Collaborate
These news organizations have followed up and written stories using this database:
- PBS NewsHour/Patchwork Nation analyzed how transportation stimulus funds were distributed across communities.
Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel
Questions? Tips?
About This Data
Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.
First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.
Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.
We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.
Read more...
Here are our tips for running background checks on stimulus contractors.
All projects for CA-34. Not all projects have been awarded contracts.
Project Name | Contractor | County | Improvement Type | Amount |
---|---|---|---|---|
BANDINI BOULEVARD FROM EASTERN AVENUE TO 26TH STREET. THE PROJECT CONSISTS IN AC OVERLAY AND MISCELLANEOUS CONCRETE WORK. (Federal ID: 5272009) | Unknown Company 14095 | Los Angeles | Pavement Improvement | $650,000 |
WILCOX AVENUE REHABILITATION FROM GAGE AVENUE TO RANDOLPH AVENUE. THE PROJECT CONSISTS IN AC OVERLAY, SIDEWALK, CURB AND GUTTER, DRIVEWAY REPLACEMENT AND MISCELLANEOUS CONCRETE WORK. (Federal ID: 5272010) | Unknown Company 4175 | Los Angeles | Pavement Improvement | $490,000 |
BLOOMFIELD AVENUE, BETWEEN ARTESIA BOULEVARD AND ALONDRA BOULEVARD: PAVEMENT REHABILITATION AND RESURFACING PROJECT, WHICH INCLUDES UPGRADES TO ACCESS RAMPS/CURB CUTS. (Federal ID: 5325012) | CITY OF CERRITOS | Los Angeles | Pavement Improvement | $1,100,000 |
LIVE OAT STREET STREET REHABILITATION PROJECT FROM WILCOX AVENUE TO SALT LAKE AVENUE. THE PROJECT CONSIST IN AN STREET RECONSTRUCTION, CURB, GUTTER AND CURB REPLACEMENT AND MISCELLANEOUS CONCRETE WORK (Federal ID: 5369008) | Unknown Company 61239 | Los Angeles | Pavement Improvement | $764,000 |
INSTALLATION OF LEFT TURN ARROWS CITYWIDE (Federal ID: 5006581) | No Contractor | Los Angeles | Safety/Traffic Management | $4,000,000 |
TRANSIT PRIORITY SYSTEM (TPS) AND ATSAC COMMUNICATION SYSTEM REHABILITATION (Federal ID: 5006582) | No Contractor | Los Angeles | Safety/Traffic Management | $6,000,000 |
SIGNAL LED RETROFIT PROGRAM - PHASE I. (Federal ID: 5006586) | No Contractor | Los Angeles | Safety/Traffic Management | $9,000,000 |
NEW TRAFFIC SIGNALS (Federal ID: 5006589) | No Contractor | Los Angeles | Safety/Traffic Management | $3,500,000 |
LOS ANGELES HIGHWAY-RAIL GRADE CROSSING SURFACE RECONSTRUCTION PROJECT - THE MAIN OBJECTIVE OF THIS PROJECT IS TO SIGNIFICANTLY IMPROVE HIGHWAY-RAIL GRADE CROSSING SURFACES CITYWIDE. MANY CROSSING SU (Federal ID: 5006590) | No Contractor | Los Angeles | Safety/Traffic Management | $7,932,000 |
HIGHWAY-RAIL GRADE CROSSING IMPROVEMENT SYSTEM. PROVIDE UPGRADES TO TRAFFIC SIGNAL EQUIPMENT AT HIGHWAY-RAIL GRADE CROSSINGS IN LA TO IMPROVE SAFETY, MOBILITY, AND ENHANCE THE OPERATIONS OF THE TRAFFI (Federal ID: 5006593) | No Contractor | Los Angeles | Safety/Traffic Management | $2,368,000 |
GREENLEAF AVENUE OVERLAY AND CLASS II BIKE LANES (Federal ID: 5111046) | No Contractor | Los Angeles | Pavement Improvement | $632,000 |
INTERSECTION OF SANTA GERTUDES AT STARBUCK ST , INSTALLATION OF NEW TRAFFIC SIGNAL. (Federal ID: 5111049) | No Contractor | Los Angeles | Safety/Traffic Management | $190,000 |
PAINTER AVENUE STREET LIGHT CONVERSION PROJECT. CONVERSION OF OLD 6,000 VOLT SERIES STREET LIGHTING SYSTEMS 120/240 VOLT MULTIPLE SYSTEMS, REPLACEMENT OF 70 WATT HPSV LUMINARIES WITH NEW ENERGY EFFICI (Federal ID: 5111052) | No Contractor | Los Angeles | Other | $300,000 |
LAUREL AVENUE FROM WHITTIER BOULEVARD (STATE ROUTE 72) TO LAMBERT ROAD. REMOVE AND REPLACE CONCRETE PAVEMENT WITH NEW PORTLAND CEMENT CONRETE PAVEMENT. REPLACE DAMAGED CURB AND GUTTER. CONSTRUCT ADA W (Federal ID: 5111053) | No Contractor | Los Angeles | Pavement Improvement | $300,000 |
LA CUARTA STREET FROM WHITTIER BLVD (SR 72) TO COLLEGE AVENUE. REMOVE/REPLACE CONCRETE PAVMT WITH ASPHALT CONCRETE AND/OR PORTLAND CEMENT CONCRETE PAVEMENT. REMOVE AND REPLACE DAMAGED CURB AND GUTTER. (Federal ID: 5111054) | No Contractor | Los Angeles | Pavement Improvement | $760,000 |
SLAUSON AVENUE/MULBERRY DRIVE RESURFACING FROM WEST CITY LIMITS AT CHETLE AVENUE TO THE EAST CITY LIMITS EAST OF GREENLEAF AVENUE. (Federal ID: 5111055) | No Contractor | Los Angeles | Pavement Improvement | $204,000 |
INTERSECTION OF MAR VISTA STREET AND CALIFORNIA AVENUE. RECONSTRUCT INTERSECTION, INSTALL UNDERGROUND CROSS CULVERTS TO ELIMINATE CROSS GUTTERS. IMPROVE TRAFFIC FLOW, DRAINAGE, ELIMINATE VEHICLE BOT (Federal ID: 5111056) | No Contractor | Los Angeles | Pavement Improvement | $160,000 |
26TH STREET IMPROVEMENT FROM ALAMEDA TO EAST OF DOWNEY ROAD. REHABILITATION OF PAVEMENT, SIDEWALK, CURB, GUTTER, DRIVE APPROACHES, INTERSECTION IMPROVEMENTS, AND TRAFFIC SIGNAL IMPROVEMENTS (Federal ID: 5139011) | No Contractor | Los Angeles | Pavement Improvement | $500,000 |
COMPLETE REHABILITATION OF 1.3 MILE LENGTH OF GOLDEN HILLS ROAD FROM SAN DIMAS CANYON TO ESPERANZA DRIVE.�� (Federal ID: 5149005) | No Contractor | Los Angeles | Pavement Improvement | $800,000 |
ARROW HIGHWAY, FROM CITY LIMIT TO CITY.REHABILITATION, RECONSTRUCTION, PEDESTRIAN IMPROVEMENTS, BIKE LANES, AND STREET LIGHTING. ASPHALT PAVEMENT, DAMAGED CURB AND GUTTER, DAMAGED SIDEWALK, HANDICAP R (Federal ID: 5162017) | No Contractor | Los Angeles | Pavement Improvement | $895,000 |
► LOCATION: THROUGHOUT CITY. ► NATURE OF PROJECT (PROJECT TYPE): REHABILITATION, RECONSTRUCTION. THIS PROJECT WILL ALLOW FOR IMPROVED PEDESTRIAN ACCESS THROUGHOUT THE CITY. ► (Federal ID: 5162018) | No Contractor | Los Angeles | Transportation Enhancements | $948,746 |
PROJECT CONSISTS OF MODIFYING THE TRAFFIC SIGNALS AT THE INTERSECTIONS OF SUNSET AVENUE AT PUENTE AVENUE, LARK ELLEN AVENUE AT PUENTE AVENUE AND NOGALES STREET AT AMANDA STREET. MODIFICATION INCLUDES (Federal ID: 5259017) | No Contractor | Los Angeles | Safety/Traffic Management | $257,000 |
SLAUSON AVENUE CORRIDOR IMPROVEMENT PROJECT STREET & MEDIAN IMPROVEMENTS. ARHM OVERLAY AND RECONSTRUCTION, INSTALLATION OF RAISED LANDSCAPED MEDIANS, STRIPING. (Federal ID: 5265010) | No Contractor | Los Angeles | Pavement Improvement | $235,000 |
ATLANTIC BLVD. SOUTH: PROJECT INCLUDES REMOVAL AND REPLACEMENT OF AC PAVEMENT, RECONSTRUCTION OF DRIVEWAY APPROACHES, SIDEWALK, CURB, GUTTER AND ARHM PAVEMENT; TRAFFIC LOOP REPLACEMENT AND RESTRIPING. (Federal ID: 5265011) | No Contractor | Los Angeles | Pavement Improvement | $648,000 |
LAKEWOOD BL: 5TH ST/CECILIA AND TELEGRAPH . , STREET RECONSTRUCTION . (Federal ID: 5334034) | No Contractor | Los Angeles | Pavement Improvement | $3,317,000 |
VARIOUS LOCATIONS (SEE STATE COMMENT) . , RESURFACING AND RECONSTRUCTION . (Federal ID: 5340012) | No Contractor | Los Angeles | Pavement Improvement | $528,000 |
REHABILITATION OF DOWNEY AVENUE, NORTH CITY LIMIT TO SOUTH CITY LIMIT. (Federal ID: 5348016) | No Contractor | Los Angeles | Pavement Improvement | $608,000 |
CONSTRUCT A RAISED, LANDSCAPED CENTER ISLAND MEDIAN IN ARTESIA BLVD. FROM LAKEWOOD BLVD. TO DOWNEY AVENUE. (Federal ID: 5348018) | No Contractor | Los Angeles | Transportation Enhancements | $1,275,000 |
WEST BRANCH GREENWAY MULTI-MODAL TRANS. CORRIDOR DESIGN AND CONSTRUCT 2.5 MILE CLASS I BIKE PATH ALONG MTA-OWNED SANTA ANA BRANCH ROW INCL. PEDESTRIAN AND LANDSCAPING (3145) (Federal ID: 5348019) | No Contractor | Los Angeles | Pavement Improvement | $700,000 |
STAGE ROAD FROM ALONDRA BOULEVARD TO EAST CITY LIMIT. SELECTIVE RECONSTRUCTION OF CURB AND GUTTER. SELECTIVE RECONSTRUCTION OF ASPHALT PAVING. RUBBERIZED ASPHALT OVERLAY. INSTALLATION AND RECONSTRU (Federal ID: 5364005) | No Contractor | Los Angeles | Pavement Improvement | $1,435,979 |
LA MIRADA BOULEVARD FROM OAKWOOD LANE TO LEFFINGWELL ROAD. SELECTIVE RECONSTRUCTION OF CURB AND GUTTER AND ASPHALT PAVEMENT. INSTALLATION OF AN RUBBERIZED ASPHALT OVERLAY. (Federal ID: 5364006) | No Contractor | Los Angeles | Pavement Improvement | $34,021 |
CITYWIDE STREET REHABILITATION: LOCAL STREET RECONSTRUCTION AND RESURFACING; COMPLETION OF CONCRETE SIDEWALK REPAIRS; CONCRETE ADA RAMPS; CONCRETE TRANSIT BUS PADS (Federal ID: 5373012) | No Contractor | Los Angeles | Pavement Improvement | $450,975 |
CITYWIDE STREET OVERLAY: RAC OVERLAY OF STREETS. (Federal ID: 5373013) | No Contractor | Los Angeles | Pavement Improvement | $921,993 |
REHABILITATION OF ROADWAY, RESTORATION OF STREET SHOULDER, HAZARD ELIMINATION AND INCIDENTAL DRAINAGE IMPROVEMENT TO PROTECT STREET EROSION. HACIENDA ROAD FROM NORTH CITY LIMITS TO AVOCADO CREST; AND (Federal ID: 5422002) | No Contractor | Los Angeles | Pavement Improvement | $500,000 |
THIS PROJECT CONSISTS OF PAVEMENT REPAIR AND STRUCTURAL OVERLAY ON MAJOR ARTERIAL STREETS IN THE CITY OF WESTLAKE VILLAGE. WITHIN LINDERO CANYON ROAD BETWEEN AGOURA ROAD AND CITY LIMIT, AGOURA ROAD B (Federal ID: 5431006) | No Contractor | Los Angeles | Pavement Improvement | $500,000 |