Project $
GA-01 $34,393,699
GA-02 $32,798,084
GA-03 $88,081,522
GA-04 $37,713,798
GA-05 $15,177,600
GA-07 $61,612,001
GA-08 $95,050,835
GA-09 $13,566,013
GA-10 $30,037,515
GA-11 $32,701,237
GA-12 $32,274,717
GA-13 $48,950,254
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for GA-06. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
PROJECT DESCRIPTION: UPGRADE EXISTING TRAFFIC SIGNAL EQUIPMENT AND PEDESTRIAN FACILITIES AT VARIOUS LOCATIONS ON OLD ALABAMA RD IN THE CITY OF ROSWELL. THE INTERSECTIONS ARE AS FOLLOWS: (Federal ID: 0009358) BROOKS-BERRY-HAYNIE & ASSOC., INC. Fulton Safety/Traffic Management $766,859
PROJECT DESCRIPTION: UPGRADE EXISTING TRAFFIC SIGNAL EQUIPMENT AND PEDESTRIAN FACILITIES AT VARIOUS LOCATIONS ON CHAMBLEE TUCKER RD, CLAIRMONT RD, & NEW PEACHTREE RD. THE INTERSECTIONS ARE AS FOLLOW (Federal ID: 0009359) BROOKS-BERRY-HAYNIE & ASSOC., INC. DeKalb Safety/Traffic Management $780,233
THIS PROJECT IS THE RESURFACING ON SR 140. THIS SECTION OF SR 140 NEEDS RESURFACING BECAUSE THE EXISTING PAVEMENT IS DETERIORATING. SR 140 WAS LAST RESURFACED IN 1990. (Federal ID: M003923) C. W. MATTHEWS CONTRACTING CO., INC. Cherokee Pavement Improvement $1,678,700
THIS PROJECT IS THE MILLING AND RESURFACING OF SR 9. THIS SECTION OF SR 9 NEEDS RESURFACING BECAUSE THE EXISTING PAVEMENT IS DETERIORATING. SR 9 WAS LAST RESURFACED IN 2000. (Federal ID: M003942) C. W. MATTHEWS CONTRACTING CO., INC. Fulton Pavement Improvement $1,766,699
THIS PROJECT IS THE MILLING AND RESURFACING OF SR 9. THIS SECTION OF SR 9 NEEDS RESURFACING BECAUSE THE EXISTING PAVEMENT IS DETERIORATING. SR 9 WAS LAST RESURFACED IN 2000. (Federal ID: M003945) C. W. MATTHEWS CONTRACTING CO., INC. Fulton Pavement Improvement $1,766,699
THIS PROJECT IS THE MILLING AND RESURFACING OF I-575/SR 417. THIS SECTION OF SR 417 NEEDS RESURFACING BECAUSE THE EXISTING PAVEMENT IS DETERIORATING. SR 417 WAS LAST RESURFACED IN 1983. (Federal ID: M003967) C. W. MATTHEWS CONTRACTING CO., INC. Cherokee Pavement Improvement $18,667,748
INTERSECTION IMPROVEMENTS ON KIMBALL BRIDGE RD AT WATERS RD IN FULTON COUNTY WILL PROVIDE KIMBALL BRIDGE RD. ONE LEFT TURN LANE, A THROUGH LANE AND ONE RIGHT TURN LANE. WESTBOUND KIMBALL BRIDGE RD. A (Federal ID: 0003769) No Contractor Fulton Pavement Improvement $1,422,750
THIS PROJECT WILL MODIFY THE INTERCHANGE OF SR 120/ROSWELL ROAD AND SR 120 ALT (FORMERLY SR 120 LOOP). THIS PROJECT IS LOCATED 100% IN THE CITY OF MARIETTA AND 100% IN COBB COUNTY. THE PROPOSED PROJE (Federal ID: 0009349) No Contractor Cobb Pavement Improvement $7,907,591
ARRA 2009 - CONSTRUCTION FOR PI# 771270-; CR 85/KIMBALL BRIDGE RD @ BIG CREEK 2 MI SE OF ALPHARETTA, CST (Federal ID: 0009367) No Contractor Fulton Bridge Replacement $5,068,193
THIS PROJECT IS TO REPLACE A NARROW AND STRUCTURALLY DEFICIENT BRIDGE ON HOWELL BRIDGE ROAD (CR 107) OVER SHARP MOUNTAIN CREEK, 2 MILES SOUTHWEST OF BALLGROUND, GEORGIA. THE NEW BRIDGE WILL BE 200 FT (Federal ID: 0057017) No Contractor Cherokee Bridge Replacement $1,728,939
THE CONSTRUCTION PROPOSES TO ADD 5' SIDEWALKS 2' BEHIND THE BACK OF THE EXISTING CURB ON BOTH SIDES OF HOLCOMB BRIDGE RD BETWEEN OLD HOLCOMB BRIDGE RD AND THE SOUTHBOUND RAMPS OF SR 400 FOR A TOTAL OF (Federal ID: 00SW004) No Contractor Fulton Transportation Enhancements $1,500,000