Georgia • GA-13 Congressional District

Get Adobe Flash player

Total # Projects: 11
Total # Contracts: 4
Total $ Projects: $48,950,254
Total $ Contracts: $4,645,380

Congressmembers

Other Congressional Districts

Project $
GA-01 $34,393,699
GA-02 $32,798,084
GA-03 $88,081,522
GA-04 $37,713,798
GA-05 $15,177,600
GA-06 $42,775,101
GA-07 $61,612,001
GA-08 $95,050,835
GA-09 $13,566,013
GA-10 $30,037,515
GA-11 $32,701,237
GA-12 $32,274,717
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for GA-13. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
THIS PROJECT CONSISTS OF RECONSTRUCTING THE EXISTING INTERSECTION OF SR 5 AND ROSE AVENUE, LOCATED JUST NORTH OF I-20 IN DOUGLAS COUNTY. THE EXISTING INTERSECTION HAS AN UNDESIRABLE "SCISSOR-TYPE" CON (Federal ID: 0000424) C. W. MATTHEWS CONTRACTING CO., INC. Douglas Safety/Traffic Management $2,465,582
THIS PROJECT CONSISTS OF THE UPGRADE OF THE TRAFFIC SIGNALS AT 5 LOCATIONS IN COBB COUNTY. PEDESTRIAN IMPROVEMENTS WILL BE INCLUDED IN THE PROJECT. THE INTERSECTIONS ARE AS FOLLOWS: 1. MABLETO (Federal ID: 0009363) BROOKS-BERRY-HAYNIE & ASSOC., INC. Cobb Safety/Traffic Management $405,909
THIS PROJECT IS THE MILLING AND RESURFACING OF SR 14 SPUR. THIS SECTION OF SR 14 SPUR NEEDS RESURFACING BECAUSE THE EXISTING PAVEMENT IS DETERIORATING. SR 14 SPUR WAS LAST RESURFACED IN 1997. (Federal ID: M003947) E. R. SNELL CONTRACTOR, INC. Fulton Pavement Improvement $876,930
THIS PROJECT IS THE MILLING AND RESURFACING OF SR 92. THIS SECTION OF SR 92 NEEDS RESURFACING BECAUSE THE EXISTING PAVEMENT IS DETERIORATING. SR 92 WAS LAST RESURFACED IN 2002. (Federal ID: M003950) C. W. MATTHEWS CONTRACTING CO., INC. Fulton Pavement Improvement $896,959
THIS PROJECT IS LOCATED ON EAGLE'S LANDING PARKWAY, 0.4 MILES EAST OF THE I-75 INTERCHANGE IN HENRY COUNTY. THIS PROJECT PROPOSES TO CONTINUE THE WIDENING OF EAGLE'S LANDING PARKWAY FROM EAGLE'S POIN (Federal ID: 0002638) No Contractor Henry Pavement Widening $33,591,874
THIS PROJECT INCLUDES ENHANCEMENTS TO PEDESTRIAN SAFETY AND IMPROVED NEAR TERM TRAFFIC FLOW. THE PROJECT WILL ALSO ADDRESS AESTHETIC CONCERNS TYPICALLY INVOLVED WITH STREETSCAPE IMPROVEMENTS. IMPROV (Federal ID: 0004633) No Contractor Clayton Transportation Enhancements $3,329,993
ARRA 2009 - CONSTRUCTION FOR PI# 0008584, CST - SR 138 @ 12 LOCS - UPGRADE TRAFFIC SIGNALS (Federal ID: 0009354) No Contractor Henry Safety/Traffic Management $1,767,050
PROJECT DESCRIPTION: UPGRADE EXISTING TRAFFIC SIGNAL EQUIPMENT AND PEDESTRIAN FACILITIES AT FIVE LOCATIONS FOR S.R. 42 IN CLAYTON COUNTY. THE INTERSECTIONS ARE AS FOLLOWS: (Federal ID: 0009356) No Contractor Clayton Safety/Traffic Management $925,621
THIS PROJECT WILL INCLUDE THE INSTALLATION OF THE NAVIGATOR SYSTEM ALONG I-675 FROM I-75 TO I-285. INCLUDED IN THE PROJECT WILL BE TWO CHANGEABLE MESSAGE SIGNS, VEHICLE DETECTION COVERAGE, CCTV CAMER (Federal ID: 6751001) No Contractor Clayton Safety/Traffic Management $1,894,362
THE PROPOSED PROJECT CONSISTS OF REPLACING THE EXISTING BRIDGE (48.43 SUFF. RATING) ALONG ANNEEWAKEE RD OVER ANNEEWAKEE CREEK WITH A NEW BRIDGE TO THE SOUTH OF THE EXISTING STRUCTURE. THE PROPOSED RO (Federal ID: 7532950) No Contractor Douglas Bridge Replacement $1,907,100
THIS PROJECT IS THE INTERSECTION IMPROVEMENT ON KINGS HIGHWAY AT CENTRAL CHURCH ROAD IN DOUGLAS COUNTY. THE PROJECT WILL PROVIDE A SEPARATE LEFT TURN BAY FOR WESTBOUND MOVEMENTS ONTO KINGS HIGHWAY AND (Federal ID: 9398001) No Contractor Douglas Safety/Traffic Management $778,753