Georgia • GA-13 Congressional District
Top 10 Largest Contracts
THIS PROJECT CONSISTS OF RECONSTRUCTING TH... | GA / Douglas |
$2,465,582
|
THIS PROJECT IS THE MILLING AND RESURFACIN... | GA / Fulton |
$896,959
|
THIS PROJECT IS THE MILLING AND RESURFACIN... | GA / Fulton |
$876,930
|
THIS PROJECT CONSISTS OF THE UPGRADE OF TH... | GA / Cobb |
$405,909
|
Total # Projects: | 11 |
Total # Contracts: | 4 |
Total $ Projects: | $48,950,254 |
Total $ Contracts: | $4,645,380 |
Congressmembers
- Sen. Saxby Chambliss (R) See Campaign Finances
- Sen. Johnny Isakson (R) See Campaign Finances
- Rep. David Scott (D) See Campaign Finances
Collaborate
These news organizations have followed up and written stories using this database:
- PBS NewsHour/Patchwork Nation analyzed how transportation stimulus funds were distributed across communities.
Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel
Questions? Tips?
About This Data
Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.
First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.
Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.
We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.
Read more...
Here are our tips for running background checks on stimulus contractors.
All projects for GA-13. Not all projects have been awarded contracts.
Project Name | Contractor | County | Improvement Type | Amount |
---|---|---|---|---|
THIS PROJECT CONSISTS OF RECONSTRUCTING THE EXISTING INTERSECTION OF SR 5 AND ROSE AVENUE, LOCATED JUST NORTH OF I-20 IN DOUGLAS COUNTY. THE EXISTING INTERSECTION HAS AN UNDESIRABLE "SCISSOR-TYPE" CON (Federal ID: 0000424) | C. W. MATTHEWS CONTRACTING CO., INC. | Douglas | Safety/Traffic Management | $2,465,582 |
THIS PROJECT CONSISTS OF THE UPGRADE OF THE TRAFFIC SIGNALS AT 5 LOCATIONS IN COBB COUNTY. PEDESTRIAN IMPROVEMENTS WILL BE INCLUDED IN THE PROJECT. THE INTERSECTIONS ARE AS FOLLOWS: 1. MABLETO (Federal ID: 0009363) | BROOKS-BERRY-HAYNIE & ASSOC., INC. | Cobb | Safety/Traffic Management | $405,909 |
THIS PROJECT IS THE MILLING AND RESURFACING OF SR 14 SPUR. THIS SECTION OF SR 14 SPUR NEEDS RESURFACING BECAUSE THE EXISTING PAVEMENT IS DETERIORATING. SR 14 SPUR WAS LAST RESURFACED IN 1997. (Federal ID: M003947) | E. R. SNELL CONTRACTOR, INC. | Fulton | Pavement Improvement | $876,930 |
THIS PROJECT IS THE MILLING AND RESURFACING OF SR 92. THIS SECTION OF SR 92 NEEDS RESURFACING BECAUSE THE EXISTING PAVEMENT IS DETERIORATING. SR 92 WAS LAST RESURFACED IN 2002. (Federal ID: M003950) | C. W. MATTHEWS CONTRACTING CO., INC. | Fulton | Pavement Improvement | $896,959 |
THIS PROJECT IS LOCATED ON EAGLE'S LANDING PARKWAY, 0.4 MILES EAST OF THE I-75 INTERCHANGE IN HENRY COUNTY. THIS PROJECT PROPOSES TO CONTINUE THE WIDENING OF EAGLE'S LANDING PARKWAY FROM EAGLE'S POIN (Federal ID: 0002638) | No Contractor | Henry | Pavement Widening | $33,591,874 |
THIS PROJECT INCLUDES ENHANCEMENTS TO PEDESTRIAN SAFETY AND IMPROVED NEAR TERM TRAFFIC FLOW. THE PROJECT WILL ALSO ADDRESS AESTHETIC CONCERNS TYPICALLY INVOLVED WITH STREETSCAPE IMPROVEMENTS. IMPROV (Federal ID: 0004633) | No Contractor | Clayton | Transportation Enhancements | $3,329,993 |
ARRA 2009 - CONSTRUCTION FOR PI# 0008584, CST - SR 138 @ 12 LOCS - UPGRADE TRAFFIC SIGNALS (Federal ID: 0009354) | No Contractor | Henry | Safety/Traffic Management | $1,767,050 |
PROJECT DESCRIPTION: UPGRADE EXISTING TRAFFIC SIGNAL EQUIPMENT AND PEDESTRIAN FACILITIES AT FIVE LOCATIONS FOR S.R. 42 IN CLAYTON COUNTY. THE INTERSECTIONS ARE AS FOLLOWS: (Federal ID: 0009356) | No Contractor | Clayton | Safety/Traffic Management | $925,621 |
THIS PROJECT WILL INCLUDE THE INSTALLATION OF THE NAVIGATOR SYSTEM ALONG I-675 FROM I-75 TO I-285. INCLUDED IN THE PROJECT WILL BE TWO CHANGEABLE MESSAGE SIGNS, VEHICLE DETECTION COVERAGE, CCTV CAMER (Federal ID: 6751001) | No Contractor | Clayton | Safety/Traffic Management | $1,894,362 |
THE PROPOSED PROJECT CONSISTS OF REPLACING THE EXISTING BRIDGE (48.43 SUFF. RATING) ALONG ANNEEWAKEE RD OVER ANNEEWAKEE CREEK WITH A NEW BRIDGE TO THE SOUTH OF THE EXISTING STRUCTURE. THE PROPOSED RO (Federal ID: 7532950) | No Contractor | Douglas | Bridge Replacement | $1,907,100 |
THIS PROJECT IS THE INTERSECTION IMPROVEMENT ON KINGS HIGHWAY AT CENTRAL CHURCH ROAD IN DOUGLAS COUNTY. THE PROJECT WILL PROVIDE A SEPARATE LEFT TURN BAY FOR WESTBOUND MOVEMENTS ONTO KINGS HIGHWAY AND (Federal ID: 9398001) | No Contractor | Douglas | Safety/Traffic Management | $778,753 |