Missouri • MO-08 Congressional District

Get Adobe Flash player

Total # Projects: 27
Total # Contracts: 22
Total $ Projects: $76,788,397
Total $ Contracts: $71,508,849

Congressmembers

Other Congressional Districts

Project $
MO-01 $7,977,918
MO-02 $66,126,304
MO-03 $6,457,028
MO-04 $58,051,657
MO-05 $2,996,122
MO-06 $66,749,084
MO-07 $53,386,727
MO-09 $62,222,719
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for MO-08. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
ARRA, ROUTE 17, TEXAS COUNTY, THIN LIFT OVERLAY FROM RTE 106 N SUMMERSVILLE TO RTE 60 IN MT VIEW, 14.628 MILES (Federal ID: 0171009) PACE CONSTRUCTION COMPANY, LLC Texas Pavement Improvement $547,476
ARRA, ROUTE 17, HOWELL COUNTY, THIN LIFT OVERLAY FROM RTE 60 IN MT VIEW TO RTE 160, 21.067 MILES (Federal ID: 0171010) PACE CONSTRUCTION COMPANY, LLC Howell Pavement Improvement $879,335
ARRA, ROUTE 21, WASHINGTON COUNTY, PAVEMENT IMPROVEMENTS FROM 1.7 MILES SOUTH OF RTE 8 N POTOSI TO RTE N, 20.7 MILES (Federal ID: 0211018) PACE CONSTRUCTION COMPANY, LLC Washington Pavement Improvement $2,311,868
ARRA, RTE 34, WAYNE CO, WIDEN, BUILD SHOULDERS, GRADING, PAVING, DRAINAGE & RESURFACING OF RTE 34 PIEDMONT TO RTE 67, 7.6 MILES (Federal ID: 0341035) H.R. QUADRI CONTRACTORS, LLC Wayne Pavement Widening $10,490,753
ARRA, ROUTE 44, PHELPS COUNTY, MAJOR PAVEMENT REHAB/RECONSTRUCTION ON I-44 WBL FM BUS LOOP 44 (ROLLA) TO SUGARTREE RD, 8.213 MILES (Federal ID: 0442223) IRON MOUNTAIN TRAP ROCK CO. Phelps Pavement Improvement $11,128,718
ARRA, ROUTE 51, PERRY COUNTY, PAVEMENT IMPROVEMENTS FROM I-55 TO RTE 72, 16.297 MILES (Federal ID: 0512016) PACE CONSTRUCTION COMPANY, LLC Perry Pavement Improvement $1,722,782
ARRA PROJ - I-55, NEW MADRIDPVMNT REHAB, N - 0.3 M S/O RTE 84 TO SCOTT/NEW MADRID CO LINE, S -SCOTT/NEW MADRID CO LINE TO ARK LINE (Federal ID: 0551134) APEX PAVING CO. New Madrid Pavement Improvement $18,423,268
ARRA, RTE 55, PEMISCOT CO, PAVEMENT REHAB-NB LANE-RTE I-55 PEMISCOT CO FROM ARKANSAS ST LINE TO 2.0 MI S OF RTE I-155 , 15.00 M (Federal ID: 0551135) CHESTER BROSS CONSTRUCTION CO. Pemiscot Pavement Improvement $16,085,636
ARRA, ROUTE 55, NEW MADRID COUNTY, WELCOME CENTER AT MARSTON, 0.3 MILE (Federal ID: 0551136) R.L. PERSONS CONSTRUCTION, INC. New Madrid Transportation Enhancements $5,356,866
ARRA, ROUTE 62, MISSISSIPPI COUNTY, THIN LIFT OVERLAY FROM RTE B IN BERTRAND TO THE CITY OF CHARLESTON, 5.856 MILES (Federal ID: 0621022) APEX PAVING CO. Mississippi Pavement Improvement $323,080
ARRA, ROUTE 63, HOWELL COUNTY, ASPHALT MILL AND FILL FROM RTE 63 TO BROADWAY IN WEST PLAINS, 1.801 MILES (Federal ID: 0631029) PACE CONSTRUCTION COMPANY, LLC Howell Pavement Improvement $506,035
ARRA, ROUTE 63, HOWELL COUNTY, ASPHALT MILL AND FILL FROM RTE 63 TO BROADWAY IN WEST PLAINS, 1.801 MILES (Federal ID: 0631029) PACE CONSTRUCTION COMPANY, LLC Howell Pavement Improvement $506,035
REHABILITATE PAVEMENT SURFACE FROM I-55 TO KINGSHIGHWAY. (Federal ID: 1130006) APEX PAVING CO. Cape Girardeau Pavement Improvement $556,616
THIN LIFT OVERLAY FROM COUNTY ROAD 462 TO RTE. 67. (Federal ID: 1200003) PACE CONSTRUCTION COMPANY, LLC Butler Pavement Improvement $357,797
THIN LIFT OVERLAY FROM RTE. V WEST OF DONIPHAN TO RTE. 160 IN DONIPHAN. (Federal ID: 1206005) PACE CONSTRUCTION COMPANY, LLC Ripley Pavement Improvement $763,655
THIN LIFT OVERLAY FROM RTE. WW IN POPLAR BLUFF TO RTE. 158. (Federal ID: 1221003) PACE CONSTRUCTION COMPANY, LLC Butler Pavement Improvement $276,723
THIN LIFT OVERLAY FROM RTE. 164 TO THE ARKANSAS STATE LINE. (Federal ID: 1286003) G&M CONCRETE&ASPHALT CO. INC. Pemiscot Pavement Improvement $472,405
THIN LIFT OVERLAY FROM RTE. U TO RTE. 164. (Federal ID: 1321002) G&M CONCRETE&ASPHALT CO. INC. Pemiscot Pavement Improvement $365,768
THIN LIFT OVERLAY FROM RTE. D TO RTE. DD (Federal ID: 1641008) G&M CONCRETE&ASPHALT CO. INC. Pemiscot Pavement Improvement $107,819
RAIL EXTENSION, SWITCH, CROSSINGS AND SIDING FOR NEW TENANT. (Federal ID: ES10002) LAMBERT ENGINEERING AND SURVEYING New Madrid Safety/Traffic Management $27,646
THIN LIFT OVERLAY FROM THE WASHINGTON COUNTY LINE TO THE CITY OF BONNE TERRE (Federal ID: S638004) LEAD BELT MATERIALS CO. INC. St. Francois Pavement Improvement $171,033
THIN LIFT OVERLAY FROM THE CITY OF BONNE TERRE TO RTE. 67 (Federal ID: S638005) LEAD BELT MATERIALS CO. INC. St. Francois Pavement Improvement $127,535
RESURFACE AND IMPROVE SHOULDERS FROM LASALLE AVE. TO LEXINGTON AVE. (Federal ID: 1277002) No Contractor Cape Girardeau Pavement Improvement $1,993,100
SIDEWALK REHABILITATION AND CONSTRUCTION NEAR THE SQUARE AND ALONG OTHER CITY STREETS (Federal ID: 9900840) No Contractor Ozark Transportation Enhancements $113,780
SIDEWALKS AND STREETSCPES (Federal ID: ES09001) No Contractor Phelps Transportation Enhancements $171,230
SIDEWALKS AND STREETSCPES (Federal ID: ES09002) No Contractor Texas Transportation Enhancements $147,500
CONSTRUCTION OF HIGH-WATER RAIL LINE THAT WILL ALLOW PORT RAIL TO OPERATE DURING HIGH WATER EVENTS. (Federal ID: ES10001) No Contractor Cape Girardeau Other $1,086,417
1167003 - 1" LEVEL COURSE FROM RTE. 60 TO RTE. K (NOTE: FOREST HIGHWAY ARRA PROJECT.) (Federal ID: 1515291167003) No Contractor Carter Pavement Improvement $365,139