Missouri • MO-09 Congressional District

Get Adobe Flash player

Total # Projects: 33
Total # Contracts: 22
Total $ Projects: $62,222,719
Total $ Contracts: $58,851,263

Congressmembers

Other Congressional Districts

Project $
MO-01 $7,977,918
MO-02 $66,126,304
MO-03 $6,457,028
MO-04 $58,051,657
MO-05 $2,996,122
MO-06 $66,749,084
MO-07 $53,386,727
MO-08 $76,788,397
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for MO-09. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
ARRA, ROUTE 15, MONROE COUNTY, PAVEMENT & SHOULDER IMPROVEMENTS FROM RT 154 N JUNCTION TO 1.1 MILES NORTH OF RT 22, 24.572 MILES (Federal ID: 0151011) APAC-MISSOURI, INC. Monroe Pavement Improvement $2,227,837
ARRA, ROUTE 15, AUDRAIN COUNTY, PAVEMENT IMPROVEMENTS FROM 1.1 MILES NORTH OF RTE 22 TO 0.2 MILE NORTH OF RTE 54, 5.038 MILES (Federal ID: 0151012) APAC-MISSOURI, INC. Audrain Pavement Improvement $880,503
ARRA PROJECT-RTE 17, MILLER COUNTY, REPLACE BRIDGE OVER THE OSAGE RIVER, 1 MILE EAST OF TUSCUMBIA .486 MILES (Federal ID: 0172010) APAC-MISSOURI, INC. Miller Bridge Replacement $8,489,728
ARRA, RTE 17, MILLER/COLE COUNTIES, THIN LIFT OVERLAY FROM RTE 54 TO BRUSH CREEK, 19.266 MILES (Federal ID: 0172011) APAC-MISSOURI, INC. Miller Pavement Improvement $848,190
ARRA, ROUTE 28, MARIES COUNTY, THIN LIFT OVERLAY FROM ROUTE 63 TO DIXON, 17.5 MILES (Federal ID: 0281009) WILLARD ASHPALT PAVING Maries Pavement Improvement $829,288
ARRA, ROUTE 44, CRAWFORD COUNTY, PAVEMENT REHAB ON WESTBOUND LANES FROM 0.6 MILE WEST OF RTE H TO PHELPS COUNTY LINE, 12.507 MILES (Federal ID: 0443100) INTERSTATE IMPROVEMENT, INC. Crawford Pavement Improvement $897,515
ARRA, RT 44, FRANKLIN CO, FULL-DEPTH PAVEMENT REPLACEMENT ON EB & WB LANES FROM W/O VIADUCT ST IN PACIFIC TO RT 100 WEST, 5.072 MI (Federal ID: 0443101) FRED WEBER, INC. Franklin Pavement Widening $17,377,496
ARRA, RTE 63, ADAIR CO, CONSTRUCT NEW TWO LANE ROADWAY EAST OF KIRKSVILLE, 6.189 MI (Federal ID: 0634066) C. J. MOYNA & SONS, INC. Adair New Construction $17,433,532
ARRA, ROUTE 70, BOONE COUNTY, THIN LIFT OVERLAY FROM RTE 63 CONNECTOR TO RTE Z, 5.34 MILES (Federal ID: 0703218) APAC-MISSOURI, INC. Boone Pavement Improvement $289,969
SIDEWALKS (Federal ID: 6201602) KOZENY WAGNER Franklin Transportation Enhancements $207,934
PAVEMENT IMPROVEMENTS ON WESTBOUND AND EASTBOUND LANES FROM BROADWAY TO RTE. 63. (Federal ID: 7401020) APAC-MISSOURI, INC. Boone Pavement Improvement $1,682,290
BUILD A RAILROAD BRIDGE OVER ROUTE 63 NORTH OF RTE. B IN COLUMBIA. (Federal ID: ES05003) EMERY SAPP & SONS, INC. Boone Safety/Traffic Management $3,307,857
THIN LIFT OVERLAY FROM RTE. 63 TO RTE. 156 IN LAPLATA. (Federal ID: S116007) CHESTER BROSS CONSTRUCTION CO. Macon Pavement Improvement $89,028
THIN LIFT OVERLAY FROM RTE. 63 TO KNOX COUNTY LINE. (Federal ID: S124007) CHESTER BROSS CONSTRUCTION CO. Macon Pavement Improvement $543,559
THIN LIFT OVERLAY ON RTE. W FROM RTE. 61 NORTH JUNCTION TO RTE. 61 SOUTH JUNCTION, AND RTE. 61 OUTER ROAD FROM RTE. W TO 0.3 MILE SOUTH OF RTE. W. (Federal ID: S192003) CHESTER BROSS CONSTRUCTION CO. Marion Pavement Improvement $177,455
THIN LIFT OVERLAY FROM BUS. RTE. 63 TO RTE. B. (Federal ID: S205005) CHESTER BROSS CONSTRUCTION CO. Randolph Pavement Improvement $577,153
THIN LIFT OVERLAY FRM RTE. 24 TO RTE. J. (Federal ID: S206007) CHESTER BROSS CONSTRUCTION CO. Monroe Pavement Improvement $212,497
THIN LIFT OVERLAY FROM BUS. RTE. 36 TO RTE. 24. (Federal ID: S233005) CHESTER BROSS CONSTRUCTION CO. Shelby Pavement Improvement $1,112,226
THIN LIFT OVERLAY FROM RTE. EE TO RTE. 154. (Federal ID: S301018) CHESTER BROSS CONSTRUCTION CO. Ralls Pavement Improvement $411,892
THIN LIFT OVERLAY FROM RTE. J TO RTE. 19. (Federal ID: S301019) CHESTER BROSS CONSTRUCTION CO. Ralls Pavement Improvement $247,082
THIN LIFT OVERLAY FROM RTE. 124 TO I-70 (Federal ID: S375003) APAC-MISSOURI, INC. Boone Pavement Improvement $827,613
THIN LIFT OVERLAY FROM RTE. T TO RTE. 94 (Federal ID: S429007) G&M CONCRETE&ASPHALT CO. INC. Warren Pavement Improvement $180,619
ARRA, RTE 19, MONTGOMERY COUNTY, RESURFACING FROM NEAR RTE B (JUST NORTH OF MONTGOMERY CITY) TO 1.7 MI SOUTH OF RTE I-70, 8.792 MI (Federal ID: 0194012) No Contractor Montgomery Pavement Improvement $2,397,400
CONSTRUCT SIDEWALKS FROM SOUTH ST. TO 4TH ST. (Federal ID: ES03002) No Contractor Warren Other $5,200
HISTORIC LIGHTING FROM CLARK STREET TO LEWIS STREET (Federal ID: ES03003) No Contractor Lewis Other $5,599
SIDEWALKS FROM BUS RT. 61 TO SOUTH COURT STREET (Federal ID: ES03004) No Contractor Pike Other $7,400
SIDEWALKS AND LIGHTING FROM MARION STREET TO HICKORY STREET (Federal ID: ES03005) No Contractor Monroe Other $7,511
PRELIMINARY ENGINEERING (Federal ID: ES06001) No Contractor Franklin Other $327,404
PRELIMINARY ENGINEERING (Federal ID: ES06002) No Contractor Franklin Other $35,000
ARRA RESURFACING W 8TH ST.; W MAIN ST.; GRAND AVE; POTTERY RD & OLD HWY 100; CITY OF WASHINGTON; 3 MILES (Federal ID: ES06006) No Contractor Franklin Pavement Improvement $683,713
RESURFACING (Federal ID: ES06008) No Contractor Franklin Other $11,360
INSTALL SHARED USE LANE (Federal ID: ES06021) No Contractor St. Charles Other $45,453
WIDEN TO 3 LANE TO ADD CAPACITY AND IMPROVE SAFETY IN HOLTS SUMMIT. (Federal ID: S383010) No Contractor Callaway Other $67,000