Project Name |
Contractor |
County |
Improvement Type |
Amount |
WETLAND MITIGATION IN THE NW QUADRANT OF THE I-90 EAST MAIN STREET INTERCHANGE IN BOZEMAN. (Federal ID: 0016073)
|
HALL CONSTRUCTION SERVICES
|
Gallatin
|
Other
|
$211,695
|
RECONSTRUCTION OF EXISTING WYLIE DRIVE IN LEWIS & CLARK COUNTY. (Federal ID: 0025050)
|
BULLOCK CONTRACTING
|
Lewis and Clark
|
Safety/Traffic Management
|
$847,281
|
BRIDGE REPLACEMENT WITHOUT ADDED CAPACITY ON US 89 (Federal ID: 0032033)
|
SLETTEN CONSTRUCTION COMPANY
|
Teton
|
Bridge Replacement
|
$2,480,683
|
OVERLAY, SLOPE FLATTENING & WIDENING ON US 89 WITHIN THE BLACKFEET RESERVATION (Federal ID: 0034013)
|
SK CONSTRUCTION INC
|
Glacier
|
Pavement Improvement
|
$9,185,714
|
OFF SITE WETLAND MITIGATION RESERVE FOR WATERSHED #13 - UPPER YELLOWSTONE IN PARK COUNTY (Federal ID: 0034026)
|
ADVANCED EARTHWORKS INC
|
Park
|
Other
|
$318,134
|
US-93 NEAR STEVENSVILLE - RECONSTRUCTION WITH ADDED CAPACITY (Federal ID: 0071118)
|
SCHELLINGER CONST CO INC
|
Ravalli
|
Pavement Widening
|
$5,039,730
|
I 15 DEARBORN REST AREA REPLACEMENT (Federal ID: 0154089)
|
DICK ANDERSON CONSTRUCTION INC - HELENA
|
Lewis and Clark
|
Safety/Traffic Management
|
$3,648,300
|
BRIDGE REPLACEMENT PROJECT ON MT 7 NORTH OF EKALAKA (Federal ID: 0271009)
|
FRANZ CONSTRUCTION INC
|
Carter
|
Pavement Improvement
|
$2,092,635
|
14.2 MILE CHIP SEAL ON MT 13 IN DANIELS COUNTY NORTH OF SCOBY (Federal ID: 0322016)
|
RIVERSIDE CONTRACTING INC-MSLA
|
Daniels
|
Pavement Improvement
|
$471,540
|
15.3 MILE OVERLAY ON MT 16 BETWEEN PLENTYWOOD AND THE PORT OF RAYMOND IN SHERIDAN COUNTY. (Federal ID: 0341009)
|
PRINCE INC
|
Sheridan
|
Pavement Improvement
|
$2,671,155
|
MILL AND FILL 5.5 MILES OF US 212 IN BIG HORN COUNTY AND WITHIN THE NORTHERN CHEYENNE RESERVATION. (Federal ID: 0371033)
|
RIVERSIDE CONTRACTING INC-MSLA
|
Big Horn
|
Pavement Improvement
|
$2,098,756
|
8.1 MILE PAVEMENT PRESERVATION, MINOR WIDENING & PAVEMENT MARKING/GUARDRAIL UPGRADE ON MT 39 IN ROSEBUD COUNTY, JUST NORTH OF THE NORTHERN CHEYENNE RESERVATION. (Federal ID: 0391039)
|
PRINCE INC
|
Rosebud
|
Pavement Improvement
|
$1,748,151
|
9 MILE OVERLAY ON MT 200 WEST OF RICHEY, IN DAWSON COUNTY (Federal ID: 0512004)
|
PRINCE INC
|
Dawson
|
Pavement Improvement
|
$2,096,639
|
14.6 MILE CHIP SEAL ON MT 86 NORTHEAST OF BOZEMAN IN GALLATIN COUNTY. (Federal ID: 0861040)
|
KNIFE RIVER - BELGRADE
|
Gallatin
|
Pavement Improvement
|
$817,590
|
5 MILE MILL AND RESURFACE OF I 90 IN SWEET GRASS COUNTY (Federal ID: 0907089)
|
RIVERSIDE CONTRACTING INC-MSLA
|
Sweet Grass
|
Pavement Improvement
|
$2,862,127
|
COLD MILL AND OVERLAY I -90 AT THE PINEHILLS INTERCHANGE AND 3.2 MILES TO THE WEST. (Federal ID: 0908157)
|
RIVERSIDE CONTRACTING INC-MSLA
|
Yellowstone
|
Pavement Improvement
|
$1,127,777
|
13.3 MILE FULL WIDTH OVERLAY OF I 90. RAMPS WILL BE COLD MILLED AND OVERLAID. THE REST AREA PARKING LOT WILL BE CRACK SEALED AND S&C. (Federal ID: 0909098)
|
PRINCE INC
|
Multiple/Statewide
|
Pavement Improvement
|
$7,214,767
|
I 94 BRIDGE DECK REHABILITATION IN ROSEBUD COUNTY (Federal ID: 0943059)
|
SLETTEN CONSTRUCTION COMPANY
|
Multiple/Statewide
|
Bridge Improvement
|
$4,844,530
|
6.2 MILE MILL AND FILL ON I 94 EAST OF WIBAUX, IN WIBAUX COUNTY. (Federal ID: 0947028)
|
PRINCE INC
|
Wibaux
|
Pavement Improvement
|
$1,199,755
|
1.4 MILE OVERLAY IN BILLINGS (Federal ID: 1028004)
|
H L OSTERMILLER CONSTRUCTION INC
|
Yellowstone
|
Pavement Improvement
|
$496,911
|
RECONSTRUCT A PORTION OF SHILO ROAD FROM 2 LANE TO 4 LANE - BILLINGS (Federal ID: 1031009)
|
RIVERSIDE SAND & GRAVEL INC
|
Yellowstone
|
Pavement Widening
|
$8,478,132
|
0.7 MILE MILL AND FILL IN BUTTE (Federal ID: 1806008)
|
JIM GILMAN EXCAVATING INC
|
Silver Bow
|
Pavement Improvement
|
$668,500
|
3.5 MILE CHIP SEAL ON S 260 NORTH OF LIBBY (Federal ID: 2601005)
|
PAVEMENT MAINTENANCE SOLUTIONS INC
|
Lincoln
|
Pavement Improvement
|
$169,456
|
2.3 MILE CHIP SEAL ON S 271 NORTHEAST OF DRUMMOND IN POWELL COUNTY (Federal ID: 2711010)
|
BLAHNIK CONSTRUCTION & READY MIX
|
Granite
|
Pavement Improvement
|
$94,206
|
INSTALLING POST MOUNTED FLASHERS AT THE INTERSECTION OF S-279 & S 231 NORTH OF HELENA (Federal ID: 2791013)
|
WESTERN TRAFFIC CONTROL INC
|
Lewis and Clark
|
Safety/Traffic Management
|
$17,090
|
INSTALLING POST MOUNTED FLASHERS ON YORK ROAD NORTHEAST OF HELENA (Federal ID: 2801019)
|
WESTERN TRAFFIC CONTROL INC
|
Lewis and Clark
|
Safety/Traffic Management
|
$20,077
|
7.7 MILE OVERLAY ON S-308 IN CARBON COUNTY WEST OF BELFRY (Federal ID: 3081026)
|
KNIFE RIVER CORPORATION- NORTH CENTRAL
|
Carbon
|
Pavement Improvement
|
$1,267,403
|
PAVE STATE SECONDARY 323 FROM RP 24.83 TO 37.1 THIS IS THE SECTION THAT IS CURRENTLY UNDER CONTRACT WITH A TOTAL RECONSTRUCT TO A ALL WEATHER GRAVEL SURFACE. (Federal ID: 3231029)
|
FOOTHILLS CONTRACTING INC
|
Carter
|
Pavement Improvement
|
$7,488,676
|
2.6 MILE SEAL AND COVER ON A STATE HIGHWAY WEST OF MISSOULA. (Federal ID: 3275813)
|
LS JENSEN CONSTRUCTION & READY MIX
|
Missoula
|
Pavement Improvement
|
$210,134
|
4.6 MILE CHIP SEAL ON S 424 WEST OF KALISPELL (Federal ID: 4241008)
|
PAVEMENT MAINTENANCE SOLUTIONS INC
|
Flathead
|
Pavement Improvement
|
$169,526
|
3.5 MILE CHIP SEAL ON S 503 SOUTHWEST OF KALISPELL (Federal ID: 5031010)
|
PAVEMENT MAINTENANCE SOLUTIONS INC
|
Flathead
|
Pavement Improvement
|
$140,553
|
2.4 MILE MILL AND FILL ON S 507 EAST OF ALBERTON, MISSOULA COUNTY (Federal ID: 5071008)
|
LS JENSEN CONSTRUCTION & READY MIX
|
Multiple/Statewide
|
Pavement Improvement
|
$418,289
|
0.9 MILE OVERLAY IN GREAT FALLS (Federal ID: 5205024)
|
UNITED MATERIALS OF GREAT FALLS INC
|
Cascade
|
Pavement Improvement
|
$534,447
|
0.7 MILE OVERLAY IN GREAT FALLS. (Federal ID: 5208002)
|
UNITED MATERIALS OF GREAT FALLS INC
|
Cascade
|
Pavement Improvement
|
$322,904
|
0.6 MILE OVERLAY IN GREAT FALLS. (Federal ID: 5209005)
|
UNITED MATERIALS OF GREAT FALLS INC
|
Cascade
|
Pavement Improvement
|
$297,891
|
0.18 MILE MILL AND FILL IN GREAT FALLS (Federal ID: 5210018)
|
UNITED MATERIALS OF GREAT FALLS INC
|
Cascade
|
Pavement Improvement
|
$317,727
|
MULTIPLE LOCATION SIDEWALK IMPROVMENT PROJECT - GREAT FALLS (Federal ID: 5299080)
|
WALKER CONSTRUCTION INC
|
Cascade
|
Transportation Enhancements
|
$950,887
|
1.09 MILE MILL AND FILL IN HELENA (Federal ID: 5802012)
|
HELENA SAND & GRAVEL INC
|
Lewis and Clark
|
Pavement Improvement
|
$614,614
|
0.3 MILE MILL AND FILL IN HELENA (Federal ID: 5805013)
|
HELENA SAND & GRAVEL INC
|
Lewis and Clark
|
Pavement Improvement
|
$224,924
|
0.83 MILE OVERLAY IN HELENA (Federal ID: 5822002)
|
HELENA SAND & GRAVEL INC
|
Lewis and Clark
|
Pavement Improvement
|
$367,196
|
0.7 MILE MILL AND FILL IN LIVINGSTON (Federal ID: 7406007)
|
KNIFE RIVER - BELGRADE
|
Park
|
Pavement Improvement
|
$197,792
|
0.8 MILE MILL AND FILL IN MISSOULA (Federal ID: 8105014)
|
KNIFE RIVER - BELGRADE
|
Missoula
|
Pavement Improvement
|
$134,635
|
0.17 MILE MILL AND FILL IN MISSOULA (Federal ID: 8107019)
|
KNIFE RIVER - BELGRADE
|
Missoula
|
Pavement Improvement
|
$68,776
|
ON THE SCOTT STREET OVERPASS IN MISSOULA, BRIDGE DECK REPAIR AND REPLACING THE SURFACE WITH A HIGH STRENGTH EPOXY CONCRETE. (Federal ID: 8109002)
|
SLETTEN CONSTRUCTION COMPANY
|
Missoula
|
Bridge Improvement
|
$1,777,546
|
0.3 MILE MILL AND FILL IN MISSOULA (Federal ID: 8113006)
|
KNIFE RIVER - BELGRADE
|
Missoula
|
Pavement Improvement
|
$107,746
|
INTERSECTION & SIGNAL IMPROVEMENT IN MISSOULA (Federal ID: 8117006)
|
KNIFE RIVER - BELGRADE
|
Missoula
|
Pavement Improvement
|
$600,125
|
2 MILE MILL AND FILL IN MISSOULA (Federal ID: 8120005)
|
KNIFE RIVER - BELGRADE
|
Missoula
|
Pavement Improvement
|
$550,396
|
BRIDGE & APPROACH REPLACEMENT WITHOUT ADDED CAPACITY (Federal ID: 9003032)
|
DICK ANDERSON CONSTRUCTION INC - HELENA
|
Blaine
|
Bridge Replacement
|
$2,183,666
|
BRIDGE REPLACEMENT PROJECT (Federal ID: 9013015)
|
FRANZ CONSTRUCTION INC
|
Fallon
|
Pavement Improvement
|
$622,038
|
CONSTRUCT A BICYCLE/PEDESTRIAN OVERCROSSING BRIDGE OVER US 93 IN PABLO. (Federal ID: 0052152)
|
No Contractor
|
Lake
|
Other
|
$270,000
|
REPLACEMENT OF AN EXISTING IRRIGATION SIPHON WITH A CULVERT ON US 287 SOUTH OF CAMERON (Federal ID: 0131045)
|
No Contractor
|
Madison
|
Pavement Improvement
|
$323,887
|
RECONSTRUCTION OF THE EXISTING ROADWAY AND STRUCTURE WORK ON MT 7 (Federal ID: 0272019)
|
No Contractor
|
Fallon
|
Pavement Improvement
|
$7,255,566
|
RECONSTRUCTION OF THE I-90 INTERCHANGE AT THE INTERSECTION WITH US 287 (Federal ID: 0906087)
|
No Contractor
|
Gallatin
|
Pavement Improvement
|
$3,676,814
|
RECONSTRUCTION OF THE SMELTER AVE. & 10TH ST. NORTH INTERSECTION (Federal ID: 1011004)
|
No Contractor
|
Cascade
|
Pavement Improvement
|
$2,228,200
|
RECONSTRUCT THE REMAINING PORTION OF SHILOH ROAD - BILLINGS (Federal ID: 1031011)
|
No Contractor
|
Yellowstone
|
Pavement Widening
|
$6,447,600
|
JCT US 191-WHITEWATER (CONST & CENG) STATE SECONDARY ROUTE 208-RECONSTRUCTION OF THE EXISTING ROADWAY... (Federal ID: 2081006)
|
No Contractor
|
Phillips
|
Pavement Improvement
|
$8,000,000
|
RECONSTRUCT EXISTING STATE SECONDARY 235 EAST OF MT 85 (Federal ID: 2351011)
|
No Contractor
|
Gallatin
|
Pavement Improvement
|
$4,924,155
|
RECONSTRUCTION OF THE EXISTING ROADWAY AND CONSTRUCTING BUS TURN AROUNDS ON STATE SECONDARY 421 7 KM E. OF COLUMBUS (Federal ID: 4211004)
|
No Contractor
|
Stillwater
|
Pavement Improvement
|
$3,795,714
|
RECONSTRUCTION OF THE EXISTING ROADWAY AND STRUCTURE WORK ON CANYON FERRY ROAD (Federal ID: 4301008)
|
No Contractor
|
Lewis and Clark
|
Pavement Improvement
|
$7,862,308
|
PHASE 3 OF A MULTIPLE LOCATION SIDEWALK IMPROVMENT PROJECT - GREAT FALLS (Federal ID: 5299081)
|
No Contractor
|
Cascade
|
Transportation Enhancements
|
$413,691
|
CONSTRUCTION OF APPROX. 2300 LN FT OF ASPHALT AND CONCRETE PATHS INCLUDING FENCING, DRAINAGE CULVERTS, SIGNING, STRIPING AND RETAINING WALL IN GREAT FALLS. (Federal ID: 5299086)
|
No Contractor
|
Cascade
|
Transportation Enhancements
|
$256,000
|
RECONSTRUCT THE EXISTING 8TH AVE ROADWAY IN LAUREL (Federal ID: 6905002)
|
No Contractor
|
Yellowstone
|
Pavement Improvement
|
$3,152,400
|
DESIGN AND CONSTRUCTION OF SIDEWALKS, BIKE LANES, AND PERIOD LIGHTING. THE PROEJCT IS IN MISSOULA ALONG BOTH SIDES IF HIGGINS AVENUE BETWEEN BROADWAY AND RAILROAD STREETS. (Federal ID: 8119001)
|
No Contractor
|
Missoula
|
Other
|
$125,000
|
DESIGN AND CONSTRUCT A BICYCLE AND PEDSTRIAN PATH IN THE MISSOULA URBANIZED AREA ALONG THE SOUTH SIDE OF MULLAN ROAD BETWEEN FLYN LANE AND COTE LANE. (Federal ID: 8123001)
|
No Contractor
|
Missoula
|
Other
|
$72,000
|
INSTALLATION OF ACCESSIBLE CURB RAMPS ON EXISTING SIDEWALKS AT MULTIPLE LOCATIONS WITHIN THE CITY OF MISSOULA. (Federal ID: 8199088)
|
No Contractor
|
Missoula
|
Other
|
$20,000
|
DESIGN AND CONSTRUCT SIDEWALKS AND BIKE PATHS IN MISSOULA - ON BOTH SIDES OF GREENOUGH DRVIE BETWEEN MADISON ST AND WATEWORKS HILL TRAILHEAD. (Federal ID: 8199089)
|
No Contractor
|
Missoula
|
Other
|
$30,000
|
REPLACE EXISTING STRUCTURE OVER THE CLARK FORK, 2 KM EAST OF WARM SPRINGS (Federal ID: 9012131)
|
No Contractor
|
Deer Lodge
|
Bridge Replacement
|
$517,000
|
PURCHASE, TRANSPORT AND SET UP EQUIPMENT AND SOFTWARE THAT WILL BE USED TO PROVIDE AND SUPPORT STATE OF THE ART TRAINING. (Federal ID: STWD016)
|
No Contractor
|
Lake
|
Other
|
$342,860
|
PROVIDE ON THE JOB TRAINING IN HIGHWAY CONSTRUCTION INDUSTRY, EQUIPMENT OPERATING, AND TRANSPORTATION TO TARGETED GROUPS IN HIGHWAY CONSTRUCTION WORKFORCE. (Federal ID: STWD017)
|
No Contractor
|
Roosevelt
|
Other
|
$334,320
|
ROCKFALL MITIGATION FOR PORTION OF ROAD RELATED TO MT PRP GLAC 10(23) PHASE 8 (Federal ID: 1517302601038)
|
No Contractor
|
Flathead
|
Pavement Improvement
|
$20,567
|
RECONSTRUCT A PORTION OF THE GOING TO THE SUN ROAD IN GLACIER NATIONAL PARK PHASE. (Federal ID: 1517302610023)
|
No Contractor
|
Flathead
|
Pavement Improvement
|
$19,202,125
|