New Hampshire • NH-02 Congressional District

Get Adobe Flash player

Total # Projects: 12
Total # Contracts: 9
Total $ Projects: $69,391,530
Total $ Contracts: $54,694,495

Congressmembers

Other Congressional Districts

Project $
NH-01 $28,060,938

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for NH-02. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
CONSTRUCT 4,000 LF OF 5' WIDE BITUMINOUS SIDEWALK ON ONE SIDE & CONSTRUCT 4000 LF OF 4' WIDE BITUMINOUS & BICYCLE LANE ON ONE SIDE: LOCATED ON THE EAST SIDE OF NH 102 BETWEEN EVERGREEN DRIVE AND MEGAN (Federal ID: A000095) PICHETTE BROTHERS CONSTRUCTION CO. Hillsborough Transportation Enhancements $340,000
EXIT 3 AREA, NB MAINLINE CONSTRUCTION FROM SALEM TOWN LINE TO MILE MARKER 6.3, INCLUDING INTERIM TRANSITIONS, AND APPROXIMATELY 3700 I.F. OF SB MAINLINE RECONSTRUCTION NORTH OF EXIT 3 (WINDHAM) (Federal ID: A000127) GEORGE R. CAIRNS AND SONS INC. Rockingham New Construction $25,881,622
VILLAGE PEDESTRIAN IMPROVEMENTS: RECONSTRUCT APPROX. 2,800' OF ROADSIDE IN THE VILLAGE TO RESTORE DEFINITION OF PEDESTRIAN ACCESS BY WAY OF SIDEWALKS AND CROSSWALKS. RECONSTRUCT SIDEWALKS, DELINEATI (Federal ID: A000341) VAN DYKE CONSTRUCTION, INC. Hillsborough Transportation Enhancements $551,406
NORTH MAIN STREET EAST TO NH9, MICROSURFACING OF TW ONLY (4.9 MILES) [PARENT = IPPP*3927] [ARRA] (Federal ID: A000838) NEW YORK BITUMINOUS PRODUCTS CORP Merrimack Pavement Improvement $792,740
EXIT 14 NORTH TO EXIT 17, 1.5" TW INLAY WITH 1.5" FULL WIDTH OVERLAY (6.1 MILES) [PARENTS = IPPP*3927, BRPPI 6601 AND GRR 785] [ARRA] (Federal ID: A000839) CONTINENTAL PAVING INC. Merrimack Pavement Improvement $5,121,186
I-93 NB AND SB; PAVEMENT REHABILITATION FROM EXIT 27 NORTH TO EXIT 28 (3.1 MILES) PARENT= IPPP*3927 & BRPPI*6601] [ARRA] (Federal ID: A000841) NEW YORK BITUMINOUS PRODUCTS CORP Grafton Pavement Improvement $863,415
EXIT 30 TO EXIT 32, 2" FULL WIDTH INLAY (5.4 MILES) [PARENT = IPPP*3927 & BRPPI 6601] [ARRA] (Federal ID: A000843) Unknown Company 15194 Grafton Pavement Improvement $8,500,850
EXIT 30 TO EXIT 32, 2" FULL WIDTH INLAY (5.4 MILES) [PARENT = IPPP*3927 & BRPPI 6601] [ARRA] (Federal ID: A000843) R. M. PIPER, INC. Grafton Pavement Improvement $7,702,359
EXIT 11 NORTH TO EXIT 12A, 1.5" FULL WIDTH INLAY (4.9 MILES) (Federal ID: A000846) PIKE INDUSTRIES, INC. Merrimack Pavement Improvement $4,940,917
STONE ARCH BRIDGE PRESERVATION PROJECT TO MAKE ACCESSIBLE TO THE PUBLIC: NEW TOP SURFACE FOR BRIDGE, STONE MASONRY, ETC. (Federal ID: A000094) No Contractor Hillsborough Transportation Enhancements $150,045
KING ST SIDEWALK CONNECTOR: CONSTRUCT SIDEWALKS ALONG NORTH MAIN ST FORM EXISTING SIDEWALK TO INTERSECTION OF US 3/4 & FROM US 3/4 INTERSECTION TO RIVER RD CONNECTING WITH EXISTING SIDEWALK ON KING ST (Federal ID: A000342) No Contractor Merrimack Transportation Enhancements $421,431
ALBUQUERQUE AVENUE TRAIL COMPLETION: CONSTRUCT 0.85 MILES AND 0.95 MILES OF PEDESTRIAN BIKEWAY ADJACENT TO ALBUQUERQUE AVENUE (TE PROGRAM) [06-26TE][ARRA] (Federal ID: A000566) No Contractor Hillsborough Transportation Enhancements $394,477
RECONSTRUCTION OF INTERCHANGE TO INCREASE CAPACITY. INCLUDES 4000' I-89 ROADWAY AND BRIDGES AND NEW CONNECTOR BRIDGES. (Federal ID: A000947) No Contractor Grafton Pavement Widening $19,831,402