Project Name |
Contractor |
County |
Improvement Type |
Amount |
THIS PROJECT IS THE FINAL PHASE OF A SAFETY IMPROVEMENT PROJECT. PROJECT INCLUDES EXCAVATING PLANTING BEDS, PLACING LOAM AND INSTALLING NEW PLANTING MATERIAL IN SELECT LOCATIONS IN THE U.S. ROUTE 1 M (Federal ID: 0001104)
|
MON LANDSCAPING
|
Washington
|
Pavement Improvement
|
$156,982
|
REPLACEMENT OF ALL SIGNAGE ON ROUTE 10 FROM PARK AVE./ROUTE 12 IN CRANSTON TO I-95 IN PROVIDENCE (5 MILES). (Federal ID: 0010011)
|
LIDDELL BROTHERS, INC.
|
Providence
|
Safety/Traffic Management
|
$5,047,069
|
REHABILITATION OF BRIDGES AT THE DILLONS CORNER ROTARY IN NARRAGANSETT. WORK TO CONSIST OF SUPERSTRUCTURE REPLACEMENT OF DILLIONS CORNER BRIDGE, WHICH CARRIES ROUTE 1 OVER KINGSTOWN RD./PT. JUDITH RD. (Federal ID: 0481001)
|
JOHN ROCCHIO CORP.
|
Washington
|
Bridge Improvement
|
$10,534,515
|
CONTINUED LONG-TERM PREVENTATIVE MAINTENANCE ON THE JAMESTOWN-VERRAZZANO BRIDGE, WHICH CARRIES ROUTE 138 OVER THE WEST PASSAGE OF NARRAGANSETT BAY. (Federal ID: 0800003)
|
AETNA BRIDGE
|
Washington
|
Bridge Improvement
|
$3,379,512
|
I-95 RESURFACING FROM THE CT STATE LINE TO EXIT 3, RICHMOND & HOPKINTON (ENGINEER: PREISS) STIMULUS FUNDING (Federal ID: 0953108)
|
D'AMBRA CONST.
|
Washington
|
Pavement Improvement
|
$12,551,712
|
REMOVAL AND REPLACEMENT OF LIGHT POLES AND ELECTRICAL SYSTEMS FOR OVERHEAD LIGHTING ON I-295 AT EXITS 1, 2, 4 AND 5 FROM WARWICK TO JOHNSTON. CONTRACT INCLUDES ADDITIONAL TRAFFIC CAMERAS FOR THE TMC. (Federal ID: 2955108)
|
ARDEN ENGINEERING
|
Kent
|
Safety/Traffic Management
|
$5,063,652
|
APPLICATION OF STRIPING ON STATE ROADWAYS IN BURRILLVILLE, CENTRAL FALLS, CUMBERLAND, GLOCESTER, LINCOLN, NORTH PROVIDENCE, NORTH SMITHFIELD, PAWTUCKET, SMITHFIELD AND WOONSOCKET. (Federal ID: 4444072)
|
TRAFFIC MARKINGS
|
Multiple/Statewide
|
Safety/Traffic Management
|
$1,811,221
|
APPLICATION OF STRIPING ON STATE ROADWAYS IN BARRINGTON, BRISTOL, EAST PROVIDENCE, LITTLE COMPTON, MIDDLETOWN, NEWPORT, PORTSMOUTH, PROVIDENCE, TIVERTON AND WARREN. (Federal ID: 4444073)
|
TRAFFIC MARKINGS
|
Multiple/Statewide
|
Safety/Traffic Management
|
$1,695,756
|
MANTON AVENUE STREETSCAPE PROJECT, PROVIDENCE, (ENGINEER: QUEENAN) STIMULUS FUNDING (Federal ID: 8888180)
|
UNIVERSAL CONSTRUCTION
|
Providence
|
Safety/Traffic Management
|
$175,548
|
STATEWIDE MAINTENANCE CONTRACT WHICH INVOLVES SIGNAL REPAIR AND MINOR RESURFACING AS NEEDED AT ROUGHLY 60 DIFFERENT INTERSECTIONS. (Federal ID: 8888181)
|
LYNCH & SONS, INC., J. H.
|
Multiple/Statewide
|
Safety/Traffic Management
|
$1,105,763
|
VARIOUS TRAFFIC SIGNAL IMPROVEMENTS INCLUDING NEW INSTALLATIONS, SIGNAL MODIFICATIONS, AND ISLAND MODIFICATIONS IN BARRINGTON, BURRILLVILLE, FOSTER, JOHNSTON, NORTH PROVIDENCE, NORTH SMITHFIELD, PAWTU (Federal ID: 8888182)
|
ROSSI ELECTRIC CO. INC.
|
Multiple/Statewide
|
Safety/Traffic Management
|
$926,116
|
REPLACEMENT AND REPAIR OF RUSTED, DAMAGED AND/OR SUBSTANDARD GUARDRAIL. (Federal ID: 9999071)
|
COSCO INC.
|
Multiple/Statewide
|
Safety/Traffic Management
|
$1,199,796
|
INSTALLATION OF NEW SIDEWALKS AND CURBING ON BRISTOL FERRY ROAD FROM WEST MAIN ROAD/ROUTE 114 TO BOYD'S LANE. INCLUDES INTERSECTION IMPROVEMENTS AND NEW TRAFFIC SIGNALS WITH PEDESTRIAN SIGNALS. (Federal ID: AWDA016)
|
NARRAGANSETT IMPROVEMENT
|
Newport
|
Pavement Improvement
|
$1,695,877
|
INSTALLATION OF NEW SIDEWALKS AND CURBING ON LEGION WAY FROM MAIN ST. TO PROVIDENCE ST. AND PROVIDENCE ST. FROM LEGION WAY TO EAST MAIN ST./ROUTE 115. (1 MILES). (Federal ID: AWDA019)
|
LUCENA BROTHERS
|
Kent
|
Pavement Improvement
|
$1,081,627
|
INSTALLATION OF NEW SIDEWALKS AND CURBING ON CHILD ST. FROM CUTLER ST. TO MASSACHUSETTS STATE LINE. (2.2 MILES). (Federal ID: AWDA020)
|
SHIRE CORP
|
Bristol
|
Pavement Improvement
|
$2,891,304
|
INVOLVED VARIOUS DRAINAGE IMPROVEMENTS IN THE FOLLOWING COMMUNITIES: HOPKINTON (MECHANIC ST.), JOHNSTON (WINSOR AVE. AT HAWKINS POND), NORTH SMITHFIELD (GREENVILLE RD.), AND WEST GREENWICH (ESCOHEAG H (Federal ID: DRNG015)
|
R.P. IANNUCILLO & SONS
|
Multiple/Statewide
|
Pavement Improvement
|
$568,032
|
DRAINAGE WORK AT THE INTERSECTION OF TEN ROD ROAD/RTE 165 AND BLACK PLAIN RD IN EXETER. (Federal ID: DRNG016)
|
ROSCITI CONSTRUCTION
|
Multiple/Statewide
|
Pavement Improvement
|
$273,699
|
INVOLVES VARIOUS DRAINAGE IMPROVEMENTS IN THE FOLLOWING COMMUNITIES: CRANSTON (PIPPIN ORCHARD RD.), LINCOLN (RIVER RD./RTE. 126), AND NARRAGANSETT (BRIDGETOWN RD.). (Federal ID: DRNG018)
|
LYNCH & SONS, INC., J. H.
|
Multiple/Statewide
|
Pavement Improvement
|
$376,189
|
POWERWASHING OF 65 OF RHODE ISLAND'S 772 BRIDGES TO REMOVE ROAD SALTS, DIRT AND BIRD DROPPINGS. INCLUDES: BURRILLVILLE, CHARLESTOWN, CRANSTON, EAST GREENWICH, EXETER, HOPKINTON, JOHNSTON, NARRAGANSETT (Federal ID: MAIN023)
|
DEANGELO BROS.
|
Multiple/Statewide
|
Bridge Improvement
|
$984,378
|
CONSTRUCTION OF A 400-FOOT ROCKY SEAWALL ALONG THE SHORELINE OF THE SEEKONK RIVER, SALT MARSH MITIGATION, INSTALLATION OF A STONE DUST RIVER WALK AND LANDSCAPING ON THE ADJACENT WARREN AVENUE PROJECT (Federal ID: R012009)
|
SUMCO ECO
|
Providence
|
Other
|
$425,170
|
RESURFACING OF PUTNAM PIKE/ROUTE 44, INCLUDING DRAINAGE IMPROVEMENTS AND GUARDRAIL REPLACEMENT, FROM TOURTELLOTE HILL RD. TO RIDOT MAINTENANCE FACILITY (2 MILES). (Federal ID: RESF136)
|
T. MIOZZI PAVING
|
Providence
|
Pavement Improvement
|
$1,866,008
|
RESURFACING OF PUTNAM PIKE/ROUTE 44, INCLUDING REPLACEMENT OF SIDEWALKS, CURBING, DRAINAGE IMPROVEMENTS, AND NEW SIGNAL, FROM AUSTIN AVE. TO WEST GREENVILLE RD. (1.3 MILES). (Federal ID: RESF137)
|
DIGREGORIO
|
Providence
|
Pavement Improvement
|
$2,949,900
|
RESURFACING OF MAIN RD./ROUTE 138, INCLUDING CURBING, SIDEWALKS, AND DRAINAGE AND GUARDRAIL IMPROVEMENTS, FROM JOHN STREET TO THE MASSACHUSETTS STATE LINE (2.3 MILES) (Federal ID: RESF138)
|
D'AMBRA CONST.
|
Newport
|
Pavement Improvement
|
$2,840,558
|
RESURFACING OF OLD LOUISQUISSET PIKE/ROUTE 246 FROM BREAKNECK HILL RD./ROUTE 123 TO ROUTE 116/ROUTE 146 INTERCHANGE (2.3 MILES). (Federal ID: RESF139)
|
CARDI CORP
|
Providence
|
Pavement Improvement
|
$1,686,602
|
RESURFACING OF WEST MAIN ROAD FROM CODDINGTON HIGHWAY TO JOHN KESSON LANE. INCLUDES REMOVAL OF EXISTING CONCRETE MEDIAN MARKERS; CURBING AND SIDEWALK REPLACEMENT; NEW SIGNAGE AND PAVEMENT MARKINGS; RE (Federal ID: RESF144)
|
D'AMBRA CONST.
|
Newport
|
Pavement Improvement
|
$6,048,527
|
APPLICATION OF RUBBERIZED CHIP SEAL. (Federal ID: RESF147)
|
ALL STATES ASPHALT
|
Multiple/Statewide
|
Pavement Improvement
|
$1,799,576
|
CLEANING AND SEALING CRACKS AND OPEN JOINTS IN THE EXISTING BITUMINOUS CONCRETE PAVEMENT WITH A HOT APPLIED RUBBERIZED ASPHALT SEALANT. (Federal ID: RESF148)
|
SEALCOATING
|
Multiple/Statewide
|
Pavement Improvement
|
$299,834
|
CLEANING AND SEALING CRACKS AND OPEN JOINTS IN THE EXISTING BITUMINOUS CONCRETE PAVEMENT WITH A HOT APPLIED RUBBERIZED ASPHALT SEALANT. (Federal ID: RESF149)
|
ANNSEAL, INC.
|
Multiple/Statewide
|
Pavement Improvement
|
$299,834
|
RESURFACING OF KINGSTOWN RD./ROUTE 138 FROM BEAVER RIVER RD. TO 660 FEET WEST OF ROUTE 112 (2 MILES). (Federal ID: RESF151)
|
CARDI CORP
|
Washington
|
Pavement Improvement
|
$3,015,646
|
RESURFACING OF TWO SECTIONS OF OCEAN RD. IN FROM NARRAGANSETT TOWN BEACH TO POINT JUDITH, NARRAGANSETT (3.7 MILES), AND SHORE ROAD FROM POST ROAD TO OCEAN VIEW HIGHWAY IN WESTERLY (4.5 MILES). (Federal ID: RESF153)
|
LYNCH & SONS, INC., J. H.
|
Washington
|
Pavement Improvement
|
$3,826,590
|
CHIP SEAL OVERLAY OF HARTFORD PIKE/ROUTE 101 FROM THE CONNECTICUT STATE LINE TO ROUTE 94 IN FOSTER AND ANAN WADE RD. TO ROUTE 102 IN SCITUATE (4 MILES). (Federal ID: RESF159)
|
LYNCH & SONS, INC., J. H.
|
Providence
|
Pavement Improvement
|
$1,721,910
|
RESURFACING OF NATE WHIPPLE HIGHWAY/ROUTE 120, INCLUDING CURBING, SIDEWALK, GUARDRAIL, MINOR DRAINAGE WORK, AND SIGNAL WORK FROM DIAMOND HILL ROAD/ROUTE 114 TO MENDON ROAD/ROUTE 122 (2.6 MILES). (Federal ID: RESF160)
|
FLEET CONSTRUCTION
|
Providence
|
Pavement Improvement
|
$3,803,682
|
RESURFACING OF NATE WHIPPLE HIGHWAY/ROUTE 120, INCLUDING CURBING, SIDEWALK, GUARDRAIL, MINOR DRAINAGE WORK, AND SIGNAL WORK FROM DIAMOND HILL ROAD/ROUTE 114 TO THE MASSACHUSETTS STATE LINE (1.7 MILES) (Federal ID: RESF166)
|
LYNCH & SONS, INC., J. H.
|
Providence
|
Pavement Improvement
|
$2,225,038
|
RECONSTRUCTION OF HARTFORD AVE./ROUTE 6A, INCLUDING CURBING, SIDEWALKS, WIDENING A PORTION TO PROVIDE A CENTER TURN LANE, A NEW DRAINAGE SYSTEM, UPGRADING TRAFFIC SIGNAL SYSTEMS, AND INSTALLATION OF F (Federal ID: RESF174)
|
DIGREGORIO
|
Providence
|
Pavement Improvement
|
$4,842,266
|
RESURFACING OF DEAN ST., CAHIR ST. AND STEWART ST., INCLUDING UPGRADED SIGNALS AND NEW STREET LIGHTS, FROM WEST EXCHANGE ST. TO POINT ST. (0.9 MILES) (Federal ID: RESF178)
|
DIGREGORIO
|
Providence
|
Pavement Improvement
|
$5,163,234
|
RESURFACING OF OAK ST./WESTERLY BRADFORD R./ROUTE 91, INCLUDING SIDEWALKS, MINOR DRAINAGE IMPROVEMENTS, WATER LINE INSTALLATION AND NEW SIGNAGE, FROM ROUTE 3 TO WESTERLY MAINTENANCE FACILITY (1.3 MILE (Federal ID: RESF179)
|
D'AMBRA CONST.
|
Washington
|
Pavement Improvement
|
$3,935,976
|
CONSTRUCTION OF STORMWATER TREATMENT POND AT INTERCHANGE OF ROUTE 6 AND KILLINGLY ST./ROUTE 128. (Federal ID: SDRP007)
|
LYNCH & SONS, INC., J. H.
|
Providence
|
Other
|
$917,944
|
REPLACEMENT OF SIGNAGE ON I-95 AT EXITS 6-8 (WEST GREENWICH, EAST GREENWICH, WEST WARWICK, AND WARWICK), EXIT 12B (WARWICK), EXISTS 16-18 (CRANSTON AND PROVIDENCE), AND EXIT 29 (PAWTUCKET). CONTRACT A (Federal ID: SIGN015)
|
ROADSAFE TRAFFIC SYSTEMS
|
Multiple/Statewide
|
Safety/Traffic Management
|
$3,399,696
|
REPLACEMENT OF ALL SIGNAGE ON ROUTE 37 FROM POST RD./ROUTE 1 IN WARWICK TO NATICK AVE. IN CRANSTON (3.2 MILES). (Federal ID: SIGN016)
|
LIDDELL BROTHERS, INC.
|
Providence
|
Safety/Traffic Management
|
$3,315,933
|
MANTON AVE. STREETSCAPE FROM DELAINE ST. TO SISSON ST. (0.8 MILES), WHICH INCLUDES SIDEWALKS, CROSSWALKS, STREET TREES AND STREET LIGHTING. OTHER FUNDS (FEDERAL AND CITY) WILL BE USED TO UPGRADE SIGNA (Federal ID: TEA2060)
|
UNIVERSAL CONSTRUCTION
|
Providence
|
Transportation Enhancements
|
$500,000
|
INSTALLATION OF RADAR-BASED VEHICLE DETECTORS, AT SAME LOCATION AS EXISTING TRAFFIC CAMERAS, TO COLLECT DATA ON TRAFFIC VOLUME, SPEEDS. THE NEW DETECTORS PROVIDE ALERTS TO TMC OPERATORS TO ANNOUNCE I (Federal ID: TRMS009)
|
ARDEN ENGINEERING
|
Multiple/Statewide
|
Safety/Traffic Management
|
$505,203
|
INSTALLATION OF RADAR-BASED VEHICLE DETECTORS IN SEVERAL LOCATIONS TO COLLECT DATA ON TRAFFIC VOLUME, SPEED, AND VEHICLE CLASSIFICATION USED FOR ANNUAL REPORTING REQUIREMENTS AND TMC TRAFFIC FLOW MAPS (Federal ID: TRMS010)
|
ARDEN ENGINEERING
|
Multiple/Statewide
|
Safety/Traffic Management
|
$1,052,724
|
REHABILITATION OF BOTH WYOMING BRIDGES, WHICH CARRY BRIDGE ST. OVER THE WOOD RIVER. (Federal ID: 0043002)
|
No Contractor
|
Washington
|
Bridge Replacement
|
$2,791,702
|
1R IMPROVEMENTS TO RTE 146 AND REHABILITATION OF THE WILBUR ROAD BRIDGE NO. 415, LINCOLN: (ENGINEER: NEVITT) STIMULUS FUNDING (Federal ID: 0146020)
|
No Contractor
|
Providence
|
Pavement Improvement
|
$10,802,278
|
REHABILITATION OF INDUSTRIAL DR., INCLUDING SIDEWALK REPAIRS AND RESURFACING, WHICH CARRIES INDUSTRIAL DR. OVER THE MOSHASSUCK RIVER. (Federal ID: 0882002)
|
No Contractor
|
Providence
|
Bridge Improvement
|
$3,433,107
|
VARIOUS TRAFFIC SIGNAL IMPROVEMENTS INCLUDING NEW INSTALLATIONS, SIGNAL MODIFICATIONS, AND ISLAND MODIFICATIONS IN COVENTRY, EAST GREENWICH, EXETER, NORTH KINGSTOWN, SOUTH KINGSTOWN, WARWICK, AND WEST (Federal ID: 8888183)
|
No Contractor
|
Multiple/Statewide
|
Safety/Traffic Management
|
$634,012
|
REPAIR SIDEWALKS ON WASHINGTON ST. FROM EMPIRE ST. TO EDDY ST. AND WESTMINSTER ST. FROM EMPIRE ST. TO 100 FEET EAST OF MATHEWSON ST. (0.3 MILES). INCLUDES LANDSCAPING AND INSTALLATION OF BIKE RACKS. (Federal ID: AWDA021)
|
No Contractor
|
Providence
|
Transportation Enhancements
|
$1,328,267
|
POWERWASHING OF 65 OF RHODE ISLAND'S 772 BRIDGES TO REMOVE ROAD SALTS, DIRT AND BIRD DROPPINGS. INCLUDES: CUMBERLAND, EAST PROVIDENCE, LINCOLN, NORTH SMITHFIELD, PAWTUCKET, PORTSMOUTH, PROVIDENCE, AND (Federal ID: MAIN022)
|
No Contractor
|
Multiple/Statewide
|
Bridge Improvement
|
$1,391,634
|
RESURFACING OF DIAMOND HILL RD./RTE. 114, INCLUDING CURBING, SIDEWALK, GUARDRAIL, MINOR DRAINAGE WORK, AND SIGNAL WORK, FROM SOCIAL STREET TO BOUND ROAD (2.2 MILES) (Federal ID: RESF170)
|
No Contractor
|
Providence
|
Pavement Improvement
|
$5,288,262
|
RESURFACING OF HIGH ST./DIAMOND HILL RD./ROUTE 114, INCLUDING CURBING, SIDEWALK, GUARDRAIL, MINOR DRAINAGE WORK, AND SIGNAL WORK, FROM CUMBERLAND PUBLIC LIBRARY TO BLACKSTONE STREET (1.2 MILES). (Federal ID: RESF175)
|
No Contractor
|
Providence
|
Pavement Improvement
|
$1,910,540
|
PROJECT TO REVIEW APPROXIMATELY 60 OUT OF 130 STORM WATER DRAINAGE SYSTEMS, PONDS, CATCH BASINS, ETC. THAT WERE PREVIOUSLY UPGRADED TO MEET FEDERAL BEST MANAGEMENT PRACTICES, IN ACCORDANCE WITH STATE (Federal ID: SDRP008)
|
No Contractor
|
Providence
|
Other
|
$197,832
|
OJT TRAINING SUPPORTIVE SERVICES - ARRA OJT/SS PROGRAM 2009 - (PM - CRUM) - STIMULUS FUNDING (Federal ID: SSRV002)
|
No Contractor
|
Multiple/Statewide
|
Other
|
$350,000
|
WESTMINSTER ST. STREETSCAPE FROM I-95 SERVICE ROAD NO. 7 TO OLNEYVILLE SQUARE/MANTON AVE./PLAINFIELD ST. (1.3 MILES), WHICH INCLUDES SIDEWALKS, CROSSWALKS, BICYCLE LANES, STREET TREES AND STREET LIGHT (Federal ID: TEAC090)
|
No Contractor
|
Providence
|
Transportation Enhancements
|
$3,300,000
|