Rhode Island • Providence County

Get Adobe Flash player

Total # Projects: 21
Total # Contracts: 14
Total $ Projects: $56,163,760
Total $ Contracts: $34,640,304

Other Counties

Project $
Bristol $2,891,304
Kent $4,746,578
Newport $10,642,649
Washington $33,319,641

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for Providence. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
REPLACEMENT OF ALL SIGNAGE ON ROUTE 10 FROM PARK AVE./ROUTE 12 IN CRANSTON TO I-95 IN PROVIDENCE (5 MILES). (Federal ID: 0010011) LIDDELL BROTHERS, INC. Providence Safety/Traffic Management $5,047,069
MANTON AVENUE STREETSCAPE PROJECT, PROVIDENCE, (ENGINEER: QUEENAN) STIMULUS FUNDING (Federal ID: 8888180) UNIVERSAL CONSTRUCTION Providence Safety/Traffic Management $175,548
CONSTRUCTION OF A 400-FOOT ROCKY SEAWALL ALONG THE SHORELINE OF THE SEEKONK RIVER, SALT MARSH MITIGATION, INSTALLATION OF A STONE DUST RIVER WALK AND LANDSCAPING ON THE ADJACENT WARREN AVENUE PROJECT (Federal ID: R012009) SUMCO ECO Providence Other $425,170
RESURFACING OF PUTNAM PIKE/ROUTE 44, INCLUDING DRAINAGE IMPROVEMENTS AND GUARDRAIL REPLACEMENT, FROM TOURTELLOTE HILL RD. TO RIDOT MAINTENANCE FACILITY (2 MILES). (Federal ID: RESF136) T. MIOZZI PAVING Providence Pavement Improvement $1,866,008
RESURFACING OF PUTNAM PIKE/ROUTE 44, INCLUDING REPLACEMENT OF SIDEWALKS, CURBING, DRAINAGE IMPROVEMENTS, AND NEW SIGNAL, FROM AUSTIN AVE. TO WEST GREENVILLE RD. (1.3 MILES). (Federal ID: RESF137) DIGREGORIO Providence Pavement Improvement $2,949,900
RESURFACING OF OLD LOUISQUISSET PIKE/ROUTE 246 FROM BREAKNECK HILL RD./ROUTE 123 TO ROUTE 116/ROUTE 146 INTERCHANGE (2.3 MILES). (Federal ID: RESF139) CARDI CORP Providence Pavement Improvement $1,686,602
CHIP SEAL OVERLAY OF HARTFORD PIKE/ROUTE 101 FROM THE CONNECTICUT STATE LINE TO ROUTE 94 IN FOSTER AND ANAN WADE RD. TO ROUTE 102 IN SCITUATE (4 MILES). (Federal ID: RESF159) LYNCH & SONS, INC., J. H. Providence Pavement Improvement $1,721,910
RESURFACING OF NATE WHIPPLE HIGHWAY/ROUTE 120, INCLUDING CURBING, SIDEWALK, GUARDRAIL, MINOR DRAINAGE WORK, AND SIGNAL WORK FROM DIAMOND HILL ROAD/ROUTE 114 TO MENDON ROAD/ROUTE 122 (2.6 MILES). (Federal ID: RESF160) FLEET CONSTRUCTION Providence Pavement Improvement $3,803,682
RESURFACING OF NATE WHIPPLE HIGHWAY/ROUTE 120, INCLUDING CURBING, SIDEWALK, GUARDRAIL, MINOR DRAINAGE WORK, AND SIGNAL WORK FROM DIAMOND HILL ROAD/ROUTE 114 TO THE MASSACHUSETTS STATE LINE (1.7 MILES) (Federal ID: RESF166) LYNCH & SONS, INC., J. H. Providence Pavement Improvement $2,225,038
RECONSTRUCTION OF HARTFORD AVE./ROUTE 6A, INCLUDING CURBING, SIDEWALKS, WIDENING A PORTION TO PROVIDE A CENTER TURN LANE, A NEW DRAINAGE SYSTEM, UPGRADING TRAFFIC SIGNAL SYSTEMS, AND INSTALLATION OF F (Federal ID: RESF174) DIGREGORIO Providence Pavement Improvement $4,842,266
RESURFACING OF DEAN ST., CAHIR ST. AND STEWART ST., INCLUDING UPGRADED SIGNALS AND NEW STREET LIGHTS, FROM WEST EXCHANGE ST. TO POINT ST. (0.9 MILES) (Federal ID: RESF178) DIGREGORIO Providence Pavement Improvement $5,163,234
CONSTRUCTION OF STORMWATER TREATMENT POND AT INTERCHANGE OF ROUTE 6 AND KILLINGLY ST./ROUTE 128. (Federal ID: SDRP007) LYNCH & SONS, INC., J. H. Providence Other $917,944
REPLACEMENT OF ALL SIGNAGE ON ROUTE 37 FROM POST RD./ROUTE 1 IN WARWICK TO NATICK AVE. IN CRANSTON (3.2 MILES). (Federal ID: SIGN016) LIDDELL BROTHERS, INC. Providence Safety/Traffic Management $3,315,933
MANTON AVE. STREETSCAPE FROM DELAINE ST. TO SISSON ST. (0.8 MILES), WHICH INCLUDES SIDEWALKS, CROSSWALKS, STREET TREES AND STREET LIGHTING. OTHER FUNDS (FEDERAL AND CITY) WILL BE USED TO UPGRADE SIGNA (Federal ID: TEA2060) UNIVERSAL CONSTRUCTION Providence Transportation Enhancements $500,000
1R IMPROVEMENTS TO RTE 146 AND REHABILITATION OF THE WILBUR ROAD BRIDGE NO. 415, LINCOLN: (ENGINEER: NEVITT) STIMULUS FUNDING (Federal ID: 0146020) No Contractor Providence Pavement Improvement $10,802,278
REHABILITATION OF INDUSTRIAL DR., INCLUDING SIDEWALK REPAIRS AND RESURFACING, WHICH CARRIES INDUSTRIAL DR. OVER THE MOSHASSUCK RIVER. (Federal ID: 0882002) No Contractor Providence Bridge Improvement $3,433,107
REPAIR SIDEWALKS ON WASHINGTON ST. FROM EMPIRE ST. TO EDDY ST. AND WESTMINSTER ST. FROM EMPIRE ST. TO 100 FEET EAST OF MATHEWSON ST. (0.3 MILES). INCLUDES LANDSCAPING AND INSTALLATION OF BIKE RACKS. (Federal ID: AWDA021) No Contractor Providence Transportation Enhancements $1,328,267
RESURFACING OF DIAMOND HILL RD./RTE. 114, INCLUDING CURBING, SIDEWALK, GUARDRAIL, MINOR DRAINAGE WORK, AND SIGNAL WORK, FROM SOCIAL STREET TO BOUND ROAD (2.2 MILES) (Federal ID: RESF170) No Contractor Providence Pavement Improvement $5,288,262
RESURFACING OF HIGH ST./DIAMOND HILL RD./ROUTE 114, INCLUDING CURBING, SIDEWALK, GUARDRAIL, MINOR DRAINAGE WORK, AND SIGNAL WORK, FROM CUMBERLAND PUBLIC LIBRARY TO BLACKSTONE STREET (1.2 MILES). (Federal ID: RESF175) No Contractor Providence Pavement Improvement $1,910,540
PROJECT TO REVIEW APPROXIMATELY 60 OUT OF 130 STORM WATER DRAINAGE SYSTEMS, PONDS, CATCH BASINS, ETC. THAT WERE PREVIOUSLY UPGRADED TO MEET FEDERAL BEST MANAGEMENT PRACTICES, IN ACCORDANCE WITH STATE (Federal ID: SDRP008) No Contractor Providence Other $197,832
WESTMINSTER ST. STREETSCAPE FROM I-95 SERVICE ROAD NO. 7 TO OLNEYVILLE SQUARE/MANTON AVE./PLAINFIELD ST. (1.3 MILES), WHICH INCLUDES SIDEWALKS, CROSSWALKS, BICYCLE LANES, STREET TREES AND STREET LIGHT (Federal ID: TEAC090) No Contractor Providence Transportation Enhancements $3,300,000