Project $
TX-02 $5,881,206
TX-03 $2,828,650
TX-04 $38,932,873
TX-05 $17,763,728
TX-06 $43,945,108
TX-07 $244,952
TX-08 $13,964,320
TX-09 $2,500,000
TX-10 $31,945,897
TX-11 $42,429,393
TX-12 $14,316,525
TX-13 $32,229,923
TX-14 $83,652,876
TX-15 $132,770,970
TX-16 $1,921,821
TX-17 $26,533,992
TX-18 $28,000,052
TX-19 $44,332,010
TX-20 $1,490,926
TX-21 $12,620,628
TX-22 $6,557,033
TX-23 $25,056,262
TX-24 $250,000,000
TX-25 $15,087,610
TX-26 $4,167,298
TX-27 $23,287,836
TX-28 $62,439,796
TX-29 $2,617,000
TX-30 $18,910,541
TX-31 $26,500,002
TX-32 $0
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for TX-01. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
LP 49 FR. SH 31,2.0 MI E OF FM 2661,S & SE TO. SH 155, 2.1 MI N OF FM 2868 ;CONSTRUCT 2 LNS CONTROLLED ACCESS TOLL ROAD ON NEW LOCATION (Federal ID: 2005996) LONGVIEW BRIDGE AND ROAD, LTD. Smith New Construction $33,468,320
US 259 FR. RUSK COUNTY LINE TO. SH 204 ;RESURFACE WITH POROUS FRICTION COURSE (Federal ID: 2009560) MOORE BROTHERS CONSTRUCTION COMPANY Nacogdoches Pavement Improvement $3,421,618
FM 138 FR. NACOGDOCHES CO LINE TO. FM 1645 ;RECONSTRUCT AND WIDEN EXISTING PAVEMENT (Federal ID: 2009562) PINTO CONSTRUCTION CO., INC. Shelby Pavement Improvement $1,199,984
US 84 FR. TENAHA CITY LIMITS TO. MORRIS CREEK ;REHAB EXISTING PAVEMENT (Federal ID: 2009563) A. L. HELMCAMP, INC. Shelby Pavement Improvement $7,000,000
US 79 FR. 0.1 MI. S. OF MILL CREEK TO. FM 31 AT DEBERRY WIDEN TO ADD SHOULDERS AND RESURFACE 4-LANE RURAL HIGHWAY (Federal ID: 2009566) A. L. HELMCAMP, INC. Panola Pavement Improvement $2,810,529
US 80 FR. SP 63/SH 31 IN LONGVIEW, E TO. HARRISON C/L ;PLANE & RESURFACE ROADWAY (Federal ID: 2009580) MADDEN CONTRACTING COMPANY, INC. Gregg Pavement Improvement $2,500,000
US 69 FR. 0.134 MI N OF IH 20 IN LINDALE, S TO. LP 323 IN TYLER ;RESURFACE ROADWAY (Federal ID: 2009583) REYNOLDS & KAY, LTD. Smith Pavement Improvement $4,000,000
US 259 FR. IH 20 N FRONTAGE RD, N TO. US 80, IN LONGVIEW ;PLANE & RESURFACE ROADWAY (Federal ID: 2009584) KNIFE RIVER CORPORATION - SOUTH Gregg Pavement Improvement $3,100,000
US 259 FR. US/BU 259 SPLIT, S OF KILGORE, S TO. FM 850 AT JACOBS ;PLANE & RESURFACE ROADWAY (Federal ID: 2009596) MADDEN CONTRACTING COMPANY, INC. Rusk Pavement Improvement $4,500,000
LP 49 FR. 0.294 MI W OF FM 756, NE TO. 0.266 MI W OF SH 110; ELECTRONIC TOLL GANTRIES (Federal ID: 2009679) LONGVIEW BRIDGE AND ROAD, LTD. Smith Other $2,116,000
LP 500 FR. US 96 TO. SH 7; OVERLAY (Federal ID: 2009696) MOORE BROTHERS CONSTRUCTION COMPANY Shelby Pavement Improvement $532,583
VA FR. VARIOUS LOCATIONS IN ATL DISTRICT TO. .; INSTALLATION AND UPGRADE OF TRAFFIC CONTROL DEVICES (Federal ID: 2010007) No Contractor Cass Safety/Traffic Management $475,698
FM 134 FR. FM 2208 TO. HARRISON C/L; RESTORE SECTION AND RESURFACE 2 LANE HIGHWAY (Federal ID: 2010008) No Contractor Marion Pavement Improvement $332,580
US 259 FR. 0.2 MI S OF FM 557 TO. 0.2 MI N OF SH 155; REPAIR PAVEMENT ON EXISTING 4 LANE HIGHWAY (Federal ID: 2010012) No Contractor Upshur Pavement Improvement $715,360
FM 2493 FR. LP 323 IN TYLER, S TO. 0.1 MI N OF SH 57 (GRANDE BLVD); PLANE & RESURFACE ROADWAY (Federal ID: 2010094) No Contractor Smith Pavement Improvement $830,000