Texas • TX-15 Congressional District
Top 10 Largest Contracts
US 281 FR. BUS 281 NORTH SIDE TO. BUS 281 ... | TX / Brooks |
$25,860,724
|
US 281 FR. 0.9 MILES SOUTH OF FM 3066 TO. ... | TX / Brooks |
$20,389,604
|
US 181 FR. O.76 MI. S. OF FM 1465 TO. BEE ... | TX / Bee |
$2,492,100
|
US 77 FR. ODEM N. CITY LIMITS TO. S. END U... | TX / San Patricio |
$2,015,198
|
US 77 FR. N. OF REFUGIO N. CITY LIMITS TO.... | TX / Refugio |
$1,674,297
|
SH 234 FR. IH 37 TO. US 77 ODEM ;REHAB AND... | TX / San Patricio |
$1,288,706
|
FM 2046FR. COUNTY ROAD 82D TO. FM 1944 ;RE... | TX / San Patricio |
$812,909
|
BU 281RFR. FM 1352 TO. FM 1930 ;OVERLAY RO... | TX / Jim Wells |
$684,659
|
BU 77-TFR. US 181 TO. US 77 S. RELIEF ROUT... | TX / San Patricio |
$451,189
|
Total # Projects: | 16 |
Total # Contracts: | 9 |
Total $ Projects: | $132,770,970 |
Total $ Contracts: | $55,669,386 |
Congressmembers
- Sen. Kay Bailey Hutchison (R) See Campaign Finances
- Rep. Rubén Hinojosa (D) See Campaign Finances
- Sen. John Cornyn (R) See Campaign Finances
Other Congressional Districts
Project $ | |
---|---|
TX-01 | $58,730,270 |
TX-02 | $5,881,206 |
TX-03 | $2,828,650 |
TX-04 | $38,932,873 |
TX-05 | $17,763,728 |
TX-06 | $43,945,108 |
TX-07 | $244,952 |
TX-08 | $13,964,320 |
TX-09 | $2,500,000 |
TX-10 | $31,945,897 |
TX-11 | $42,429,393 |
TX-12 | $14,316,525 |
TX-13 | $32,229,923 |
TX-14 | $83,652,876 |
TX-16 | $1,921,821 |
TX-17 | $26,533,992 |
TX-18 | $28,000,052 |
TX-19 | $44,332,010 |
TX-20 | $1,490,926 |
TX-21 | $12,620,628 |
TX-22 | $6,557,033 |
TX-23 | $25,056,262 |
TX-24 | $250,000,000 |
TX-25 | $15,087,610 |
TX-26 | $4,167,298 |
TX-27 | $23,287,836 |
TX-28 | $62,439,796 |
TX-29 | $2,617,000 |
TX-30 | $18,910,541 |
TX-31 | $26,500,002 |
TX-32 | $0 |
Show/hide all |
Collaborate
These news organizations have followed up and written stories using this database:
- PBS NewsHour/Patchwork Nation analyzed how transportation stimulus funds were distributed across communities.
Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel
Questions? Tips?
About This Data
Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.
First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.
Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.
We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.
Read more...
Here are our tips for running background checks on stimulus contractors.
All projects for TX-15. Not all projects have been awarded contracts.
Project Name | Contractor | County | Improvement Type | Amount |
---|---|---|---|---|
BU 281RFR. FM 1352 TO. FM 1930 ;OVERLAY ROADWAY (Federal ID: 2009490) | BAY LTD | Jim Wells | Pavement Improvement | $684,659 |
BU 77-TFR. US 181 TO. US 77 S. RELIEF ROUTE ;MILL, SEAL AND OVERLAY (Federal ID: 2009492) | BALLENGER CONSTRUCTION COMPANY | San Patricio | Pavement Improvement | $451,189 |
SH 234 FR. IH 37 TO. US 77 ODEM ;REHAB AND WIDEN ROADWAY (Federal ID: 2009493) | BAY LTD | San Patricio | Pavement Improvement | $1,288,706 |
US 77 FR. N. OF REFUGIO N. CITY LIMITS TO. REFUGIO N. CITY LIMITS ;MILL AND OVERLAY_(NORTH BOUND LANES ONLY) (Federal ID: 2009494) | HUNTER INDUSTRIES, LTD. | Refugio | Pavement Improvement | $1,674,297 |
FM 2046FR. COUNTY ROAD 82D TO. FM 1944 ;REHAB AND WIDEN ROADWAY (Federal ID: 2009495) | BAY LTD | San Patricio | Pavement Improvement | $812,909 |
US 181 FR. O.76 MI. S. OF FM 1465 TO. BEE STREET IN NORMANA ;UNDERSEAL AND OVERLAY (Federal ID: 2009496) | HUNTER INDUSTRIES, LTD. | Bee | Pavement Improvement | $2,492,100 |
US 281 FR. 0.9 MILES SOUTH OF FM 3066 TO. BUS 281 SOUTH SIDE ;CONSTRUCT 4 LANE EXPRESSWAY_WITH TOLLED MAIN LANES (Federal ID: 2009663) | BALLENGER CONSTRUCTION COMPANY | Brooks | Pavement Widening | $20,389,604 |
US 281 FR. BUS 281 NORTH SIDE TO. BUS 281 SOUTH SIDE ;CONSTRUCT 4 LANE EXPRESSWAY WITH TOLLED MAIN LANES (Federal ID: 2009664) | BALLENGER CONSTRUCTION COMPANY | Brooks | Pavement Widening | $25,860,724 |
US 77 FR. ODEM N. CITY LIMITS TO. S. END US 77 RELIEF RT. ; OVERLAY ROADWAY (Federal ID: 2009805) | BAY LTD | San Patricio | Pavement Improvement | $2,015,198 |
ON MI 2 N FROM SH 107 (CONWAY AVE.) TO TAYLOR ROAD. RECONSTRUCTION AND WIDENING OF MILE 2 NORTH ROAD. (Federal ID: 2008119) | No Contractor | Hidalgo | Pavement Widening | $6,109,724 |
US 59 FR. BU 59 TO. SAN ANTONIO ST. ;CONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE AND APPROACHES (Federal ID: 2009646) | No Contractor | Live Oak | Pavement Widening | $21,600,000 |
US 281 FR. 0.95 MI. N. OF FM 2508 TO. 0.21 MI. S. OF CR 449 ;CONSTRUCT DIAMOND INTERCHANGE (Federal ID: 2009647) | No Contractor | Jim Wells | Pavement Widening | $13,000,000 |
CR FR. ON "I" ROAD FROM US 281 SOUTH TO. OWASSA RD.; WIDEN TO 4 LANES (Federal ID: 2009689) | No Contractor | Hidalgo | Pavement Widening | $4,750,297 |
SH 44 FR. VENTURA ST., IN SAN DIEGO, EAST TO. APPROX. 0.15 MI E OF FM 1554 CN; REHAB. EXISTING ROADWAY (Federal ID: 2010032) | No Contractor | Jim Wells | Pavement Improvement | $5,512,948 |
US 77 FR. ARANSAS RIVER BRIDGE TO. BU 77-T; OVERLAY AND SEAL EXISTING LANES (Federal ID: 2010034) | No Contractor | San Patricio | Pavement Improvement | $2,950,000 |
SH 107 FR. 0.163 MI E OF FM 493 TO. 0.394 MI E OF FM 88; OVERLAY (Federal ID: 2010080) | No Contractor | Hidalgo | Pavement Improvement | $1,980,490 |