Project Name |
Contractor |
County |
Improvement Type |
Amount |
REHABILITATION OF THE EXISTING PAVEMENT WITH A HOT MIX ASPHALT PAVEMENT SHALL BE ACCOMPLISHED OVER 27.96 LANE MILES OF ROADWAY. THE BASIC SAFETY FEATURES WITHIN THE PROJECT LIMITS SHALL BE UPGRADED (Federal ID: 0002301)
|
INLAND ASPHALT COMPANY
|
Pend Oreille
|
Pavement Improvement
|
$6,331,649
|
PEDESTRIAN BRIDGE OVER GOOSE CREEK AND PATHWAY, ADJACENT TO US 2 FROM VICINITY MP 221.93 TO MP 222.29. FUNDING TO SUPPLEMENT EXISTING WSDOT PROJECT SHORTFALL. (Federal ID: 0002302)
|
WESTWAY CONSTRUCTION, INC.
|
Lincoln
|
Safety/Traffic Management
|
$160,000
|
THIS PROJECT WILL CONSTRUCT CURB, GUTTER, SIDEWALK, LIGHTING, DRAINAGE AND OTHER WORK ON US 97, 16TH AVE AND JUNIPER ST. (Federal ID: 0097137)
|
CATES & ERB, INC.
|
Okanogan
|
Transportation Enhancements
|
$0
|
THIS SECTION OF US 195 NORTH OF COLFAX HAS A HIGH FREQUENCY OF CROSS- OVER COLLISIONS. BY INSTALLING CENTERLINE RUMBLE STRIPS, WE WILL REDUCE THE RISK OF CROSSOVER COLLISIONS BY ALERTING INATTENTIVE O (Federal ID: 0195046)
|
NORTH STAR ENTERPRISES 1, INC.
|
Whitman
|
Safety/Traffic Management
|
$118,868
|
REHABILITATION OF THE EXISTING PAVEMENT WITH A HOT MIX ASPHALT PAVEMENT SHALL BE ACCOMPLISHED OVER 4.66 LANE MILES OF ROADWAY. THE BASIC SAFETY FEATURES WITHIN THE PROJECT LIMITS SHALL BE UPGRADED TO (Federal ID: 0206003)
|
INLAND ASPHALT COMPANY
|
Spokane
|
Pavement Improvement
|
$716,066
|
CONSTRUCT 4,700 LF OF 5' WIDE SIDEWALK ALONG OKOMA DRIVE (SR 215) FORM JASMINE ST. TO W. 4TH AVENUE; INSTALLATION OF ADA COMPLIANT SIDEWALK RAMPS AT INTERSECTIONS; CROSSWALKS; 2,400 LF OF NEW CURB; AN (Federal ID: 0215006)
|
CATES & ERB, INC.
|
Okanogan
|
Transportation Enhancements
|
$118,702
|
REHABILITATION WITH A HOT MIX ASPHALT PAVEMENT APPLICATION SHALL BE ACCOMPLISHED OVER 14.87 MILES OF ROADWAY. THE BASIC SAFETY FEATURES WITHIN THE PROJECT LIMITS SHALL BE UPGRADED TO MAINTAIN SAFE HIG (Federal ID: 0395088)
|
HAP TAYLOR & SONS, INC DBA K
|
Stevens
|
Pavement Improvement
|
$2,176,575
|
REHABILITATION OF THE EXISTING PAVEMENT WITH A HOT MIX ASPHALT PAVEMENT SHALL BE ACCOMPLISHED OVER 47.13 LANE MILES OF ROADWAY. THE BASIC SAFETY FEATURES WITHIN THE PROJECT LIMITS SHALL BE UPGRADED (Federal ID: 0395089)
|
CENTRAL WASHINGTON ASPHALT
|
Stevens
|
Pavement Improvement
|
$6,776,092
|
SR 902 HAS A HIGH FREQUENCY OF CROSSOVER COLLISIONS. BY INSTALLING CENTERLINE RUMBLESTRIPS ALONG THE ENTIRE ROUTE OF SR 902, WE WILL REDUCE THE RISK OF CROSSOVER COLLISIONS BY ALERTING INATTENTIVE OR (Federal ID: 0902319)
|
NORTH STAR ENTERPRISES 1, INC.
|
Spokane
|
Safety/Traffic Management
|
$32,751
|
CONSTRUCT 12' WIDE TRAIL FROM MILTON STREET 4.4 MILES SOUTHWEST TO CONNECT TO THE EXISTING TRAIL NEAR THE CHENEY/SPOKANE ROAD AND SHERMAN INTERSECTION. INCLUDES THE REHABILITATION OF 5 BRIDGES AS WELL (Federal ID: 1220021)
|
WESSLEN CONSTRUCTION, INC.
|
Spokane
|
Transportation Enhancements
|
$778,317
|
BST OVER GRAVEL BUSHING, THIN LIFT OVERLAY, PRE-LEVELING, CHIP SEALS. GOULD CITY-MAYVIEW, MP 2.9 TO MP 9.64 IRON SPRINGS RD MP 0 TO MP 3.27, MOUNTAIN RD MP 0 TO MP 2.44 PEOLA RD MP 10.98 TO MP 13.52. (Federal ID: 2012017)
|
GARFIELD COUNTY
|
Garfield
|
Pavement Improvement
|
$0
|
BST OVER GRAVEL BUSHING, THIN LIFT OVERLAY, PRE-LEVELING, CHIP SEALS. GOULD CITY-MAYVIEW, MP 2.9 TO MP 9.64 IRON SPRINGS RD MP 0 TO MP 3.27, MOUNTAIN RD MP 0 TO MP 2.44 PEOLA RD MP 10.98 TO MP 13.52. (Federal ID: 2012017)
|
SELLAND CONSTRUCTION, INC.
|
Garfield
|
Pavement Improvement
|
$0
|
REPAIR 22 SPALLED CONCRETE PILES BY ATTACHING SLEEVES TO THE PILES AND GROUTING IN PLACE. MILL AND OVERLAY DECK SLAB WITH 1 1/2" OF LATEX MODIFIED CONCRETE. ASPHALT APPROACHES WILL BE PAVED AND RAIS (Federal ID: 32DE001)
|
SPOKANE ROCK PRODUCTS
|
Spokane
|
Bridge Improvement
|
$268,943
|
REPAIR 22 SPALLED CONCRETE PILES BY ATTACHING SLEEVES TO THE PILES AND GROUTING IN PLACE. MILL AND OVERLAY DECK SLAB WITH 1 1/2" OF LATEX MODIFIED CONCRETE. ASPHALT APPROACHES WILL BE PAVED AND RAIS (Federal ID: 32DE001)
|
WESSLEN CONSTRUCTION, INC.
|
Spokane
|
Bridge Improvement
|
$0
|
THE PROJECT WILL GRIND AND INLAY 2 INCHES OF HOT MIX ASPHALT. TRAFFIC ISLAND MODIFICATIONS, HANDICAP RAMP UPGRADES, SIGNAL LOOPS AND INTERCONNECT CONDUIT INSTALLATION ALONG WITH STORMWATER UPGRADES W (Federal ID: 3840008)
|
SPOKANE ROCK PRODUCTS
|
Spokane
|
Pavement Improvement
|
$0
|
THE PROJECT WILL GRIND AND INLAY 2 INCHES OF HOT MIX ASPHALT. TRAFFIC ISLAND MODIFICATIONS, HANDICAP RAMP UPGRADES, SIGNAL LOOPS AND INTERCONNECT CONDUIT INSTALLATION ALONG WITH STORMWATER UPGRADES W (Federal ID: 3840008)
|
INLAND ASPHALT
|
Spokane
|
Pavement Improvement
|
$2,256,393
|
CONSTRUCT NEW ROADWAY BETWEEN LINCOLN ROAD AND ASH STREET. NEW PAVING, SIDEWALKS, CURBING, BIKE & SHARED USE LANES, SWALES, PLANTINGS AND IMPROVED HORIZONTAL AND VERTICAL GRADES. GRIND & OVERLAY FROM (Federal ID: 3867001)
|
WESSLEN CONSTRUCTION, INC.
|
Spokane
|
Pavement Improvement
|
$1,250,000
|
RECONSTRUCT EXISTING ROADWAY BY USING CEMENT TREATED BASE AND BY PLACING A 3" LIFT OF HOT MIX ASPHALT. HORIZONTAL AND VERTICAL ALIGNMENT TO REMAIN THE SAME. (Federal ID: 3867002)
|
SPOKANE ROCK PRODUCTS
|
Spokane
|
Pavement Improvement
|
$802,000
|
THIS PROJECT WILL RECONSTRUCT A PORTION OF FIVE MILE RD BETWEEN BERRIDAE AND WAIKIKI BY PULVERIZING THE EXISTING PAVEMENT, PLACING 2" OF ESTC AND 8" OF HMA. THE REMAINING PORTIONS OF FIVE MILE ROAD W (Federal ID: 3867003)
|
SPOKANE ROCK PRODUCTS
|
Spokane
|
Pavement Improvement
|
$0
|
RECONSTRUCT APPROXIMATELY 3,600 LINEAR FEET OF SPEYERS ROAD, FROM W. CITY LIMITS TO FREMONT AVENUE, INCLUDING WIDENING TO 30-FEET, CURB AND GUTTER, SIDEWALK ON ONE SIDE, STORM DRAINAGE SYSTEM, AND ILL (Federal ID: 4708001)
|
SOTO & SONS
|
Yakima
|
Pavement Improvement
|
$1,258,290
|
THE PROJECT INCLUDES GRINDING AND OVERLAYING WITH HOT MIX ASPHALT. THE PROJECT WILL SEEK TO RECYCLE SOME OF THE EXISTING PAVEMENT. SIDEWALKS WILL BE UPDATED TO ADA STANDARDS. (Federal ID: 6005002)
|
COFFMAN EXCAVATION LLC
|
Asotin
|
Pavement Improvement
|
$0
|
THE PROJECT INCLUDES GRINDING AND OVERLAYING WITH HOT MIX ASPHALT. THE PROJECT WILL SEEK TO RECYCLE SOME OF THE EXISTING PAVEMENT. SIDEWALKS WILL BE UPDATED TO ADA STANDARDS. (Federal ID: 6005002)
|
POE ASHPALT PAVING, INC.
|
Asotin
|
Pavement Improvement
|
$641,147
|
RECONSTRUCT 13TH AVENUE TO MINOR ARTERIAL STANDARDS FROM ROSE ST. TO ABADIE ST. AND FROM CHERRY ST. TO REES AVE. INCLUDING SIDEWALKS, BIKE FACILITIES, STORMWATER FACILITIES, STREET LIGHTING, TRAFFIC (Federal ID: 7169001)
|
GRANITE CONSTRUCTION NORTHWEST
|
Walla Walla
|
Pavement Widening
|
$0
|
RESURFACING 1760 L.F. OF COLLECTOR ARTERIAL: WHITMAN ST FROM KAMIAKEN TO MAPLE, MAIDEN LANE FROM WHITMAN TO OPAL, AND OPAL FROM MAIDEN LANE TO CAMPUS. THIS IS STATE ROUTE #7418 (Federal ID: 7418002)
|
POE ASHPALT PAVING, INC.
|
Whitman
|
Pavement Improvement
|
$265,972
|
RESURFACING 1760 L.F. OF COLLECTOR ARTERIAL: WHITMAN ST FROM KAMIAKEN TO MAPLE, MAIDEN LANE FROM WHITMAN TO OPAL, AND OPAL FROM MAIDEN LANE TO CAMPUS. THIS IS STATE ROUTE #7418 (Federal ID: 7418002)
|
INTERSTATE CONCRETE & ASPHALT CO.
|
Whitman
|
Pavement Improvement
|
$0
|
PAVEMENT PRESERVATION/CHIP SEAL OF COUNTY MAJOR COLLECTORS WILLIAMS LAKE AND CEDONIA-ADDY ROADS. (Federal ID: 9933001)
|
INLAND ASPHALT
|
Stevens
|
Pavement Improvement
|
$0
|
PAVEMENT PRESERVATION/CHIP SEAL OF COUNTY MAJOR COLLECTORS WILLIAMS LAKE AND CEDONIA-ADDY ROADS. (Federal ID: 9933001)
|
GRANITE NORTHWEST, INC.
|
Stevens
|
Pavement Improvement
|
$975,276
|
REPLACE PORTABLE HAR TRAILERS DEPLOYED ON SR 20 AND US 395 FOR SHERMAN PASS WITH PERMANENT HAR STATIONS, AND INSTALL A NEW STATION IN THE VICINITY OF THE HATTON COULEE REST AREA. (Federal ID: 9999549)
|
AZTECH ELECTRIC, INC.
|
Multiple/Statewide
|
Safety/Traffic Management
|
$240,000
|
THIN-LIFT OVERLAY 4.24 MILES OF ROADWAY WITH .15' OF HOT MIX ASPHALT, 25' WIDE. (Federal ID: A221003)
|
GRANITE NORTHWEST, INC.
|
Lincoln
|
Pavement Improvement
|
$479,479
|
WORK WILL CONSIST OF A HOT MIX ASPHALT OVERLAY INCLUDING STRIPING ON WAWAWAI ROAD FROM MILEPOST 13.96 TO MILEPOST 19.40. (Federal ID: A381004)
|
DEBCO CONSTRUCTION
|
Whitman
|
Pavement Improvement
|
$767,447
|
WORK WILL CONSIST OF A HOT MIX ASPHALT OVERLAY INCLUDING STRIPING ON WAWAWAI ROAD FROM MILEPOST 13.96 TO MILEPOST 19.40. (Federal ID: A381004)
|
GRANITE NORTHWEST, INC.
|
Whitman
|
Pavement Improvement
|
$0
|
DEER VALLEY ROAD FROM MP 8.42 TO MP 9.55 (COYOTE TRAIL TO GRAY ROAD). RECONSTRUCT PAVEMENT STRUCTURE WITH FULL DEPTH RECLAMATION AND HOT MIX ASPHALT PAVING. (Federal ID: D261001)
|
GRANITE NORTHWEST, INC.
|
Pend Oreille
|
Pavement Improvement
|
$0
|
DEER VALLEY ROAD FROM MP 8.42 TO MP 9.55 (COYOTE TRAIL TO GRAY ROAD). RECONSTRUCT PAVEMENT STRUCTURE WITH FULL DEPTH RECLAMATION AND HOT MIX ASPHALT PAVING. (Federal ID: D261001)
|
INTERSTATE CONCRETE & ASPHALT CO.
|
Pend Oreille
|
Pavement Improvement
|
$461,000
|
2" HOT MIX ASPHALT OVERLAY ON MAIN STREET (FROM CITY LIMITS TO THE SOUTH, NORTH TO LAKE STREET) & EAST LAKE STREET (FROM MAIN STREET EAST TO CITY LIMITS) LENGTH OF PROJECT 0.54 MILES (Federal ID: F241005)
|
HURST CONSTRUCTION, LLC
|
Okanogan
|
Pavement Improvement
|
$0
|
2" HOT MIX ASPHALT OVERLAY ON MAIN STREET (FROM CITY LIMITS TO THE SOUTH, NORTH TO LAKE STREET) & EAST LAKE STREET (FROM MAIN STREET EAST TO CITY LIMITS) LENGTH OF PROJECT 0.54 MILES (Federal ID: F241005)
|
GRANITE NORTHWEST, INC.
|
Okanogan
|
Pavement Improvement
|
$98,998
|
OVERLAY 2" OF ASPHALT BETWEEN THE CURBING ON SOUTH MAIN STREET FROM SR195 AND MAIN STREET TO FAIRVIEW STREET AND MEADOW INTERSECTION. (Federal ID: I382004)
|
MOTLEY MOTLEY, INC.
|
Whitman
|
Pavement Improvement
|
$112,056
|
RECONSTRUCTION OF ROADBED, ROADWAY WIDENING, CENTER TURN LANE, TRAFFIC ROUNDABOUT, NEW CURB, GUTTER AND SIDEWALK, STORMWATER DISPOSAL SYSTEM, WATER AND WASTEWATER UTILITY RELOCATION. (Federal ID: Y329008)
|
MOTLEY MOTLEY, INC.
|
Spokane
|
Pavement Improvement
|
$0
|
RECONSTRUCTION OF ROADBED, ROADWAY WIDENING, CENTER TURN LANE, TRAFFIC ROUNDABOUT, NEW CURB, GUTTER AND SIDEWALK, STORMWATER DISPOSAL SYSTEM, WATER AND WASTEWATER UTILITY RELOCATION. (Federal ID: Y329008)
|
MOUNTAIN CREST ENTERPRISES
|
Spokane
|
Pavement Improvement
|
$1,462,107
|
THIS ENHANCEMENT PROJECT WILL ADD VEGETATION AND AN IRRIGATION SYSTEM TO THE WEST ENTRANCE INTO THE CITY OF DAYTON ALONG US 12. (Federal ID: 0012194)
|
No Contractor
|
Columbia
|
Transportation Enhancements
|
$148,593
|
DOWEL BAR RETROFIT AND HMA PAVING WITH BASIC SAFETY RESTORATION (Federal ID: 0195047)
|
No Contractor
|
Spokane
|
Pavement Improvement
|
$2,093,057
|
REPLACE EXISTING TIMBER BRIDGE WITH NEW PRE STRESSED CONCRETE BRIDGE. (Federal ID: 0205002)
|
No Contractor
|
Stevens
|
Pavement Improvement
|
$350,000
|
CONSTRUCT SIDEWALKS AND DRAINAGE ALONG US 395 FROM JUNIPER STREET TO KETTLE FALLS CITY LIMITS. (Federal ID: 0395081)
|
No Contractor
|
Stevens
|
Transportation Enhancements
|
$43,174
|
UPGRADE OF SOUTH SIDE OF STREET TO URBAN STANDARDS TO SUPPORT AND INSTALL 10' -WIDE MULTI-USE PATH CONNECTING MAJOR RESIDENTIAL DEVELOPMENT, LOCAL AIRPORT (MARTIN AIRFIELD), SCHOOLS, AND EXISTING PEDE (Federal ID: 7166001)
|
No Contractor
|
Walla Walla
|
Transportation Enhancements
|
$58,000
|
THE CONSTRUCTION OF A TURN LANE, CURB, SIDEWALK, STREET LIGHTING AND BICYCLE PATHWAYS ON CHENEY-SPANGLE ROAD FROM SR904 TO CHENEY CITY LIMITS. (Federal ID: 7690002)
|
No Contractor
|
Spokane
|
Transportation Enhancements
|
$576,416
|
OVERLAY EAST DAYTON AVENUE WITH HMA FROM FRONT STREET TO US 12. (Federal ID: B074001)
|
No Contractor
|
Columbia
|
Pavement Improvement
|
$225,000
|
RESURFACING OF 9 MILES OF BRIDGE CREEK RD. - MP 10.29 TO MP 17.40. WORK WILL CONSIST OF PRELEVELING DEFICIENT AREAS OF ROADWAY SURFACE WITH COLD MIX ASPHALT AND A BITUMINOUS SURFACE TREATMENT. (Federal ID: L102009)
|
No Contractor
|
Ferry
|
Pavement Improvement
|
$370,000
|