Washington • WA-01 Congressional District

Get Adobe Flash player

Total # Projects: 9
Total # Contracts: 7
Total $ Projects: $34,966,414
Total $ Contracts: $4,912,981

Congressmembers

Other Congressional Districts

Project $
WA-02 $24,742,161
WA-03 $37,968,285
WA-04 $66,248,835
WA-05 $36,017,035
WA-06 $36,237,781
WA-07 $20,655,775
WA-08 $41,102,176
WA-09 $53,144,228
Show/hide all

Back to Homepage / Related Story

Collaborate

These news organizations have followed up and written stories using this database:

Add yourself to this list: News organizations are welcome to use data here in their own stories. Please credit ProPublica for providing the data. If you have a good story to share or collaborate on, contact Senior Editor Tom Detzel

Questions? Tips?

E-mail us.

About This Data

Note: To build this database, ProPublica obtained two sets of records from the U.S. Department of Transportation. We cleaned it to remove duplicates and other discrepancies, but it may have mistakes we didn't catch. If you find one, please let us know and include any information that may help us verify the correction. Also, the federal data is based on the states’ monthly reporting and may not be up-to-date.

First, we received an updated copy of the national database of stimulus road and bridge projects as of Sept. 25. Separately, we obtained data that states filed to the federal government as part of the stimulus legislation's reporting requirements. These data list which contractors had been awarded particular projects. We were able to trace more than 90 percent of the funds to individual counties. In a few other cases, projects are statewide and cannot be narrowed to county or serve multiple counties. We’ve indicated those cases in the data.

Wherever possible, we matched DOT projects to state recovery filings. They did not match in every instance. The DOT projects, which total $19 billion, include hundreds of projects not yet associated with a contractor. The contractors' data totals about $13 billion in obligated funds. In a few cases, state contractors did not match a DOT project. Some projects also have multiple contractors. When there is no matching contractor information for a project, searches and lists will return a blank.

We're trying to make this information as accurate as possible, so if you see something that needs to be corrected, please let us know.

Read more...

Here are our tips for running background checks on stimulus contractors.

All projects for WA-01. Not all projects have been awarded contracts.

Project Name Contractor County Improvement Type Amount
PAVEMENT GRIND AND OVERLAY TO REHABILITATE FAILING ASPHALT PAVEMENT. WORK ALSO INCLUDES NEW CURB RAMPS MEETING ADA GUIDELINES, STORM DRAIN REPAIRS AND A NEW CHANNELIZATION PLAN INCLUDING BIKE FACILIT (Federal ID: 2506003) T.E. BRIGGS CONSTRUCTION CO. Snohomish Pavement Improvement $796,649
THIS PROJECT WILL MODIFY THE EXISTING I-5/196TH ST SW INTERCHANGE TO PROVIDE A PEDESTRIAN ROUTE ACROSS I-5 ALONG 196TH ST SW. (Federal ID: 2523001) FRIBERG CONSTRUCTION CO. Snohomish Transportation Enhancements $0
THIS PROJECT WILL MODIFY THE EXISTING I-5/196TH ST SW INTERCHANGE TO PROVIDE A PEDESTRIAN ROUTE ACROSS I-5 ALONG 196TH ST SW. (Federal ID: 2523001) TRI-STATE CONSTRUCTION CO. Snohomish Transportation Enhancements $1,250,000
A 2,700 FOOT SECTION OF ROADWAY SERVING FOUR PUBLIC SCHOOLS, A GOLF COURSE, A BOEING ENGINEERING FACILITY WITH 1,000 EMPLOYEES AND MAJOR RESIDENTIAL AREAS, WILL BE REBUILT TO PROVIDE PROPER BASE AND R (Federal ID: 2722001) GRANITE CONSTRUCTION Snohomish Pavement Improvement $626,929
PHASE II INCLUDES A TWO-WAY LEFT TURN LANE, BIKE LANES, DRAINAGE IMPROVEMENTS, CURB, SIDEWALK, AND INTERSECTION CHANNELIZATION AT FINN HILL ROAD. PHASE IIIA CONSTRUCTS BIKE LANES, CURBS, GUTTER AND S (Federal ID: 6683004) STAN PALMER CONSTRUCTION, INC. Kitsap Pavement Improvement $2,192,764
PHASE II INCLUDES A TWO-WAY LEFT TURN LANE, BIKE LANES, DRAINAGE IMPROVEMENTS, CURB, SIDEWALK, AND INTERSECTION CHANNELIZATION AT FINN HILL ROAD. PHASE IIIA CONSTRUCTS BIKE LANES, CURBS, GUTTER AND S (Federal ID: 6683004) LAKESIDE INDUSTRIES Kitsap Pavement Improvement $0
SHOULDER IMPROVEMENTS NEAR BLAKELY ELEMENTARY SCHOOL. (Federal ID: 6701001) LIDEN LAND DEVELOPMENT & EXCAVATION, INC. Kitsap Transportation Enhancements $46,639
THE PROJECT IS LOCATED IN THE NORTH CREEK BUSINESS PARK AND WILL CONSTRUCT A PORTION OF MISSING TRAIL BETWEEN NE 195TH STREET AND NORTH CREEK PARKWAY, CONSTRUCT PEDESTRIAN SIGNALS AT TWO LOCATIONS AND (Federal ID: 0110008) No Contractor King Transportation Enhancements $500,000
THE PROPOSED PROJECT WILL CONSTRUCT A PEDESTRIAN BRIDGE (APPROXIMATELY 100 FOOT LONG) OVER NORTH CREEK NORTH OF 228TH STREET SE, CONSTRUCT APPROXIMATELY 4,000 LINER FEET OF NEW AND EXISTING 10-12 FOOT (Federal ID: 0110009) No Contractor King Transportation Enhancements $600,000
PAVEMENT REPAIRS AND RESURFACING OF DAYTON ST. (5TH AVE S TO ADMIRAL WAY), 212TH ST SW (72ND AVE W TO 84TH AVE W), 220TH ST SW (SR 99 TO 84TH AVE W), AND OLYMPIC VIEW DR (76TH AVE TO PUGET DR), AS WEL (Federal ID: 0365007) No Contractor Snohomish Pavement Improvement $999,985
I-405 IS HIGHLY CONGESTED IN THIS LOCATION. NORTHBOUND I-405 WILL BE WIDENED TO ADD AN AUXILIARY (ADD/DROP) LANE BETWEEN NE 195TH STREET AND SR 527. (Federal ID: 4053859) No Contractor Multiple/Statewide Pavement Widening $26,991,402