"COVID-19 3610" NO COST EXTENSION - REHABILITATE FOUR CANNON CARRIAGES |
Contract/Procurement/Acquisition Support Services |
STEEN CANNON & ORDINANCE WORKS INC |
June 03, 2021 |
$0 |
ADMIN CORRECTION TO POP - AMIS ROUGH CANYON LIFT STATION REPLACEMENT |
Water Supply Facilities Maintenance |
KSC FEDERAL CONTRACTORS LLC |
May 18, 2021 |
$0 |
X:NOGRN, PORTABLE TOILETS NEEDS FOR NOVEMBER 2020, MOUNT RUSHMORE NATIONAL MEMORIAL - COVID-19 RESPONSE.
MODIFICATION #1 TO DEOBLIGATE FUNDS FOLLOWING FINAL INVOICE. |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
May 13, 2021 |
-$274 |
X:NOGRN, PORTABLE TOILETS NEEDS FOR DECEMBER 2020, MOUNT RUSHMORE NATIONAL MEMORIAL - COVID-19 RESPONSE.
MODIFICATION #1 TO DEOBLIGATE FUNDS REMAINING AFTER FINAL INVOICE. |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
May 10, 2021 |
-$274 |
TEMPORARY MALL AND PARK WIDE TRASH REMOVAL |
Landscaping/Groundskeeping Services |
ZERO WASTE SOLUTIONS, INC. |
May 03, 2021 |
$393,800 |
NR-IMD - MOJA/DEVA CLOSE OUT MEETINGS |
Land Surveys-Cadastral Services (Non Construction) |
COGAN TECHNOLOGY INC. |
April 29, 2021 |
$0 |
X:NOGRN, SUPPLY INSTALL PREFAB RESTROOM BUILDING THEODORE ROOSEVELT NP. THE REASON FOR THIS MODIFICATION IS TO EXTEND THE POP END DATE TO 31 MAY 21 DUE TO THE COVID-19. |
Miscellaneous Prefabricated Structures |
UNIVERSAL BUILDING CONTRACTORS |
April 26, 2021 |
$0 |
X:NOGRN, PORTABLE TOILETS NEEDS FOR MAY/JUNE 2021, MOUNT RUSHMORE NATIONAL MEMORIAL - COVID-19 RESPONSE. |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
April 22, 2021 |
$8,357 |
PURCHASE AMMUNITION FOR GEORGE WASHINGTON BIRTHPLACE NATIONAL MONUMENT (GEWA)
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE. THE VENDOR NOTIFIED THE CONTRACT SPECIALIST THAT DELIVERY WILL BE DELAYED BEYOND JANUARY 6, 202 |
Ammunition through 30MM |
OLIN WINCHESTER LLC |
March 31, 2021 |
$0 |
SWAN WINTER VESSEL CHARTER |
Passenger Marine Charter Services |
ISLAND C ENTERPRISES LLC |
March 25, 2021 |
$9,598 |
X:NOGRN YCR AMMUNITION FOR YELLOWSTONE NATIONAL PARK
P00004 IS TO EXTEND THE PERIOD OF PERFORMANCE DUE TO COVID-19 RELATED DELAYS. |
Ammunition through 30MM |
RTP ARMOR, LLC |
March 22, 2021 |
$0 |
X:NOGRN, SERVICE, ALCATRAZ WATER TAXI SERVICE AUGUST 2020 |
Vessel Freight Services |
CROSS LINK, INC. |
March 17, 2021 |
-$5,813 |
NCR-NAMA: TEMP LANDSCAPE MAINT MONUMENTAL CORE MARCH 2021 |
Landscaping/Groundskeeping Services |
CUSTOM LAWN SERVICE INC |
March 17, 2021 |
$81,998 |
X:NOGRN, PORTABLE TOILETS NEEDS FOR MARCH/APRIL 2021, MOUNT RUSHMORE NATIONAL MEMORIAL - COVID-19 RESPONSE. |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
February 25, 2021 |
$8,357 |
NOGRN, CUVA EMERGENCY PORTABLE TOILETS
THE PURPOSE OF THIS MODIFICATION IS TO...
1. EXTEND THE PERIOD OF PERFORMANCE FOR UNITS AT BRANDYWINE FALLS THRU 31 MARCH 2021 AND PROVIDE FUNDING FOR THAT EXTENSION.
ALL ELSE REMAINS UNCHANGED. |
Plumbing, Heating and Waste Disposal Equipment Rental |
MILLER AND COMPANY PORTABLE TOILET SERVICES, INC |
February 24, 2021 |
$4,410 |
REQUIREMENT FOR LINE SHAFT CARRIAGE WITH INSTALLATION FOR HUTR
MODIFICATION P00003 EXTENDS THE PERIOD OF PERFORMANCE DUE TO COVID-19 CLOSURES |
Office Furniture |
SPACESAVER STORAGE SYSTEMS, INC. |
February 11, 2021 |
$0 |
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE DATE DUE TO COVID 19 RELATED ISSUES WITH COMPONENT DELIVERIES AND STAFFING AND TO CHANGE NPS POC |
Ammunition through 30MM |
RUAG AMMOTEC USA, INC. |
February 09, 2021 |
$0 |
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE IN ORDER TO COMPLETE THIS REQUIREMENT |
Other Education/Training |
EFFECTIVE DIGITAL PRESENTATIONS, INC. |
February 03, 2021 |
$0 |
EMERGENCY PORTABLE TOILET RENTAL DUE TO COVID-19 PANDEMIC. MODIFICATION 3 - DEOBLIGATES EXCESS FUNDING FOR CONTRACT CLOSEOUT. |
Trash/Garbage Collection Services |
LEVITZ, WAYNE A |
February 02, 2021 |
-$21,696 |
IMR PPE EMERGENCY PURCHASE 3 MODIFICATION 2 - TERMINATES FOR THE GOVERNMENT'S CONVENIENCE. |
Laboratory Equipment and Supplies |
GREEN DREAM INTERNATIONAL LLC |
January 27, 2021 |
-$24,300 |
EMERGENCY PURCHASE OF PPE IN RESPONSE TO COVID-19 PANDEMIC - MODIFICATION 2 - CHANGES QUANTITY DELIVERED AND DEOBLIGATES EXCESS FUNDING |
Laboratory Equipment and Supplies |
GREEN DREAM INTERNATIONAL LLC |
January 27, 2021 |
-$9,408 |
IMR PPE EMERGENCY PURCHASE 5 MODIFICATION 2 - CANCELS PORTION OF ORDER FOR CONVENIENCE TO THE GOVERNMENT. |
Laboratory Equipment and Supplies |
GREEN DREAM INTERNATIONAL LLC |
January 27, 2021 |
-$44,480 |
G:EPREF, DEMOLITION AND REPLACEMENT OF 4 COMFORT STATIONS, THRO, EXTEND PERFORMANCE END DATE |
Miscellaneous Buildings Construction |
NOVOTNY CONSTRUCTION LLC |
January 26, 2021 |
$0 |
X:NOGRN YCR AMMUNITION FOR YELLOWSTONE NATIONAL PARK
P00003 IS TO EXTEND THE PERIOD OF PERFORMANCE, AND AND ALLOW FOR OTHER THAN BRAND NAME AMMO THAT MEETS THE SPECIFICATIONS, DUE TO COVID-19 RELATED MANUFACTURING DELAYS. |
Ammunition through 30MM |
RTP ARMOR, LLC |
January 20, 2021 |
$0 |
MOD P00007 CHANGES SAMO PARK CLEANING AREAS SAP RECEIVING OFFICIAL TO J. TRONCOSO |
Custodial Janitorial Services |
PJ CEPHAS CORPORATION |
January 19, 2021 |
$0 |
DESIGN/BUILD OF ICE AGE TRAIL WAYSIDE EXHIBIT
MODIFICATION P00001:
THIS MODIFICATION IS INTENDED TO ADDRESS PROJECT SCHEDULE DISRUPTIONS, SITE VISITS / ETC., DUE TO COVID-19 RELATED ISSUES. IN ADDITION, CHANGES TO SIGNAGE MATERIALS AND SIZES |
Arts/Graphics |
SEA REACH LTD |
January 12, 2021 |
$1,220 |
NCR-NAMA:TEMP TRASH REMOVAL SERVICES FOR MALL AREA DUE TO COVID |
Landscaping/Groundskeeping Services |
ZERO WASTE SOLUTIONS, INC. |
January 07, 2021 |
$19,541 |
NCR-NAMA: TEMP COVID TRASH REMOVAL SERVICES PARK |
Landscaping/Groundskeeping Services |
ZERO WASTE SOLUTIONS, INC. |
January 07, 2021 |
$65,823 |
MOD 02, EXERCISE OPTION YEAR ONE (1). MAINTENANCE OF PEARCE FERRY ROAD, LAKE MEAD NATIONAL RECREATION AREA |
Highways/Roads/Streets/Bridges/Railways Maintenance |
RODGERS, STEVEN R |
January 07, 2021 |
$65,688 |
NCR-NAMA:TEMP LANDSCAPE MAINT MONUMENTAL CORE COVID |
Landscaping/Groundskeeping Services |
CUSTOM LAWN SERVICE INC |
January 07, 2021 |
$102,690 |
X:NOGRN HAND SANITIZER AND DISINFECTANT SPRAY IN RESPONSE TO COVID-19 FOR GLACIER NATIONAL PARK
P00001 IS TO DECREASE FUNDING FOR CANCELLED LINE ITEM DUE TO COVID-19. |
Laboratory Equipment and Supplies |
PREMIER AND COMPANIES INCORPORATED |
January 05, 2021 |
-$2,157 |
NOGRN, CUVA EMERGENCY PORTABLE TOILETS
THE PURPOSE OF THIS MODIFICATION IS TO...
1. EXTEND THE PERIOD OF PERFORMANCE FOR UNITS AT BRANDYWINE FALLS THRU 31 JANUARY 2021 AND PROVIDE FUNDING FOR THAT EXTENSION.
ALL ELSE REMAINS UNCHANGED. |
Plumbing, Heating and Waste Disposal Equipment Rental |
MILLER AND COMPANY PORTABLE TOILET SERVICES, INC |
December 31, 2020 |
$2,205 |
CHOH FY20 REPLACE LOCK GATES 2 AND 20 - MODIFICATION TO EXTEND PERIOD OF PERFORMANCE END DATE DUE TO SUPPLY SHORTAGES RELATED TO COVID-19. |
Repair or Alteration of Other Administrative Facilities And Service Buildings |
B3 ENTERPRISES LLC |
December 30, 2020 |
$0 |
NR-EQD-269-ECONOMIC ANALYSES FOR GUIS |
Economic Special Studies/Analysis |
RESOURCE SYSTEMS GROUP, INC. |
December 23, 2020 |
$9,834 |
ADMIN CORRECTION TO POP - AMIS ROUGH CANYON LIFT STATION REPLACEMENT |
Water Supply Facilities Maintenance |
KSC FEDERAL CONTRACTORS LLC |
December 22, 2020 |
$0 |
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE DUE TO COVID-19 TRAVEL RESTRICTION |
Arts/Graphics |
106 GROUP LTD., THE |
December 21, 2020 |
$0 |
USPP FY21 COVID 19 RESPIRATORY FIT TEST WMA AND NYFO |
Miscellaneous Equipment and Materials Testing |
SAFEWARE INC. |
December 17, 2020 |
$23,578 |
X:NOGRN, PORTABLE TOILETS NEEDS FOR JANUARY/FEBRUARY 2021, MOUNT RUSHMORE NATIONAL MEMORIAL - COVID-19 RESPONSE. |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
December 17, 2020 |
$8,083 |
G:EPREF, JEWEL CAVE NATIONAL MONUMENT ROOF REPLACEMENT CUSTER APARTMENT, ENERGY EFFICIENT SHINGLES, EXTENSION FOR PERIOD OF PERFORMANCE DUE TO CHANGE OF SUPPLIER FOR GUTTERS/DOWNSPOUTS, DELIVERY OF PRODUCT, AND SUPPLY CHAIN ISSUES DUE TO COVID-19. |
Repair or Alteration of Family Housing Facilities |
BETTY FOSTER ROOFING, LLC |
December 16, 2020 |
$0 |
PFMD ENERGY & WATER AUDITS FOR 2019 |
Program Management/Support Services |
WOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS, INC. |
December 15, 2020 |
$0 |
ENVIRONMENTAL MANAGEMENT PROGRAM AUDIT. THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDS OF $4,851.10 FOR ADDITIONAL AD HOC SERVICES DUE TO COVID-19. |
Other Environmental Services |
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. |
December 09, 2020 |
$4,851 |
MOD P00006 CHANGES SAMO PARK CLEANING AREAS |
Custodial Janitorial Services |
PJ CEPHAS CORPORATION |
December 09, 2020 |
$0 |
TIME EXTENSION DUE TO COVID, CHCU-DIGITIZATION OF REITER NOTEBOOKS |
Other Professional Services |
DODGE-CHROME INC |
December 03, 2020 |
$0 |
X:NOGRN, PORTABLE TOILETS NEEDS FOR OCTOBER 2020, MOUNT RUSHMORE NATIONAL MEMORIAL - COVID-19 RESPONSE.
MODIFICATION #1 TO DEOBLIGATE FUNDS REMAINING AFTER INVOICE. |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
December 03, 2020 |
-$274 |
X:CPGRE, REPLACE WATER SUPPLY LINE AT GEORGE WASHINGTON CARVER NATIONAL MONUMENT, CHANGE THE PERIOD OF PERFORMANCE DUE TO COVID-19 DELAYS AND ADD 52.222-99 DEVIATION. |
Water Supply Facilities Maintenance |
STILTEN, LTD. CO. |
December 03, 2020 |
$0 |
ZION TRANSPORTATION SYSTEM AND SHUTTLE BUS OPERATIONS. MODIFICATION 3 IS AN EQUITABLE ADJUSTMENT TO THE CONTRACTOR FOR COVID EXPENSES OF $86,221.70 AND ALSO FOR ENGINE REPAIRS IN THE AMOUNT OF $15,552.19 |
Motor Passenger Services |
RATP DEV USA, INC. |
December 03, 2020 |
$15,552 |
NCR-NAMA:TEMP LANDSCAPE MAINT MONUMENTAL CORE COVID |
Landscaping/Groundskeeping Services |
CUSTOM LAWN SERVICE INC |
December 02, 2020 |
$91,857 |
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE DUE TO COVID-19 CLOSURE AND WEATHER CONDITIONS. |
Landscaping/Groundskeeping Services |
ACCORD FEDERAL SERVICES, LLC |
December 01, 2020 |
$0 |
USPP FY21-COVID-19 RPP MEDICAL EVALUATION QUESTIONNAIRE |
Scientific Data Special Studies/Analysis |
APPLE OCCUPATIONAL MEDICAL SERVICES LLC |
December 01, 2020 |
$11,250 |
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE DUE TO COVID-19 CLOSURE AND WEATHER CONDITIONS. |
Landscaping/Groundskeeping Services |
CORSICANA GERANIUM GARDEN |
December 01, 2020 |
$0 |
X:NOGRN, PORTABLE TOILETS NEEDS FOR SEPTEMBER 2020, MOUNT RUSHMORE NATIONAL MEMORIAL -COVID 19 RESPONSE. TO CORRECT A CLERICAL ERROR IN THE PERIOD OF PERFORMANCE FROM 09/30/21 TO 09/30/20 |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
November 30, 2020 |
$0 |
THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXPIRED FUNDING OPTION YEAR 4, DUE TO COVID-19 PARK CLOSURE |
Custodial Janitorial Services |
K CLEAN /SWEEP-RITE |
November 30, 2020 |
-$26,694 |
X:ESTAR, MODIFICATION IS TO EXTEND CONTRACT DUE TO COVID-19 PRODUCTION DELAYS, RELOCATE THERMOSTAT, AND INSTALL ADDITIONAL RETURN AIR DUCT. |
Other Administrative Facilities and Service Buildings Maintenance |
BKM-IEC LLC |
November 30, 2020 |
$6,760 |
X:NOGRN, PORTABLE TOILETS NEEDS FOR DECEMBER 2020, MOUNT RUSHMORE NATIONAL MEMORIAL - COVID-19 RESPONSE. |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
November 25, 2020 |
$8,494 |
REQUIREMENT FOR LINE SHAFT CARRIAGE WITH INSTALLATION FOR HUTR
MODIFICATION P00002 EXTENDS THE PERIOD OF PERFORMANCE DUE TO COVID-19 CLOSURES |
Office Furniture |
SPACESAVER STORAGE SYSTEMS, INC. |
November 25, 2020 |
$0 |
NCR-NAMA: TEMP COVID TRASH REMOVAL SERVICES PARK |
Landscaping/Groundskeeping Services |
ZERO WASTE SOLUTIONS, INC. |
November 24, 2020 |
$65,824 |
NCR-NAMA:TEMP TRASH REMOVAL SERVICES FOR MALL AREA DUE TO COVID |
Landscaping/Groundskeeping Services |
ZERO WASTE SOLUTIONS, INC. |
November 24, 2020 |
$19,541 |
ARCHEOLOGICAL SURVEY OF THE STEHEKIN VALLEY ROAD REROUTE AND RIPARIAN ZONE PLAN PILOT PROJECT. MOD EXTENDS COMPLETION DATE FOR RIPARIAN ZONE SURVEY AND REPORTS DUE TO PANDEMIC. |
Archeological/Paleontological Special Studies/Analysis |
ASM AFFILIATES INC |
November 24, 2020 |
$0 |
MOD 16 IS AN EQUITABLE ADJUSTMENT TO THE CONTRACT FOR COSTS REQUIRED TO RUN THE BRCA SHUTTLE BUS OPERATION SAFELY DUE TO THE COVID-19 PANDEMIC |
Motor Passenger Services |
RED CANYON TRANSIT, LLC |
November 23, 2020 |
$0 |
MOD 15 IS AN EQUITABLE ADJUSTMENT TO THE CONTRACT FOR FIXED COSTS INCURRED BY THE CONTRACTOR DURING THE STOP WORK ORDER |
Motor Passenger Services |
RED CANYON TRANSIT, LLC |
November 23, 2020 |
$0 |
X:NOGRN, SERVICE, ALCA WATER TAXI SERVICE |
Vessel Freight Services |
CROSS LINK, INC. |
November 20, 2020 |
$17,438 |
X:NOGRN, MOUNT RUSHMORE NATIONAL MEMORIAL PAVEMENT AND RETAINING WALL IMPROVEMENTS QUARTERS 44&45. EXTENSION TO PERIOD OF PERFORMANCE DID TO COVID19. |
Repair or Alteration of Family Housing Facilities |
RANGEL CONSTRUCTION COMPANY LLC |
November 20, 2020 |
$0 |
THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE DUE TO COVID-19 TRAVEL RESTRICTIONS AND CHANGE POC&CO |
Arts/Graphics |
106 GROUP LTD., THE |
November 17, 2020 |
$0 |
PORE003-21 PROSPECTUS DEVELOPMENT |
Operations Research/Quantitative Analysis Services |
CONCESSIONS HOSPITALITY MANAGEMENT GOVERNMENT SERVICES, LLC |
November 17, 2020 |
$0 |
UPDATES TO EXISTING FINANCIAL MANAGEMENT AND PLANNING&DEVELOPMENT E-COURSES, DEVELOPMENT OF CONTRACT MANAGEMENT E-COURSE |
Other Management Services |
D'VINCI INTERACTIVE, INC. |
November 17, 2020 |
$0 |
MOD P00005 COVID-19 ADDITIONAL CLEANING |
Custodial Janitorial Services |
PJ CEPHAS CORPORATION |
November 09, 2020 |
$54,702 |
X:EPREF, EXTEND THE PERIOD OF PERFORMANCE TO REMOVE AND REPLACE THE DECKING AT THE HOUSING AND HQ BUILDINGS OF JEWEL CAVE NATIONAL MONUMENT. |
Other Residential Buildings Maintenance |
DOUG O'BRYAN CONTRACTING, INC. |
November 03, 2020 |
$0 |
G:EPREF, DEMOLITION AND REPLACEMENT OF 4 COMFORT STATIONS, THRO, EXTEND PERFORMANCE END DATE |
Miscellaneous Buildings Construction |
NOVOTNY CONSTRUCTION LLC |
November 03, 2020 |
$0 |
X:NOGRN YCR AMMUNITION FOR YELLOWSTONE NATIONAL PARK
P00002 IS TO EXTEND THE PERIOD OF PERFORMANCE DUE TO COVID-19 RELATED MANUFACTURING DELAYS |
Ammunition through 30MM |
RTP ARMOR, LLC |
November 02, 2020 |
$0 |
X:NOGRN, REPLACE SEWAGE PUMPS AND CONTROLLERS, EXTEND PERFORMANCE DUE TO COVID19 SUPPLY DELAYS |
Sewage and Waste Facilities Repair |
MAINLINE CONTRACTING, INC. |
October 27, 2020 |
$0 |
TIME EXTENSION DUE TO GOVERNMENT DELAY: VALL-A&E REHABILITATE HISTORIC BOND CABIN |
Other Architecture and Engineering Services |
ANDERSON HALLAS ARCHITECTS, PC |
October 27, 2020 |
$0 |
X:NOGRN, PORTABLE TOILETS NEEDS FOR NOVEMBER 2020, MOUNT RUSHMORE NATIONAL MEMORIAL - COVID-19 RESPONSE. |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
October 26, 2020 |
$8,220 |
X:NOGRN, PORTABLE TOILETS NEEDS FOR OCTOBER 2020, MOUNT RUSHMORE NATIONAL MEMORIAL - COVID-19 RESPONSE. |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
October 20, 2020 |
$8,494 |
G:EPREF, TWO MERCURY OUTBOARD MOTORS FOR DELIVERY TO VOYAGEURS NATIONAL PARK, ETHANOL FUEL. THE REASON FOR THIS MODIFICATION IS TO EXTEND THE POP END DATE TO 28 DEC 20 DUE TO THE COVID-19. |
Gasoline Reciprocating Engines Except Aircraft and Components |
THE WASHINGTON MARINA COMPANY INC |
October 19, 2020 |
$0 |
MOD 08, EXTEND CONTRACT PERFORMANCE PERIOD DUE TO COVID-19. |
Environmental Assessments |
WATER, CIVIL, AND ENVIRONMENTAL INCORPORATED |
October 15, 2020 |
$0 |
GLACIER FIRE SUPPRESSION AND ELECTRICAL SYSTEM INSTALLATIONS - MODIFICATION 4 TO DEOBLIGATE EXCESS FUNDING AND CLOSE OUT THIS CONTRACT. |
Repair or Alteration of Miscellaneous Buildings |
ADVANCED SOLUTIONS GROUP, LLC |
October 14, 2020 |
-$0 |
GOGA ALCATRAZ OVERNIGHT WATCHMAN SERVICES. IN ACCORDANCE WITH ACQUISITION POLICY AND PROCEDURES MEMORANDUM 1443.01-04 REVISION 1, UNAUTHORIZED COMMITMENTS AND RATIFICATIONS, BILATERAL MODIFICATION P00008 IS TO DOCUMENT THE APPROVAL OF AN UNAUTHORIZED |
Guard Services |
GLOBAL SECURITY MANAGEMENT AGENCY, INC. |
September 24, 2020 |
$26,800 |
EPREF - INDU DISPATCH WORKSTATION C-SOFT 24-LINE SOFTWARE V7&ACCESSORIES |
Information Technology Software |
ACG SYSTEMS, INC. |
September 24, 2020 |
$7,250 |
NOGRN, CUVA EMERGENCY PORTABLE TOILETS
THE PURPOSE OF THIS MODIFICATION IS TO...
1. EXTEND THE PERIOD OF PERFORMANCE FOR UNITS AT BRANDYWINE FALLS THRU 31 DECEMBER 2020.
2. DE-OBLIGATE EXCESS FUNDING.
ALL ELSE REMAINS UNCHANGED. |
Plumbing, Heating and Waste Disposal Equipment Rental |
MILLER AND COMPANY PORTABLE TOILET SERVICES, INC |
September 24, 2020 |
-$15,043 |
ITSTR, INDU DISPATCH WORKSTATION MONITOR |
Information Technology Input/Output and Storage Devices |
TRI-STATE CAMERA EXCH. INC. |
September 24, 2020 |
$425 |
ITSTR, INDU DISPATCH WORKSTATION DELL COMPONENTS |
Digital Computers |
DELL FEDERAL SYSTEMS L.P. |
September 24, 2020 |
$7,739 |
EMERGENCY PORTABLE TOILET RENTAL DUE TO COVID-19 PANDEMIC. MODIFICATION 2 - EXTENDS POP TO 12/31/2020. |
Trash/Garbage Collection Services |
LEVITZ, WAYNE A |
September 21, 2020 |
$0 |
GLACIER FIRE SUPPRESSION AND ELECTRICAL SYSTEM INSTALLATIONS - MODIFICATION 3 TO PROVIDE AN EQUITABLE ADJUSTMENT FOR A DELAY OF WORK DUE TO COVID-19 AND FOR A CREDIT FOR ELECTRICAL WORK THAT WAS NOT NEEDED UNDER THIS TASK ORDER. |
Repair or Alteration of Miscellaneous Buildings |
ADVANCED SOLUTIONS GROUP, LLC |
September 18, 2020 |
$556 |
IMR PPE EMERGENCY PURCHASE 11: DISINFECTANT WIPES
MOD P00002 EXTENDS POP AND INCORPORATES REPLACEMENT FOR ORIGINAL PRODUCT WHICH IS UNAVAILABLE DUE TO HIGH DEMAND. |
Laboratory Equipment and Supplies |
COMPETITIVE CHOICE, INC. |
September 17, 2020 |
$0 |
CONSERVATION TREATMENT OF 5 OUTDOOR CULTURAL RESOURCES AT THE MCLOUGHLIN HOUSE LOCATED IN OREGON CITY, OREGON. THIS CONTRACT WAS AWARDED UNDER FAR PART 13 SIMPLIFIED ACQUISITION PROCEDURES.
THIS MODIFICATION ISSUES AN AMENDED SOW AND EXTENDS THE |
Repair or Alteration of Restoration of Real Property (Public or Private) |
DEAN & ASSOCIATES CONSERVATION SERVICES |
September 17, 2020 |
$0 |
X:NOGRN HAND SANITIZER AND DISINFECTANT SPRAY IN RESPONSE TO COVID-19 FOR GLACIER NATIONAL PARK |
Laboratory Equipment and Supplies |
PREMIER AND COMPANIES INCORPORATED |
September 16, 2020 |
$31,074 |
COVID TIME EXTENSION&COST IMPACT - IMR ENVIRONMENTAL AND SAFETY AUDITS 2019 |
Other Environmental Services |
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. |
September 15, 2020 |
$19,573 |
COVID TIME EXTENSION, FY19 ENVIRONMENTAL PROGRAM SUPPORT |
Other Environmental Services |
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. |
September 15, 2020 |
$0 |
YELLOWSTONE SANITIZER SYSTEMS, CLOROX 60025 OR 60010 BRAND NAME OR EQUAL
MODIFICATION 2 - DELIVERY DATE EXTENSION. |
Miscellaneous Maintenance and Repair Shop Specialized Equipment |
AMERICAN SANITARY PRODUCTS INCORPORATED |
September 15, 2020 |
$0 |
CHCU ABANDONED FIRING RANGE PA/SI, TIME EXTENSION DUE TO COVID AND SITE VISIT |
Other Environmental Services |
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. |
September 15, 2020 |
$2,550 |
SUPPLY, PORTACOUNT 8048 AND ACCESSORIES, MWRO |
Medical and Surgical Instruments, Equipment and Supplies |
TSI INCORPORATED |
September 14, 2020 |
$18,031 |
FONTANA CEMETERY VISITATION TAXI PURPOSE OF MODIFICATION P00002 IS TO CANCEL TRIPS FOR THE 2020 SEASON, DUE TO COVID-19 |
Marine Charter Services |
FONTANA VILLAGE, INC. |
September 14, 2020 |
-$16,000 |
MUSEUM INTERPRETIVE EXHIBIT FABRICATION AT MAINLAND VISITOR CENTER, CHANNEL ISLANDS NATIONAL PARK, VENTURA COUNTY, CALIFORNIA. THIS MODIFICATION EXTENDS THE PERFORMANCE END DATE DUE TO CURRENT COVID-19 TRAVEL RESTRICTIONS PREVENTING WORK. |
Furniture Maintenance & Repair |
EXHIBITOLOGY LLC |
September 12, 2020 |
$0 |
ENVIRONMENTAL MANAGEMENT PROGRAM AUDIT. THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDS OF $34,110.66 FOR ADDITIONAL AD HOC SERVICES DUE TO COVID-19 AND EXTEND THE PERIOD OF PERFORMANCE TO 01/30/2022. |
Other Environmental Services |
AMEC FOSTER WHEELER ENVIRONMENT & INFRASTRUCTURE, INC. |
September 11, 2020 |
$34,111 |
PROVIDE PORTABLE TOILETS - GUMO
THE PRIMARY PURPOSE OF THIS ORDER IS TO PROVIDE FOR THE RENTAL AND SERVICING OF UP TO 10 PORTA TOILETS PER WEEK, DUE TO HEALTH SAFETY CONCERNS AND COMPLIANCE WITH REQUIREMENTS IN RESPONSE TO THE COVID-19 PANDEMIC. |
Toiletries Equipment Rental |
LMC SERVICES, INC. |
September 10, 2020 |
$14,000 |
REQUIREMENT FOR DEVELOPMENT AND PRODUCTION OF PUBLIC SERVICE ANNOUNCEMENTS FOR GLCA
MODIFICATION P00002 ADDRESSES SCHEDULE AND COST CHANGES CAUSED BY COVID-19 DELAYS |
Advertising Services |
SILVER FIR MEDIA INC. |
September 10, 2020 |
$4,500 |
X:NOGRN PORTABLE TOILET NEEDS FOR JULY 4TH 2020, MOUNT RUSHMORE NATIONAL MEMORIAL - COVID-19 RESPONSE, MODIFICATION #1 TO DEOBLIGATE FUNDS REMAINING AFTER FINAL INVOICE. |
Toiletries Equipment Rental |
GO PRO SEPTIC LLC |
September 10, 2020 |
-$288 |
THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE PERIOD OF PERFORMANCE DUE TO COVID-19 RESPONSE, CHANGE THE NPS POC, AND CHANGE THE CONTRACTING OFFICER |
Scientific/Management Education/Training |
WORKS ON PAPER LLC |
September 09, 2020 |
$0 |
ZION TRANSPORTATION SYSTEM AND SHUTTLE BUS OPERATIONS. MODIFICATION 1 IS AN EQUITABLE ADJUSTMENT FOR FIXED COSTS INCURRED DURING THE STOP WORK ORDER WHICH WAS ISSUED DUE TO THE COVID PANDEMIC. |
Motor Passenger Services |
RATP DEV USA, INC. |
September 09, 2020 |
$0 |
G:EPREF, ELEVATOR REPAIR&SERVICE FOR WIND CAVE NATIONAL PARK
EXTEND POP |
Miscellaneous Equipment Maintenance & Repair |
ELEVATOR REPAIR SERVICE, INC. |
September 08, 2020 |
$0 |