TIME EXTENSION MODIFICATION DUE TO COVID-19 FOR CONVERT CPO CLUB BLDG 1342 TO SECURITY OFFICE AT NAF ATSUGI, JAPAN |
KANAGAWA NABCO PTY.LTD. |
Department of the Navy |
August 17, 2018 |
April 23, 2021 |
$0 |
VACUUM PUMP REPLACEMENT AND LABOR FOR DEMOLITION AND INSTALLATION, BUILDING 37 |
CAPITAL COMPRESSOR, INC. |
National Institutes of Health |
March 24, 2021 |
April 24, 2021 |
$29,700 |
ISSUE NOTICE TO PROCEED & CHANGE CONTRACT COMPLETION DATE. |
NICHOLS CUSTOM BUILDERS & DESIGN, INC. |
General Services Administration |
January 21, 2021 |
August 16, 2021 |
$0 |
INSTALLATION OF NEW ROLL UP DOOR |
NEW JERSEY OVERHEAD DOOR LLC |
Department of Veterans Affairs |
February 01, 2021 |
April 30, 2021 |
$18,757 |
COVID-19
N232 RETRO-COMMISSIONING
EXPOSURE TO A POSITIVE CASE OF COVID. TIME ONLY ADDED TO TASK ORDER. |
LEAD BUILDERS, INC. |
National Aeronautics and Space Administration |
July 06, 2020 |
January 15, 2021 |
$0 |
COVID-19
HISTORIC PRESERVATION OF BUILDING 025
EXPOSURE TO COVID 19, CONSTRUCTION SITE SHUTDOWN FOR 14 CALENDAR DAYS. |
SOUTHWESTERN DAKOTAH, INC. |
National Aeronautics and Space Administration |
May 29, 2019 |
September 11, 2020 |
$0 |
COVID-19
N240 SEISMIC RISK REDUCTION, CLEAN ROOM
HALF DAY LOST AND COVID SUPPLIES. |
SOUTHWESTERN DAKOTAH, INC. |
National Aeronautics and Space Administration |
May 29, 2019 |
September 11, 2020 |
$2,254 |
COVID-19
N232 RETRO-COMMISSIONING
SUPPLIER DELAY DUE TO COVID. TIME ONLY ADDED. |
LEAD BUILDERS, INC. |
National Aeronautics and Space Administration |
July 06, 2020 |
January 15, 2021 |
$0 |
GLACIER FIRE SUPPRESSION AND ELECTRICAL SYSTEM INSTALLATIONS - MODIFICATION 4 TO DEOBLIGATE EXCESS FUNDING AND CLOSE OUT THIS CONTRACT. |
ADVANCED SOLUTIONS GROUP, LLC |
National Park Service |
July 08, 2019 |
October 01, 2020 |
-$0 |
C109357- REPLACE AUTOMATIC FAUCETS IN PUBLIC RESTROOM AND CONVERT TO CHICAGO TOUCHLESS FAUCET, WORK ORDER # 2540585, POOLESVILLE CAMPUS, BRIAN KECK |
SKOOKUM EDUCATIONAL PROGRAMS |
National Institutes of Health |
September 29, 2020 |
October 31, 2022 |
$26,317 |
GLACIER FIRE SUPPRESSION AND ELECTRICAL SYSTEM INSTALLATIONS - MODIFICATION 3 TO PROVIDE AN EQUITABLE ADJUSTMENT FOR A DELAY OF WORK DUE TO COVID-19 AND FOR A CREDIT FOR ELECTRICAL WORK THAT WAS NOT NEEDED UNDER THIS TASK ORDER. |
ADVANCED SOLUTIONS GROUP, LLC |
National Park Service |
July 08, 2019 |
October 01, 2020 |
$556 |
THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE STATEMENT OF WORK (SOW), PROVIDE THE FUNDING INCREASE FOR THE CHANGE, AND EXTEND THE PERIOD OF PERFORMANCE...A. REMOVE CURRENT SOW AND REPLACE WITH ATTACHED SOW REV. A...B. PRICE HAS INCREASED BY |
HYDRAULIC AND PNEUMATIC SYSTEMS INC |
National Aeronautics and Space Administration |
September 25, 2019 |
October 30, 2020 |
$16,218 |
RELOCATE CHEMICAL STORAGE BLDG B521 |
DISTRICT VETERANS CONTRACTING, INC. |
Department of Veterans Affairs |
September 27, 2019 |
November 13, 2020 |
$0 |
N240 SEISMIC RISK REDUCTION, CLEAN ROOM THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE SEISMIC UP-GRADE OF BUILDING N240. THIS WORK CONSIST OF BUT NOT LIMITED TO PROVIDING VERTICAL STEEL BRACING AND HORIZONTAL ROD BRACING IN CLEAN ROOM ALONG WITH STRENGTHENING CONCRETE FOUNDATION FOR THE VERTICAL BRACING, THE REMOVAL, STORAGE, REPLACEMENT OR RE-INSTALLATION OF DOORS, WINDOWS, PARTITIONS, RAISED FLOORING, ASSOCIATED STAIRS AND RAILS, FLOOR SLABS, FLOOR FINISHES, LAY-IN CEILINGS, ASSOCIATED DIFFUSERS, SPRINKLER HEADS, EXIT SIGNAGE, ELECTRICAL DEVICES, JUNCTION BOXES, CONDUIT, CONDUCTORS, SECOND FLOOR ELECTRICAL PANELS AND TRANSFORMERS, FIRE ALARM AND FIRE SUPPRESSION COMPONENTS, MECHANICAL DEVICES, PIPING, DUCTING, AND GRILLES. RESTORATION AND CLEANING OF THE CLEAN ROOM, AFTER CONSTRUCTION. |
SOUTHWESTERN DAKOTAH, INC. |
National Aeronautics and Space Administration |
May 29, 2019 |
September 11, 2020 |
$0 |
N245 SEISMIC RISK REDUCTION |
PATRIOT CONSTRUCTION, INC. |
National Aeronautics and Space Administration |
June 26, 2019 |
September 11, 2020 |
$0 |
COVID-19 DIB
REPLACE PIPES AT SPACE LAUNCH COMPLEX 6 PONDS |
SJD&B, INC. |
Department of the Air Force |
October 29, 2019 |
December 10, 2020 |
$0 |
THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE STATEMENT OF WORK (SOW), PROVIDE THE FUNDING INCREASE FOR THE CHANGE, AND EXTEND THE PERIOD OF PERFORMANCE...A. REMOVE CURRENT SOW AND REPLACE WITH ATTACHED SOW REV. A...B. PRICE HAS INCREASED BY |
HYDRAULIC AND PNEUMATIC SYSTEMS INC |
National Aeronautics and Space Administration |
September 25, 2019 |
October 30, 2020 |
$0 |
N240 SEISMIC RISK REDUCTION, CLEANROOM. THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE SEISMIC UP-GRADE OF BUILDING N240. THIS WORK CONSIST OF BUT NOT LIMITED TO PROVIDING VERTICAL STEEL BRACING AND HORIZONTAL ROD BRACING IN CLEAN ROOM ALONG WITH STRENGTHENING CONCRETE FOUNDATION FOR THE VERTICAL BRACING, THE REMOVAL, STORAGE, REPLACEMENT OR RE-INSTALLATION OF DOORS, WINDOWS, PARTITIONS, RAISED FLOORING, ASSOCIATED STAIRS AND RAILS, FLOOR SLABS, FLOOR FINISHES, LAY-IN CEILINGS, ASSOCIATED DIFFUSERS, SPRINKLER HEADS, EXIT SIGNAGE, ELECTRICAL DEVICES, JUNCTION BOXES, CONDUIT, CONDUCTORS, SECOND FLOOR ELECTRICAL PANELS AND TRANSFORMERS, FIRE ALARM AND FIRE SUPPRESSION COMPONENTS, MECHANICAL DEVICES, PIPING, DUCTING, AND GRILLES. RESTORATION AND CLEANING OF THE CLEAN ROOM, AFTER CONSTRUCTION. |
SOUTHWESTERN DAKOTAH, INC. |
National Aeronautics and Space Administration |
May 29, 2019 |
September 11, 2020 |
$0 |
BUILDING 45 HEATING DESIGN |
IRONWOOD COMMERCIAL BUILDERS, INC. |
National Aeronautics and Space Administration |
September 24, 2019 |
July 31, 2020 |
$0 |
N245 SEISMIC RISK REDUCTION |
PATRIOT CONSTRUCTION, INC. |
National Aeronautics and Space Administration |
June 26, 2019 |
September 11, 2020 |
$0 |
POP EXT- ALT CARE FACILITY- ST. LUKE HOSPITAL |
APTIM FEDERAL SERVICES, LLC |
Department of the Army |
April 11, 2020 |
October 05, 2020 |
$0 |
N245 SEISMIC RISK REDUCTION |
PATRIOT CONSTRUCTION, INC. |
National Aeronautics and Space Administration |
June 26, 2019 |
September 11, 2020 |
$0 |
BUILDING 45 HEATING DESIGN |
IRONWOOD COMMERCIAL BUILDERS, INC. |
National Aeronautics and Space Administration |
September 24, 2019 |
July 31, 2020 |
$0 |
N240 SEISMIC RISK REDUCTION, CLEAN ROOM THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE SEISMIC UP-GRADE OF BUILDING N240. THIS WORK CONSIST OF BUT NOT LIMITED TO PROVIDING VERTICAL STEEL BRACING AND HORIZONTAL ROD BRACING IN CLEAN ROOM ALONG WITH STRENGTHENING CONCRETE FOUNDATION FOR THE VERTICAL BRACING, THE REMOVAL, STORAGE, REPLACEMENT OR RE-INSTALLATION OF DOORS, WINDOWS, PARTITIONS, RAISED FLOORING, ASSOCIATED STAIRS AND RAILS, FLOOR SLABS, FLOOR FINISHES, LAY-IN CEILINGS, ASSOCIATED DIFFUSERS, SPRINKLER HEADS, EXIT SIGNAGE, ELECTRICAL DEVICES, JUNCTION BOXES, CONDUIT, CONDUCTORS, SECOND FLOOR ELECTRICAL PANELS AND TRANSFORMERS, FIRE ALARM AND FIRE SUPPRESSION COMPONENTS, MECHANICAL DEVICES, PIPING, DUCTING, AND GRILLES. RESTORATION AND CLEANING OF THE CLEAN ROOM, AFTER CONSTRUCTION. |
SOUTHWESTERN DAKOTAH, INC. |
National Aeronautics and Space Administration |
May 29, 2019 |
September 11, 2020 |
$0 |
VARIOUS HEATING VENTILATION AIR CONDITIONING (HVAC) AND HEAT PUMP REPAIRS. MODIFICATION TO EXTEND CONTRACT COMPLETION DATE 66 DAYS TO JULY 31, 2020 DUE TO DENIED ACCESS TO SITE. |
8-KOI, INC. |
National Aeronautics and Space Administration |
September 28, 2018 |
July 31, 2020 |
$0 |
ALTERNATE CARE FACILITY (ACF): SUBURBAN COLLECTION SHOWPLACE (NOVI SHOWPLACE), MI - DE-OB MODIFICATION |
GILBANE FEDERAL |
Department of the Army |
April 05, 2020 |
April 20, 2020 |
-$245,485 |
ALTERNATE CARE FACILITY (ACF): THE RANCH EVENTS COMPLEX, LOVELAND, CO - MODIFICATION TO INCORPORATE THE FINAL BUILD OUT REQUIREMENTS |
AECOM TECHNICAL SERVICES, INC. |
Department of the Army |
April 08, 2020 |
June 08, 2020 |
-$1,207,073 |
ALTERNATE CARE FACILITY (ACF): ST. LUKES HOSPITAL - PHOENIX, AZ - IMPLEMENT BUILD OUT |
APTIM FEDERAL SERVICES, LLC |
Department of the Army |
April 11, 2020 |
October 05, 2020 |
$2,625,356 |
COVID-19 2020 - SUSPENSION MOD |
CREW MW III, LLC |
Department of the Air Force |
September 17, 2019 |
May 14, 2020 |
$0 |
PARTIAL INTERIOR REMODEL OF HISTORIC BUILDING INTO OFFICE SPACE AT FORT VANCOUVER NHS. MODIFICATION #6 EXTENDS THE PERFORMANCE PERIOD DUE TO COVID-19 PANDEMIC EXCUSABLE DELAY. |
AMCORE CONSTRUCTION, LLC. |
National Park Service |
October 23, 2018 |
June 29, 2020 |
$0 |
B4826 HANGAR REPAIR AND MODERNIZATION |
CJW JOINT VENTURE |
National Aeronautics and Space Administration |
September 26, 2019 |
November 24, 2020 |
$0 |
ALTERNATE CARE FACILITY (ACF): SUBURBAN COLLECTION SHOWPLACE (NOVI SHOWPLACE), MI - DEFINITIZATION MOD |
GILBANE FEDERAL |
Department of the Army |
April 05, 2020 |
April 20, 2020 |
-$1,000,253 |
ALTERNATE CARE FACILITY (ACF): COLORADO CONVENTION CENTER - DENVER, CO - MODIFICATION TO COMPLETE FULL CONSTRUCTION |
ECC ENVIRONMENTAL LLC |
Department of the Army |
April 05, 2020 |
October 31, 2020 |
$21,535,927 |
BUILDING 45 HEATING DESIGN |
IRONWOOD COMMERCIAL BUILDERS, INC. |
National Aeronautics and Space Administration |
September 24, 2019 |
July 31, 2020 |
$8,879 |
N245 SEISMIC RISK REDUCTION |
PATRIOT CONSTRUCTION, INC. |
National Aeronautics and Space Administration |
June 26, 2019 |
September 11, 2020 |
$0 |
ALTERNATE CARE FACILITY (ACF): SUBURBAN COLLECTION SHOWPLACE (NOVI SHOWPLACE), MI - MODIFICATION |
GILBANE FEDERAL |
Department of the Army |
April 05, 2020 |
April 20, 2020 |
$2,000,000 |
ALTERNATE CARE FACILITY (ACF): THE RANCH EVENTS COMPLEX, LOVELAND, CO - MODIFICATION FOR COST VARIANCE, LIMITATION OF FUNDS |
AECOM TECHNICAL SERVICES, INC. |
Department of the Army |
April 08, 2020 |
June 08, 2020 |
$6,000,000 |
ALTERNATE CARE FACILITY (ACF): ST. LUKES HOSPITAL - PHOENIX, AZ |
APTIM FEDERAL SERVICES, LLC |
Department of the Army |
April 11, 2020 |
October 05, 2020 |
$481,424 |
ALTERNATE CARE FACILITY (ACF): TCF CENTER - DETROIT, MI - DEFINITIZATION |
DETROIT REGIONAL CONVENTION FACILITY AUTHORITY |
Department of the Army |
March 31, 2020 |
April 12, 2020 |
$3,690,034 |
ALTERNATE CARE FACILITY (ACF): SUBURBAN COLLECTION SHOWPLACE (NOVI SHOWPLACE), MI - FUNDING MOD |
GILBANE FEDERAL |
Department of the Army |
April 05, 2020 |
April 20, 2020 |
$5,500,001 |
ALTERNATE CARE FACILITY (ACF): THE RANCH EVENTS COMPLEX, LOVELAND, CO - MODIFICATION TO INCREASE BUDGET |
AECOM TECHNICAL SERVICES, INC. |
Department of the Army |
April 08, 2020 |
June 08, 2020 |
$3,500,000 |
ALTERNATE CARE FACILITY (ACF): COLORADO CONVENTION CENTER - DENVER, CO - INCREASED SITE PREPARATION BUDGET |
ECC ENVIRONMENTAL LLC |
Department of the Army |
April 05, 2020 |
October 31, 2020 |
$8,000,000 |
ALTERNATE CARE FACILITY (ACF): THE RANCH EVENTS COMPLEX, LOVELAND, CO |
AECOM TECHNICAL SERVICES, INC. |
Department of the Army |
April 08, 2020 |
June 08, 2020 |
$5,038,488 |
ALTERNATE CARE FACILITY (ACF): TCF CENTER - DETROIT, MI - MODIFICATION |
DETROIT REGIONAL CONVENTION FACILITY AUTHORITY |
Department of the Army |
March 31, 2020 |
April 12, 2020 |
$987,781 |
ALTERNATE CARE FACILITY (ACF): TCF CENTER - DETROIT, MI - PERIOD OF PERFORMANCE MODIFICATION |
DETROIT REGIONAL CONVENTION FACILITY AUTHORITY |
Department of the Army |
March 31, 2020 |
April 12, 2020 |
$0 |
ALTERNATE CARE FACILITY (ACF): COLORADO CONVENTION CENTER - DENVER, CO |
ECC ENVIRONMENTAL LLC |
Department of the Army |
April 05, 2020 |
October 31, 2020 |
$5,073,865 |
ALTERNATE CARE FACILITY (ACF): SUBURBAN COLLECTION SHOWPLACE (NOVI SHOWPLACE), MI |
GILBANE FEDERAL |
Department of the Army |
April 05, 2020 |
April 20, 2020 |
$5,499,999 |
ALTERNATE CARE FACILITY (ACF): TCF CENTER - DETROIT, MI |
DETROIT REGIONAL CONVENTION FACILITY AUTHORITY |
Department of the Army |
March 31, 2020 |
April 12, 2020 |
$4,774,999 |
REPAIR AIRCRAFT SHOP B1360 |
HCR CONSTRUCTION INC. |
Department of the Air Force |
July 20, 2017 |
May 31, 2020 |
$0 |
SUSPENSION OF WORK DUE TO COVID-19 AND USER MANNING IN THE BUILDING. |
CLARK ENTERPRISES, INC., J. W. |
Department of the Air Force |
April 26, 2019 |
May 14, 2020 |
$0 |
BUILDING 45 HEATING DESIGN |
IRONWOOD COMMERCIAL BUILDERS, INC. |
National Aeronautics and Space Administration |
September 24, 2019 |
July 31, 2020 |
$0 |
THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE SEISMIC UP-GRADE OF BUILDING N240. THIS WORK CONSIST OF BUT NOT LIMITED TO PROVIDING VERTICAL STEEL BRACING AND HORIZONTAL ROD BRACING IN CLEAN ROOM ALONG WITH STRENGTHENING CONCRETE FOUNDATION FOR THE VERTICAL BRACING, THE REMOVAL, STORAGE, REPLACEMENT OR RE-INSTALLATION OF DOORS, WINDOWS, PARTITIONS, RAISED FLOORING, ASSOCIATED STAIRS AND RAILS, FLOOR SLABS, FLOOR FINISHES, LAY-IN CEILINGS, ASSOCIATED DIFFUSERS, SPRINKLER HEADS, EXIT SIGNAGE, ELECTRICAL DEVICES, JUNCTION BOXES, CONDUIT, CONDUCTORS, SECOND FLOOR ELECTRICAL PANELS AND TRANSFORMERS, FIRE ALARM AND FIRE SUPPRESSION COMPONENTS, MECHANICAL DEVICES, PIPING, DUCTING, AND GRILLES. RESTORATION AND CLEANING OF THE CLEAN ROOM, AFTER CONSTRUCTION. |
SOUTHWESTERN DAKOTAH, INC. |
National Aeronautics and Space Administration |
May 29, 2019 |
September 11, 2020 |
$0 |