HEALTHEON, INC.
minority owned
Total Committed Value of Federal Contracts
$376K
Total Contracts
2
Total Actions
18
Location
New Orleans, LA

Recent Contract Actions

Contracts can have multiple “contract actions”: This is how agencies spend money for a specific purpose, adjust the amount committed or change the contract in a way that doesn’t affect the amount. That last scenario is usually indicated by a $0 action. If there is a contract action for a negative amount, it generally means the contract was adjusted or canceled.

Description Category Agency Signed Amount Committed
COVID-19 SITE CLOSURE RESULTED IN RENTAL COSTS DURING CLOSURE AND TO INCORPORATE A REQUEST FOR EQUITABLE ADJUSTMENT. A1 FIREX PIPING REPLACEMENT AND RUN TANK PAINTING AT STENNIS SPACE CENTER, MS Miscellaneous Buildings Construction National Aeronautics and Space Administration January 27, 2021 $68,195
CATHODIC PROTECTION SYSTEM REHAB TASK ORDER UNDER MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR STENNIS SPACE CENTER, MISSISSIPPI Miscellaneous Buildings Construction National Aeronautics and Space Administration September 25, 2020 $13,000
HIGH VOLTAGE DUCT BANK REFURBISHMENT AT STENNIS SPACE CENTER, MS (B. 9101) Electrical and Electronic Equipment Components Maintenance & Repair National Aeronautics and Space Administration September 24, 2020 $64,400
THE CONTRACTOR SHALL PROVIDE ALL RESOURCES (EXCEPT AS EXPRESSLY STATED IN THE CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO DELIVER AND PERFORM THE WORK IN ACCORDANCE WITH THE DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK AND DRAWINGS PROVIDED FOR THIS TASK ORDER, YOUR BASIC TERMS AND CONDITIONS, DRAWINGS, AND SPECIAL CONDITIONS PROVIDED WITH THIS TASK ORDER. THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSIST OF PROVIDING THE LABOR, EQUIPMENT, TOOLS, AND MATERIALS NECESSARY TO COMPLETE THE CONSTRUCTION AND/OR REPAIR AND MODIFY OF ELECTRICAL UTILITY EQUIPMENT AT BUILDING 2311 AND EQUIPMENT UTILITY AND CONTROL FOR LOCK GATES AT BUILDING 2310. THE WORK ALSO INCLUDES THE PROCUREMENT AND INSTALLATION OF EQUIPMENT TO BE PROVIDED NEW BY THE CONTRACTOR AS INDICATED AND REQUIRED FOR THE PROVISION OF FULLY FUNCTION SYSTEMS. THE TYPES OF EQUIPMENT INCLUDE BUT ARE NOT LIMITED TO TRANSFORMERS, MOTOR CONTROL ENTERS, CABLES, SWITCHES, SWITCHBOARD CONTROL SYSTEMS, CONSOLES, LIGHTS, VALVES, NEW DUCTBANK, PIPING, ELECTRICAL CABINETS, CONCRETE, PAVEMENT AND DEMOLITION. MUCH OF THE WORK IS IN CONFINED SPACES. CONTRACTOR SHALL PERFORM ALL PARTIAL CONSTRUCTION AS SUGGESTED ON THE DRAWINGS TO ENSURE DOWN TIMES DOES NOT EXCEED THE TIME FRAME AS INDICATED ON DRAWING E-002. ALL TERMINATION ON MAIN CONTROL BOARD, CONSOLES, AND TESTING SHALL BE PERFORMED BY MANUFACTURER'S TECHNICIANS. "ELECTRICAL REPAIRS TO CANAL LOCK CONTROLS." REPLACE ALL EXISTING LIGHTS AND PARTIAL CONDUIT. Miscellaneous Buildings Construction National Aeronautics and Space Administration September 24, 2020 $11,099
HIGH PRESSURE GAS PIPING SYSTEMS REPLACEMENT PHASE II Gas EPG Facilities Construction National Aeronautics and Space Administration September 23, 2020 -$6,399
WEST PARK SITE INFRASTRUCTURE UPGRADES. MOD INCORPORATES REQUEST FOR EQUITABLE ADJUSTMENT DUE COVID-19 RETURN TO SITE, INCREASING TOTAL CONTRACT $23,873. COMPLETION DATE EXTENDED TO NOVEMBER 4, 2020. Miscellaneous Buildings Construction National Aeronautics and Space Administration August 31, 2020 $23,837
HIGH PRESSURE GAS PIPING SYSTEMS REPLACEMENT PHASE II Gas EPG Facilities Construction National Aeronautics and Space Administration August 20, 2020 $0
WEST PARK SITE INFRASTRUCTURE UPGRADES. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE COMPLETION DATE 15 DAYS TO AUGUST 15, 2020 TO EVALUATE DENIED ACCESS TO KSC IMPACTS CURRENTLY IN REVIEW. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. Miscellaneous Buildings Construction National Aeronautics and Space Administration July 30, 2020 $0
A1 FIREX PIPING REPLACEMENT AND RUN TANK PAINTING AT STENNIS SPACE CENTER, MS Miscellaneous Buildings Construction National Aeronautics and Space Administration July 09, 2020 $188,235
HIGH PRESSURE GAS PIPING SYSTEMS REPLACEMENT PHASE II Gas EPG Facilities Construction National Aeronautics and Space Administration July 01, 2020 $0
WEST PARK SITE INFRASTRUCTURE UPGRADES. MODIFICATION EXTENDS COMPLETION DATE TO 7/31/2020 TO EVALUATE KENNEDY SPACE CENTER DENIED ACCESS IMPACTS CURRENTLY PENDING SUBMISSION. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME. Miscellaneous Buildings Construction National Aeronautics and Space Administration June 23, 2020 $0
CATHODIC PROTECTION SYSTEM REHAB TASK ORDER UNDER MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR STENNIS SPACE CENTER, MISSISSIPPI Miscellaneous Buildings Construction National Aeronautics and Space Administration June 11, 2020 $0
A1 FIREX PIPING REPLACEMENT AND RUN TANK PAINTING AT STENNIS SPACE CENTER, MS Miscellaneous Buildings Construction National Aeronautics and Space Administration June 09, 2020 $14,036
THE CONTRACTOR SHALL PROVIDE ALL RESOURCES (EXCEPT AS EXPRESSLY STATED IN THE CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO DELIVER AND PERFORM THE WORK IN ACCORDANCE WITH THE DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK AND DRAWINGS PROVIDED FOR THIS TASK ORDER, YOUR BASIC TERMS AND CONDITIONS, DRAWINGS, AND SPECIAL CONDITIONS PROVIDED WITH THIS TASK ORDER. THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSIST OF PROVIDING THE LABOR, EQUIPMENT, TOOLS, AND MATERIALS NECESSARY TO COMPLETE THE CONSTRUCTION AND/OR REPAIR AND MODIFY OF ELECTRICAL UTILITY EQUIPMENT AT BUILDING 2311 AND EQUIPMENT UTILITY AND CONTROL FOR LOCK GATES AT BUILDING 2310. THE WORK ALSO INCLUDES THE PROCUREMENT AND INSTALLATION OF EQUIPMENT TO BE PROVIDED NEW BY THE CONTRACTOR AS INDICATED AND REQUIRED FOR THE PROVISION OF FULLY FUNCTION SYSTEMS. THE TYPES OF EQUIPMENT INCLUDE BUT ARE NOT LIMITED TO TRANSFORMERS, MOTOR CONTROL ENTERS, CABLES, SWITCHES, SWITCHBOARD CONTROL SYSTEMS, CONSOLES, LIGHTS, VALVES, NEW DUCTBANK, PIPING, ELECTRICAL CABINETS, CONCRETE, PAVEMENT AND DEMOLITION. MUCH OF THE WORK IS IN CONFINED SPACES. CONTRACTOR SHALL PERFORM ALL PARTIAL CONSTRUCTION AS SUGGESTED ON THE DRAWINGS TO ENSURE DOWN TIMES DOES NOT EXCEED THE TIME FRAME AS INDICATED ON DRAWING E-002. ALL TERMINATION ON MAIN CONTROL BOARD, CONSOLES, AND TESTING SHALL BE PERFORMED BY MANUFACTURER'S TECHNICIANS. "ELECTRICAL REPAIRS TO CANAL LOCK CONTROLS." REPLACE ALL EXISTING LIGHTS AND PARTIAL CONDUIT. Miscellaneous Buildings Construction National Aeronautics and Space Administration May 29, 2020 $0
HIGH PRESSURE GAS PIPING SYSTEMS REPLACEMENT PHASE II Gas EPG Facilities Construction National Aeronautics and Space Administration May 04, 2020 $0
A1 FIREX PIPING REPLACEMENT AND RUN TANK PAINTING AT STENNIS SPACE CENTER, MS Miscellaneous Buildings Construction National Aeronautics and Space Administration April 08, 2020 $0
CATHODIC PROTECTION SYSTEM REHAB TASK ORDER UNDER MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR STENNIS SPACE CENTER, MISSISSIPPI Miscellaneous Buildings Construction National Aeronautics and Space Administration April 02, 2020 $0
THE CONTRACTOR SHALL PROVIDE ALL RESOURCES (EXCEPT AS EXPRESSLY STATED IN THE CONTRACT AS FURNISHED BY THE GOVERNMENT) NECESSARY TO DELIVER AND PERFORM THE WORK IN ACCORDANCE WITH THE DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK AND DRAWINGS PROVIDED FOR THIS TASK ORDER, YOUR BASIC TERMS AND CONDITIONS, DRAWINGS, AND SPECIAL CONDITIONS PROVIDED WITH THIS TASK ORDER. THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSIST OF PROVIDING THE LABOR, EQUIPMENT, TOOLS, AND MATERIALS NECESSARY TO COMPLETE THE CONSTRUCTION AND/OR REPAIR AND MODIFY OF ELECTRICAL UTILITY EQUIPMENT AT BUILDING 2311 AND EQUIPMENT UTILITY AND CONTROL FOR LOCK GATES AT BUILDING 2310. THE WORK ALSO INCLUDES THE PROCUREMENT AND INSTALLATION OF EQUIPMENT TO BE PROVIDED NEW BY THE CONTRACTOR AS INDICATED AND REQUIRED FOR THE PROVISION OF FULLY FUNCTION SYSTEMS. THE TYPES OF EQUIPMENT INCLUDE BUT ARE NOT LIMITED TO TRANSFORMERS, MOTOR CONTROL ENTERS, CABLES, SWITCHES, SWITCHBOARD CONTROL SYSTEMS, CONSOLES, LIGHTS, VALVES, NEW DUCTBANK, PIPING, ELECTRICAL CABINETS, CONCRETE, PAVEMENT AND DEMOLITION. MUCH OF THE WORK IS IN CONFINED SPACES. CONTRACTOR SHALL PERFORM ALL PARTIAL CONSTRUCTION AS SUGGESTED ON THE DRAWINGS TO ENSURE DOWN TIMES DOES NOT EXCEED THE TIME FRAME AS INDICATED ON DRAWING E-002. ALL TERMINATION ON MAIN CONTROL BOARD, CONSOLES, AND TESTING SHALL BE PERFORMED BY MANUFACTURER'S TECHNICIANS. "ELECTRICAL REPAIRS TO CANAL LOCK CONTROLS." REPLACE ALL EXISTING LIGHTS AND PARTIAL CONDUIT. Miscellaneous Buildings Construction National Aeronautics and Space Administration March 27, 2020 $0
About this data
This data comes from the Federal Procurement Data System, which includes all contracts worth $10,000 or more. We look at all contracts that are tagged with the procurement code for COVID-19 or otherwise started in 2020 and contain “COVID-19” in the description. Department of Defense contracting data is subject to a 90-day delay before it appears in the data.
Close Comment Creative Commons Donate Email Facebook Mobile Phone Podcast Print RSS Search Search Twitter WhatsApp
Current site Current page