Listing all stimulus spending by amount, in descending order. Return to Forest Service page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
P & M SIGNS, INC. | $11,126 | Contract | : Contract for manufacturing road signs for the US Forest Service. All signs completed, Delivered,received, and accepted. Awaiting payment. | Agriculture, Department of / Forest Service | 8/17/2010 |
HUMAN INTERACTIVE PRODUCTS, INC. | $65,626 | Contract | : Seed and Vegetation Collection / Hand collection of seed of various native plant species on forest lands to create a seed bank (stored seed) for use in future re-vegetation projects on the National Forest. | Agriculture, Department of / Forest Service | 8/02/2010 |
GOVERNMENT CONTRACT SOLUTIONS INC | $1,627,625 | Contract | : PROVIDE CONTRACTING AND GRANTS & AGREEMENT ACQUISITION SUPPORT FOR THE FOREST SERVICE ECONOMIC RECOVERY OPERATIONS CENTERS, EROC-EAST, NORTHWEST,AND INTERMOUNTAIN | Agriculture, Department of / Forest Service | 9/24/2010 |
ANNIS, DUANE | $49,652 | Contract | : RECOVERY Deferred Trail Maintenance,clearing windfall and brush and cleaning culverts and ditches of debris on forest trails | Agriculture, Department of / Forest Service | 4/16/2010 |
CHEMILOGICAL WEED MANAGEMENT INC | $113,822 | Contract | : 165 Miles of trail maintenance in the Eagle Cap Wilderness. This consists of clearing trees, brush, roots and rocks from the trail as well as 4 feet on each side. | Agriculture, Department of / Forest Service | 3/16/2010 |
PATRICK CORPORATION | $59,133 | Contract | : Recovery Opine #2 Handline Construction on the Deschutes National Forest Bend-Fort Rock Ranger District. Bend ,Oregon. This contract consists of building Hand fire line around leave area within prescribed fire units. Totaling 203906 feet. | Agriculture, Department of / Forest Service | 7/01/2010 |
ERIC'S TREE SERVICE | $133,650 | Contract | : This is a fuel reduction project for the US Forest Service. Establishing a fire break along public roadways by grinding brush and trees to create standing tree spacing so wild fires do not travel from tree to tree above ground. | Agriculture, Department of / Forest Service | 12/17/2009 |
STONEHOUSE SIGNS, INC. | $3,864 | Contract | : We manufactured the following signs: 16 EACH 3 PART ARRA SIGNS 42 4 EACH 3 PART ARRA SIGNS 60 4 EACH 3 PART ARRA SIGN 84 | Agriculture, Department of / Forest Service | 6/25/2010 |
AZTEC ARCHEOLOGICAL CONSULTANTS LLC | $22,119 | Contract | : Modification of original contract to include additional work. | Agriculture, Department of / Forest Service | 4/12/2010 |
RUNIONS CONSTRUCTION LLC | $21,009 | Contract | : Pacific Northwest Road Maintenance Corvallis Lab Fog sealing | Agriculture, Department of / Forest Service | 1/14/2010 |
TENNESSEE VALLEY CONSTRUCTION | $198,623 | Contract | : Concrete pads and sidewalks around modular toilets in Cherokee National Forest | Agriculture, Department of / Forest Service | 4/28/2010 |
P C R INC | $251,678 | Contract | : Pine Creek Water System Upgrade | Agriculture, Department of / Forest Service | 6/14/2010 |
QUIRAM LOGGING, INC. | $18,278 | Contract | : Wildland Fire Management. Remove trees and brush to lessen fire danger in campground and surrounding area where needed. | Agriculture, Department of / Forest Service | 5/18/2010 |
RESOURCE MANAGEMENT ASSOCIATES, INC. | $10,429 | Contract | : Architect Engineering award providing project level liasison services between the USFS and the Army Corps of Engineers for the Hebo Lake Campground reconstruction project and the Sand Lake Trash Compactors project, both on the Hebo Ranger District,Siuslaw | Agriculture, Department of / Forest Service | 4/21/2010 |
PREMIER CONTRACT SERVICES | $187,277 | Contract | : Roadside hand thinning of trees and brush to reduce fire hazzard. trees and brush that are cut are either chipped in place or piled for burning later. This work is being done on forest land at Tahoe National Forest. | Agriculture, Department of / Forest Service | 8/03/2010 |
FOREST ENERGY GROUP LLC | $622,696 | Contract | : Prime Contract | Agriculture, Department of / Forest Service | 7/15/2010 |
SIMJAN, INC. | $243,119 | Contract | : Smith, Bruah, Sinclair Lake Docks | Agriculture, Department of / Forest Service | 3/29/2010 |
MISSISSIPPI PLANTATION SERVICES LLC | $224,238 | Contract | : TAS::12 1118::TAS MECHNICAL FUELS REDUCTION FOR 1,124 ACRES (BLOCK #4). | Agriculture, Department of / Forest Service | 5/14/2010 |
GRAEAGLE TIMBER CO., LLC | $274,565 | Contract | : MT. HOUGH EMPIRE STEWARDSHIP - The purpose of this stewardship contract is to improve the forest health and road system within the project area. To accomplish these objectives the contract includes the following components: stand cleaning and thinning-fr | Agriculture, Department of / Forest Service | 9/21/2010 |
TRINITY COUNTY FAIR ASSOCIATION | $7,140 | Contract | : Rental of Fairground campground with shower usage for CCC crew. | Agriculture, Department of / Forest Service | 3/30/2010 |
GRANINGS WEED CONTROL, INC. | $30,085 | Contract | : TAS::12 1102::TAS ELKHORN TRAILS MAINTENANCE WALLOWA-WHITMAN NATIONAL FOREST | Agriculture, Department of / Forest Service | 5/21/2010 |
NAVAJO NATION TRIBAL GOVERNMENT, THE | $60,380 | Contract | : Produced and delivered 64,311 ponderosa pine seedlings to the USDA Forest Service, Apache-Sitgreaves National Forest. | Agriculture, Department of / Forest Service | 8/28/2009 |
PATRICK CORPORATION | $344,739 | Contract | : Recovery- LOM/Halfway Thin and Pile ,Ochoco National Forest This project consists of 1639 acres of thinning 209 acres of hand piling 792 acres of grapple piling And 2187 cubic yards of slash pile removal. | Agriculture, Department of / Forest Service | 5/25/2010 |
SUMMIT ENGINEERING CORPORATION | $162,878 | Contract | : Professional Surveying Services for the North Washoe Cadastral Survey. The award amount was adjusted by $3998 to accommodate a change in the scope during the previous quarter. | Agriculture, Department of / Forest Service | 3/01/2010 |
DARCO, INC. | $13,869 | Contract | : Supply and delivery of 10,000 gallon, underground water storage tank per solicitation AG-82B1-S-10-0369. Delivery: 07/27/2010. For: US Forest Service - EROC Intermountain - 740 Simms Street, Golden, CO 80401-4720 | Agriculture, Department of / Forest Service | 6/04/2010 |
MUNOZ FORESTRY LLC | $233,486 | Contract | : tree thinning and fire prevention | Agriculture, Department of / Forest Service | 7/14/2010 |
KLP INC | $52,550 | Contract | : INSTALLATIO OF LIGHTNING PROTECTION SYSTEM ON LOOKOUT TOWERS. MEADOW PEAK LOOKOUT, NORTHWEST PEAK LOOKOUT AND STAHL PEAK LOOKOUT. | Agriculture, Department of / Forest Service | 5/11/2010 |
PATRICK CORPORATION | $234,829 | Contract | : Roan Mt,Grassybald,Bradley Gap and Big Hump Restoration This is a multi year brush reduction project,which consists of brush cutting(slashing) ,brush piling,and mowing on approximately 674 ac. | Agriculture, Department of / Forest Service | 5/24/2010 |
TWIN PEAKS CONSTRUCTION, INC. | $922,043 | Contract | : Construct gravel pad for new train stop along existing tracks. Construct two pavilion buildings, one kiosk gathering area, one restroom building, gravel trails and wood trails. | Agriculture, Department of / Forest Service | 9/10/2010 |
COAL BED CREEK CONSTRUCTION INC | $92,750 | Contract | : Pinedale Reforestation Site Preparation and Fuels Treatment | Agriculture, Department of / Forest Service | 7/01/2010 |
HANGING ROCK EXCAVATION & CONSTRUCTION, INC. | $21,858 | Contract | : The work involved with this project was to replace a water system at the Godman Guard Station of the Umatilla National Forest that had failed and was no longer servicable. Work invloved installing collection lines at a spring source, installing approximat | Agriculture, Department of / Forest Service | 5/20/2010 |
GMS ENVIRONMENTAL FORESTY, INC. | $9,420 | Contract | : The purpose of this award was for the treatment/elimination of certain targeted non-native invasive species (vegetation)located in approximately 62 separate areas ranging from one tenth (0.10) of an acre to over fifty (50) acres with an aggregate total of | Agriculture, Department of / Forest Service | 7/07/2010 |
ACCESS PERSONNEL SERVICES, INC. | $31,578 | Contract | : To provide pilot services to tag animals in and around the national park. Flying involves a single engine tail wheel aircraft, equipped with telemetry sensors, used to track collard animals in and aroung Yosemite National Park area. | Agriculture, Department of / Forest Service | 8/11/2010 |
SOUTHERN UNITED CONTRACTING, LLC | $93,495 | Contract | : Mark Twain National Forest sidewalk project. | Agriculture, Department of / Forest Service | 5/25/2010 |
ECES INC. | $230,121 | Contract | : REPLACEMENT OF CULVERT IN THE US NFS ON SERVICE ROAD 615 | Agriculture, Department of / Forest Service | 5/10/2010 |
TM CONSTRUCTION, INC. | $75,857 | Contract | : Purpose of this contract is to reconstruct parts of Ocean Blvd; a logging road located at False Island on Chichigof Island. Items of work include: shot rock hauling and placement on the road, culvert replacement, install fish passage culvert with log wei | Agriculture, Department of / Forest Service | 12/29/2009 |
SUMMITT FORESTS INC | $45,780 | Contract | : BIG HORN WUI FUELS TREATMENT IDIQ PUSSYFOOT -SELECTIVE SLASHING/THINNING AND YARDING SLASH AND MECHANICAL PILING ON THE PAINTROCK R.D. OF THE BIGHORN N.F. | Agriculture, Department of / Forest Service | 9/15/2009 |
WEST RANGE RECLAMATION, LLC | $398,972 | Contract | : This project is for the removal of live and dead beetle infested timber on the Arapaho/Roosevelt National Forest. It requires mechanical logging and manual logging operations. | Agriculture, Department of / Forest Service | 4/06/2010 |
DELANGE ENTERPRISES INC | $28,849 | Contract | : RECOVERY Middle Fork Campground Drainage Repair consisting of replacing and installing culverts and ditch construction. Removal and disposal of waste, culverts, drainage excavation, mobilization, road surfacing and miscellaneous site work. | Agriculture, Department of / Forest Service | 5/28/2010 |
THOMAS, M DAVID | $15,488 | Contract | : Reconstruction of trail, removal of trees/shrubs, construction of pungents, water bars, & stairs. | Agriculture, Department of / Forest Service | 5/14/2010 |
CONLEY, TERRY | $242,480 | Contract | : CUT SKID AND DECK FOREST THINNING ON VALLES CALDERAS NATIONAL PRESERVE | Agriculture, Department of / Forest Service | 4/20/2010 |
TRIPLE TREE, INC. | $283,195 | Contract | : This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The contractor shall r | Agriculture, Department of / Forest Service | 6/10/2010 |
EPSILON CONSTRUCTION CORP. | $62,500 | Contract | : El Yunque National Forest Sign Installation Project | Agriculture, Department of / Forest Service | 6/25/2010 |
ADVANCED ENVIRONMENTAL SOLUTIONS, INC | $438,648 | Contract | : Construction of (6) restroom facilties within Santa Fe National Forest | Agriculture, Department of / Forest Service | 6/27/2010 |
COLWELL CONSTRUCTION COMPANY, INC. | $93,989 | Contract | : Repair the Anna Ruby Falls Foot Trails. This project consist of milling and repairing the subgrade. | Agriculture, Department of / Forest Service | 5/21/2010 |
BOWEN, JACK ALLEN | $25,335 | Contract | : Road Resurfacing on the Green Mountain National Forest, Southern Half | Agriculture, Department of / Forest Service | 2/18/2010 |
INTERNATIONAL DISTRICT HOUSING AND SOCIAL SERVICES | $32,000 | Grant | Recovery Act of 2009: Capital Improvement and Maintenance: ARRA- IDHA Job Training Development in which youth participate in stewardship projects in the national forests in order to learn skills and job opportunities in the environmental field. | Agriculture, Department of / Forest Service | 1/15/2010 |
HIGH COUNTRY SPRAYERS, LLC | $110,000 | Contract | : To perform road side noxious weed spraying on Federal Forest service roads as well as misc. forest owned properties. Cover 50 feet from center of road each direction. Spraying 400 miles of road and nearly 150 acres of buildings, campsites, misc. gravel | Agriculture, Department of / Forest Service | 5/25/2010 |
TRINITY VENTURES LLC | $300,337 | Contract | : The intent of this contract is for the improvments/rehab at two separate campgrounds on the Bitterroot National Forest. Listed from South to North as follows: 1) Warm Springs Campground- mill the existing chip seal surfacing and mix with the subbase mate | Agriculture, Department of / Forest Service | 5/04/2010 |
STEHEKIN OUTFITTERS, LLC | $11,780 | Contract | : Pack Stock Field Support for Chelan stimulus trail projects | Agriculture, Department of / Forest Service | 3/30/2010 |
FIBRECON PACIFIC INTL, LLC | $57,073 | Contract | : The road network that connects the city Cashmere Wa. and US#97,north of Wenatchee and US#2 is named Swakane Canyon Road. This road network is jointly owned by the USFS and the WDFW. This area is popular for outdoor recreation , Hunting, hiking, fishing ,H | Agriculture, Department of / Forest Service | 12/17/2009 |
DAVIS & WISE SOLUTIONS, LLC | $52,164 | Contract | : Supply, deliver and offload gravel to various campsites in the Rio Grande National Forest,CO. | Agriculture, Department of / Forest Service | 3/24/2010 |
EAGLE PASS REFORESTATION, INC. | $52,250 | Contract | : RECOVERY-BAPTIST, UPPER ROGUE FLAME PILE BURNING & MOP UP | Agriculture, Department of / Forest Service | 7/28/2010 |
G IKOLA INC | $144,140 | Contract | : 2.7Contract was awarded to perform commercial and precommercial thinning on 220 acres of tree plantation, planted in the 1960s, located on the New Meadows Ranger District of the Payette National Forest, located in the West Central Moutians of Idaho. Also | Agriculture, Department of / Forest Service | 9/30/2009 |
WOOD PRODUCT SIGNS/RECYCLE PLUS, INC. | $2,994 | Contract | : ROUTED USFS SIGNS, USING HDPE PLASTIC | Agriculture, Department of / Forest Service | 6/25/2010 |
NATURCHEM, INC. | $102,870 | Contract | : Herbicide Application at Francis Marion National Forest for Lygodium and invasive exotic vegetation. | Agriculture, Department of / Forest Service | 4/12/2010 |
TRAIL DESIGN SPECIALISTS, LLC | $175,500 | Contract | : Trail Maintenance for Moore Cove, Rainbow Falls, Fletcher Creek and Squirrel Gap trails in NC. | Agriculture, Department of / Forest Service | 5/28/2010 |
LIBBY AUTO SALES INC | $9,000 | Contract | : RENTAL VEHICLE | Agriculture, Department of / Forest Service | 5/20/2010 |
BITTERROOT SPRAYING LLC | $5,750 | Contract | : Herbicide application | Agriculture, Department of / Forest Service | 11/25/2009 |
G IKOLA INC | $116,624 | Contract | : Through utiliztion of commercial and pre-commercial thinning, this project aims to improve overall forest health, thereby reducing fire hazard in this wildland/urban interface area near McCall, Idaho. Also improved utilization of forest biomass will be a | Agriculture, Department of / Forest Service | 12/21/2009 |
KOOCANUSA EXCAVATING, INC. | $51,900 | Contract | : Kootenai Bridges | Agriculture, Department of / Forest Service | 7/29/2010 |
SOUTHERN WEST VIRGINIA ASPHALT, INC | $150,968 | Contract | : Expect delivery o f10,465 tons of aggregate for the Northern Region of the Monongahela National Forest. | Agriculture, Department of / Forest Service | 5/11/2010 |
E.C. THINNING LLC | $22,644 | Contract | : THINNING | Agriculture, Department of / Forest Service | 12/02/2009 |
ROBERT NORIE | $9,000 | Contract | : Pre Commercial Thinning Surveys. Collecting data on the general health of specified areas within the Idaho Panhandle National Forest. This requires crawling through dense stands of trees and brush collecting data on tree species number of trees, hieghth o | Agriculture, Department of / Forest Service | 1/09/2010 |
TRINITY VENTURES LLC | $95,597 | Contract | : The intent of this contract is for improvments at the Mill Canyon Trailhead on the Bitterroot National Forest as follows- Reconditioning of FS Road 1328 leading to the trailhead, also the parking area at the trailhead and placing a 4 compacted lift of cru | Agriculture, Department of / Forest Service | 5/04/2010 |
BEDROCK CONSTRUCTION GROUP, INC. | $17,269 | Contract | : Trail maintenance services on various trails in the Skykomish Ranger dist. | Agriculture, Department of / Forest Service | 12/08/2009 |
YAQUI ELECTRIC CO LLC | $296,684 | Contract | : Perform the removal of existing failing roofing systems and the replacement of them with various materials per the following: Powers Garden, Barfoot Lookout & Atascosa Lookout Roof Replacements 1 Mobilization LSQ 1 JB Powers Garden 2 Remove Ex | Agriculture, Department of / Forest Service | 6/02/2010 |
ADMIRALTY CONSTRUCTION, INC | $611,850 | Contract | : Prime contract for the construction of an ADA accessible bridge and trails. | Agriculture, Department of / Forest Service | 5/13/2010 |
F D RILEY & SONS INC | $58,165 | Contract | : To Demolish and rebuild rifle range shelters | Agriculture, Department of / Forest Service | 5/18/2010 |
FORSMAN, WILLIAM F | $22,240 | Contract | : TRAIL BRUSHING AND CLEARING. THIS WORK INCLUDES THE CLEARING AND REPAIRING OF TRAIL ROADS IN OROFINO. | Agriculture, Department of / Forest Service | 4/16/2010 |
CEDAR STORE, INC. THE | $76,909 | Contract | : Manufacture, transportation and assembly of a 30' x 44' All Steel Rectangular Pavilion in Kingshill, US Virgin Islands | Agriculture, Department of / Forest Service | 5/20/2010 |
MERCIER'S INCORPORATED | $55,986 | Contract | : Midewin National Tallgrass Prairie | Agriculture, Department of / Forest Service | 2/11/2010 |
MCDANIEL CONSULTING | $7,875 | Contract | : Engineering Construction Inspection, campground reconstruction. Will inspect aggregate and asphalt for the reconstruction of a camp site. | Agriculture, Department of / Forest Service | 9/15/2010 |
DILLS CREEK, INC. | $239,141 | Contract | : Road 2810 Repair & Culvert Replacement | Agriculture, Department of / Forest Service | 6/01/2010 |
PEARSON CONSTRUCTION | $22,984 | Contract | : STAR MEADOWS BUNKHOUSE RENOVATION & RESTORATION. | Agriculture, Department of / Forest Service | 6/07/2010 |
WILLIAM E CARLES | $21,606 | Contract | : Trail Construction and reconstruction | Agriculture, Department of / Forest Service | 6/15/2010 |
YOUNGWIRTH, BRADLEY & LORENDA | $54,918 | Contract | : non erfo flood repair | Agriculture, Department of / Forest Service | 6/02/2010 |
SUMMIT ENGINEERING CORPORATION | $133,296 | Contract | : Professional Surveying Services for the White Pine Mining District Mapping | Agriculture, Department of / Forest Service | 6/24/2010 |
GRAYBACK FORESTRY, INC. | $12,785 | Contract | : Hand pile and hand pile burn 24 acres per modification from 30 acres (12,785.10) | Agriculture, Department of / Forest Service | 4/26/2010 |
WORMAN FOREST MANAGEMENT LLC | $68,404 | Contract | : precommercial tree thinning | Agriculture, Department of / Forest Service | 3/18/2010 |
OLD 7, INC. | $71,940 | Contract | : removal of juniper trees on approximately 1000 acres | Agriculture, Department of / Forest Service | 4/15/2010 |
RIVERVIEW CONSTRUCTION | $45,467 | Contract | : NEW PUMP HOUSE AND PIPING | Agriculture, Department of / Forest Service | 8/20/2010 |
WAGON WHEEL TRUCKING AND ROLLOFFS, LLC | $7,620 | Contract | : install contrete sidewalks along trail at low water points | Agriculture, Department of / Forest Service | 3/01/2010 |
CENTRAL ENVIRONMENTAL, INC. | $582,657 | Contract | : Construction of snowmachine bridges along the historic iditarod trail | Agriculture, Department of / Forest Service | 6/01/2010 |
SUPREME CONTRACTING, INC. | $98,500 | Contract | : Roof Contract | Agriculture, Department of / Forest Service | 8/16/2010 |
TRIPLE TREE, INC. | $477,890 | Contract | : This project is to repair storm water runoff damage to the road surface and ditch. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage ditch. The Contractor shall r | Agriculture, Department of / Forest Service | 9/04/2009 |
WILBURN CONSTRUCTION, INC | $60,278 | Contract | : West Side Bridge Repair | Agriculture, Department of / Forest Service | 3/25/2010 |
TWIN PEAKS CONSTRUCTION | $19,680 | Contract | : roadside brush cutting | Agriculture, Department of / Forest Service | 5/25/2010 |
FIVE BEARS OUTFITTERS | $30,150 | Contract | : ARRA Recipient, Recovery Deferred Trail Maintenance | Agriculture, Department of / Forest Service | 9/17/2010 |
A. HAROLD AND ASSOCIATES LLC | $89,250 | Contract | : Demo of existing restroom at Hog Pen Landing, pump, clean and fill vault. Concrete apron construction host site, sidewalk, parking space and the relo of existing kiosk and fee tube. | Agriculture, Department of / Forest Service | 6/21/2010 |
SOLID WASTE SYSTEMS EQUIPMENT, LLC | $24,800 | Contract | : Simply provided 28 2 yard rear-load bear-proof dumpsters and hauled full dumpsters away and discarded the loads. | Agriculture, Department of / Forest Service | 9/23/2010 |
CONCO CONCRETE SPECIALISTS, L.L.C. | $19,620 | Contract | : Demolition of old restroom and site preperation for new restroom | Agriculture, Department of / Forest Service | 5/19/2010 |
PROFESSIONAL ASBESTOS REMOVAL CORPORATION | $3,416 | Contract | : Demolition, transport and disposal of structure with lead-based paint at the Sierra National Forest | Agriculture, Department of / Forest Service | 5/19/2010 |
EAGLE DEER RESERVE LIMITED | $115,358 | Contract | : Replacement of water supply at Fall Lake Campground | Agriculture, Department of / Forest Service | 4/14/2010 |
GRANITE EXCAVATION, INC. | $1,026,570 | Contract | : Southfork Salmon River Road Chipseal. Project consists of sweeping approximately 31 miles of forest highway. We then place CSS-1 hot asphalt oil to the surface and apply 3/8 chip rock to create a wear surface for the roadway. | Agriculture, Department of / Forest Service | 12/30/2009 |
PACIFIC LUMBER RESOURCES, INC. | $5,775 | Contract | : For 150 gallons of waterproofer for picnic tables maintenance in the Clearwater Forest | Agriculture, Department of / Forest Service | 4/12/2010 |
CACTUS TRANSPORT, INC. | $302,961 | Contract | : PAVING CORONADO NATIONAL FOREST | Agriculture, Department of / Forest Service | 12/02/2009 |
KOMADA, LLC | $2,511,300 | Contract | : This project was awarded for new construction - the complete design and construction of the Beckworth Fire Station at Nervino Airport. | Agriculture, Department of / Forest Service | 9/01/2010 |
APTCON, INC. | $39,304 | Contract | : WHITESIDE OBSERVATION DECK REPLACEMENT | Agriculture, Department of / Forest Service | 7/01/2010 |
B & N WEED CONTROL INCORPORATED | $9,428 | Contract | : For spraying weeds along roadsides on the Lolo National Forest. | Agriculture, Department of / Forest Service | 3/25/2010 |
ENGINEERS CONSTRUCTION, INC. | $150,900 | Contract | : Construction of Bottomless Stream Culvert | Agriculture, Department of / Forest Service | 3/31/2010 |
HCE, INC. | $318,836 | Contract | : Rehabilitation/reconstruction of 5 recreation sites in 5 separate locations in various parts of the ELDORADO NATIONAL FOREST. Work consists of clearing and grubbing, grading of roads, trails, spurs and campsites, selective removal and salvage of existing | Agriculture, Department of / Forest Service | 7/13/2010 |
LWF EXCAVATING | $72,706 | Contract | : Trail brushing and cleaning. Support activities for forestry. | Agriculture, Department of / Forest Service | 3/31/2010 |
C L D CONSULTING ENGINEERS, INC. | $83,940 | Contract | : Region-wide O&M (Operations and Maintenance) Manual Development and Completion and Sanitary Surveys of water and sewer/septic systems for selected campgrounds and sites in the Green and White Mountain national forests. | Agriculture, Department of / Forest Service | 3/12/2010 |
MORRIS SURVEYING ENGINEERING, LLC | $1,000 | Contract | : Field Survey | Agriculture, Department of / Forest Service | 3/18/2010 |
MADSON, CURTIS A JR | $18,345 | Contract | : Tree marking and timber volume measurements for U.S. Forest Service timber sales | Agriculture, Department of / Forest Service | 4/21/2010 |
CONCO CONCRETE SPECIALISTS, L.L.C. | $387,928 | Contract | : Water system upgrages. | Agriculture, Department of / Forest Service | 6/29/2010 |
TRINITY VENTURES LLC | $393,246 | Contract | : Reconstruction & Optional Loop Campsites- this project consists of relocation/realignment of 12 existing camping spurs, removal of existing picnic tables and fire rings. Placement of of new picnic tables, fire rings, and tent pads at 3 of the sites. Rec | Agriculture, Department of / Forest Service | 5/19/2010 |
ASTEC ENGINEERING, INC. | $84,597 | Contract | : CADSTRAL LAND SURVEY | Agriculture, Department of / Forest Service | 5/20/2010 |
U-CAN-AFFORD LANDSCAPING INC | $65,611 | Contract | : doing water sampling at campsites and sending to labs for testing and compiling results | Agriculture, Department of / Forest Service | 12/07/2009 |
THOMPSON CONTRACTING, INC. | $619,030 | Contract | : Vinal Lake/Long Meadows/Lake Creek road reconditioning | Agriculture, Department of / Forest Service | 5/04/2010 |
GAVER INDUSTRIES, INC. | $108,975 | Contract | : Asphalt paving of ATV trailhead | Agriculture, Department of / Forest Service | 12/28/2009 |
TRAIL DESIGN SPECIALISTS, LLC | $53,155 | Contract | : Trail Maintenance for Looking Glass, Deer Lake, Hard Times trails | Agriculture, Department of / Forest Service | 6/24/2010 |
TNT CONSTRUCTION | $57,500 | Contract | : Clearwater painting for Powell, Kooskia, Canyon work centers. | Agriculture, Department of / Forest Service | 8/25/2010 |
OLD 7, INC | $71,940 | Contract | : hand and mechanical thinning and removal of juniper timber | Agriculture, Department of / Forest Service | 4/15/2010 |
G IKOLA INC | $358,849 | Contract | : Through utilization of commercial timber harvest and pre-commercial thinning, this project strives to restore Northern Idaho Ground Squirrel habitat & return general forest ecosystem to historic natural fire regime conditions. | Agriculture, Department of / Forest Service | 6/10/2010 |
MASTER BUILDING SPECIALTIES, INC. | $4,007 | Contract | : toilet partitions | Agriculture, Department of / Forest Service | 9/15/2010 |
EVERGREEN ALASKA INC | $179,600 | Contract | : Hazaerdous fuels reduction in the Chugach National Forest. | Agriculture, Department of / Forest Service | 12/22/2009 |
LINK'S CONSTRUCTION LLC | $65,640 | Contract | : Remodel the interior of a visitor information center. This included removing walls, removing/changing electrical outlets/switches/fixtures, install a new southern yellow pine T&G floor, re-finish interior wood and trim, build and install new exterior doo | Agriculture, Department of / Forest Service | 4/12/2010 |
MUNOZ FORESTRY LLC | $213,884 | Contract | : tree thinning and fire prevention | Agriculture, Department of / Forest Service | 6/29/2010 |
K & K DIRT WORKS | $2,231 | Contract | : The purpose of this project is to decrease the inpact of soil and water degradation of dispersed recreation sites on the Tell City Ranger district. This project will also restrict travel beyond the designated site thus further elimination excess soil eros | Agriculture, Department of / Forest Service | 8/09/2010 |
SCOTT TIMBER CONTRACTING INC | $153,921 | Contract | : The Pinecrest Forest Health Stewardship project was designed to improve the overall health of the forest within the Pinecrest Basin. Within the project boundaries there are several large campgrounds, Permittee cabins, commercial area, and a large boating | Agriculture, Department of / Forest Service | 9/07/2010 |
TWIN PEAKS CONSTRUCTION | $28,650 | Contract | : roadside brush cutting | Agriculture, Department of / Forest Service | 5/10/2010 |
MUNOZ FORESTRY LLC | $12,160 | Contract | : tree thinning | Agriculture, Department of / Forest Service | 4/06/2010 |
ALESSIO & SONS CO | $210,480 | Contract | : Midewin National Tallgrass Prairie, Infrastructure Demo, ITEMS 1 & 2 Project includes but is not limited to: removal and disposal of the slab and foundation wall, and stabilize the sites of four buildings 62-6, 62-7, 62-8, and 62-9 in Group 62 South | Agriculture, Department of / Forest Service | 5/28/2010 |
ARROWHEAD STARR COMPANY | $96,575 | Contract | : Forestry work | Agriculture, Department of / Forest Service | 12/11/2009 |
WINTER SUN CONSTRUCTION LLC | $41,889 | Contract | : mechanical fuel reduction with chainsaws on seven miles of Forest Service boundary near Blowing Rock, NC | Agriculture, Department of / Forest Service | 5/19/2010 |
MOORE, W H CASH LUMBER L L C | $20,985 | Contract | : Provide vigas, latillas, corbels, posts, and rough sawn lumber for the Camino Real | Agriculture, Department of / Forest Service | 6/30/2010 |
FRANCES CONSTRUCTION, INC. | $1,185,869 | Contract | : San Joaquin Experimental Range (SJER) Seismic Upgrade. Seismic retrofit of historic adobe buildings, roof replacement, new electrical/mechanical/plumbing, new ADA bathroom and ADA access/parking, new interior finishes(painting,flooring,fixxtures), and new | Agriculture, Department of / Forest Service | 9/14/2010 |
MANAGEMENT ENGINEERING ASSOCIATES LLC | $259,000 | Contract | : Design and implementation of energy efficiency interventions at Pine Creek Work Center in Mt. Saint Helens National Forest | Agriculture, Department of / Forest Service | 9/28/2010 |
ATHERLY CONTRACTING, LLC | $10,815 | Contract | : Plantation Tree Thinning on the Malheur National Forest | Agriculture, Department of / Forest Service | 8/10/2010 |
WILBURN CONSTRUCTION, INC | $119,725 | Contract | : East Side Bridge Repair | Agriculture, Department of / Forest Service | 3/02/2010 |
STATEWIDE CONTRACT SERVICES, LLC | $81,715 | Contract | : HISTORIC RESTORATION PORJECT. PROVIDE MASONRY RESTORATION ON GODMAN STOVES. REABILITATE CAMP SITE TOILETS AND WALKWAYS | Agriculture, Department of / Forest Service | 5/14/2010 |
CONFIDENT STAFFING, INC. | $300,000 | Contract | : Temporary Services Contract for up to 5, qualified Type 1/2 Prescribed Fire Managers or Prescribed Fire Burn Boss to be Project Inspectors on various contract prescribed fires and to prepare, modify or review burn plans. | Agriculture, Department of / Forest Service | 5/26/2010 |
SCHLEGEL & SONS CONTRACTORS, INC | $245,676 | Contract | : Gravel and Laydown Project at Jewel Basin | Agriculture, Department of / Forest Service | 6/28/2010 |
SMITH CRANE & RIGGING, INC. | $1,960,444 | Contract | : DG Plantation ARRA stewardship Project. Tree removal for fuels reduction and creation of biomass to create energy and provide jobs. | Agriculture, Department of / Forest Service | 9/09/2010 |
NAMBE PUEBLO HEALTHCARE SERVICES, LLC | $247,710 | Contract | : Little Tesuque Improvements | Agriculture, Department of / Forest Service | 9/01/2010 |
BLUE SPRUCE BUILDERS, INC. | $88,760 | Contract | : Replace Doors, frames and hardware for various campground and day use area restrooms | Agriculture, Department of / Forest Service | 4/20/2010 |
PONDEROSA REFORESTATION, INC. | $1,649,312 | Contract | : TAS::12 1118::TAS RECOVERY UPPER HELLGATE #7 AND GALICE #10 FUEL REDUCTION | Agriculture, Department of / Forest Service | 5/26/2010 |
CUMMINGS, RON | $147,168 | Contract | : Caribou-Callahan Road Commissioning | Agriculture, Department of / Forest Service | 7/27/2010 |
ROGERS, JAMES TRUCKING & EXCAVATING INC | $50,350 | Contract | : TAS::12 1102::TAS -SIGNS-INSTALL This contract is to install signs around Rutland, VT. | Agriculture, Department of / Forest Service | 5/26/2010 |
CHANNEL CONSTRUCTION INC | $5,130 | Contract | : Supply D-1 material to Trail of Time Trailhead | Agriculture, Department of / Forest Service | 5/11/2010 |
WESTERN BRUSH SHREDDING, L.L.C. | $82,908 | Contract | : Nutrioso Pinyon-Juniper Restoration. Single tree dozer push extraction. Grassland restoration project | Agriculture, Department of / Forest Service | 5/02/2010 |
ROBERT JOHNSON SHOP | $110,539 | Contract | : REMOVE ABOUT 525 VERY OLD SIGNS IN THE BOISE NATIONAL FOREST NEAR BOISE,IDAHO. REPLACE THESE SIGNS WITH NEW ALUMINUM SIGNS WITH ANTI-GRAFFITI OVERLAY OR NEW HIGH DENSITY POLY (HDPE) SIGNS. | Agriculture, Department of / Forest Service | 3/08/2010 |
CRONIN CONSTRUCTION, INC. | $348,420 | Contract | : This award was for the renovation (Renovation (also called remodeling) is the process of improving a structure) of the Leon Sink recreation area. Renovations include, but are not limited to, removal and replacement of a bench, installation of a new ramp, | Agriculture, Department of / Forest Service | 6/30/2010 |
FOX COMPANY | $30,023 | Contract | : MANTENANCE TO ROOF INCLUDING REPAIRS TO A STANDING SEAM METAL ROOF | Agriculture, Department of / Forest Service | 5/18/2010 |
CAMPBELL CONSTRUCTION | $85,951 | Contract | : stough reservoir | Agriculture, Department of / Forest Service | 5/11/2010 |
RMA ARCHITECTS PSC | $9,146 | Contract | : Stake and flag 33 signs throughout El Yunque Caribbean National Forest | Agriculture, Department of / Forest Service | 4/19/2010 |
ROBINSON CONTRACTING, INC. | $91,757 | Contract | : Paddle Creek Culvert Replacement, Wayne National Forest, Ironton District | Agriculture, Department of / Forest Service | 5/27/2010 |
ENTERPRISE RENT-A-CAR GOVERNMENT PROCUREMENT, INC | $10,720 | Contract | : TAS::12 1102::TAS CAPITAL IMPROVEMENT & MAINTENANCE RECOVERY (ARRA)CIM-05-02T. GSAEBUY RFQ NO. 434117. VEHICLE RENTAL - RENTAL OF 3 FULL SIZED, 4X4, EXTENDED CAB PICKUP TRUCKS TO ASSIST WITH CREW LOGISTICAL SUPPORT ON KLAMATH NATIONAL FOREST. FULL SIZE | Agriculture, Department of / Forest Service | 2/03/2010 |
CONSTRUCTION MACHINERY INDUSTRIAL, LLC | $5,000 | Contract | : TAS ARRA Project CIM-1005, 1004-2T Trail of Time Equipment Rental w/o Operator | Agriculture, Department of / Forest Service | 5/11/2010 |
MCALLISTER CONSTRUCTION COMPANY, L.L.C. | $77,700 | Contract | : Porovide all labor, material and equipment to successfully removae and replace four exisitng boardwalks and construct a trail bridge along a 2.12 mile section of the Bartram Trail located in the Tuskegee National Forest in Macon County, AL | Agriculture, Department of / Forest Service | 9/07/2010 |
B & N WEED CONTROL INCORPORATED | $23,000 | Contract | : Apply herbicides to kill noxiouus weeds on roadsides and trails on national forest land in MT. | Agriculture, Department of / Forest Service | 8/31/2010 |
ZITONE CONSTRUCTION & SUPPLY CO INC | $353,910 | Contract | : Upgradeing the Electrical Utilites to Grey Towers Historic Location | Agriculture, Department of / Forest Service | 6/11/2010 |
MOUNTAIN VIEW SALES & CONTRACTING LLC | $9,895 | Contract | : roadside brushing | Agriculture, Department of / Forest Service | 9/03/2009 |
HOLLI FOREST PRODUCTS | $40,800 | Contract | : Prepare a post timber harvest site for natural regeneration or replanting. | Agriculture, Department of / Forest Service | 4/21/2010 |
RAMOS REFORESTATION, INC. | $293,022 | Contract | : Tree cutting and lopping/ scattering of activity created by slash, tree cutting and bucking of activity created by existing slash, hand piling | Agriculture, Department of / Forest Service | 6/03/2010 |
PRICE CONTRACTING, INC. | $208,930 | Contract | : Replacing a old deficient treated-timber bridge with a 2-lane, 54' concrete bridge. | Agriculture, Department of / Forest Service | 5/18/2010 |
TARR, ALBERT EXCAVATING, INC. | $6,682 | Contract | : ANF Rec Sign Deferred Maintenance - Install Signs | Agriculture, Department of / Forest Service | 2/03/2010 |
G IKOLA INC | $184,447 | Contract | : Utilization of commercial timber harvest and non-commercial thinning to change fire and vegetative conditions to those that more closely resemble historic condition, thereby improving the integrity of the landscape and it's resilience to wildland fire, an | Agriculture, Department of / Forest Service | 6/10/2010 |
K & K DIRT WORKS | $11,566 | Contract | : Work includes, removal of fill material and reshape drainage crossing, removal of asphale, excavation and recontour of old road and parking area, removal of culverts and reconstructin of drainage cross, obliterated road and parking access. | Agriculture, Department of / Forest Service | 6/11/2010 |
HABITAT RESTORATION LLC | $29,117 | Contract | : Phase II Early Seral Restoration | Agriculture, Department of / Forest Service | 3/31/2009 |
F D RILEY & SONS INC | $105,662 | Contract | : MAINTENANCE AND REPAIR AT THE LONG CANE RANGER DISTRICT IN THE SUMTER NATIONAL FOREST IN SC. | Agriculture, Department of / Forest Service | 5/11/2010 |
NORTHWEST MANAGEMENT INC | $110,356 | Contract | : Capital Improvement and Maintenance Thinning Services; Cut trees, thin brush species for fire hazard reduction;Location of work in Dubois, WY, USFS Wind River/Washakie RD. | Agriculture, Department of / Forest Service | 12/17/2009 |
HEARD PLUMBING INC | $59,512 | Contract | : WILLOW CREEK CAMPGROUND WELL HOWARDS GULCH WELL PUMP | Agriculture, Department of / Forest Service | 5/11/2010 |
ENDLESS GUTTER & SHEET METAL CO INC | $62,672 | Contract | : replace wood roof and gutter repair | Agriculture, Department of / Forest Service | 12/08/2009 |
CHAPARRAL MATERIALS, INC. | $12,436 | Contract | : Provide Acoustical Ceiling system in accordance with RFQ AG-8371-S-10-0010. | Agriculture, Department of / Forest Service | 7/26/2010 |
TWO SHOES, INC. | $183,750 | Contract | : Continental Divide Trail Corridor Clearing and Tral Features Construction | Agriculture, Department of / Forest Service | 8/12/2010 |
MORGAN & SON EARTH MOVING INC | $16,077 | Contract | : Reconditioning 1.5 miles of forest road, installing culverts, removal of a culvert, installing drivable water-bars, filling an eroded embankment and installing a gate. The reconditioning work included scarifying the surface to fill erosion ruts up to 10 d | Agriculture, Department of / Forest Service | 1/06/2010 |
WEST RANGE RECLAMATION, LLC | $137,641 | Contract | : FUELS REDUCTION-this project tasks us with the removal of timber to thin the forest and reduce the risk of catastrophic fires. | Agriculture, Department of / Forest Service | 9/09/2010 |
LANDSTAR DEVELOPMENT | $211,500 | Contract | : Rock Creek trail bridge #2 & #4, St. Paul Trail Bridge. Construct timber trail bridge to be used for pedestrian and livestock stream crossings. Bridges span approximately 40 feet and are 6' wide. | Agriculture, Department of / Forest Service | 7/27/2010 |
B NEXT CONSTRUCTION INC | $385,969 | Contract | : Midowin National Tall Grass Prarie - Improving fish passage in the rivers and streams. | Agriculture, Department of / Forest Service | 12/31/2009 |
TRAIL DYNAMICS LLC | $179,865 | Contract | : Maintenance is to be performed on 10.8 miles of existing All-Terrain Vehicle and Motorcycle trails to bring them up to current USDA Forest Service trail standards on Brown Mountain Off-Highway Vehicle (OHV) Trails 3, 5, 7, and 9. Work will include, but ma | Agriculture, Department of / Forest Service | 5/26/2010 |
MARSHFIELD FOREST SERVICE, INC | $104,119 | Contract | : TAS::12 1118::TAS FOR WILDLAND FIRE MANAGEMENT Non-native spieces control with application of herbicide by backpack. | Agriculture, Department of / Forest Service | 3/26/2010 |
WESTERN PROCESSING INC | $7,774 | Contract | : AG-82B1-D-10-0211 Bitterroot Roadside Brushing Bitterroot National Forest Hamilton, Montana 16.4 miles | Agriculture, Department of / Forest Service | 7/19/2010 |
STATEWIDE CONTRACT SERVICES, LLC | $83,419 | Contract | : 1912 Rd Realignment. Staking, clearing and grubbing, rdway excavation road reconditioning. Aggregate surface grading Fixing a public road. | Agriculture, Department of / Forest Service | 6/24/2010 |
C. E. RUSSELL, INC. | $108,099 | Contract | : CONSTRUCTION OF PINNACLE MOUNTAIN TRAIL AND RELOCATION OF MARGARETTE TRAIL ON THE NOLICHUCKY AND UNAKA RANGER DISTRICTS IN THE CHEROKEE NATIONAL FOREST | Agriculture, Department of / Forest Service | 5/21/2010 |
SIBERT, KEITH TRUCKING | $26,690 | Contract | : federally awarded contract | Agriculture, Department of / Forest Service | 4/08/2010 |
DLM CONTRACTING ENTERPRISES, INC. | $379,015 | Contract | : Black Canyon Fish Barrier Structure, Gila National FOrest | Agriculture, Department of / Forest Service | 7/23/2010 |
SIBERT, KEITH TRUCKING | $8,000 | Contract | : road work | Agriculture, Department of / Forest Service | 6/17/2010 |
SIERRA SECURITY SYSTEMS INC | $26,086 | Contract | : fire protection | Agriculture, Department of / Forest Service | 6/17/2010 |
NORTH, ERIC | $3,224 | Contract | : Kirtland Warbler Surveys- Chequamegon-Nicolet National Forest | Agriculture, Department of / Forest Service | 10/19/2009 |
BENNETT LUMBER PRODUCTS, INC. | $49,067 | Contract | : Noxious Weed Spray Clearwater National Forest | Agriculture, Department of / Forest Service | 3/04/2010 |
CAPITOL CITY CONSTRUCTION | $56,700 | Contract | : Mt. Roosevelt TowerRestoration | Agriculture, Department of / Forest Service | 6/21/2010 |
SPECIALIZED TREE SERVICE | $5,710 | Contract | : remove hazordus trees | Agriculture, Department of / Forest Service | 6/09/2010 |
C. L. HEILMAN COMPANY, INC. | $330,660 | Contract | : remove existing timber bridge and replace with cast pre cast bridge 100'in length. | Agriculture, Department of / Forest Service | 6/17/2010 |
MUTCH'S FORESTRY SERVICE LLC | $17,259 | Contract | : Timber and Boundary Marking and Timber Cruising on the Superior National Forest | Agriculture, Department of / Forest Service | 4/14/2010 |
WEBER CONSTRUCTION, INC. | $213,825 | Contract | : Recovery - Olympic National Forest Road 2160 Culvert Replacement | Agriculture, Department of / Forest Service | 5/06/2010 |
PENNEL, GEORGE TRUCKING & ESCIV | $11,099 | Contract | : Stormproof and Road Decomission | Agriculture, Department of / Forest Service | 12/29/2009 |
HAUSANRUFE | $6,300 | Contract | : HITCHING RAILS | Agriculture, Department of / Forest Service | 2/02/2010 |
SPECIALIZED TREE SERVICE | $19,340 | Contract | : remove hazordus trees from with in use recreation | Agriculture, Department of / Forest Service | 7/13/2010 |
WDJB, INC | $115,432 | Contract | : Pine Ridge defered maintenance Painting, Roofing, Gravel roads,drill well | Agriculture, Department of / Forest Service | 5/28/2010 |
TRANSECT ARCHAEOLOGICAL | $19,830 | Contract | : Heritage Trail Survey: South Wenaha-Tucannon Wilderness Trails Survey | Agriculture, Department of / Forest Service | 5/17/2010 |
RIO GRANDE ACE HARDWARE & BUILDING MATERIALS CO. | $6,000 | Contract | : PURCHASE ORDER FOR LUMBER AND BUILDING MATERIAL SUPPLIES. | Agriculture, Department of / Forest Service | 4/15/2010 |
DUMAN INC | $14,650 | Contract | : willamette rd Upper McKenzie RD Decommissioning Phase 3 | Agriculture, Department of / Forest Service | 5/12/2010 |
NORTHSTAR TECHNOLOGY CORP | $42,301 | Contract | : INSPECTION SERVICES | Agriculture, Department of / Forest Service | 9/22/2010 |
ENGINEERING/REMEDIATION RESOURCES GROUP, INC. | $30,058 | Contract | : This project involves abatement of lead based paint, soil testing, clean-up of contaminated soil, backfill with clean soil, and encapsulating lead based paint in one building located at Peterson Prarie north of Trout Lake, Washington. | Agriculture, Department of / Forest Service | 1/12/2010 |
J & R BARNUM EQUIPMENT, INC | $308,460 | Contract | : Thinning, fire fuels reduction | Agriculture, Department of / Forest Service | 8/27/2010 |
ANTUS, JOSH CONSTRUCTION | $52,344 | Contract | : Ecosystem restoration of ATV trails | Agriculture, Department of / Forest Service | 5/27/2010 |
HAUSANRUFE | $12,194 | Contract | : FENCE CONSTUCTION | Agriculture, Department of / Forest Service | 3/17/2010 |
FREEMAN DAVID | $30,520 | Contract | : Reduce fuel loading along roads and private land boundaries, create buffers along private land boundaries establish permanent fuel breaks, reduce fuel loading in and around upcoming prescribed burn areas. | Agriculture, Department of / Forest Service | 5/28/2010 |
NO FAULT ASPHALT, INC. | $34,468 | Contract | : Paving work for Riverside Day Use | Agriculture, Department of / Forest Service | 6/22/2010 |
EAGLE DEER RESERVE LIMITED | $141,175 | Contract | : Restore , roof and paint | Agriculture, Department of / Forest Service | 3/30/2010 |
ENTRIX, INC. | $483,462 | Contract | : Cardno ENTRIX will complete cultural surveys for the USDA Dixie site. | Agriculture, Department of / Forest Service | 9/16/2010 |
TROPICAL WHISPER | $3,013 | Contract | : Sign Installation and Tree Removal , Lake Eaton | Agriculture, Department of / Forest Service | 6/28/2010 |
TRIPLE TREE, INC. | $291,306 | Contract | : Re-establish cushion material to specified depth on native surface roads, using mobile rock milling equiptment. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage d | Agriculture, Department of / Forest Service | 6/17/2010 |
GMS ENVIRONMENTAL FORESTY, INC. | $16,232 | Contract | : The purpose of this award was for the elimination of non-invasive species (vegetation). Located in target area approximately 160 acres in the Sumter National Forest. | Agriculture, Department of / Forest Service | 7/06/2010 |
OLSON, JAY | $4,500 | Contract | : Hire an experienced trail designer to help with trail design for ARRA stimulus projects. | Agriculture, Department of / Forest Service | 10/28/2009 |
SCOTT FENCING COMPANY, INC | $637 | Contract | : Rental of fence utilized at the Carson National Forest | Agriculture, Department of / Forest Service | 8/01/2010 |
SOUTHWEST RESEARCH | $240,123 | Contract | : Common Stand Exam Project on the Dixie Ranger District of the Escalante National Forest, UT. Workers hike through the woods and measure tree heights, tree health, and fire danger at plots located with GPS units. Each plot contains data on the forest com | Agriculture, Department of / Forest Service | 6/03/2010 |
RANDALL LUMBER & HARDWARE, INC. | $6,000 | Contract | : FOR THE PURCHASE OF PRESSURE TREATED LUMBER,HARDWARE,ELECTRICAL,PLUMBING AND MISC BUILDING MATERIALS FOR THE CAMINO REAL RANGER DISTRICT | Agriculture, Department of / Forest Service | 4/14/2010 |
ARROWHEAD STARR COMPANY | $64,800 | Contract | : Killing Kudzu with Herbicide | Agriculture, Department of / Forest Service | 8/17/2009 |
HINKLE CONTRACTING COMPANY, LLC | $84,000 | Contract | : Furnish Haul and Place Stone on Forestry Service Roads in the Daniel Boone National Forest | Agriculture, Department of / Forest Service | 12/15/2009 |
COAL BED CREEK CONSTRUCTION INC | $12,540 | Contract | : supply and haul gravel to various locations in Montezuma and Dolores Counties | Agriculture, Department of / Forest Service | 6/15/2010 |
MCCUNE BROTHERS LLC | $3,250 | Contract | : HIDDEN VALLEY WEST BRIDGE REPLACEMENT, ARRA CIM-0808-17T, GEORGE WASHINGTON/JEFFERSON NF, VIRGINIA | Agriculture, Department of / Forest Service | 12/14/2009 |
COLORADO NETWORK STAFFING, INC. | $24,656 | Contract | : Temporary Civil Engineering Services. Created (1) one Civil Engineering Technician position for the US Forest Service. The purpose of the contract is to bring the campground water systems on the Arapaho/Roosevelt National Forests up to current State water | Agriculture, Department of / Forest Service | 9/03/2010 |
BIG SKY DEVELOPMENT, INC. | $160,525 | Contract | : Install Access Management by installing berms and gates throughout the National Forest in the area. | Agriculture, Department of / Forest Service | 6/16/2010 |
US WEST RESEARCH INC | $28,968 | Contract | : Historic American Engineering Report (HAER) of Sweetwater Mine Site, Sequoia National Forest | Agriculture, Department of / Forest Service | 1/26/2010 |
J & R BARNUM EQUIPMENT, INC | $51,888 | Contract | : mastication, fire fuels reduction | Agriculture, Department of / Forest Service | 8/27/2010 |
DON GARCIA EXCAVATING AND PAVING INC | $187,111 | Contract | : This project consists of building a timber, glue-laminated trail bridge with concrete abutments over Grass Lake Creek on the Tahoe Rim Trail. | Agriculture, Department of / Forest Service | 7/09/2010 |
TCA, LLC | $617,117 | Contract | : Building a bridge called Nevada Ogden Birdge over Little Blackfoot river in Montana | Agriculture, Department of / Forest Service | 8/06/2010 |
VEHICLE SERVICES INC | $12,200 | Contract | : PROVIDED 6 RENTAL VEHICLES TO THE PA US FORESTRY SERVICE | Agriculture, Department of / Forest Service | 5/26/2010 |
ADVERTISING CONCEPTS, INCORPORATED | $343,100 | Contract | : Signage System in Inyo National Forest, Mammoth Lakes, CA. to construct cohesive signage system including interpretive messaging and wayfinding along Lake Mary Bike path. Fabricate and install approximately 150 custom directional signs with structural st | Agriculture, Department of / Forest Service | 7/02/2010 |
LIPPERT HEAVY EQUIPMENT, INC. | $695,209 | Contract | : Lakeview Reeder Construction & Reconstruction - Road 308 Relocation per the requirements of solicitation #AG-82B1-S-10-0255. Priest Lake Ranger District. This project includes New construction and reconstruction of the road, excavation, rock aggregate pla | Agriculture, Department of / Forest Service | 6/04/2010 |
WILLIAM E CARLES | $22,736 | Contract | : trail construction and reconstruction | Agriculture, Department of / Forest Service | 5/25/2010 |
D & H HAULING & EXCAVATION, LLC | $105,940 | Contract | : Hand slash and Excavator Pliling. On upper East Virginia. | Agriculture, Department of / Forest Service | 11/18/2009 |
MERLAN ASSOCIATES, LLC | $78,000 | Contract | : Archval research and report on selected portions of the Old Spanish Trail/Camino Real de Tierra Adentro. | Agriculture, Department of / Forest Service | 1/29/2010 |
W P & H C INCORPORATED | $13,564 | Contract | : Kamiah Bunkhouse Residence Remodel (Plumbing Upgrades) | Agriculture, Department of / Forest Service | 3/31/2010 |
RANDALL LUMBER & HARDWARE, INC. | $6,000 | Contract | : FOR THE PURCHASE OF TOOLS SUPPLIES AND EQUIPMENT FOR THE CAMINO REAL RANGER DISTRICT | Agriculture, Department of / Forest Service | 4/15/2010 |
NORTHSTAR TECHNOLOGY CORP | $150,000 | Contract | : INSPECTIONS SERVICES | Agriculture, Department of / Forest Service | 9/23/2010 |
3B'S FORESTRY, INCORPORATED | $146,177 | Contract | : Task Order AG-82B1-D-10-0205 White Pine Pruning of 1246 Acres under IDIQ AG-0281-C-08-0012 | Agriculture, Department of / Forest Service | 6/29/2010 |
ZACHARIAS, R N LOGGING INC | $301,667 | Contract | : Log, process, load, and haul fuels from USFS ground. Additional soils protection progects. | Agriculture, Department of / Forest Service | 9/24/2010 |
SAGEBRUSH INN INC. | $278,364 | Contract | : Provide lodging and meals for crews that are rebuilding the Forest Service Station. Breakfast, Box lunch and dinner is provided daily | Agriculture, Department of / Forest Service | 9/15/2010 |
FAHRNER ASPHALT SEALERS, L.L.C. | $9,716 | Contract | : MAINTENANCE ON PARKING LOT | Agriculture, Department of / Forest Service | 3/01/2010 |
JMK | $17,250 | Contract | : Narrative: The ARRA work on the Boston Mountain Ranger District G?? Ozark-St. Francis National Forests in Arkansas, consisted of 3 contracts to repair damage done by a January, 2009 ice storm and the associated cleanup activities at Lake Wedington and Whi | Agriculture, Department of / Forest Service | 4/20/2010 |
BC CONCRETE, INC. | $74,923 | Contract | : Supply and install 4 vault toilets and one pumphouse for the Bitterroot national forest. | Agriculture, Department of / Forest Service | 4/26/2010 |
FOREST PRODUCTS INC | $82,741 | Contract | : We harvest, delimb, skid, deck and transport logs affected by the pine beetle epidemic and considered hazard trees. | Agriculture, Department of / Forest Service | 9/14/2010 |
JMK | $1,400 | Contract | : Narrative: The ARRA work on the Boston Mountain Ranger District G?? Ozark-St. Francis National Forests in Arkansas, consisted of 3 contracts to repair damage done by a January, 2009 ice storm and the associated cleanup activities at Lake Wedington and Whi | Agriculture, Department of / Forest Service | 4/21/2010 |
MESCALERO APACHE TRIBE | $340,203 | Contract | : 16 Springs Stewardship Contract, North Skyline Cable Yarding Unit | Agriculture, Department of / Forest Service | 7/17/2009 |
STEHLY BROTHERS DRILLING, INC. | $102,761 | Contract | : Cleveland NF Water Well Improvements at Los Rasalies Ravine and Well Destruction at Various Locations for Cleveland NF. | Agriculture, Department of / Forest Service | 8/02/2010 |
MARMON, WILLIAM | $5,600 | Contract | : Shoshone County Roads Project Forest Wide Maintenance | Agriculture, Department of / Forest Service | 4/09/2010 |
KIRKLAND, RON | $24,300 | Contract | : Survey and monument existing USFS property corners. If property corners were missing, re-establish and re-set. Mark and post property lines. | Agriculture, Department of / Forest Service | 10/26/2009 |
ELECTRIC PUMP & TOOL SERVICE, INC. | $45,775 | Contract | : relace pumps for lift station improvement. | Agriculture, Department of / Forest Service | 12/29/2009 |
K2 FABRICATION, INC. | $73,655 | Contract | : Fabrication of Trailhead, assurance signs, you are here signs and other misc signage for Linclon National Forest. Capitol Improvement and Maintenance | Agriculture, Department of / Forest Service | 12/31/2009 |
KIT CARSON ELECTRIC EDUCATION FOUNDATION, INC. | $3,177 | Contract | : CONVERT 840 FEET OF POWER FROM OVER HEAD TO UNDERGROUND POWER AT THE PENASCO CAMINO REAL RANGER DISTRICT | Agriculture, Department of / Forest Service | 3/30/2010 |
KESLER CONSTRUCTION INC | $102,397 | Contract | : BOAT RAMP PROJECT | Agriculture, Department of / Forest Service | 5/25/2010 |
GRAVES BAY | $74,320 | Contract | : Betty Creek Road Decommision | Agriculture, Department of / Forest Service | 4/23/2010 |
WHITNEY CONSTRUCTION | $168,000 | Contract | : Camp Horshoe Dinning Hall improvements Base Bid Work Schedule 1- Order windows, contact miss utility, consult YMCA camp director as to scheduled use of dining hall 2- Haul back hoe to site and dig and install conduit for new electrical service 3- Move | Agriculture, Department of / Forest Service | 5/06/2010 |
ENVIRO LAND MANAGEMENT, LLC | $803,261 | Contract | : Cut, masticate and mulch trees and shrubs covering 1140 acres for Wildland Urban Interface protection from wildfire. | Agriculture, Department of / Forest Service | 6/24/2010 |
CONSTRUCTION TECHNOLOGY & MANAGEMENT, INC | $165,106 | Contract | : Cimarron water replacement and Goose lake bridge | Agriculture, Department of / Forest Service | 9/28/2009 |
TRIPLE TREE, INC. | $433,673 | Contract | : Re-establish cushion material to specified depth on native surface roads, using mobile rock milling equiptment to manufacture cushion from in-place boulders and bed rock in the road surface. The work also includes replacement of ditch refief culverts and | Agriculture, Department of / Forest Service | 9/30/2009 |
WEST FOREST, INC. | $226,679 | Contract | : MASTICATION: Mechanical Treatment to remove ladder fuels and to reduce the continuity of fuels adjacent to an urban interface community. | Agriculture, Department of / Forest Service | 5/18/2010 |
QUALITY BUILT POLE BUILDINGS | $389,030 | Contract | : re-roof cabins at camp nesbit, Build ada ramps, remodle bath houses to specs | Agriculture, Department of / Forest Service | 6/30/2010 |
COOL ROOFING SYSTEMS, INC. | $780,107 | Contract | : Recovery-San Jacinto Ranger District-CIM-05-03F. Facilities Roofing Project-Total Price includes Base bid plus additive items-San Jacinto Ranger District. | Agriculture, Department of / Forest Service | 7/23/2010 |
GANAHL LUMBER COMPANY | $3,465 | Contract | : Lumber and building materials | Agriculture, Department of / Forest Service | 8/16/2010 |
CONSTRUCTORA CAMPO RICO, INC. | $263,200 | Contract | : Yokahu Tower Renovation and Trail Maintenance for El Yunque National Forest | Agriculture, Department of / Forest Service | 6/25/2010 |
KORELL OUTFITTERS | $10,000 | Contract | : Lowman packing services | Agriculture, Department of / Forest Service | 5/12/2010 |
R & B CONTRACTING | $461,600 | Contract | : Excavator Piling on the Kootenai National Forest. | Agriculture, Department of / Forest Service | 7/15/2010 |
AGGRESSIVE INDUSTRIES, INC. | $7,625 | Contract | : DECKING PANELS FOR THE ALLEGHENY NATIONAL FOREST | Agriculture, Department of / Forest Service | 9/13/2010 |
WESTERN PROCESSING INC | $61,509 | Contract | : Bitterroot Roadside Brushing located on the Stevensville, Darby, Sula, and West Fork Districts of the Bitterroot National Forest Hamilton, Montana Pre-work meeting: May 24,2010 Work started: June 23, 2010 Performance is til: September 30,2011 | Agriculture, Department of / Forest Service | 12/29/2009 |
P & M SIGNS, INC. | $197,181 | Contract | : Contract for manufacturing road signs for the US Forest Service. ALL signs completed, delivered, received, accepted, and PAID for. | Agriculture, Department of / Forest Service | 6/10/2010 |
ECLIPSE ENGINEERING INC | $99,117 | Contract | : Structural review of fire lookout towers in the Malheur National Forest | Agriculture, Department of / Forest Service | 7/08/2010 |
DREAMSCAPES, LLC. | $275,333 | Contract | : mechanical mulching, disking, and seeding @ Shawnee National Forest | Agriculture, Department of / Forest Service | 11/19/2009 |
ROBERTS PAVING INC. | $668,653 | Contract | : Parking Lot Modifications to Wayne National Forest | Agriculture, Department of / Forest Service | 4/15/2010 |
SOLARGLASS WINDOW & DOOR INC | $51,158 | Contract | : Supply replacement windows | Agriculture, Department of / Forest Service | 8/04/2010 |
DINK'S CONSTRUCTION, LLC | $83,355 | Contract | : replacement of an existing wooden trail bridge that provides access to an overlook.the project includes the removal of the existing trail bridge, and replacing with a new 45 foot wooden trail bridge | Agriculture, Department of / Forest Service | 5/12/2010 |
ATTACK-ONE FIRE MANAGEMENT SERVICES, INC | $199,014 | Contract | : Mechanical Fuel Reduction | Agriculture, Department of / Forest Service | 5/25/2010 |
HEGFORS INC TRUCKING & CONSTRUCTION | $46,205 | Contract | : Demolition of Existing Restroom Structures on the Superior National Forest covering the following - Echo lake, Johnson Lake, Little Indian Souix Trailhead, Laurentian Snowmobile Trailhead, White Pine Picnic Area - Cadotte lake Campground, Birchlake Campgr | Agriculture, Department of / Forest Service | 3/17/2010 |
NORTHWEST MANAGEMENT INC | $130,150 | Contract | : Wildland Fire Management; Capital improvement and Maintenance Thinning Services; cut trees, thin brush species for fire hazard reduction | Agriculture, Department of / Forest Service | 12/18/2009 |
SPUR CONSTRUCTION | $3,442,646 | Contract | : Bath house door and jam replacement | Agriculture, Department of / Forest Service | 8/13/2010 |
RODGERS, STEVEN R GENERAL ENGINEERING & BUILDING CONTRACTORS | $49,500 | Contract | : Water well abandonmenton the Angeles National Forest | Agriculture, Department of / Forest Service | 5/11/2010 |
ROCK GROUP LLC, THE | $48,000 | Contract | : Delivered limestone products to Daniel Boone National Forest Roads | Agriculture, Department of / Forest Service | 12/15/2009 |
CANAL WOOD, L.L.C. | $175,584 | Contract | : WFM-0812-12HF FRANCIS MARION BIOMASS THINNING FOR HAZARDNESS FUEL REDUCTION | Agriculture, Department of / Forest Service | 8/19/2009 |
HAYS, DONALD R JR | $441,581 | Contract | : Build 2008 meters of trail and associated boardwalks | Agriculture, Department of / Forest Service | 8/26/2010 |
BRIMHALL SAND, ROCK & BUILDING MATERIALS | $218,369 | Contract | : Haul 3/4 aggregate from Alpine Pit, Work with finish blade contractor coordinating haul locations (NFSR 24, NFSR 249, NFSR 249E). | Agriculture, Department of / Forest Service | 12/17/2009 |
NORTH, ERIC | $3,224 | Contract | : Endangered and Threatened Species Surveys Kirtland's Warbler | Agriculture, Department of / Forest Service | 10/20/2009 |
PREMIER CONTRACT SERVICES | $187,277 | Contract | : Roadside Hand Thinning | Agriculture, Department of / Forest Service | 8/03/2010 |
SOURCE, LLC | $3,000 | Contract | : Manufacture custom precast stairs for the Trail of Time utilizing high performance concrete. | Agriculture, Department of / Forest Service | 8/27/2010 |
FOREST PRODUCTS INC | $46,228 | Contract | : Hazard Tree Removal | Agriculture, Department of / Forest Service | 9/16/2010 |
MARSHFIELD FOREST SERVICE, INC | $147,445 | Contract | : Non-native spieces control with application of herbicide by backpack | Agriculture, Department of / Forest Service | 3/26/2010 |
SEIFERTS FIELD AND FOREST RESTORATION SERVICES LLC | $427,466 | Contract | : Invasive species | Agriculture, Department of / Forest Service | 8/22/2011 |
CXT INCORPORATED | $197,614 | Contract | : Supply and deliver eight precast concrete restroom buildings to the Kaibab National Forest. | Agriculture, Department of / Forest Service | 2/24/2010 |
STOLTZE, F H LAND & LUMBER CO (INC) | $28,315 | Contract | : Timber sale contract with embedded ARRA funding for coop road reconstruction-Clause C5.216# for $28,315.00. Project was to reconstruct 3 miles of Forest Service Road #433 and 3.1 miles of Forest Service Road #494 on the Kootenai National Forest. | Agriculture, Department of / Forest Service | 12/13/2011 |
CHRIS HARNER EXCAVATING | $197,183 | Contract | : TAS::12 1102::TAS, SNF ARRA RD MTCE EAST, APP: CIM-0900-2R-436-0908-01, Road Blading and Hauling Aggregate and Backhoeing in the Shawnee National Forest | Agriculture, Department of / Forest Service | 12/23/2009 |
MCSTONE AGGREGATES LLC | $16,906 | Contract | : Aspen Loop trail maintenance-Dolores District San Juan National Forest. Task Order AG-82B1-D-10-0217 | Agriculture, Department of / Forest Service | 7/29/2010 |
WEST RANGE RECLAMATION, LLC | $118,256 | Contract | : FUELS REDUCTION-this project tasks us with the removal of timber to thin the forest and reduce the risk of catastrophic fires. | Agriculture, Department of / Forest Service | 9/08/2010 |
WEST RANGE RECLAMATION, LLC | $94,673 | Contract | : FUELS REDUCTION-this project tasks us with the removal of timber to thin the forest and reduce the risk of catastrophic fires. | Agriculture, Department of / Forest Service | 9/08/2010 |
KRIEGE LOGGING LLC | $369,109 | Contract | : MALHEUR STEWARTSHIP COLABERATED TASK ORDER 7, RD 1. LOGGING UNIT PER CONTRACT. CUTTING TREES, SKIDDING TREES TO LANDING, DELIMBING TREES, LOADING LOGS ONTO TRUCKS AND HAULING LOGS TO MILL. | Agriculture, Department of / Forest Service | 6/30/2010 |
SEA REACH LTD | $55,628 | Contract | : interpretive planning for the Sawtooth NRA. | Agriculture, Department of / Forest Service | 4/02/2010 |
HEARD PLUMBING INC | $59,512 | Contract | : Willow Creek Campground and Howards Gulch Water Systems improvements | Agriculture, Department of / Forest Service | 5/11/2010 |
DLT SOLUTIONS, LLC | $3,781 | Contract | : Autodesk Software and License Purchase. | Agriculture, Department of / Forest Service | 6/21/2010 |
J RAYMOND FORESTRY INC | $665,305 | Contract | : fuel reduction in RR national forest,Siskyou NF | Agriculture, Department of / Forest Service | 12/30/2009 |
EASTERN OREGON STEWARDSHIP SERVICES CORP | $35,898 | Contract | : Collection and mapping native seed for the Malheur National Forest | Agriculture, Department of / Forest Service | 7/29/2010 |
GARY L BERG | $37,772 | Contract | : Professional Survey Services: Submeter GPS Data Collection, documentation and reporting. | Agriculture, Department of / Forest Service | 8/12/2010 |
MCSTONE AGGREGATES LLC | $127,085 | Contract | : Aspen Loop trail maintenance-Dolores District San Juan National Forest. Task Order AG-82B1D-10-0242 | Agriculture, Department of / Forest Service | 9/09/2010 |
ALFONSO GALLEGOS INC | $97,740 | Contract | : Pre-commercial tree thinning services in the Cabinet Creek Ranger District, Trout Creek, Montana | Agriculture, Department of / Forest Service | 8/03/2010 |
SUPREME CONTRACTING, INC. | $109,700 | Contract | : Roof Contract | Agriculture, Department of / Forest Service | 8/16/2010 |
DOLORES, COUNTY OF | $225,000 | Grant | Recovery Act of 2009: Wildland Fire Management: To Control Noxious Weeds in the Glade area of the San Juan National Forest. We have purchased new GIS and have inventoried for first season on noxious weeds. We have started the inventory process for the 2011 year and hope to begin treatment within thehe n... Show more | Agriculture, Department of / Forest Service | 5/10/2010 |
J RAYMOND FORESTRY INC | $191,335 | Contract | : Unit and roadside vegetation, precommerical thinning/release, prunning, hand piling and chipping | Agriculture, Department of / Forest Service | 5/26/2010 |
SAFEWAY SIGN COMPANY | $43,637 | Contract | : FOREST WIDE SIGN REPLACEMENT | Agriculture, Department of / Forest Service | 5/03/2010 |
LABODA GRADING INC. | $32,000 | Contract | : RESTROOM BLDG REPLACEMENTS-DEMO OF EXISTING RESTROOM STRUCTURES. BLANKENBERG BOAT ACCESS. | Agriculture, Department of / Forest Service | 3/17/2010 |
CRAWFORD COUNTY ROAD COMMISSION | $41,128 | Grant | Recovery Act of 2009: Wildland Fire Management: CONSTRUCTION AND MAINTENANCE OF FUEL BREAKS ALONG COUNTY AND FOREST SERVICE ROADS REDUCING ROAD BRUSHING AND CLEAING COSTS | Agriculture, Department of / Forest Service | 3/22/2010 |
BULLSEYE BUILDERS, INC. | $27,958 | Contract | : SLICKROCK TRAIL BRIDGE | Agriculture, Department of / Forest Service | 5/28/2010 |
WEST RANGE RECLAMATION, LLC | $96,115 | Contract | : FUELS REDUCTION-this project tasks us with the removal of timber to thin the forest and reduce the risk of catastrophic fires. | Agriculture, Department of / Forest Service | 9/16/2010 |
ACME AUTO LEASING LLC | $284,592 | Contract | : Leased Vehicles | Agriculture, Department of / Forest Service | 8/20/2009 |
KORNISH FOREST CONTRACTING INC | $379,079 | Contract | : Aspen Pre-commercial Thinning, Cut/skid,and Slash removal. | Agriculture, Department of / Forest Service | 6/24/2010 |
KORNISH FOREST CONTRACTING INC | $139,871 | Contract | : Mastication / Hazardous Fuels Reduction Project | Agriculture, Department of / Forest Service | 5/19/2010 |
MERCURY CONSTRUCTORS, INC. | $27,207 | Contract | : This project was a realignment of an existing Forest Service Road known as ?High Creek Road? that was located on private property. The existing road was on the private property for approximately one half of a mile. A new route was selected for the roadway | Agriculture, Department of / Forest Service | 1/20/2011 |
MESCALERO APACHE TRIBE | $357,240 | Contract | : George Unit, Service. TAS::12 1118::TAS, RECOVERY. PURPOSE OF THIS TASK ORDER IS TO PROVIDE HAZARDOUS FUEL REDUCTION BY THIN AND LOP TREES. | Agriculture, Department of / Forest Service | 4/06/2010 |
EDL CONSTRUCTION, INC. | $119,460 | Contract | : TAS::12 1102::TAS CAMINO REAL RANGER STATION - PHOTOVOLTAIC SYSTEM INSTALLATION IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. THE PROJECT IS LOCATED ON THE CARSON NATIONAL FOREST IN NEW MEXICO. WORK SHALL CONSIST OF DESIGN, SUPPLY AND INSTALLATION O | Agriculture, Department of / Forest Service | 9/24/2010 |
ALPHA & OMEGA GROUP PC | $56,305 | Contract | : Project Narrative The National Forests in North Carolina requests engineering services from Alpha and Omega Group, PC for the survey, geotechnical investigation, design, preparation of plans and specifications for the removal and replacement of the sing | Agriculture, Department of / Forest Service | 5/24/2010 |
THORNE BAY WOOD PRODUCTS ENTERPRISE | $27,916 | Contract | : Produce and deliver 19,940 BF of Yellow Cedar Lumber [831 Pcs. 3 x 8 x 12'] to Northland Barge in Petersburg, AK. | Agriculture, Department of / Forest Service | 5/21/2010 |
FIELD SERVICES INTERNATIONAL, LLC | $67,938 | Contract | : Resurface and Re-paving of Parking lot in Westminster, South Carolina | Agriculture, Department of / Forest Service | 11/10/2009 |
ECES INC. | $104,999 | Contract | : RECOVERY BASIN CREEK & ALFORD SPRINGS AOP | Agriculture, Department of / Forest Service | 5/11/2010 |
MARK A. TEMPLE CONSTRUCTION, INC. | $5,432 | Contract | : Fabricate two culvert bat cages and install. The cages prevent people from entering the abandoned mine and eliminate the risk of injury but allows bat and other creatures access. | Agriculture, Department of / Forest Service | 3/08/2011 |
WESTSIDE UTILITIES & EXCAVATION | $6,876 | Contract | : Replace outhouse vents | Agriculture, Department of / Forest Service | 5/11/2010 |
RAINEY CONSTRUCTION, INC. | $21,636 | Contract | : Forest-Wide Hazardous Fuel Reduction. This work consisted of removing all dead woody material from a predetermined corridor (firebreak) given to us on a map. There were 78 miles of firebreaks to be cleared. They ranged from 10-16 ft. in width. We used | Agriculture, Department of / Forest Service | 12/30/2009 |
PALOUSE-CLEARWATER ENVIRONMENTAL INSTITUTE | $110,189 | Grant | Recovery Act of 2009: Capital Improvement and Maintenance: The North Idaho Counties Trail Maintenance and Reconstruction Project emphasis is to decommission user-created trails. The Palouse Ranger District of the Clearwater National Forest has identified that an extensive system of unauthorized, usececreated Off Hi... Show more | Agriculture, Department of / Forest Service | 2/11/2010 |
WESTSIDE UTILITIES & EXCAVATION | $14,854 | Contract | : Food Storage Lockers | Agriculture, Department of / Forest Service | 5/18/2010 |
SOURCE, LLC | $1,000 | Contract | : Provide protection mats for the Trail of Time project. | Agriculture, Department of / Forest Service | 8/31/2010 |
GROSSHENING INC | $354,900 | Contract | : Infrastructure demolition, removal and disposal of concrete buildings at the Midewin National Tallgrass in Wilmington Il. | Agriculture, Department of / Forest Service | 5/28/2010 |
F D RILEY & SONS INC | $58,165 | Contract | : To Demolish and rebuild rifle range shelters | Agriculture, Department of / Forest Service | 5/18/2010 |
F D RILEY & SONS INC | $105,662 | Contract | : MAINTENANCE AND REPAIR AT THE LONG CANE RANGER DISTRICT IN THE SUMTER NATIONAL FOREST IN SC. | Agriculture, Department of / Forest Service | 5/11/2010 |
JOE MCGEE CONSTRUCTION COMPANY, INC | $945,151 | Contract | : FOUR BRIDGES REPLACMENT & ASSOCIATED ROAD WORK ON THE TOMBIGBEE NAT. FOREST | Agriculture, Department of / Forest Service | 12/02/2009 |
ROCK GROUP LLC, THE | $84,000 | Contract | : FURNISH HAUL AND SPREAD AGGREGATE ON FOREST SERVICE ROADS, DANIEL BOONE NF, WHITLEY, MCCREARY, PULASKI COUNTIES, KENTUCKY. | Agriculture, Department of / Forest Service | 12/15/2009 |
HARNEY ROCK & PAVING CO. | $247,976 | Contract | : This project consists of applying a chip seal to Forest Road 17 which is 11.13 miles long and is a double lane road with an existing asphalt paved surface 28' wide. | Agriculture, Department of / Forest Service | 6/03/2010 |
HOME REPAIR SPECIALIST INC, THE | $855 | Contract | : Work was for dry rot repair from a window replacement. Installed new wooden window frames. | Agriculture, Department of / Forest Service | 9/13/2010 |
AGEE CONSTRUCTION | $121,447 | Contract | : The purpose of the contract is to maintain forest roads and to clean debris from ditches to keep drainage flowing in the proper chanels | Agriculture, Department of / Forest Service | 8/30/2010 |
HOMER TREE SERVICE, INC. | $76,200 | Contract | : Chipping & Removal of Large Woody Debris. General debris disposal, removal or railroad ties. | Agriculture, Department of / Forest Service | 5/06/2010 |
DM & M CAPITAL, INC | $5,968 | Contract | : Fabrication of interpretive signage for Wayne National Forest | Agriculture, Department of / Forest Service | 1/28/2010 |
MUNOZ FORESTRY LLC | $213,884 | Grant | Recovery Act of 2009: Capital Improvement and Maintenance: tree tinning | Agriculture, Department of / Forest Service | 6/29/2010 |
WILLIAMS CONSTRUCTION & CABINETRY, INC. | $45,690 | Contract | : Build wellhouse at Rattlerford Campround | Agriculture, Department of / Forest Service | 4/08/2010 |
CHERRY VALLEY EXCAVATING | $29,922 | Contract | : clearing & grubbing,removal & disposal of waste,excavation, crushed aggregate, camping spur leveling, install culverts | Agriculture, Department of / Forest Service | 6/01/2010 |
MUNOZ FORESTRY LLC | $226,224 | Contract | : tree thinnig and piling | Agriculture, Department of / Forest Service | 1/01/2000 |
MESCALERO APACHE TRIBE | $248,843 | Contract | : 16 Springs Stewardship Contract, South Skyline Cable Yarding Unit - This project involves thinning of small diameter trees to reduce hazardous fuels and wildland fire danger. The project utilizes a small skyline yarder to move the thinned material up to | Agriculture, Department of / Forest Service | 1/26/2010 |
BROWNE, F X, INC | $59,139 | Contract | : Preparation of Operation and Maintenance Manuals for various water and wastewater systems in the Allegheny National Forest | Agriculture, Department of / Forest Service | 2/22/2011 |
HENRY LUCIEDO | $14,410 | Contract | : HAND TREE THINNING WITH CHAINSAWS | Agriculture, Department of / Forest Service | 6/01/2010 |
J RAYMOND FORESTRY INC | $191,335 | Contract | : Unit and roadside vegatation precommercial thinning/release, prunning, hand piling and chipping. | Agriculture, Department of / Forest Service | 5/26/2010 |
WILLIAMS CONSTRUCTION & CABINETRY, INC. | $1,079,751 | Contract | : Obliterate trails in Tellico Area | Agriculture, Department of / Forest Service | 5/28/2011 |
TOM VRANIZAN CONTRACTING, CORP. | $13,930 | Contract | : grinding and removal of landing piles | Agriculture, Department of / Forest Service | 5/18/2010 |
CATENA GROUP INC | $41,816 | Contract | : This project is for a multi-year aquatic monitoring on the Upper Tellico and Upper Snowbird Creek Watersheds in the Tusquitee and Cheoah Ranger Districts of the Nantahala National Forest. The contractor will use the Basinwide Visual Estimation Technique ( | Agriculture, Department of / Forest Service | 6/01/2010 |
CUMMINGS, RON | $158,351 | Contract | : Caribou-Callahan Road Commissioning project | Agriculture, Department of / Forest Service | 7/27/2010 |
HOLMAN CONSULTING ENGINEERS, P.C. | $29,770 | Contract | : Quality Control and Inspection | Agriculture, Department of / Forest Service | 6/24/2010 |
WORMAN FOREST MANAGEMENT LLC | $49,462 | Contract | : PRECOMMERCIAL THINNING OF DESIGNATED CONIFER PLANTATIONS | Agriculture, Department of / Forest Service | 3/19/2010 |
CAROLINA GROUND SERVICES, L.L.C. | $268,380 | Contract | : Bundled Mechanical WUI Treatment Project | Agriculture, Department of / Forest Service | 3/15/2011 |
HAYS JR, DONALD R | $441,581 | Contract | : *RECOVERY* - This project is funded by the American Recovery & Reinvestment Act (ARRA). The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the construction of a mu | Agriculture, Department of / Forest Service | 8/26/2010 |
COUNTRY CLASSIC, INC | $4,345 | Contract | : SIGNS | Agriculture, Department of / Forest Service | 5/26/2010 |
DLM CONTRACTING ENTERPRISES, INC. | $379,015 | Contract | : Erect fish barrier in Black Canyon. | Agriculture, Department of / Forest Service | 7/23/2010 |
CHEQUAMEGON BAY ENGINEERING, INC. | $44,451 | Contract | : The contract involves services for construction phase services for the installation of new wast water improvements at the Chippewa Campground. The work involves oversight of construction activities including onsite inspection and review of shop drawings | Agriculture, Department of / Forest Service | 4/07/2010 |
MENDIOLA FORESTRY SERVICES, LLC | $116,110 | Contract | : TAS::12 1118::TAS FOR WILDLAND FIRE MANAGEMENT ARRA / KOOTENAI NATIONAL FOREST / 2010/SLASHING / THINNING / D5. This contract is to slash and cut trees in Libby, Mt. | Agriculture, Department of / Forest Service | 6/01/2010 |
PREMIER CONTRACT SERVICES | $187,277 | Contract | : TREE THINNING AND BRUSH CUTTING WITHIN UNITS; AND ROADSIDE TREE THINNING AND BRUSHCUTTING/CHIPPING. | Agriculture, Department of / Forest Service | 8/03/2010 |
INSCO INSURANCE SERVICES, INC. | $508,095 | Contract | : NORTH CAROLINA FOREST WIDE TRAILS MAINTENANCE AND DAVIS CREEK ROAD RECONDITIONING | Agriculture, Department of / Forest Service | 6/01/2011 |
LINDERS, EMILY COOKING | $7,260 | Contract | : Cook for California Conservation Corps/Americorps Backcountry Trail Crew. Provide two hot meals and bagged lunch for 18-person trail crew. Live in remote wilderness setting for duration of contract. Direct corpsmembers in set-up of backcountry trail cam | Agriculture, Department of / Forest Service | 6/05/2010 |
CKC CONSTRUCTION & MATERIALS, LLC | $38,936 | Contract | : Construct approximately .7 miles of new roadway by hauling 1372 tons of engineered fill to plate the new roadway. After constructing new roadway, decommission existing user created road of .6 miles. | Agriculture, Department of / Forest Service | 3/09/2010 |
KADIX SYSTEMS, LLC | $93,830 | Contract | : To perform procurement acquisition and processing and grant and agreements tracking and distribution. The Procurement Technician works on various aspects of procurement such as creating contract files, maintain data for contract reporting purposes, and su | Agriculture, Department of / Forest Service | 4/20/2011 |
WORK HORSE, INC. | $162,445 | Contract | : This contract involves trail restoration of the Wenaha River Trail. | Agriculture, Department of / Forest Service | 4/07/2010 |
ENVIRONMENTAL FORESTRY, INC. | $172,805 | Contract | : ROAD SIDE BRUSH MULCHING, mulching to maintain safety of public roads on federal land. | Agriculture, Department of / Forest Service | 6/28/2010 |
GAGE IT CONSTRUCTION LLC | $330,367 | Contract | : PERMANENT SIGNING | Agriculture, Department of / Forest Service | 3/30/2010 |
JOHNSON ROCK PRODUCTS INC | $20,772 | Contract | : Supply & spread oyster shells on beach for Snowy Plover Habitat enhancement | Agriculture, Department of / Forest Service | 5/18/2010 |
STATEWIDE CONTRACT SERVICES, LLC | $233,173 | Contract | : This project will widen existing road segments to provide adequate with 14' paved surface with shoulders on FDR58 work consists of clearing, grubbing, excavation, aggregate surfacing and asphalt overlay. there are seven segments with one option segment | Agriculture, Department of / Forest Service | 6/24/2010 |
GOVERNMENT CONTRACT SOLUTIONS INC | $74,501 | Contract | : PROVIDE CONTRACTING AND GRANTS & AGREEMENT ACQUISITION SUPPORT FOR THE FOREST SERVICE ECONOMIC RECOVERY OPERATIONS CENTERS, EROC-EAST AND NORTHWEST | Agriculture, Department of / Forest Service | 4/20/2011 |
KLEEMAN, ANGELA | $99,234 | Contract | : Repair road settlements, replace drain pipe, replace asphalt | Agriculture, Department of / Forest Service | 4/13/2011 |
FOSSIL INDUSTRIES, INC. | $4,427 | Contract | : Manufacturing of Harris River interpretive trail signs | Agriculture, Department of / Forest Service | 5/11/2010 |
WORKMAN, SOLOMAN | $108,651 | Contract | : Motorized vehicle usage sign placement. | Agriculture, Department of / Forest Service | 4/09/2010 |
MOTT EXCAVATING, INC | $69,031 | Contract | : Shawnee NF, Lincoln Memorial Dev Rec Area Maint. Resurface Parking Lots and Access Drive | Agriculture, Department of / Forest Service | 5/10/2010 |
COASTAL CAROLINA THERAPY,LLC | $164,738 | Contract | : Furnish and install 3 Vault Toilets in NC NF | Agriculture, Department of / Forest Service | 5/25/2010 |
MUTCH'S FORESTRY SERVICE LLC | $16,552 | Contract | : provide tree marking, boundary painting, and cruising services on the Superior national forest | Agriculture, Department of / Forest Service | 4/16/2010 |
PACIFIC PONDEROSA | $3,414 | Contract | : TAS::12 1102::TAS RECOVERY CIM-0301-09R NFSR 26 CULVERT MATERIALS FOR SURFACING&SOIL STABILZATION PROJECT - APACHE SITGREAVES NATIONAL FOREST. | Agriculture, Department of / Forest Service | 12/15/2009 |
WARM SPRINGS GEO VISIONS | $265,621 | Contract | : To conduct a cultural resource survey of approximately 5,982 acres, monitor 50 existing sites, record 25 new sites and record 30 new isolates. | Agriculture, Department of / Forest Service | 4/23/2010 |
MCALLISTER, MICHAEL L | $17,335 | Contract | : TAS::12 1118::TAS RECOVERY - MALHEUR NATIONAL FOREST 2010 STAND EXAM 5 (DEARDORF-BIG COW), OREGON | Agriculture, Department of / Forest Service | 3/08/2010 |
SOUTHERN RESOURCE MANAGEMENT, L.L.C. | $103,443 | Contract | : 646 acres of fuel reduction.F uel reduction is conducted by grinding and/or mulching understory (brush and small trees) to reduce the availability of fuel for forest fires. This fuel reduction under this contract is completed using an articulated rubber t | Agriculture, Department of / Forest Service | 8/04/2011 |
GRANINGS WEED CONTROL, INC. | $45,000 | Contract | : TAS::12 1102::TAS RECOVERY - NOXIOUS WEED SPRAYING, CLEARWATER NF | Agriculture, Department of / Forest Service | 6/02/2010 |
MCSTONE AGGREGATES LLC | $50,162 | Contract | : TAS::12 1102::TAS FOR CAPITAL IMPROVEMENT & MAINTENANCE RECOVERY - Cleaned and rebuilt 30 miles of trail. | Agriculture, Department of / Forest Service | 12/02/2009 |
HARRISON, DAROL F | $3,486 | Contract | : Installation of air conditioning unit in the Henry Koen Building in Russellville, AR | Agriculture, Department of / Forest Service | 6/10/2010 |
PANNIER CORPORATION, THE | $7,224 | Contract | : fabication of fiberglass embedded panels. | Agriculture, Department of / Forest Service | 6/03/2010 |
WAYPOINT TECHNOLOGY GROUP | $5,210 | Contract | : Trimble GeoExplorer XT Handheld with Terra Sync Professional Software | Agriculture, Department of / Forest Service | 12/30/2009 |
HOLLOWAY TRENCHING, LLC | $15,000 | Contract | : Water System Repairs at Lake Russell | Agriculture, Department of / Forest Service | 9/01/2011 |
WARM SPRINGS GEO VISIONS | $135,757 | Contract | : To conduct a cultural resource survey of approximately 4,164 acres. | Agriculture, Department of / Forest Service | 4/23/2010 |
ALPINE EXCAVATION AND CONSTRUCTION COMPA | $13,500 | Contract | : Aggregate material for shoulder surfacing | Agriculture, Department of / Forest Service | 3/22/2010 |
FREMONT FOREST SYSTEMS INC | $111,985 | Contract | : Upper Grande Ronde Tree Planting | Agriculture, Department of / Forest Service | 3/30/2010 |
HAMMITT, MERNE | $102,347 | Contract | : Water System Upgrade, Buffalo Gap Campground, USDA Forest Serrvice, Near Medora, ND | Agriculture, Department of / Forest Service | 8/23/2010 |
VIITA'S EXCAVATING, INC. | $426,173 | Contract | : reconstructing atv and snowmobile trails | Agriculture, Department of / Forest Service | 5/27/2010 |
COUNTY OF SONOMA | $2,623 | Contract | : TAS::12 1102::TAS ARRA - CIM-05-07A - REDWOOD PICNIC TABLE BUILT This work was to build a picnic table at the redwood. | Agriculture, Department of / Forest Service | 4/14/2010 |
E-CORP. | $95,018 | Contract | : The purpose of this award is for re-lighting of the RMRS Shrub Sciences Lab at Provo Utah with new energy efficient lighting. | Agriculture, Department of / Forest Service | 3/26/2010 |
CNA SURETY CORPORATION | $35,929 | Contract | : McKenzie River District Office Renovation Project Completion - Punch List Work including LEED Certification and repair work. | Agriculture, Department of / Forest Service | 10/24/2011 |
FIVE BEARS OUTFITTERS | $22,800 | Contract | : Deferred Trail Maintenance, Clearwater National Forest | Agriculture, Department of / Forest Service | 4/14/2010 |
ED BIRKMEIER WELL DRILLING, LTD. | $33,200 | Contract | : TAS::12 1102::TAS CIM-0900-4F-734-0910-01 ARRA RECOVERY ABANDON WELLS | Agriculture, Department of / Forest Service | 4/17/2010 |
CHIMAYO YOUTH CONSERVATION CORPS | $32,962 | Contract | : Angel Fire Hazardous Fuel Reduction Project-East Fuelbreak of La Jara. Hand Piling of dead and down slash in accordance with statement of work, contract terms and conditions. No slash existing prior to thinning contract is to be piled. Bucking is require | Agriculture, Department of / Forest Service | 4/08/2010 |
GARCIA FOREST SERVICE LLC | $610,928 | Contract | : Federally awarded Contract | Agriculture, Department of / Forest Service | 12/28/2009 |
TRINITY VENTURES LLC | $335,864 | Contract | : Preparation, paving and striping of road and parking stalls; construction of sediment basins/ditches lined with class 1 riprap; boulder placement/removal; 6' layer of compacted aggregate surfacing on 6' wide foot paths to be constructed. Construction of | Agriculture, Department of / Forest Service | 7/06/2010 |
SOUTHERN CUSTOM APPLICATORS, LLC | $1,397,488 | Contract | : Provide all labor, materials,permits,licenses and equipment for Kudzu eradication as prescribed. | Agriculture, Department of / Forest Service | 12/22/2009 |
WORMAN FOREST MANAGEMENT LLC | $49,462 | Contract | : precommercial thinning | Agriculture, Department of / Forest Service | 3/19/2010 |
HAYS JR, DONALD R | $441,581 | Contract | : *RECOVERY* - This project is funded by the American Recovery & Reinvestment Act (ARRA). The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the construction of a mu | Agriculture, Department of / Forest Service | 8/26/2010 |
RML INCORPORATED | $103,708 | Contract | : Meadow restoration, West Fork Corral Creek culvert replacement. | Agriculture, Department of / Forest Service | 6/24/2010 |
CAROLINA GROUND SERVICES, L.L.C. | $268,380 | Contract | : Bundled Mechanical WUI Treatment Project on the Prescott National Forest | Agriculture, Department of / Forest Service | 3/15/2011 |
VAAGEN BROS. LUMBER, INC. | $281,884 | Contract | : Malo Task Order 3 Stewardship project | Agriculture, Department of / Forest Service | 5/27/2010 |
FLORA PACIFICA INC | $6,000 | Contract | : The purpose of this award is to propagate various species of endangered plants in Gold Beach,Oregon. | Agriculture, Department of / Forest Service | 3/18/2010 |
ALPHA SERVICES, LLC | $23,040 | Contract | : Replace and maintain Vexar tubing for newly panted seedlings. | Agriculture, Department of / Forest Service | 8/25/2010 |
ALPHA SERVICES, LLC | $698,395 | Contract | : Tree thinning services and fuel reduction | Agriculture, Department of / Forest Service | 6/01/2010 |
GAGE IT CONSTRUCTION LLC | $330,367 | Contract | : PERMANENT SIGNING | Agriculture, Department of / Forest Service | 3/19/2010 |
BOX ELDER, COUNTY OF | $500,000 | Grant | Recovery Act of 2009: Capital Improvement and Maintenance: Willard Peak Road | Agriculture, Department of / Forest Service | 3/25/2009 |
UPPER PENINSULA POWER COMPANY INC | $15,320 | Contract | : cover the cost of a new electric extension to the USFS at Grand Island | Agriculture, Department of / Forest Service | 4/06/2010 |
CORDOVA LOGGING INC | $187,310 | Contract | : CUT SKID AND DECK MONIGHAN CANYON. | Agriculture, Department of / Forest Service | 4/20/2010 |
L. R. COSTANZO COMPANY, INC | $1,079,555 | Contract | : Black Locust Allee Restoration Project at Grey Towers | Agriculture, Department of / Forest Service | 6/02/2010 |
TREASURE VALLEY FOREST PRODUCTS, LLC | $256,665 | Contract | : Atlanta South Reoffer timber Sale | Agriculture, Department of / Forest Service | 12/28/2009 |
AGEE CONSTRUCTION | $5,666 | Contract | : ROAD BLADING | Agriculture, Department of / Forest Service | 6/24/2010 |
WALLOWA RESOURCES INC | $250,800 | Grant | Recovery Act of 2009: Wildland Fire Management: ARRA Forest Fuels Reduction, Jobs and Biomass Utilization. This Grant enables the Wallowa-Whitman National Forest to thin overstocked forest stands that fall within the Wallowa County (OR) Community Wildfire Protection Plan. Benefits include restoringng o... Show more | Agriculture, Department of / Forest Service | 9/28/2009 |
BARRETO FORESTRY CONTRACTING, INC | $539,882 | Contract | : HAZARDOUS FUELS REDUCTION WITH HERBICIDES | Agriculture, Department of / Forest Service | 5/19/2010 |
OLD 7, INC | $71,940 | Contract | : clearing and removal of juniper timber | Agriculture, Department of / Forest Service | 4/15/2010 |
T & T CONTRACTING INC | $72,500 | Contract | : Crushing and Stockpiling | Agriculture, Department of / Forest Service | 12/22/2009 |
J RAYMOND FORESTRY INC | $665,305 | Contract | : fuel reduction and siskyou natl forest | Agriculture, Department of / Forest Service | 12/30/2009 |