Listing all stimulus spending by amount, in descending order. Return to U.S. Fish and Wildlife Service page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
CASCADE DESIGN PROFESSIONALS, INC | $5,000 | Contract | : Scoping Visit to Quilcene Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 6/15/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $59,254 | Contract | : Planning & Design Services for Rehab Predator Exclusion Cover at Lower Raceways at Carson NFH | Interior, Department of / U.S. Fish and Wildlife Service | 8/19/2009 |
CTA INC. | $182,320 | Contract | : Electric Power Generation (EPG)-Part of Project R8CA install photovoltaic (PV) systems. AE design for PV systems. | Interior, Department of / U.S. Fish and Wildlife Service | 9/01/2009 |
WHIDBEY-CAMANO LAND TRUST | $230,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To accomplish restoration of coastal prairie habitat and contribute to re-establishing a self-sustainng population of the federally threatened golden paintbrush plant (Castilleja levisecta). The project will 1) augment the existsting golden paintbrush popu... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/22/2009 |
SHOALWATER BAY INDIAN TRIBE | $50,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Reintroduce Pink Sand Verbena, a plant species that was previously thought to be extirpated in Washington State. Establish a second population of Pink Sand Verbena on tribal lands to assist with the recovery of this plant specieies. Actions under the cont... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/05/2009 |
EARTH WORKS INSTITUTE | $19,300 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This contract funded by the Recovery Act is for the purpose of developing and implementing several site-specific cooperative partnership projects for the enhancement of wildlife habitat. Projects focus on increasing the resilienence of wildlife habitat in ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/21/2009 |
BURTON CONSTRUCTION, INC. | $107,011 | Contract | : Upgrade the Garage/Shop building to meet seismic requirements as discovered by Seismic Evaluation performed in 2003. Design Build, design specific retrofits to correct identified deficiencies and then construct those retrofits. | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
CHUGACH INDUSTRIES, INC. | $2,283,905 | Contract | : The purpose of this mod is to add additional funding for energy renovation work for Office Row Housing on Midway Atoll. | Interior, Department of / U.S. Fish and Wildlife Service | 7/28/2009 |
MCMILLEN, LLC | $71,219 | Contract | : The work effort included design and preparation of construction documents for a new, appropriately sized chiller dedicated to egg incubation at the Kooskia Hatchery. Additional work elements included the rehabilitation of other system components includin | Interior, Department of / U.S. Fish and Wildlife Service | 9/08/2009 |
BURTON CONSTRUCTION, INC. | $334,341 | Contract | : Provide planning, design and construction services in accordance with USFWS Region 1 & 8 General Engineering Requirements, as further defined and expanded upon in the solicitation and its amendments, to repair or replace, as needed, the main electric serv | Interior, Department of / U.S. Fish and Wildlife Service | 9/21/2009 |
COMBINED EFFORT, INC. | $174,214 | Contract | : design build of new storage barn at Steigerwald National Wildlife Refuge. Project also includes new gravel road and demo of old storage building. Award amount increased due to change order. | Interior, Department of / U.S. Fish and Wildlife Service | 8/31/2009 |
ENGINEERING SCIENCE & CONSTRUCTION L.L.C. | $42,550 | Contract | : This award is for the design of refurbishing of Page Springs Dam at Malheur NWR. The refurbishment includes design of new automatic control panels. | Interior, Department of / U.S. Fish and Wildlife Service | 8/19/2009 |
NH ENGINEERING, PLLC | $355,940 | Contract | : Engineering Project Manager - assist engineering staff in managing construction projects under the American Recovery and Reinvestment Act of 2009. | Interior, Department of / U.S. Fish and Wildlife Service | 5/29/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $105,139 | Contract | : This project is to repair the raceway headbox and walkway Deck at the Quilcene National Fish Hatchery (NFH). The concrete headbox structure, which serves nine 8' x 80'raceways, is severely deteriorated. Metal channels that provide support to the concret | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $56,381 | Contract | : Steigerwald Tier 1 Energy Updates | Interior, Department of / U.S. Fish and Wildlife Service | 10/07/2009 |
CHIHUAHUAN DESERT RESEARCH INSTITUTE | $32,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Work planned for this award will restore and enhance 178 acres of native grassland habitat on the landsite of the Chihuahuan Desert Nature Center. The project will provide native grassland habitat for migratory and resident wildldlife species found in the ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/07/2009 |
COASTAL PRAIRIES COALITION, GRAZING LANDS CONSERVA | $100,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Prairie Enhancement for Prairie Chicken Habitat | Interior, Department of / U.S. Fish and Wildlife Service | 8/14/2009 |
GAME AND FISH, ARIZONA DEPT OF | $40,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To provide technical and financial assistance to identify, protect, conserve, manage, enhance or restore habitat or species on private lands. | Interior, Department of / U.S. Fish and Wildlife Service | 7/30/2009 |
VERMEJO PARK, L.L.C. | $35,000 | Contract | : This grant supports native fish conservation and restoration in New Mexico. The Vermejo Park Ranch and other state and private partners have initiated a multi-year effort to restore, conserve, and manage native Rio Grande cutthroat trout in the upper Ver | Interior, Department of / U.S. Fish and Wildlife Service | 7/29/2009 |
JACOBS ENGINEERING GROUP INC. | $26,026 | Contract | : Provide Preliminary Planning and Professional Engineering services for assisting the US Fish and Wildlife Service (USFWS) in awarding a Design Build Contract, for the relocation of the 25kV transmission line across the tidal marshlands within the Bandon M | Interior, Department of / U.S. Fish and Wildlife Service | 9/30/2009 |
KITTITAS CONSERVATION TRUST | $62,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Habitat restoration, Cle Elum River | Interior, Department of / U.S. Fish and Wildlife Service | 7/31/2009 |
NATURE CONSERVANCY, THE | $560,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This project between the U.S. Fish and Wildlife Service and The Nature Conservancy benefits the public by restoring habitat for many wildlife species dependant on mature forest stands for survival. This endeavor is a continuatioion of an ongoing large scal... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/24/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $48,950 | Contract | : Abernathy Earthen Basin Repair - AE Planning & Design Services | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
TETRA TECH, INC. | $205,786 | Contract | : Comprehensive Energy & Water Evaluation Study - U.S. Fish and Wildlife Service, Region Eight. This study includes evaluations for multiple complexes within the states of California, and Nevada. | Interior, Department of / U.S. Fish and Wildlife Service | 10/08/2009 |
COMBINED EFFORT, INC. | $33,647 | Contract | : Repair water control structures at the Kern County National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
MOLOKAI LAND TRUST | $50,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Mokio Coastal Strand Restoration on Molokai | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $287,873 | Contract | : U.S. Fish and Wildlife Service - Quilcene National Fish Hatchery - Hatchery Seismic & Safety Upgrade | Interior, Department of / U.S. Fish and Wildlife Service | 6/15/2009 |
SK QUALITY CUSTOMS BUILDERS INC | $16,768 | Contract | : Replace Septic System | Interior, Department of / U.S. Fish and Wildlife Service | 9/23/2009 |
SAIGAN CONSTRUCTION, INC. | $80,448 | Contract | : Replace 47 valves at Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
DOBSON RANCH | $37,000 | Contract | : This ARRA project is being implemented in order for the FWS and Dobson Ranch LLC to work together to restore habitat (approx. 1,710 acres) for the candidate lesser prairie-chicken and other grassland dependent species. | Interior, Department of / U.S. Fish and Wildlife Service | 8/10/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $12,937 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Imperial National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation s service projects. An SCA in... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
APRISA TECHNOLOGY,LLC | $1,214 | Contract | : RECOVERY -EA Camera/Video Equipment | Interior, Department of / U.S. Fish and Wildlife Service | 8/13/2009 |
DELL MARKETING L.P. | $5,709 | Contract | : DESKTOPS | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
RUDYARD ELECTRICAL SERVICE, INC | $11,938 | Contract | : Remove and replace lights with energy efficient lights at Pendills Creek Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 9/12/2009 |
LUEDTKE LUMBER & LOGGING | $24,000 | Contract | : Prairie field grubing and clearing. | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
MIKE'S TREE SERVICE, INC | $18,200 | Contract | : stump and brush grinding | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
NATURE CONSERVANCY, THE | $55,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This ARRA project is being implemented in order for the FWS and TNC to work together for the purpose of implementing prescribed burns on private lands targeting Native Ecosystems in the State of Texas. With the participation of i interested landowners, this... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/21/2009 |
CONSERVATION COMMISSION OF OKLAHOMA | $50,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Implementing prescribed fire on private lands to restore native ecosystems and landscapes to their historical biological diversity and productivity and decrease wildfire potential. OCC will work with 3 local conservation districicts to provide finanical as... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/21/2009 |
CORONADO RESOURCE CONSERVATION & DEVELOPMENT AREA | $45,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Funding for staffing and supplies for Invasive Weed Control in Cochise County, AZ | Interior, Department of / U.S. Fish and Wildlife Service | 7/30/2009 |
COASTAL BEND BAYS & ESTUARIES PROGRAM, INC | $455,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The purpose is to provide financial and technical assistance for the design and implementation of the Nueces Bay Portland-Causeway Marsh Restoration Project near Indian Point in Nueces Bay, in Nueces County, Texas. The objectivives are to restore a minimu... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/19/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $5,262 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funded services to the Sequoyah National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation n service projects. The Hunt... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $12,937 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the KOFA National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation servivice projects. An SCA Habita... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
MAUI COASTAL LAND TRUST, INC | $70,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This award is provided for the conduct of ecological restoration work on 8 acres of coastal habitat on Maui, Hawai'i. | Interior, Department of / U.S. Fish and Wildlife Service | 7/20/2009 |
WILDERNESS GRAPHICS INC | $95,000 | Contract | : Develop interpretive concept plan for exhibits at Southeast Louisiana NWR Complex in Lacombe, LA. From final concept plan, design, fabricate, and install exhibits selected by SELA. | Interior, Department of / U.S. Fish and Wildlife Service | 9/09/2009 |
JOHNSON-MCADAMS FIRM, P.A., THE | $273,219 | Contract | : USFW Energy Audits West | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
SEASONS CHANGE, LLC | $30,032 | Contract | : Replace HVAC Systems at Klamath Basin NWRC | Interior, Department of / U.S. Fish and Wildlife Service | 9/02/2009 |
YERBA BUENA ENGINEERING & CONSTRUCTION INC | $217,000 | Contract | : STONE LAKE: CONCRETE TRAIL. | Interior, Department of / U.S. Fish and Wildlife Service | 7/31/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $1,200,000 | Contract | : San Francisco National Wildlife Refuge Complex Phase Two of building renovations: envelope and finises renovations in HQ levels 1 & 2 and all other areas of HQ levels 3 & 4; including relocation of modular office. This action includes incidental furnitur | Interior, Department of / U.S. Fish and Wildlife Service | 6/03/2009 |
ALPHA-BOULDER LIMITED LIABILITY COMPANY | $276,184 | Contract | : ARRA Program Management -- overseeing various infrastructure projects through completion. | Interior, Department of / U.S. Fish and Wildlife Service | 7/06/2009 |
LOWER ELWHA TRIBE COMMUNITY COUNCIL | $141,000 | Contract | : Cooperative agreement between the USFWS and Lower Elwha Tribe to construct and obtain the necessary permits to to install a fish management weir in the Elwha River for the purposes of monitoring and ennumerating adult salmon returns to the Elwha River. | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2009 |
KITTITAS COUNTY CONSERVATION DISTRICT | $36,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This Cooperative Agreement is being implemented for the purposes of : 1) helping to reverse the trend of declining fish and wildlife habitat by removing an old irrigation dam that is a barrier to migrating fish (near City of Ellelensburg, Kittitas County, W... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2009 |
TILLAMOOK ESTUARIES PARTNERSHIP | $339,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Support restoration actions in the 43 acres of the Miami River wetlands in Tillamook County. | Interior, Department of / U.S. Fish and Wildlife Service | 7/24/2009 |
TROUT UNLIMITED, INC. | $87,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Upper Cub River Fish Passage Restoration--This award is being used to install a fish screen at an irrigation diversion on the Upper Cub River near Preston, ID, to prevent entrainment and mortality of Bonneville cutthroat trout anand other native fish specie... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/28/2009 |
QUICK SAND EXPRESS, INC | $24,986 | Contract | : Supply, Deliver and Spread 3/4 AB Gravel | Interior, Department of / U.S. Fish and Wildlife Service | 9/03/2009 |
CAREY STAFFING ASSOCIATES LLC | $69,417 | Contract | : Provide a part-time contractor to work under the Asst. Regional Director of External Affairs and assist Regional Office program and information managers with American Recovery and Reinvestment Act communications including 1) internal comunications to fiel | Interior, Department of / U.S. Fish and Wildlife Service | 9/11/2009 |
OAK POINT ASSOCIATES | $94,297 | Contract | : A/E Design Services for the construction of a bunkhouse at the Rachel Carson NWR. Addtional funding for permitting service, fees, and Geothermal Test Well. | Interior, Department of / U.S. Fish and Wildlife Service | 8/12/2009 |
OAK POINT ASSOCIATES | $138,682 | Contract | : Architectural and Engineering (A/E) Services (Phase I and Phase II)-- Additonal funding for Geotechnical Investigation and permitting | Interior, Department of / U.S. Fish and Wildlife Service | 8/11/2009 |
TTR, L.L.C. | $617,796 | Contract | : Rehabilitation of the Rightmeyer House for the United States Department of the Interior, Fish and Wildlife Service, Back Bay National Wildlife Refuge, Virginia Beach, Virginia. Work shall include converting a residential house to offices and visitors cent | Interior, Department of / U.S. Fish and Wildlife Service | 6/24/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $10,162 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Gulf of Maine Coastal Program from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation servivice projects. Two SCA inter... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/15/2009 |
PLATTE RIVER WHOOPING CRANE MAINTENANCE TRUST, INC | $103,510 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This project will partially restore and enhance the ecological functions and values of riverine/grassland habitat along the central Platte River by: 1) restoring approximately 27,000 linear feet of riverine backwater and wetland d slough habitat; 2) promoti... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 5/08/2008 |
MALTA APPLIANCE CENTER & H V A C, LLC | $3,251 | Contract | : Replacement of office air conditioner with energy efficient R410a SEER 14 unit | Interior, Department of / U.S. Fish and Wildlife Service | 8/25/2009 |
ANCHORAGE PARK FOUNDATION | $246,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The purpose of the Salmon Rearing Habitat Restoration & Protection Project at Lynwood Park & Related Habitat Improvements is to implement approximately -+ mile of streambank restoration in addition to watershed and related riparirian habitat improvements th... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/05/2009 |
TOLSON, SIMPSON & ASSOCIATES, CONSULTING ENGINEERS, INC. | $7,867 | Contract | : Initial Site Visit & Compliance Report at Bon Secour Nunley House | Interior, Department of / U.S. Fish and Wildlife Service | 8/20/2009 |
LYMAN, DAVIDSON, DOOLEY, INC | $76,165 | Contract | : Cost Estimating Services for the MATOC Solicitation and TaskOrder for Tennessee NWR, Mammoth Spring, Arkansas NWR, Coastal NC NWR | Interior, Department of / U.S. Fish and Wildlife Service | 6/25/2009 |
CENTER OF EXCELLENCE FOR HAZARDOUS MATERIALS MANAGEMENT | $117,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This Award (Cooperative Agreement) is being implemented in order for the Service and the Cooperator to work together on privately owned lands for the purpose of improving native short-grass sand scrub, sand dunes, and desert grasassland habitats of southeas... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/21/2009 |
DESIGN PROFESSIONALS INC | $11,103 | Contract | : Monument setting for Assabet River NWR | Interior, Department of / U.S. Fish and Wildlife Service | 9/14/2009 |
D AND R RANCHES LLC | $25,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This ARRA project is being implemented in order for the FWS and D and R ranches to work together to restore habitat (approx. 1.296 acres) for the candidate lesser prairie-chicken and other grassland dependednt species. | Interior, Department of / U.S. Fish and Wildlife Service | 8/10/2009 |
ALASKA ASSOCIATION CONSERVATION DISTRICTS | $220,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The purpose of this grant was to manage small incipient infestations of invasive weeds across Alaska. Targeting small infestations of weeds, before they grow out of control, is known as early detection and rapid-response. EDRR R is the most cost-effective... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/06/2009 |
THE KENAI WATERSHED FORUM INC | $45,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Reed Canary Grass Treatment | Interior, Department of / U.S. Fish and Wildlife Service | 8/14/2009 |
MCS ENVIRONMENTAL, INC. | $115,951 | Contract | : Work consists of design, fabircation and installaion of reconditioned flatbed railcar bridge including, cast-in place or pre-cast fabricated abutments | Interior, Department of / U.S. Fish and Wildlife Service | 6/09/2009 |
RED WILK CONSTRUCTION INC | $181,258 | Contract | : Remove & Replace asphalt entrance roads DC Booth National Historic Fish Hatchery Lawerence County South Dakota | Interior, Department of / U.S. Fish and Wildlife Service | 8/13/2009 |
SCHWAN ELECTRIC INC | $9,171 | Contract | : Electrical work at the Sand Lake NWR, 39650 Sand Lake Drive, Columbia, SD | Interior, Department of / U.S. Fish and Wildlife Service | 8/18/2009 |
MALTA APPLIANCE CENTER & H V A C, LLC | $4,772 | Contract | : Replacement of (3) 100K unit heaters with 83% efficient heaters. | Interior, Department of / U.S. Fish and Wildlife Service | 8/28/2009 |
MATANUSKA-SUSITNA BOROUGH | $256,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To imporve migratory fish passage on Wasilla Creek at Grantham Road by building a bridge to replace an undersized culvert. | Interior, Department of / U.S. Fish and Wildlife Service | 9/03/2009 |
COPPER RIVER WATERSHED PROJECT INC | $233,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Restore fish passage for coho salmon, pink salmon, and cutthroat trout to improve rearing and spawning habitat in Eccles Creek and tributary Whiskey Creek. This will be accomplished by replacing two culverts associated with Whiskskey Creek and one large cul... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 6/01/2009 |
NATURAL RESOURCES, ALASKA DEPARTMENT OF | $100,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Funds the Division of Agriculture, Plant Materials Center to eradicate and evaluate efforts to eradicate spotted knapweed from the state of Alaska. Spotted knapweed is a notorious invasive weed that costs millions of dollars in n management and lost resour... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/13/2009 |
PRICEWATERHOUSECOOPERS LLP | $276,648 | Contract | : The Service requires contractor assistance to successfully implement, execute and / or mointor the braod array of reuirements outlined in the implementing guidance and various memos issued by OMB and the Department of the Interior, as well as other author | Interior, Department of / U.S. Fish and Wildlife Service | 6/11/2009 |
NATURE CONSERVANCY, THE | $39,832 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This ARRA project is being implemented in order for the FWS and TNC to work together for the purpose of implementing prescribed burns on private lands targeting HUC units associated with the black bear recovery efforts in East TeTexas. With the participati... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/21/2009 |
MALLET RANGE | $24,000 | Contract | : This ARRA project is being implemented in order for the FWS and Mallet Ranch to work together to restore habitat (approximately 1,737 acres) for the candidate lesser prairie-chicken and other grassland dependend species. | Interior, Department of / U.S. Fish and Wildlife Service | 8/10/2009 |
BEITO PLUMBING & HEATING INC | $50,485 | Contract | : Repair Solar Heating panels | Interior, Department of / U.S. Fish and Wildlife Service | 9/03/2009 |
CONSERVATION RESOURCE ALLIANCE | $37,500 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Replacement of a perched culvert on Silver Creek, located in Lake County, MI to restore fish passage and natural flow of sediments to benefit native brook trout. | Interior, Department of / U.S. Fish and Wildlife Service | 8/10/2009 |
CALYPTUS CONSULTING GROUP, INC. | $748,599 | Contract | : Contract ended on 9/30/11 | Interior, Department of / U.S. Fish and Wildlife Service | 6/30/2009 |
POST BUCKLEY SCHUH & JERNIGAN INC | $94,747 | Contract | : RECOVERY-NEPA FOR ARRA PROJECTS AT MALHEUR NATIONAL WILDLIFE REFUGE | Interior, Department of / U.S. Fish and Wildlife Service | 9/11/2009 |
PROGRESSIVE CONSULTING ENGINEERS INC | $12,279 | Grant | National Trails System Projects: Site Investigation, Replacement of Water Lines, Marion, IL. Task Order No. 301818Y096 is issued for Architect Engineering services consisting of a site investigation to update an existing water plan and to develop a plan for water lines and distribution | Interior, Department of / U.S. Fish and Wildlife Service | 6/25/2008 |
TED FRANK CONSTRUCTION & TRUCKING, INC. | $108,743 | Contract | : WOODY BIOMASS PROJECT FOR TREE CLEARING, PILING AND/OR CHIPPING, WOODY BIOMASS UTILIZTION RELATED ACTIVIES. | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
STANLEY CONSULTANTS, INC. | $15,057 | Contract | : RECOVERY - ARCHITECT-ENGINEER SERVICES FOR SITE SURVEYS AT OTTAWA NWR FOR THE FOLLOWING PROJECTS: (1) SOUTH BOUNDARY DIKE EROSION REPAIR TAS::14 1613::TAS; FFS PROJECT NO. R3BA (2) DRAINAGE DITCH CLEANOUT TAS::14 1610::TAS; FFS PROJECT NO. R3GF | Interior, Department of / U.S. Fish and Wildlife Service | 9/16/2009 |
URS GROUP, INC. | $182,165 | Contract | : TAS::16 1410::TAS FFS PROJECT NUMBER R9VA LEED CONSULTING SERVICES AT THE NATIONAL CONSERVATION TRAINING CENTER | Interior, Department of / U.S. Fish and Wildlife Service | 9/16/2009 |
CONSERVATION COMMISSION OF OKLAHOMA | $50,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Implementing prescribed fire on private lands to restore native ecosystems and landscapes to their historical biological diversity and productivity and decrease wildfire potential. OCC will work with 3 local conservation districicts to provide finanical as... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/21/2009 |
NATURE CONSERVANCY, THE | $38,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This ARRA project is being implemented in order for the FWS and TNC to work together for the purpose of implementing prescribed burns on private lands targeting grassland habitat in the Edwards Plateau and the Trans-Pecos Ecoregigions of Texas. With the pa... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/21/2009 |
TOM MEHRINGER CONSTRUCTION, INC. | $4,783 | Contract | : Provided ventilation system labor, (4) 12 x 10' continuous vents and freight. | Interior, Department of / U.S. Fish and Wildlife Service | 6/22/2009 |
MACHADO BACKHOE, INC. | $10,600 | Contract | : REPAIR DEADMAN CREEK CANAL AT MERCED NWR. EXCAVATOR/OPERATOR | Interior, Department of / U.S. Fish and Wildlife Service | 9/01/2009 |
URS GROUP, INC. | $308,539 | Contract | : TAS::16 1410::TAS FFS PROJECT NUMBER R9VA LEED CONSULTING SERVICES AT THE NATIONAL CONSERVATION TRAINING CENTER; Leadership in Energy and Environmental Design (LEED) Existing Building Operation and Maintenance (EB O&M) Certification Consulting and support | Interior, Department of / U.S. Fish and Wildlife Service | 9/16/2009 |
TOLSON, SIMPSON & ASSOCIATES, CONSULTING ENGINEERS, INC. | $196,871 | Contract | : Energy Audit - East Region - ARRA | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
SPECTRA TECH, INC. | $315,721 | Contract | : The effort required under this Performance Work Statement is to provide Contracting Support Services to the US Fish and Wildlife Service, Region 4, Atlanta, Georgia. The contracted services will support the programs administered by USFWS Region 4 Contrac | Interior, Department of / U.S. Fish and Wildlife Service | 6/25/2009 |
US MILITARY CORP | $28,774 | Contract | : GRAVEL DELIVERY | Interior, Department of / U.S. Fish and Wildlife Service | 8/10/2009 |
LYMAN, DAVIDSON, DOOLEY, INC | $3,092 | Contract | : Architectural Site Visit to St. Marks NWR and Lower Suwanee NWR | Interior, Department of / U.S. Fish and Wildlife Service | 6/25/2009 |
PEINE, PATRICK | $93,392 | Contract | : Professional, Administrative and Management Support Services | Interior, Department of / U.S. Fish and Wildlife Service | 6/02/2009 |
BAD RIVER WATERSHED ASSOCIATION, INC. | $14,700 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This federal assistance is being provided to help restore and manage native habitat on non-federal lands located in the Bad River watershed of Lake Superior. To accomplish this goal, the Bad River Watershed Association intends toto remove a fish passage bar... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/17/2009 |
JOHN MILNER ASSOCIATES, INC. | $40,997 | Contract | : Condition Assessment Report of Snowden Hall, located within the Patuxent Research Refuge compound in Laurel, Maryland, for compliance with Section 106 of the National Historic Preservation Act. | Interior, Department of / U.S. Fish and Wildlife Service | 9/08/2009 |
RETTEW ASSOCIATES, INC. | $13,536 | Contract | : RETTEW Associates, Inc., provided additional site survey for the design of the proposed new Headquarters and Visitor Contact Facility to be located at the Long Island Complex National Wildlife Refuge, Shirley, NY. The area of additional survey was approxi | Interior, Department of / U.S. Fish and Wildlife Service | 6/10/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $11,440 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award, Amendment 2 of Agreement # 50181RJ001, funds services to the Lamar Fish Technology Center from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people f for environmental and conse... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/11/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $186,168 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This award funds services to US Fish and Wildlife Agency's Northeast Regional Office and Gulf of Maine Coastal Programs, from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualalified young people for env... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/11/2009 |
PUBLIC ARCHAEOLOGY LABORATORY, INCORPORATED, THE | $69,067 | Contract | : Archaeological Survey for the proposed Administration / Visitor Facility Wertheim | Interior, Department of / U.S. Fish and Wildlife Service | 9/08/2008 |
WEST ELECTRIC INC | $3,750 | Contract | : boiler updates | Interior, Department of / U.S. Fish and Wildlife Service | 8/26/2009 |
BRIDGETON PLUMBING & HEATING SUPPLY CO. | $5,609 | Contract | : TANKLESS ON DEMAND WATER HEATERS | Interior, Department of / U.S. Fish and Wildlife Service | 8/25/2009 |
F. S. ROD, INC | $10,089 | Contract | : Delivery of rip rap to canal lining Deadman Creek on Merced NWR | Interior, Department of / U.S. Fish and Wildlife Service | 9/01/2009 |
HDR ENGINEERING, INC. | $103,492 | Contract | : Residential soil investigations, site layouts, and foundation designs - Innoko National Wildlife Refuge - McGrath, Alaska | Interior, Department of / U.S. Fish and Wildlife Service | 9/14/2009 |
KENAI, CITY OF | $62,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Award Title: Protect Sensitive Dune & Tidal Wetland Habitat at the Mouth of the Kenai River in Alaska Project. Description: Purpose is to protect approximately 150 acres of sensitive dune habitat along the mouth of the Kenai Rivever, ensure critical dune ha... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/15/2009 |
ASRC MANAGEMENT SERVICES, INC. | $11,995 | Contract | : 1.Complete ARRA enhancements to the Fisheries Information System (FIS). | Interior, Department of / U.S. Fish and Wildlife Service | 6/08/2009 |
REDOUBT INDUSTRIES INC | $496,619 | Contract | : Recovery-Togiak & Kanuti PV_DHW System: Base Bid of $57,508.84, Phase 1, Design: Contractor shall provide all labor, materials, equipment and supervision necessary to design 1)Solar Photovoltaic (PV) or Hot Water (HW) heating systems for a Hangar in Dill | Interior, Department of / U.S. Fish and Wildlife Service | 9/16/2009 |
TRAFFIC AND PARKING CONTROL CO., INC. | $17,444 | Contract | : Traffic signs for USFWS in Suwanee, GA | Interior, Department of / U.S. Fish and Wildlife Service | 8/28/2009 |
US MILITARY CORP | $20,700 | Contract | : GRAVEL DELIVERY | Interior, Department of / U.S. Fish and Wildlife Service | 8/18/2009 |
SPECTRA TECH, INC. | $288,474 | Contract | : The contractor shall provide Contracting Support Services in support of the acquisition cycle to include development, management and measurement of contracting actions including contract closeout. The work may include some/all of the following tasks: pr | Interior, Department of / U.S. Fish and Wildlife Service | 9/08/2009 |
DEPRIEST AIR CONDITIONING & HEATING INC | $10,160 | Contract | : HVAC Replacement | Interior, Department of / U.S. Fish and Wildlife Service | 8/24/2009 |
HDR ENGINEERING, INC. | $140,293 | Contract | : Phase 1 - Repair and Long-term Replacement Design of Ultraviolet (UV) Irradiation System | Interior, Department of / U.S. Fish and Wildlife Service | 9/16/2009 |
HDR ENGINEERING, INC. | $4,011 | Contract | : Site Visit for replacement of stand-by 110 KVA diesel generator - Nashua National Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 9/17/2009 |
NORTHWOODS STEWARDSHIP CENTER | $22,570 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To promote and stimulate public purposes such as education, job training, development of responsible citizenship, productive community involvement, and furthering the understanding and appreciation of natural and cultural resourcrces through the involvement... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 6/19/2009 |
MCMILLEN, LLC | $2,333,660 | Contract | : The scope of work requried demolition of existing refuge housing which were built in 1961 and overtime have been infested with mice feces, deceased mice, and nesting locations. This was made evident when nests were found behind the heating systems for a | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
PRICEWATERHOUSECOOPERS LLP | $304,054 | Contract | : Region 4 requires contractor assistance to successfully implement, execute and / or mointor the braod array of reuirements outlined in the implementing guidance and various memos issued by OMB, the Department of the Interior, FWS BMO, as well as other aut | Interior, Department of / U.S. Fish and Wildlife Service | 7/27/2009 |
PRICEWATERHOUSECOOPERS LLP | $65,568 | Contract | : Reporting is integral to communicating the success of FWS programs funded through the Recovery Act; transparency and accountability must guide these efforts. External Affairs (EA) will achieve increased transparency and accountability by maintaining a use | Interior, Department of / U.S. Fish and Wildlife Service | 6/16/2009 |
AHTNA ENGINEERING SERVICES, LLC | $203,747 | Contract | : To rehabilitate interior and exterior portions of a wood frame, gable roof, single story Residence/Bunkhouse. | Interior, Department of / U.S. Fish and Wildlife Service | 8/26/2009 |
WORLD LIBERTY FOUNDATION | $58,560 | Contract | : REMOVE, RECYCLE AND REPLACE FOUR WIRE STEEL POST FENCE | Interior, Department of / U.S. Fish and Wildlife Service | 8/12/2009 |
NATURE CONSERVANCY, THE | $134,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This Cooperative Agreement is being implemented in order to develop a restoration design for the Chocktoot Creek delta that would restore the hydrologic regime in Chocktoot Creek and the alluvial fan onto Sycan Marsh. Restoring g the hydrologic regime and ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
MONTANA CONSERVATION CORP | $92,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: MCC and FWS have a mutual interest in accomplishing needed conservation and environmental restoration projects within the landscape of National Wildlife Refuge System units. The involvement of young adults in the care and enhancncement of public resources ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/15/2009 |
J-MAC, INC. | $4,005 | Contract | : Wood/Plastic Composite Lumber | Interior, Department of / U.S. Fish and Wildlife Service | 8/10/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $15,507 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Craig Brook National Fish Hatchery from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation n service projects. Two SCA ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/03/2009 |
C & S ENGINEERS, INC. | $1,048,380 | Contract | : A/E Design Services for the construction of headquarters/administration visitor facility in Long Island. | Interior, Department of / U.S. Fish and Wildlife Service | 7/27/2009 |
THE KENAI WATERSHED FORUM INC | $107,692 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Wetland Inventory for Priority Matanuska-Susitna Watershed Areas | Interior, Department of / U.S. Fish and Wildlife Service | 8/06/2009 |
MATANUSKA-SUSITNA BOROUGH | $100,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To improve migratory fish passage on Cottonwood Creek at Engstrom Road through undersized culvert replacement. | Interior, Department of / U.S. Fish and Wildlife Service | 9/10/2009 |
MCS ENVIRONMENTAL, INC. | $66,322 | Contract | : install 10 Geothermal wells 200 feet deep. 2 new circulation pumps including thermometers | Interior, Department of / U.S. Fish and Wildlife Service | 8/24/2009 |
WEATHERCRAFT COMPANY OF NORTH PLATTE | $11,315 | Contract | : Remove and replace overhead doors at Pony Lake Subheadquaters Maintenance Building | Interior, Department of / U.S. Fish and Wildlife Service | 7/21/2009 |
POLAR KING INTERNATIONAL, INC. | $27,878 | Contract | : Refrigeration Equipment | Interior, Department of / U.S. Fish and Wildlife Service | 7/25/2009 |
SOMMERVILLE-WILSON, INC. | $90,000 | Contract | : Exhibit Design and signage | Interior, Department of / U.S. Fish and Wildlife Service | 9/03/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $42,761 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This award funded services to the Desert National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation s service projects. SCA inter... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
K-CON, INC. | $325,904 | Contract | : Prefabricated 1381 sqft 3 bedroom residential building | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
NATIONAL RIFLE ASSOCIATION OF AMERICA | $40,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The Award funding provided by the Service and the Coopertor will provide forest stand improvement on approx. 600 acres of pinion-juniper habitat. This thinning will permit understory deciduous shrubs to grow and serve as forage,e, cover, and nesting habita... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/21/2009 |
4 CONTROL INC | $37,125 | Contract | : Chemical Application of brush | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
NORTH CENTRAL WILD FIRE LLC | $31,500 | Contract | : Commercail logging services for the mechanical treatments for hazardous fuel reductions | Interior, Department of / U.S. Fish and Wildlife Service | 11/25/2009 |
TEAMSTAFF GOVERNMENT SOLUTIONS, INC. | $10,004 | Contract | : Reports within the Division of Engineering, which provides engineering, architectural and specialized services for National Wildlife Refuges and Fish Hatcheries/Fish Health Centers within Region 3. The organizational mission includes the design, construc | Interior, Department of / U.S. Fish and Wildlife Service | 8/12/2009 |
PHEASANTS FOREVER, INC. | $70,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Restoration and management of native habitats on the Beaver Farm, Marion County, OH. | Interior, Department of / U.S. Fish and Wildlife Service | 8/20/2009 |
CATERPILLAR INC. | $62,979 | Contract | : 1 x 299C Caterpillar skid steer loader with requested delivery date of December 2009. | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
STANLEY CONSULTANTS, INC. | $6,907 | Contract | : TAS::14 1610::TAS FFS PROJECT R3BC - A/E DESIGN SERVICES. PROJECT INVOLVES PERFORMING AN INITIAL PHASE I SITE VISIT REGARDING THE RESTORATION OF THE GUTTENBURG MOIST SOIL DIKE. THIS PROJECT WILL ULTIMATELY INVOLVE THE PREPARATION OF THE FINAL PLANS, SPECI | Interior, Department of / U.S. Fish and Wildlife Service | 9/11/2009 |
LHB, INC. | $3,536 | Contract | : A/E SERVICES. PREPARE VALUE ENGINEERING REPORT FOR THE GALLERY VENTILATION DOOR, SLOPED GLAZING, AND FIXED PANE WINDOW REPLACEMENT FOR THE DESOTO NATIONAL WILDLIFE REFUGE, MISSOURI VALLEY, IA | Interior, Department of / U.S. Fish and Wildlife Service | 9/01/2009 |
OAK POINT ASSOCIATES | $58,381 | Contract | : A/E Design Services - Phase I - Alternate Energy Evaluation -- Additional funding for Phase II A/E Design Services - Alternative Energy Design. -- Additional funding for Phase III -- Construction Administration and Inspection Services | Interior, Department of / U.S. Fish and Wildlife Service | 8/12/2009 |
BRANSCOME INC. | $614,795 | Contract | : waterline & electric utility replacement | Interior, Department of / U.S. Fish and Wildlife Service | 7/02/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $10,449 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Gulf of Maine Coastal Program from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation servivice projects. An SCA intern... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/11/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $13,260 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the White River National Hatchery from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation servivice projects. An SCA intern... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/21/2009 |
TAYLOR STUDIOS INC | $383,960 | Contract | : Exhibit Design Services The contractor shall provide all plant, operations, equipment, materials and labor necessary to provide Exhibit Design, Fabrication and Installation. Helen C. Fenske Visitor Center. | Interior, Department of / U.S. Fish and Wildlife Service | 9/09/2009 |
MCS ENVIRONMENTAL, INC. | $36,975 | Contract | : Replace Elk Lake Road Kiosk | Interior, Department of / U.S. Fish and Wildlife Service | 10/08/2009 |
WMB CORP. | $28,610 | Contract | : heat system lost trail wildlife refuge | Interior, Department of / U.S. Fish and Wildlife Service | 8/07/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $18,095 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Bear River Migratory Bird Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation seservice projects. An SCA Env... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/16/2009 |
DAHN DESIGN, LLC | $19,196 | Contract | : design and illustration and fabrication for interpretive panels at Red Rock Lake NWR | Interior, Department of / U.S. Fish and Wildlife Service | 8/25/2009 |
MATANUSKA-SUSITNA BOROUGH | $120,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To improve migratory fish passage on Little Su Tributary at Edgerton Road through the replacement of three undersized culverts and habitat restoration. | Interior, Department of / U.S. Fish and Wildlife Service | 9/03/2009 |
SMALLWOOD CREEK, INC. | $97,000 | Contract | : return 40 acres of retired homestead/farmland back into wetland habitat. This will be accomplished by creating a wetland (Fen) consisting of a stream channel and anumber of intermittent ponds. | Interior, Department of / U.S. Fish and Wildlife Service | 8/14/2009 |
DEL TERRA INC | $11,780 | Contract | : Survey Mayhew landing tract 219 | Interior, Department of / U.S. Fish and Wildlife Service | 7/13/2009 |
PARKER TIDE CORP. | $271,448 | Contract | : Provided Procurement Analyst Services for the American Recovery and Reinvestment Act Review. | Interior, Department of / U.S. Fish and Wildlife Service | 6/25/2009 |
HEARTLAND SURVEYING & MAPPING, PLLC | $16,199 | Contract | : Site Survey Hagerman VC | Interior, Department of / U.S. Fish and Wildlife Service | 7/11/2009 |
A-1 HEAT & AIR CONDITIONING | $7,233 | Contract | : The purpose of installing a high efficiency heating and cooling system is to save energy while providing overall comfort throughout the structure that was not being provided by the existing old equipment. This was done by replace old equipment with new e | Interior, Department of / U.S. Fish and Wildlife Service | 8/26/2009 |
VERN'S MANUFACTURING, INC. | $1,490 | Contract | : ATV Trailer | Interior, Department of / U.S. Fish and Wildlife Service | 6/25/2009 |
COLEMAN, JASON A | $21,844 | Contract | : The Fish and Wildlife Service (FWS) contracted Solano Archaeological Services to conduct a cultural resource study of a 5-acre Area of Potential Effect (APE) within the San Luis National Wildlife Refuge Complex (SLNWRC). The FWS is planning on constructi | Interior, Department of / U.S. Fish and Wildlife Service | 7/29/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $41,912 | Contract | : A 12-inch diameter, approximately 300 foot long drain line at the Dennis Pond of the Tualatin River National Wildlife Refuge has failed, requiring removal and replacement. Constructed in 1974, the pond captures storm water runoff and drainage from imperv | Interior, Department of / U.S. Fish and Wildlife Service | 8/25/2009 |
CTA INC. | $33,690 | Contract | : Electric Power Generation (EPG) - Part of project R8GR Replace inefficient HVACS and water heaters. AE design for boiler at Humbolt Bay NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 9/01/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $20,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Turnbull National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation s service projects. Under the... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 6/17/2009 |
METHOW SALMON RECOVERY | $172,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Beaver Creek fish passage and habitat restoration: the purpose of the project is to help restore habitat needed for recovery of TES fish within Beaver Creek by helping to reverse the trend of declining fish and wildlife habitat. . The project will achieve t... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/04/2009 |
GAME AND FISH, ARIZONA DEPT OF | $70,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To provide technical and financial assistance to identify, protect, conserve, manage, enhance or restore habitat or species on private lands. | Interior, Department of / U.S. Fish and Wildlife Service | 7/29/2009 |
HDR ENGINEERING, INC. | $4,019 | Contract | : Site visit for Electrical Design for Well #8 | Interior, Department of / U.S. Fish and Wildlife Service | 9/17/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $13,397 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Dwight D. Eisenhower National Fish Hatchery from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and consnservation service projects.... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/18/2009 |
STUDENT CONSERVATION ASSOCIATION, INC., THE | $63,462 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This award funds services to the Attwater Prairie Chicken National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental l and conservation service p... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/13/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $21,091 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award will fund services to the Attwater Prairie Chicken National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmentatal and conservation service... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/28/2009 |
LAWSON RIDGE INC | $0 | Contract | : brush mowing | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
CROSSLAND CONSTRUCTION COMPANY, INC. | $109,105 | Contract | : LEED Consulting, Commissioning, and Fees, Photovoltaic Panels | Interior, Department of / U.S. Fish and Wildlife Service | 7/01/2009 |
KRAEMER BROTHERS, LLC | $331,026 | Contract | : Installation of photovoltaic system | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
BAD RIVER WATERSHED ASSOCIATION, INC. | $40,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This federal assistance is being provided to help restore and manage native habitat on non-federal lands located in the Bad River watershed of Lake Superior. To accomplish this goal, the Bad River Watershed Association intededs t to remove fish passage barr... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/17/2009 |
CHESANING, VILLAGE OF | $99,400 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Replace a failed dam with a rock ramp / riffle structure to provide fish passage to approximately 37 miles of previously inaccessible river habitat. | Interior, Department of / U.S. Fish and Wildlife Service | 8/07/2009 |
URBAN COMPANIES | $24,677 | Contract | : loading dock rehabilitation | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
MIKE'S TREE SERVICE, INC | $5,000 | Contract | : Three Lakes Project woody biomass removal | Interior, Department of / U.S. Fish and Wildlife Service | 9/29/2009 |
TEPA EC, LLC | $107,636 | Contract | : ROADWAY PAVEMENT ON SPILLWAYS FOR UNIT 25 & 26, QUIVIRA NWR, KANSAS. | Interior, Department of / U.S. Fish and Wildlife Service | 6/02/2009 |
SHANKS ELECTRIC CORPORATION | $188,358 | Contract | : Provide equipment, labor and material to install a grid tied 20KW Nominal Potovoltaic (PV) System. Located in Ennis National Fish Hatchery, 180 Fish Hatchery Road, Ennis Montana 59729-9113. | Interior, Department of / U.S. Fish and Wildlife Service | 8/19/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $25,800 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Marais des Cygnes National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conseservation service projects. ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/18/2009 |
FALL RIVER RESOURCE CONSERVATION DISTRICT | $435,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Stream Restoration and wet meadow enhancement project. | Interior, Department of / U.S. Fish and Wildlife Service | 7/28/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $16,231 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Kern National Wildlife Refuge Complex from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservatition service projects. A Vis... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/10/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $23,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Sonny Bono Salton Sea National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and c conservation service projec... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/11/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $44,510 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the National Key Deer Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation service prprojects. SCA Habitat Manage... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
SPECTRA TECH, INC. | $424,533 | Contract | : The contractor shall provide Contracting Support Services in support of the acquisition cycle to include development, management and measurement of contracting actions including contract closeouts. These services may include any of these tasks: provide p | Interior, Department of / U.S. Fish and Wildlife Service | 6/25/2009 |
BSE PERFORMANCE LLC | $20,850 | Contract | : Gravel Delivery | Interior, Department of / U.S. Fish and Wildlife Service | 9/06/2009 |
WOLFE, LENAIRE F CO INC | $9,500 | Contract | : Replacement of HVAC systems at 2 different locations, Orangeburg NFH, Orangeburg,SC | Interior, Department of / U.S. Fish and Wildlife Service | 10/28/2009 |
WOLFE, LENAIRE F CO INC | $9,500 | Contract | : Replacement of HVAC systems at 2 different locations, Orangeburg NFH, Orangeburg,SC | Interior, Department of / U.S. Fish and Wildlife Service | 10/28/2009 |
NORTHWOODS STEWARDSHIP CENTER | $17,368 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To promote and stimulate public purposes such as education, job training, development of responsible citizenship, productive community involvement, and furthering the understanding and appreciation of natural and cultural resourcrces through the involvement... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/14/2009 |
FORMATIONS INC | $827,500 | Contract | : Design / Fabricate and Install exhibits at San Luis Visitor Center | Interior, Department of / U.S. Fish and Wildlife Service | 7/16/2009 |
BRATSLAVSKY CONSULTING ENGINEERS, INC. | $162,000 | Contract | : The contract is for construction inspection services associated with the construction of a New Headquarters/Visitor Center project. | Interior, Department of / U.S. Fish and Wildlife Service | 8/13/2009 |
SACRED POWER, CORPORATION | $365,953 | Contract | : To place multiple Photovoltiac (PV) Systems at two National Wildlife Refuges. Bosque Del Apache: originally was to put a 7.5 kW PV System on the roof top of the Storage Building but then it was decied to not do that but to Put up a Solar Shade Structure | Interior, Department of / U.S. Fish and Wildlife Service | 9/30/2009 |
RPR ARCHITECTS | $192,133 | Contract | : Architectural and Engineering Services to replace seismically unsafe shop building at Sacramento NWR CA. Construction Management and Administration added 2/25/2010. | Interior, Department of / U.S. Fish and Wildlife Service | 9/21/2009 |
COMBINED EFFORT, INC. | $158,376 | Contract | : Design build of fish crowders at Carson National Fish Hatchery. Award amount increased due to change order. | Interior, Department of / U.S. Fish and Wildlife Service | 9/15/2009 |
RED, INC. | $100,800 | Contract | : Writing, editing and web posting for additional year. | Interior, Department of / U.S. Fish and Wildlife Service | 8/24/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $59,172 | Contract | : Cliff Ridge Road serves as both a public and management access road. It is especially important to fire management and the G?closest resourceG? concept of initial attack during fire emergencies as shared and agreed to by the Service and all of our fire | Interior, Department of / U.S. Fish and Wildlife Service | 8/20/2009 |
GARDEN ISLANDS RESOURCE CONSERVATION & DEVELOPMENT INC | $100,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The project is to conduct ecological restoration on the 270 acres of Lehua Island, Kauai, Hawaii by propagating native plants and harvesting seeds that are weed and insect free. Seeds are being gathered from some 5,000 native plalants already established at... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/22/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $32,275 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This award funded services to the Bill Williams River National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and c conservation service projec... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/15/2009 |
UNIVERSITY OF OKLAHOMA | $30,700 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Fence marking in the Texas Panhandle to reduce mortality rates in the Lesser Prairie-Chicken. | Interior, Department of / U.S. Fish and Wildlife Service | 8/27/2009 |
TRINITY BASIN CONSERVATION FOUNDATION | $50,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This ARRA project is being implemented in order for the FWS and TBCF to work together on private lands within the Trinity River basin to improve the quality of life, economic sustainability and ecological integrity of areas assocociated with the Trinity Riv... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/04/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $17,826 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The project award funds services to the Trinity River National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and c conservation service projec... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2009 |
SRF CONSULTING GROUP, INC. | $33,619 | Contract | : Topographical and Geotechnical Investigations for Visitor centers Mingo National Wildlife Refuge Puxico MO, Upper Mississippi National Wildlife Refuge, LaCrosse, WI | Interior, Department of / U.S. Fish and Wildlife Service | 7/31/2009 |
MCS ENVIRONMENTAL, INC. | $218,880 | Contract | : Install PV and Wind Turbine Grid System | Interior, Department of / U.S. Fish and Wildlife Service | 6/09/2009 |
KEPLIN-GRACON JV | $6,057,444 | Contract | : Design build energy efficient headquarters/administrative/visitor building in Audubon NWR, ND. | Interior, Department of / U.S. Fish and Wildlife Service | 6/10/2009 |
YEAR ONE, INC | $60,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The overall purpose of the project is to implement weed control, establish a new trail corridor and some fence construction if time allows. Houndstongue will be targeted for eradication while mullein, thistle, and Russian olive w will be reduced as much as ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/27/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $8,600 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Seedskadee National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservationon service projects. Two int... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/22/2009 |
BARLOVENTO, L.L.C. | $1,442,732 | Contract | : D/B Headquarters Office Bldgs Yazoo and Panther Swamp NWR | Interior, Department of / U.S. Fish and Wildlife Service | 9/18/2009 |
SPECPRO ENVIRONMENTAL SERVICES LLC | $44,951 | Contract | : MELALEUCA CONTROL AT UNITS 6 AND 8 - US FISH AND WILDLIFE | Interior, Department of / U.S. Fish and Wildlife Service | 7/21/2008 |
LYMAN, DAVIDSON, DOOLEY, INC | $76,165 | Contract | : Cost Estimating Services for the MATOC Solicitation and Task Order for Tennessee NWR, Mammoth Spring, Arkansas NWR, Coastal NC NWR | Interior, Department of / U.S. Fish and Wildlife Service | 6/26/2009 |
NORTHWOODS STEWARDSHIP CENTER | $20,680 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To promote and stimulate public purposes such as education, job training, development of responsible citizenship, productive community involvement, and furthering the understanding and appreciation of natural and cultural resourcrces through the involvement... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 6/19/2009 |
GLACIER ELECTRIC CONSTRUCTION, INC. | $97,940 | Contract | : Kenai National Wildlife Refuge Parking Lot Lighting | Interior, Department of / U.S. Fish and Wildlife Service | 8/24/2009 |
REDOUBT INDUSTRIES INC | $86,416 | Contract | : Kodiak Shop Renovations: Base bid of $4001.47 consists of contractor traveling to Kodiak to verify the scope of work and to provide upon completion a proposal for work required under Optional Bid Items 1&2. Optional Bid Item #1 will consist of removing | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
ANCHORAGE PARK FOUNDATION | $88,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The purpose of this project is to restore and rehabilitate approximately -+ mile of riparian habitat and to prevent further bank erosion and trail infrastructure impacts caused by bank trampling. Bioengineering restoration technhniques will be used includi... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/30/2009 |
PRICEWATERHOUSECOOPERS LLP | $304,054 | Contract | : Region 4 requires contractor assistance to successfully implement, execute and / or mointor the braod array of reuirements outlined in the implementing guidance and various memos issued by OMB, the Department of the Interior, FWS BMO, as well as other aut | Interior, Department of / U.S. Fish and Wildlife Service | 7/27/2009 |
SIERRA EQUIPMENT RENTAL, INC | $29,227 | Contract | : Core trenching at Klamath Basin | Interior, Department of / U.S. Fish and Wildlife Service | 8/13/2009 |
ATLANTIC AIR CORPORATION | $3,634 | Contract | : Ice machine/dispenser last qtr. No Sales this Quarter | Interior, Department of / U.S. Fish and Wildlife Service | 9/18/2009 |
REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | $150,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award is to support direction and eradication of Zostera japonica, an invasive, non-native eelgrass found on intertidal mudflats of Humboldt Bay. | Interior, Department of / U.S. Fish and Wildlife Service | 8/20/2009 |
PACIFIC COAST FISH, WILDLIFE, AND WETLANDS RESTORATION ASSOCIATION | $49,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The title of this award is Cooperative Agreement Between USDI Fish and Wildlife Service and Pacific Coast Fish, Wildlife and Wetlands Restoration Association. The overall purpose is to carry out fish and wildlife habitat practiceces and developments. Specif... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/31/2009 |
FRIENDS OF DUNES, THE | $47,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: On the ground restoration activities at the Humboldt Coastal Nature Center on 2.5 acres | Interior, Department of / U.S. Fish and Wildlife Service | 7/28/2009 |
LHB, INC. | $47,740 | Contract | : A-E Design Ottawa NWR Photo Voltaic | Interior, Department of / U.S. Fish and Wildlife Service | 8/17/2009 |
HOUSE OF GLASS, INC. | $16,764 | Contract | : Remove and Replace windows in Several Buildings. Remove and Replace two Overhead Doors. Remove and Replace two walk through doors. | Interior, Department of / U.S. Fish and Wildlife Service | 9/11/2009 |
NATURE CONSERVANCY, THE | $75,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: ARRA funding is being used for aquatic habitat restoration and management throughout the Raccoon Creek watershed, a tributary of the lower Etowah River that supports significant populations of two species endemic to the Etowah babasin, the federally endange... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/08/2009 |
TIDEWATER PRESERVATION, INC | $151,185 | Contract | : Rehabilitation of the Wilna Quarters - RRV | Interior, Department of / U.S. Fish and Wildlife Service | 11/09/2009 |
NEIL H. DANIELS, INC. | $32,278 | Contract | : Emergency Rehabilitation of main hatchery outfall at the White River National Fish Hatdhery, Bethel, Vermont | Interior, Department of / U.S. Fish and Wildlife Service | 12/02/2009 |
SITE CONTRACTORS INC | $206,750 | Contract | : Asbestos Removal & Demolition Forked River GAme Farm | Interior, Department of / U.S. Fish and Wildlife Service | 12/04/2009 |
AMERICAN ARCHITECTURAL RESTORATION, LLC | $88,050 | Contract | : Rehabilitation of doors and windows at Eastern Neck National Wildlife Refuge, Rock Hall, Maryland | Interior, Department of / U.S. Fish and Wildlife Service | 12/22/2009 |
PROJECT SHARE | $75,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The overall purpose of this project is to restore fish passage and re-establish natural hydrology, temperature, sediment and nutrient transport regimes to benefit sea-run fishes of historical economic, social, and ecological signgnificance (e.g. anadromous ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/21/2009 |
PROJECT SHARE | $75,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The overall purpose of this project is to restore fish passage and re-establish natural hydrology, temperature, sediment and nutrient transport regimes to benefit sea-run fishes of historical economic, social, and ecological signgnificance (e.g. anadromous ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/21/2009 |
FISHAMERICA FOUNDATION | $83,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To provide the necessary personnel, materials, services, facilities, funds, and otherwise perform all things necessary for or incidental to the performance of the construction of bridge spans, wing walls, and pavement for the Wililey Drive Upstream Low Wate... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 11/03/2009 |
ALTERNATIVE ENVIRONMENTAL SOLUTIONS, INC. | $4,865 | Contract | : The purpose of this project was to complete a survey for the presence of asbestos containing building materials (ACBMs) and a limited survey (via excavation) for the presence of underground storage tanks (USTs), at the Edwin B. Forsythe National Wildlife | Interior, Department of / U.S. Fish and Wildlife Service | 9/18/2009 |
FLEX-A-LITE CONSOLIDATED, INC. | $170,000 | Contract | : Provide commercial Atlantic salmon egg incubation systems to include purchase and delivery of 80 ea. 16-Tray V-incubation with front isolation panels and 12 ea. 8-Tray V-Incubation with front isolation panels. | Interior, Department of / U.S. Fish and Wildlife Service | 9/19/2009 |
PERIMETER INSULATION INC | $2,400 | Contract | : ASBESTOS SURVEY | Interior, Department of / U.S. Fish and Wildlife Service | 9/22/2009 |
LYONS/ZAREMBA INC. | $742,350 | Contract | : Fabricate and install exhibits at E MA VCS Assabet NWR | Interior, Department of / U.S. Fish and Wildlife Service | 8/12/2009 |
BURGESS & NIPLE, INC | $16,240 | Contract | : Alternative energy system evaluation, to include building geothermal heating and cooling, solar-photovoltaic and wind generation, solar thermal, and lighting modifications. | Interior, Department of / U.S. Fish and Wildlife Service | 8/12/2009 |
JOHN MILNER ASSOCIATES, INC. | $5,829 | Contract | : Determination of Eligibility Study - Quarters 147, Patuxent Research Refuge, Laurel, MD | Interior, Department of / U.S. Fish and Wildlife Service | 12/07/2009 |
OAK POINT ASSOCIATES | $25,561 | Contract | : Implement Energy Efficiency - Tier 1 A/E Design Services (Phase 1A and 1B) | Interior, Department of / U.S. Fish and Wildlife Service | 12/04/2009 |
BURGESS & NIPLE, INC | $43,914 | Contract | : Evaluate suitability of geothermal heating and cooling sytsem based on life cycle cost analysis. Generate construction documents for new geothermal heating and cooling system for visitor's center. | Interior, Department of / U.S. Fish and Wildlife Service | 9/09/2009 |
KEPLIN-GRACON JV | $20,071 | Contract | : Construct a 12' x9' entry on the NW side of main building with 2 60x60 windows which have 2 lite sliders, triple pain double insulated glass. 38 entry door with panic bar and low threshold handicap accessible. Rafters will be 2x4 with 24 overhang 4-12 pi | Interior, Department of / U.S. Fish and Wildlife Service | 11/12/2009 |
SINGLETON ENTERPRISES | $597,570 | Contract | : Install 20' pipe at Saratoga National Fish hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 8/07/2009 |
ALLEN BRADBURY CONSTRUCTION LLC | $145,264 | Contract | : Replace 14 piling markers for tideland boundary. Boundary piles are missing and need to be replaced. Mod 0001 dated 12/7/10 deduct pilings | Interior, Department of / U.S. Fish and Wildlife Service | 11/09/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $82,024 | Contract | : This project involves the removal of accumulated sediments from the hatchery?s settling ponds. Prior to removing the accumulated sediments, these sediments are to be tested for the presence of toxic substances. If no toxic substances are detected, the s | Interior, Department of / U.S. Fish and Wildlife Service | 11/25/2009 |
BURTON CONSTRUCTION, INC. | $109,000 | Contract | : Camas National Wildlife Refuge Complex; Drilling and replacing existing well at Quarters #2 including pump, voltage, panels, breaker circuits, ground rods to uphold new electrical requirements. Replumbing Quarters #2 comlete with drainage. | Interior, Department of / U.S. Fish and Wildlife Service | 11/25/2009 |
TCHULA GRAIN COMPANY, INC | $1,200 | Contract | : At Morgan Brake NWR, a new metal roof was installed on an educational/informational kiosk located at Providence fishing ponds. | Interior, Department of / U.S. Fish and Wildlife Service | 9/03/2009 |
ALLEN BRADBURY CONSTRUCTION LLC | $1,741 | Contract | : Replace Irrigation Mainline at McCormack Unit at Umatilla NWR | Interior, Department of / U.S. Fish and Wildlife Service | 12/16/2009 |
HALL, W E CO (INC) | $9,440 | Contract | : Corrugated galvanized steel pipe products and accessories, fabricated flashboard riser 4' high, and Waterman C-10 canal gate w/4' high painted frame. | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
MCNEALY EXCAVATING INC | $46,100 | Contract | : Construct Entrance Road Safety Improvements @ Conboy Lake Nat. Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 10/06/2009 |
CALVIN JORDAN ASSOCIATES INC | $3,650 | Contract | : Attend a Pre-Bid Site Visit for the Construction Contract of the Equipment Storage Building, Hakalau Forest | Interior, Department of / U.S. Fish and Wildlife Service | 9/13/2009 |
SMITH-ROOT, INC. | $18,000 | Contract | : ELECTRIC WEIR REPAIR AT THE QUILCENE NATIONAL FISH HATCHERY PER AT SOW. | Interior, Department of / U.S. Fish and Wildlife Service | 9/18/2009 |
DELL MARKETING L.P. | $1,395 | Contract | : Desktop Computer | Interior, Department of / U.S. Fish and Wildlife Service | 12/04/2009 |
BRATSLAVSKY CONSULTING ENGINEERS, INC. | $23,036 | Contract | : On-call Project Management and Engineering services to provide support on miscellaneous ARRA projects in Regions 1 and 8. | Interior, Department of / U.S. Fish and Wildlife Service | 10/16/2009 |
RIDER LEVETT BUCKNALL LTD. | $29,808 | Contract | : Contractor will assist the Engineering staff of the Fish and Wildlife Service in managing construction projects under the American Recovery and Reinvestment Act of 2009 (ARRA) | Interior, Department of / U.S. Fish and Wildlife Service | 10/16/2009 |
GHD INC. | $553,674 | Contract | : Engineering design of fish passage and screening improvements for Grain Camp, Busse, and Sod House diversion dams at Malheur National Wildlife Refuge. Services included development of construction documents, consultation with Refuge and permitting agenci | Interior, Department of / U.S. Fish and Wildlife Service | 10/07/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $169,879 | Contract | : EAGLE CREEK TIER 1 ENERGY UPGRADE | Interior, Department of / U.S. Fish and Wildlife Service | 11/25/2009 |
ALLEN BRADBURY CONSTRUCTION LLC | $264,567 | Contract | : Excavate and remove deteriorated steel irrigation pipeline. Replace with new mainline and manifold at Whitcomb Island, Umatilla Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 12/15/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $21,628 | Contract | : The work to be performed under this contract consists of furnishing all labor, equipment, materials, and supplies necessary for the repair and modification of the Hatchery Creek intake water control structure. This includes construction of a new metal ba | Interior, Department of / U.S. Fish and Wildlife Service | 11/12/2009 |
ROGERS SURVEYING INC | $20,000 | Contract | : Saddle Mountain National Wildlife Refuge Arid Lands Ecological Reserve Unit Boundary Posting | Interior, Department of / U.S. Fish and Wildlife Service | 10/07/2009 |
BURTON CONSTRUCTION, INC. | $527,170 | Contract | : Kooskia National Fish Hatchery, Kooskia Idaho; Contractor is to furnish all facilities, tools, equipment, materials, supplies, and manufactured articles, all permits to perform Rehabilitation of the Incubation Chilled Reuse System and Well No's 1 & 5. De | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
CHUGACH INDUSTRIES, INC. | $1,212,942 | Contract | : Electrical and heating, ventilation, and air conditioning (HVAC) rehabilitation for 3-story converted U.S. Navy dormitory now used for Midway Atoll National Wildlife Refuge Visitors. Recent modifications to scope include installation of heavy duty door cl | Interior, Department of / U.S. Fish and Wildlife Service | 11/16/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $2,495 | Contract | : Abernathy Fish Technology Center | Interior, Department of / U.S. Fish and Wildlife Service | 10/07/2009 |
JACOBS ENGINEERING GROUP INC. | $198,313 | Contract | : We provide Professional Engineering services for assisting the US Fish and Wildlife Service (USFWS) in completion of a Design Build (DB) Contract, for the relocation of the 25kV transmission line across the tidal marshlands within the Bandon Marsh Nationa | Interior, Department of / U.S. Fish and Wildlife Service | 11/09/2009 |
TETRA TECH, INC. | $70,675 | Contract | : Spring Creek National Fish Hatchery Repair Water Pumps and Motors. | Interior, Department of / U.S. Fish and Wildlife Service | 9/29/2009 |
TETRA TECH, INC. | $195,653 | Contract | : Comprehensive Energy & Water Evaluation Study - U.S. Fish and Wildlife Service, Region One. This study includes evaluations for multiple complexes within the states of Oregon, Washington, Idaho, and the Pacific Islands. | Interior, Department of / U.S. Fish and Wildlife Service | 10/07/2009 |
TETRA TECH, INC. | $133,759 | Contract | : A-E Services in support of Water Pumps and motors - condition assessment and rehabilitation, at Warm Springs National Fish Hatchery. This task has been amended to include construction administration(CA). These CA work-effort tasks are in progress and ar | Interior, Department of / U.S. Fish and Wildlife Service | 10/08/2009 |
SAYBR CONTRACTORS, INC. | $144,891 | Contract | : Replace rood on the hatchery feed storage building - includes change orders for 22,277.00 | Interior, Department of / U.S. Fish and Wildlife Service | 12/07/2009 |
SAYBR CONTRACTORS, INC. | $54,608 | Contract | : on site assessment of water pump and control panel at Makah National Fish Hatchery located in Neah Bay, WA - Prepare annotated recommendation for repair or replacement of pump and control panel | Interior, Department of / U.S. Fish and Wildlife Service | 12/10/2009 |
HONOLULU MARINE LLC | $465,004 | Contract | : provide vessel to transport construction material from honolulu to tern, laysan and midway. | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
QUIGG BROS., INC. | $222,725 | Contract | : Willapa Bay Boundary Piling Contract Award Project involves driving piling identifying the boundaries of the Willapa Bay NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
CTG ENTERPRISES, INC. | $52,000 | Contract | : 61094-0000-000 Project is seeking Leadership Environmental and Energy Design certification for new construction [LEED NC 2009] under United States Green Building Council [USGBC]. We are performing Fundamental and Enhanced Commissioning for the San Diego N | Interior, Department of / U.S. Fish and Wildlife Service | 12/16/2009 |
DREW GEORGE & PARTNERS, INC. | $60,900 | Contract | : Provide LEED Project Management Services to facilitate LEED Gold Certification for the new San Diego NWRC Visitor Contact Station / Administration Headquarters and a LEED Silver Certification for the Service/Support Building. Work with the project team s | Interior, Department of / U.S. Fish and Wildlife Service | 12/07/2009 |
ALLEN BRADBURY CONSTRUCTION LLC | $562,468 | Contract | : Initial award is for performing the scope visit only. The Mod 0001 issued 12/22/09 includes the construction for replacing the hatchery roof. MOD 0002 dated 3/31/10 is to demolish the Sand Feeder Shed. MOD 0003 changes delivery date only. | Interior, Department of / U.S. Fish and Wildlife Service | 11/23/2009 |
ALLEN BRADBURY CONSTRUCTION LLC | $411,763 | Contract | : Design & replace existing Quarters #58. Addl work: Site survey, foundation & framing design, fire sprinkler, fire alarm design/install, HVAC design/install, electrical design/install. | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
BERGERSON CONSTRUCTION INC | $125,595 | Contract | : Mainland Barge Landing Rehabilitation | Interior, Department of / U.S. Fish and Wildlife Service | 10/08/2009 |
WTD HOLDINGS, INC. | $606,727 | Contract | : Equipment Storage Building - Project with graveled parking lot and two 25,000 gallon rainwater catchments tanks at the Big Island NWRC/Hakalau Forest | Interior, Department of / U.S. Fish and Wildlife Service | 10/08/2009 |
MUSSELMAN CONSTRUCTION CO. | $39,600 | Contract | : 120 DAY RENTAL OF ONE EXCAVATOR & ONE DUMP TRUCK | Interior, Department of / U.S. Fish and Wildlife Service | 10/22/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $424,857 | Contract | : CARSON FISH HATCHERY PREDATOR COVER SYSTEM | Interior, Department of / U.S. Fish and Wildlife Service | 12/15/2009 |
RPR ARCHITECTS | $54,381 | Contract | : Value Engineering Study of the design devlopment documents, completed by Line and Space LLC of a new Visitors center and Administrative Facility at the San Diego National Wildlife Refuge Complex at Chula Vista California. | Interior, Department of / U.S. Fish and Wildlife Service | 11/12/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $164,850 | Contract | : ABERNATHY FISH TECH CENTER REHAB WATER METER SYSTEM | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $257,747 | Contract | : The project is to provide all the labor, materials and equipment necessary to design, furnish and completely replace the existing photovoltaic electrical system at Laysan Island. This project also requires that (5) tent platforms as described above be de | Interior, Department of / U.S. Fish and Wildlife Service | 12/18/2009 |
ANC RESEARCH & DEVELOPMENT, LLC | $245,552 | Contract | : The mission of the Abernathy Fish Technology Center is to provide leadership in the scientifically based management of national fishery resources through development of new concepts and techniques to solve specific problems in aquatic restoration and reco | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $549,857 | Contract | : MALHEUR NWR PAGE SPRING DAM REHAB | Interior, Department of / U.S. Fish and Wildlife Service | 12/28/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $1,272,058 | Contract | : Scope of work at the Spring Creek National Fish Hatchery is replacement of 14 pumps and motors along with upgrade of new service switchgear to include ATS (automatic transfer switch) and motor control center. All motors for pumps will be high efficient w | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $127,316 | Contract | : ABERNATHY FISH TECH CENTER EARTHEN SETTLING BASIN | Interior, Department of / U.S. Fish and Wildlife Service | 12/29/2009 |
BURTON CONSTRUCTION, INC. | $169,604 | Contract | : Provide Minidoka and Grays Lake NWR's a series of Tier 1 energy upgrades to the multiple buildings on the Refuge site. | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $43,752 | Contract | : The scope of this requirement is specifically listed in the project manual and generally described here: a. Provide sealants and caulking, as specified, at the building exterior envelope to provide a watertight and weather tight building. Provide weathe | Interior, Department of / U.S. Fish and Wildlife Service | 12/29/2009 |
RANSENBERG, ALAN | $966,792 | Contract | : Our award was received from the U.S. Fish and Wildlife Service. We will be creating and developing interior and exterior interpretive exhibits from the concept level through final design, fabrication and installation for Kealia Pond National Wildlife Refu | Interior, Department of / U.S. Fish and Wildlife Service | 12/28/2009 |
GHD INC. | $1,019,866 | Contract | : Design of LEED Certified headquarters/visitor center for the Kealia Pond National Wildlife Refuge in Maui, Hawaii | Interior, Department of / U.S. Fish and Wildlife Service | 5/15/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $948,000 | Contract | : The Turnbull NWR located in northeastern Washington State has several exiting buildings that due to rising energy cost, limited operating budgets and a variety of Federal energy reduction mandates, necessitate that the fish and Wildlife Service renovate | Interior, Department of / U.S. Fish and Wildlife Service | 6/15/2009 |
PARAMETRIX, INC. | $19,995 | Contract | : Public Clam Beds Boundary Surveying and Posting | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $29,665 | Contract | : LITTLE WHITE SALMON HATCHERY WALKWAY REPLACEMENT | Interior, Department of / U.S. Fish and Wildlife Service | 8/14/2009 |
TETRA TECH, INC. | $16,000 | Contract | : Nisqually National Wildlife Refuge; Peer Value Analysis for Project to Construct Boardwalk Replacement for Brown Farm Dike Trail, Phase 1 | Interior, Department of / U.S. Fish and Wildlife Service | 8/17/2009 |
FIVE RIVERS CONSTRUCTION, INC. | $2,642,169 | Contract | : NISQUALLY REFUGE BOARDWALK | Interior, Department of / U.S. Fish and Wildlife Service | 9/23/2009 |
ALLEN BRADBURY CONSTRUCTION LLC | $42,613 | Contract | : Repair refuge headquarters and visitor center | Interior, Department of / U.S. Fish and Wildlife Service | 10/06/2009 |
ATA SERVICES INC | $44,971 | Contract | : To provide a General Clerk to work with the US Fish and Wildlife regional office in Albuquerque | Interior, Department of / U.S. Fish and Wildlife Service | 8/26/2009 |
ATA SERVICES INC | $12,381 | Contract | : To provide a Engineering Tech to work with the US Fish and Wildlife regional office in Albuquerque | Interior, Department of / U.S. Fish and Wildlife Service | 12/03/2009 |
ATA SERVICES INC | $29,600 | Contract | : To provided termporary employement who will provide temporary contract specialist/Administrators to work at the US Fish and Wildlife Service Regional Office | Interior, Department of / U.S. Fish and Wildlife Service | 11/19/2009 |
JCF BRIDGE & CONCRETE, INC. | $681,000 | Contract | : n/a | Interior, Department of / U.S. Fish and Wildlife Service | 11/27/2009 |
R L MCDONNELL CONSTRUCTION | $13,550 | Contract | : Replace Sewer Line | Interior, Department of / U.S. Fish and Wildlife Service | 11/05/2009 |
DE LOS SANTOS CONSTRUCTION, INC. | $543,260 | Contract | : Seismic Rehabilitation of building at the Willow Beach National Fish Hachery, in Mohave County, AZ | Interior, Department of / U.S. Fish and Wildlife Service | 10/13/2009 |
RORE, INC. | $279,386 | Contract | : The project has been awarded to design and construct Influent Water Filtration System at the Inks Dam National Fish Hatchery.The filtration system has been designed with an emphasis on minimizing wasted water and energy. | Interior, Department of / U.S. Fish and Wildlife Service | 11/05/2009 |
T. MCDONALD CONSTRUCTION, INC. | $18,900 | Contract | : Install water structures, culverts, building roads, road paving | Interior, Department of / U.S. Fish and Wildlife Service | 11/05/2009 |
MAC ELECTRIC INC | $357,000 | Contract | : Solar PV Install at Imperial and Cibola NWRs | Interior, Department of / U.S. Fish and Wildlife Service | 11/12/2009 |
ERNEST R. GARZA AND COMPANY, P.C. | $317,180 | Contract | : Installion of 2 15kw solar generation systems | Interior, Department of / U.S. Fish and Wildlife Service | 11/16/2009 |
JCF BRIDGE & CONCRETE, INC. | $751,000 | Contract | : Design build two each prestressed concrete single lane vehicle bridges for USFWS vehicles so they can access various parts of the wildlife refuge. Project is in support of reestablishing thousands of acres of coastal wetlands cut off from tidal waters fro | Interior, Department of / U.S. Fish and Wildlife Service | 11/27/2009 |
TEXAS SOLAR POWER COMPANY | $98,625 | Contract | : Award will be used to install 22 kilowatts of solar power at the Buffalo Lake National Wildlife Refuge, which is located in Northern Texas, near Amarillo, Texas. The solar system will include photovoltaic panels, inverters and other electrical components | Interior, Department of / U.S. Fish and Wildlife Service | 11/18/2009 |
HEARTLAND MIDWEST LLC | $65,447 | Contract | : Install Water Supply Pipeline | Interior, Department of / U.S. Fish and Wildlife Service | 11/19/2009 |
TEXAS SOLAR POWER COMPANY | $84,046 | Contract | : Award will be used to install 19 kilowatts of solar power on the Office Building roof of the San Bernard National Wildlife Refuge, which is located near the Southern coast of Texas, near Freeport Texas. The solar system will include photovoltaic panels, | Interior, Department of / U.S. Fish and Wildlife Service | 11/19/2009 |
SAIGAN CONSTRUCTION, INC. | $71,814 | Contract | : Replace Pond Kettle for Dexter Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
MARSH DEVELOPMENT, INC. | $219,684 | Contract | : SAN BERNARDINO NWR FENCE AND VEHICLE BARRIER PROJECTS | Interior, Department of / U.S. Fish and Wildlife Service | 11/27/2009 |
WILDLIFE CONSERVATION, OKLAHOMA DEPARTMENT OF | $50,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Native Ecosystems Cooperative Agreement - Awards will be made to landowners who make conservation effort to restore native habitat.Restoration will be reported as acres of improvement. | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2009 |
WILDLIFE CONSERVATION, OKLAHOMA DEPARTMENT OF | $92,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Bottomland Hardwwod Cooperative Agreement - Awards will be made to landowners who make a conservation effort to restore native habitat.Restoration will be reported as acres of improvement. | Interior, Department of / U.S. Fish and Wildlife Service | 7/22/2009 |
BLACK BEAR CONSERVATION COMMITTEE | $50,000 | Contract | : The goals of this project are to restore and enhance bottomland hardwood and riparian habitat, control invasive species and revegetate historically native hard and soft mass producing tree species. This will include herbicide applications, site prep and | Interior, Department of / U.S. Fish and Wildlife Service | 7/29/2009 |
EAGLE VALLEY SOIL AND WATER CONSERVATION DISTRICT | $236,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Installation of Fish Screens for fish passage on Eagle Creek in Richland, OR. Reconstruction and design of the irrigation diversion at the Kay-Young Ditch on Eagle Creek which was severly damaged in the 2010 flood. | Interior, Department of / U.S. Fish and Wildlife Service | 8/19/2009 |
FISH AND WILDLIFE, OREGON DEPARTMENT OF | $196,599 | Contract | : The US Fish and Wildlife Service (USFWS) Malheur National Wildlife Refuge will contract to design and construct fish screen and passage facilities to reconnect 60 miles of native fish (redband trout) habitat. The Oregon Department of Fish and Wildlife (O | Interior, Department of / U.S. Fish and Wildlife Service | 10/01/2009 |
SIGNS DIRECT INC | $6,420 | Contract | : 8' galvanized u-channel steel posts | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
WILDLIFE CONSERVATION, OKLAHOMA DEPARTMENT OF | $66,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Lesser Prairie-Chicken Agreement.Awards will be made to landowners who make conservation effort to restore habitat.Restoration will be reported as acres of improvement. | Interior, Department of / U.S. Fish and Wildlife Service | 7/22/2009 |
RIVER CITY PLUMBING AND CONSTRUCTION | $3,300 | Contract | : Install energy efficient waterheaters and create jobs. | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
RIVER CITY PLUMBING AND CONSTRUCTION | $8,641 | Contract | : Replace furnace with energy efficient one, and replace two waterheaters with energy efficient electric, update electrical panel. | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
TEPA EC, LLC | $126,329 | Contract | : Provide and install safety modifications (new guardrails, fencing & markers) at four (4) bridge sites at Quivira National Wildlife Refuge, Kansas. | Interior, Department of / U.S. Fish and Wildlife Service | 10/08/2009 |
KJ PLUMBING & HEATING, LLC | $9,400 | Contract | : Water heaters Duct replacement | Interior, Department of / U.S. Fish and Wildlife Service | 12/29/2009 |
MCMILLEN, LLC | $1,190,267 | Contract | : Furnish all labor, materials and equipment to design and build of one bank of eight (8) reinforced concrete raceways and the rehabilitation of six (6) rearing ponds. Included with this project will be associated structures, supply piping to new raceways | Interior, Department of / U.S. Fish and Wildlife Service | 11/30/2009 |
PAINTED SKY RESOURCE CONSERVATION AND DEVELOPMENT COUNCIL | $994,584 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Fish passage dam modification for dam located in Delta, Colorado known as the Hartland Dam. | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
PRAIRIE HEATING & AIR, INC. | $4,049 | Contract | : furnace/boiler replacement | Interior, Department of / U.S. Fish and Wildlife Service | 11/13/2009 |
CRESCENT ELECTRIC SUPPLY COMPANY | $5,291 | Contract | : HATCHERY LIGHTS | Interior, Department of / U.S. Fish and Wildlife Service | 8/12/2009 |
GRAND LAKE ELECTRIC & HEATING | $7,250 | Contract | : visitor/admin building heating upgrade | Interior, Department of / U.S. Fish and Wildlife Service | 8/07/2009 |
KISNER DOOR LLC | $9,180 | Contract | : Commercial Garage Doors & 3/4 HP Door Openers | Interior, Department of / U.S. Fish and Wildlife Service | 12/14/2009 |
MAIN ELECTRIC CONSTRUCTION, INC. | $6,744 | Contract | : INSTALL OFF PEAK CONTROLS FOR 4 PUMPING STATIONS SMALL ENERGY PROJECT | Interior, Department of / U.S. Fish and Wildlife Service | 11/09/2009 |
M.L. DENNIS CONSULTING | $6,250 | Contract | : National Register nomination | Interior, Department of / U.S. Fish and Wildlife Service | 12/10/2009 |
RICK, GLENN A ENGINEERING & DEVELOPMENT CO | $50,475 | Contract | : Develop Design Solutions to the Drainage Channels and Surrounding Slopes along Millar Ranch Road at San Diego NWR, CA | Interior, Department of / U.S. Fish and Wildlife Service | 12/03/2009 |
PROGRESSIVE CONSULTING ENGINEERS INC | $58,968 | Contract | : A/E Services to provide concrete testing, soils testing and to develop plans, specifications, and cost estimates to rehabilitate the Radial Gate Structure according to requirements shown in Phase 1 Report. | Interior, Department of / U.S. Fish and Wildlife Service | 12/22/2009 |
SRF CONSULTING GROUP, INC. | $33,642 | Contract | : Topographical and Geotechnical Investigations for site surveys and borings for new administration/visitor buildings, roads, parking lots and associated facilities for Upper Mississippi National Wildlife & Fish Refuge Onalaska WI and Mingo National Wildlif | Interior, Department of / U.S. Fish and Wildlife Service | 7/31/2009 |
PROGRESSIVE CONSULTING ENGINEERS INC | $5,286 | Contract | : Phase 1 Site Visit. A/E Services to perform an initial Phase 1 Site Visit regarding the construction of a new Radial Gate Structure at Squaw Creek NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 7/17/2009 |
PROGRESSIVE CONSULTING ENGINEERS INC | $6,745 | Contract | : Site visit for Phase 1 A/E design services for Water Management Ditch Rehabilitation project, Aggassiz NWR, Middle River, MN | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2009 |
PROGRESSIVE CONSULTING ENGINEERS INC | $115,564 | Contract | : Site Investigation - Site Investigation includes topographical survey, geotechnical report, and Hydrology/Hydraulics Analysis for eight proposed projects located at the Agassiz National Wildlife Refuge. Contractor shall provide all labor, tools, equipmen | Interior, Department of / U.S. Fish and Wildlife Service | 10/21/2009 |
MEP ASSOCIATES, LLC | $42,129 | Contract | : A/E Services - Boyer Chute NWR HVAC Mechanical Upgrades | Interior, Department of / U.S. Fish and Wildlife Service | 7/17/2009 |
RHINO CONTRACTORS LTD | $35,522 | Contract | : Road Rehab to Los Negros Creek | Interior, Department of / U.S. Fish and Wildlife Service | 12/31/2009 |
LYNN VESSELS CONSTRUCTION, LLC | $15,940 | Contract | : Fencing replacement Contract to replace dilapidated fence on the Harris Creek and Goode Units at Hagerman NWR, located near Sherman, Texas, in Grayson County. 4600 LF of 5 strand babrbed fence with sign posts installed at every 0.25 miles along the fence | Interior, Department of / U.S. Fish and Wildlife Service | 12/31/2009 |
US MILITARY CORP | $28,992 | Contract | : GRAVEL DELIVERY | Interior, Department of / U.S. Fish and Wildlife Service | 11/20/2009 |
J. NEWELL CORPORATION | $9,208 | Contract | : Square aluminum fish screens for fish hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 11/23/2009 |
CENTENNIAL CONTRACTORS ENTERPRISES, INC. | $97,796 | Contract | : Design, fabrication, and erection of a 1,200 s.f. open sided pre-engineered metal building to be utilized for equipment storage at Matamuskeet National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 11/19/2009 |
DUCKS UNLIMITED, INC. | $154,000 | Contract | : Design build for levee rehabilitation work at Tennessee NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 12/22/2009 |
BUSINESS WORLD CONTRACTORS | $193,886 | Contract | : Recovery - ARRA Vista Del Mar Tract Fencing Recovery - ARRA Sam Fordyce South Tract Fencing | Interior, Department of / U.S. Fish and Wildlife Service | 12/08/2009 |
T. L. WALLACE CONSTRUCTION, INC. | $5,659,618 | Contract | : Design-Build Services for the USFWS Texas Chenier Plains Office Complex & Visitors Center in Anahuac, Texas. | Interior, Department of / U.S. Fish and Wildlife Service | 12/08/2009 |
ARCHITECTURAL & ENVIRONMENTAL ASSOCIATES INC | $75,767 | Contract | : electrical repairs adn solar PV system design and install3ation | Interior, Department of / U.S. Fish and Wildlife Service | 12/08/2009 |
RHINO CONTRACTORS LTD | $9,120 | Contract | : Demo two 40' walls | Interior, Department of / U.S. Fish and Wildlife Service | 11/30/2009 |
SOUTHWEST INTERFACE SOLUTIONS | $799,828 | Contract | : Salt Cedar removal along Pecos River. | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $4,677 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Seqouyah National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation s service projects. One SCA i... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 12/04/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $28,086 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funded services to the Buenos Aires National Wildlife Refuge from the Student Conservation Association's (SCA) Conservation Intern (CI) program, which recruits and maintains qualified young people in environmental and c conservation service projec... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 12/17/2009 |
ATA SERVICES INC | $224,998 | Contract | : Contract personnel for specific ARRA driven media outreach and writing/editing projects under the Recovery act. Also to contract personnel for ARRA specific projects we posting, and audio/video file production | Interior, Department of / U.S. Fish and Wildlife Service | 7/28/2009 |
COUNTERTRADE PRODUCTS, INC. | $2,984 | Contract | : Maxmind Software updates | Interior, Department of / U.S. Fish and Wildlife Service | 8/06/2009 |
ATA SERVICES INC | $272,976 | Contract | : To provided termporary employement who will provide temporary contract specialist/Administrators to work at the US Fish and Wildlife Service Regional Office | Interior, Department of / U.S. Fish and Wildlife Service | 9/08/2009 |
PROFESSIONAL SERVICE INDUSTRIES, INC. | $4,994 | Contract | : Geotechnical Investigaion and Soils Report: Hagerman NWR-Visitor Center/Administration Building Sites, Grayson County, Texas | Interior, Department of / U.S. Fish and Wildlife Service | 10/13/2009 |
PARKER TIDE CORP. | $440,728 | Contract | : Assist with additional acquisitions and contract actions resulting from increased needs for the ARRA. | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
ATA SERVICES INC | $121,286 | Contract | : To provided termporary employement who will provide temporary Grant and Greement assistant to work at the US fish and Wildlife Service Regional Office in Albuquerque | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
CANO CORPORATION | $2,614 | Contract | : Manufacturing of two workstations and provide all necessary tools and labor to design and install computer workstations. | Interior, Department of / U.S. Fish and Wildlife Service | 10/26/2009 |
PROFESSIONAL SERVICE INDUSTRIES, INC. | $26,673 | Contract | : Wetland Delineation Survey: Havasu NWR, Arizona Topock Marsh Water Infrastructure Improvement Project - Modification #2 Add Wetland Delineation and Permitting | Interior, Department of / U.S. Fish and Wildlife Service | 11/03/2009 |
PROFESSIONAL SERVICE INDUSTRIES, INC. | $4,963 | Contract | : Geotechnical Investigation and Soils Report: Deep Fork NWR ? Headquarters Building Site | Interior, Department of / U.S. Fish and Wildlife Service | 11/03/2009 |
CAPITOL EXHIBIT SERVICES, INC. | $346,398 | Contract | : Hagerman NWR Exhibits | Interior, Department of / U.S. Fish and Wildlife Service | 11/16/2009 |
WILDERNESS GRAPHICS INC | $670,400 | Contract | : Design, fabricate, and install exhibits at Texas Chenier Plains NWR Complex at Anahuac, TX. | Interior, Department of / U.S. Fish and Wildlife Service | 11/17/2009 |
AMERICAN BUILD & DESIGN, INC | $90,056 | Contract | : UVALDE, TX 20x20x12 METAL BUILDING & 40x50x16 STEEL SHADE STRUCTURE | Interior, Department of / U.S. Fish and Wildlife Service | 12/31/2009 |
HEARTLAND SURVEYING & MAPPING, PLLC | $16,199 | Contract | : TOPOGRAPHIC MAPPING OF THE HAGERMAN NWR HEADQUARTERS SITE NEAR SHERMAN, TEXAS | Interior, Department of / U.S. Fish and Wildlife Service | 7/11/2009 |
CLARK EQUIPMENT COMPANY | $63,702 | Contract | : Skid Steer Loader and Attachments | Interior, Department of / U.S. Fish and Wildlife Service | 10/20/2009 |
HEARTLAND SURVEYING & MAPPING, PLLC | $9,989 | Contract | : Deep Fork HQ Building Site Survey | Interior, Department of / U.S. Fish and Wildlife Service | 11/03/2009 |
CIVIL ENGINEERING CONSULTANTS DON DURDEN INC | $10,489 | Contract | : Site survey for building, access road, parking lot, and facilities design, and other data, near Brazoria, and Angleton, Texas. Site is approcimately 16 acres, approximately 770 feet east to west, and 900 feet north to south, and includes existing roads, | Interior, Department of / U.S. Fish and Wildlife Service | 11/10/2009 |
CATALYST ARCHITECTURE, LLC | $361,199 | Contract | : On 11/10/2009 the U.S. Fish and Wildlife Service awarded Catalyst Architecture, LLC a contract to provide planning, design, construction management and inspection services for a new Administrative Headquarters and Visitor Center for the Hagerman National | Interior, Department of / U.S. Fish and Wildlife Service | 11/10/2009 |
YUNKER PLASTICS INC | $36,404 | Contract | : Install 12,379 sf of Firestone 45 mil reinforced EPDM Geommebrane in fish rearing pond. Dig anchor trench. | Interior, Department of / U.S. Fish and Wildlife Service | 12/08/2009 |
DUCKS UNLIMITED, INC. | $88,119 | Contract | : Design/build services for replacing L. Goodall Water Control Structure | Interior, Department of / U.S. Fish and Wildlife Service | 9/17/2009 |
BARRY LARSON & SON, INC. | $1,033,711 | Contract | : Visitor's Center Window Replacement for Energy conservation at DeSoto National Wildlife Refuge, Missouri Valley, IA. Supply and install all labor, material, and equipment necessary to replace and rehabilitate all of the windows and frames in the existing | Interior, Department of / U.S. Fish and Wildlife Service | 12/22/2009 |
OLSON CONSTRUCTION TRF INC | $499,850 | Contract | : 100% complete | Interior, Department of / U.S. Fish and Wildlife Service | 6/03/2009 |
RONCO CONSTRUCTION COMPANY, INC | $189,659 | Contract | : New Geothermal Well Field, insulate exterior walls. Insulate attic spaces, new interior metal wall and ceiling panels, new underfloor heating system, new concrete slab on grade, and complete H.V.A.C. System for two existing Shop Buildings. | Interior, Department of / U.S. Fish and Wildlife Service | 6/30/2009 |
DUCKS UNLIMITED, INC. | $779,000 | Contract | : Restore wetlands, RMV Runways & Taxiways at Wallkill River NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 11/23/2009 |
DUCKS UNLIMITED, INC. | $18,574 | Contract | : Replace Water Control Structure #14 | Interior, Department of / U.S. Fish and Wildlife Service | 9/15/2009 |
DUCKS UNLIMITED, INC. | $46,394 | Contract | : Replace Entrance Road Culverts/WCS at Eastern Neck NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 12/04/2009 |
ERICKSON BUILDERS & CO. INC. | $192,636 | Contract | : Open to all competition | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
NATURE CONSERVANCY, THE | $65,800 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The purpose for the project is to restore stream channel habitat on the Recipient's Big Darby Creek Headwaters Preserve located in Logan County, Ohio. To accomplish this goal, Recipient intends to work with the natural gas utilility, Columbia Gas, to reloc... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/29/2009 |
NATURE CONSERVANCY, THE | $17,500 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Manage this tract of land as dry prairie by invasive species removal, brush removal, as well as tree removal to benefit grassland birds and reduce invasive woody encroachment adjacent to grassland. | Interior, Department of / U.S. Fish and Wildlife Service | 10/29/2009 |
NATURE CONSERVANCY, THE | $70,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Funds will be used to manage invasive plants at key conservation lands primarily in the Interior Low Plateau ecoregion of Indiana, focusing on sites with listed and at-risk species (meaning rare species and/or those species declilining in numbers) that are ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 12/04/2009 |
OZAUKEE WASHINGTON LAND TRUST INC, THE | $454,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The objective of this award is to establish migratory bird stopover habitat on non-federal lands located in Port Washingon, Ozaukee County, Wisconsin, specifically on a 142 acre site to be known as the Forest Beach Migratory Preseserve. Restoration of vario... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/11/2009 |
CONSERVATION, MISSOURI DEPARTMENT OF | $144,900 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To replace an existing low water crossing over the Niangua River in Dallas County, Missouri, with a newly designed clear-span crossing to facilitate fish passage and allow for improved sediment transport, and therefore, increase e stream stability.... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/10/2009 |
BARRY CONSERVATION DISTRICT | $74,900 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Removal of the Nashville and Maple Hill Dam structures and replacement with weir structures to permit fish passage and improve overall habitat and water quality on the Thornapple River in the Lake Michigan basin. Open over 60 ririver and tributary miles fo... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/17/2009 |
WINNEBAGO COUNTY FOREST PRESERVE DISTRICT | $25,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Floodplain wetland habitat will be restored at the Crooked River Forest Preserve along the Pecatonica River in Winnebago County, Illinois. The funding will help pay for the planting of trees to reconstruct the historic floodplaiain forest and excavate low ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/31/2009 |
PENNAZ, TERRY | $31,640 | Contract | : Provides engineering consultant services for Regional Headquarters on an as-needed basis. This may include engineering design, construction management, review of plans and specifications, preparation of scope of services, and other engineering services. | Interior, Department of / U.S. Fish and Wildlife Service | 12/22/2009 |
SCOTT'S HELICOPTER SERVICE INC | $26,842 | Contract | : Helicopter Application of Herbicide on 175 Acres within the Agassiz NWR | Interior, Department of / U.S. Fish and Wildlife Service | 9/23/2009 |
RIVERDALE ENVIRONMENTAL SERVICE INC | $30,795 | Contract | : Tree cutting & biomass removal for the Litchfield WMD of the US Fish & Wildlife | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
CROP PRODUCTION SERVICES, INC. | $11,134 | Contract | : Chemicals | Interior, Department of / U.S. Fish and Wildlife Service | 9/15/2009 |
TEAMSTAFF GOVERNMENT SOLUTIONS, INC. | $360,570 | Contract | : Reports within the Division of Engineering, which provides engineering, architectural and specialised services for National Wildlife Refuges and Fish Hatcheries/Fish Health Centers within Region 3. The organizational mission includes the design, construct | Interior, Department of / U.S. Fish and Wildlife Service | 12/11/2009 |
TEAMSTAFF GOVERNMENT SOLUTIONS, INC. | $121,482 | Contract | : This position reported to the Chief, Construction and Acquisition Division to provide general clerical support for the execution of engineering, Contracting/acquisition and facilities management servcies within Regional Headquarters at Bloomington, MN. | Interior, Department of / U.S. Fish and Wildlife Service | 12/14/2009 |
ARROWHEAD CONTRACTING, INC. | $3,574,614 | Contract | : Design and construction of Visitor Center. | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
ARROWHEAD CONTRACTING, INC. | $5,098,121 | Contract | : Design and construction of visitor center. | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
DELL MARKETING L.P. | $2,153 | Contract | : Non_Tied Peripherals, Notebooks | Interior, Department of / U.S. Fish and Wildlife Service | 11/25/2009 |
MWH CONSTRUCTORS, INC. | $5,881,153 | Contract | : The project is for the design/build of new headquarters and visitor center at Coastal North Carolina National Wildlife Refuge, Manteo, North Carolina. | Interior, Department of / U.S. Fish and Wildlife Service | 10/29/2009 |
JOHNSON-MCADAMS FIRM, P.A., THE | $23,412 | Contract | : Big Branch Energy Study/Design | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
TOLSON, SIMPSON & ASSOCIATES, CONSULTING ENGINEERS, INC. | $9,653 | Contract | : Perform Topo Survey Lower Suwannee Maint. Yard | Interior, Department of / U.S. Fish and Wildlife Service | 11/19/2009 |
TOLSON, SIMPSON & ASSOCIATES CONSULTING ENGINEERS, INC | $178,268 | Contract | : A/E Design Services for New Environmental Education Bldg. at St. Marks, NWR | Interior, Department of / U.S. Fish and Wildlife Service | 12/09/2009 |
TOLSON, SIMPSON & ASSOCIATES, CONSULTING ENGINEERS, INC. | $14,848 | Contract | : Task 2 - Design System 10K-W Photovoltaic | Interior, Department of / U.S. Fish and Wildlife Service | 12/10/2009 |
SHAW ENVIRONMENTAL & INFRASTRUCTURE, INC. | $5,892,022 | Contract | : Design and Build a Visitor Center / Administration / Environmental Education Facility at the Tennessee National Wildlife Refuge in Paris, TN. The building will be approximately 12,500 square feet. The facility will achieve a LEED certification and incor | Interior, Department of / U.S. Fish and Wildlife Service | 10/26/2009 |
BARLOVENTO, L.L.C. | $198,946 | Contract | : Greening Items,Yazoo NWR and Panther Swamp NWR | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
RYLL INTERNATIONAL LLC | $104,250 | Contract | : supply and deliver of 610 limestone aggregate | Interior, Department of / U.S. Fish and Wildlife Service | 5/29/2009 |
NPI, INC. | $500 | Contract | : COR/COTR training Norcross, GA August 17-21, 2009 | Interior, Department of / U.S. Fish and Wildlife Service | 9/09/2009 |
LINC GOVERNMENT SERVICES, LLC | $1,281,082 | Contract | : Mammoth Springs Phase 2 - Design Build Mammoth Spring Fish Hatchery. | Interior, Department of / U.S. Fish and Wildlife Service | 10/26/2009 |
BEST-WADE PETROLEUM, INC. | $9,990 | Contract | : Fueling their fuel tanks | Interior, Department of / U.S. Fish and Wildlife Service | 10/26/2009 |
SOUTHERN CUSTOM EXHIBITS OF ALABAMA, INC. | $600,000 | Contract | : DESIGN AND FABRICATION OF EXHIBITS FOR NEW VISITOR CENTER AT TENNESEE NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 1/20/2010 |
LEE, COUNTY OF | $225,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Hydrological restoration of farm field and exotic plant treatment on Smokehouse Bay Preserve. | Interior, Department of / U.S. Fish and Wildlife Service | 10/19/2009 |
PUBLIC ARCHAEOLOGY LABORATORY, INCORPORATED, THE | $16,881 | Contract | : Archaeological Survey of Waterline | Interior, Department of / U.S. Fish and Wildlife Service | 11/23/2009 |
LYONS/ZAREMBA INC. | $1,132,018 | Contract | : Design, fabrication, installation of educational and interpretive exhibits for the new visitor center at the Long Island National Wildlife Refuge, Shirley, NY | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2009 |
UNIVERSITY SYSTEM OF NEW HAMPSHIRE | $28,846 | Contract | : The specific ARRA funding under this award is part of a much larger project. The overall fundamental project objective is stream (habitat) restoration for Southampton Creek, Upper Southampton Township, Bucks County, PA. The pupose of this specific fundi | Interior, Department of / U.S. Fish and Wildlife Service | 9/02/2009 |
M.J.J. CONSTRUCTION LLC | $96,817 | Contract | : Furnish & install a solar thermal system to supplement building heating/hot water system for the new Vistor Contact Station | Interior, Department of / U.S. Fish and Wildlife Service | 11/30/2009 |
HDR ENGINEERING, INC. | $19,998 | Contract | : Conduct a feasiblity study on three different microturbine scenarios at Greer's Ferry NFH in Heber Springs, Arkansas. | Interior, Department of / U.S. Fish and Wildlife Service | 12/15/2009 |
HDR ENGINEERING, INC. | $17,342 | Contract | : USFWS is planning on issuing a construction contract to replace an existing 110 KVA diesel generator at the Nashua National Fish Hatchery. The purpose of this task order is for electrical engineering professional services to provide recommendations and e | Interior, Department of / U.S. Fish and Wildlife Service | 11/24/2009 |
HDR ENGINEERING, INC. | $10,916 | Contract | : The USFWS is planning to issue a construction contract to connect a new water supply well into the North Attleboro National Fish Hatchery. The purpose of this task order is for the services of an electrical engineer to provide recommendations and electri | Interior, Department of / U.S. Fish and Wildlife Service | 11/24/2009 |
CAROLINA MOUNTAIN LAND CONSERVANCY | $200,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Contract for habitat restoration. | Interior, Department of / U.S. Fish and Wildlife Service | 10/21/2009 |
CONSERVATION & NATURAL RESOURCES, ALABAMA DEPT OF | $300,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This project will foster landscape level ecosystem restoration for the longleaf pine community and will help build partnerships among the Division of Wildlife and Freshwater Fisheries, the US Fish and Wildlife Service and privatete landowners. Services will... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/19/2009 |
LITTLE TENNESSEE WATER SHED ASSOCIATION, THE | $75,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The $75,000 in ARRA funds were granted to the Little Tennessee Watershed Association to complete restoration activities on a 'shovel ready' project designed to improve fish passage on tributary streams in the Little Tennessee Riviver watershed in Macon Coun... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/21/2009 |
AGRICULTURE, TENNESSEE DEPARTMENT OF | $250,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Provide funds to implement best management proactices (BMPs) to improve water quality and wildlife habitat withint the Elk River Watershed, the Upper Duck Watershed (upstream of Columbia), the Upper Caney Fork River Watershed (upupstream of Center Hill Rese... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/22/2009 |
NATURE CONSERVANCY, THE | $137,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To implement the protection and recovery of riparian corridors and the reduction and prevention of non-point source pollution on private lands along the Clinch, Powell, and Holston Rivers and their tributaries in Tennessee. | Interior, Department of / U.S. Fish and Wildlife Service | 10/27/2009 |
FLORIDA THREE RIVERS RESOURCE CONSERVATION AND DEVELOPMENT COUNCIL INC | $600,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Hydrolic and Environmental Restoration | Interior, Department of / U.S. Fish and Wildlife Service | 10/23/2009 |
PARKS, RECREATION AND TOURISM, SOUTH CAROLINA DEPARTMENT OF | $139,000 | Contract | : Restoration of coastal pine habitats including: - compliance archeological reviews to allow habitat restoration timber thinning - mechanical mulching of hardwood midstory - hand clearance of hardwood mistory - hand application of herbicide to prevent | Interior, Department of / U.S. Fish and Wildlife Service | 10/19/2009 |
LONGLEAF ALLIANCE, INC., THE | $200,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Cooperative Agreement between USDI-FWS and The Longleaf Alliance, Inc. to facilitate habitat restoration and improvement primarily for Federal trust resources in longleaf pine habitats on private lands in Georgia. | Interior, Department of / U.S. Fish and Wildlife Service | 10/21/2009 |
THE INSTITUTE FOR REGIONAL CONSERVATION | $400,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Pine Rocklands Initiative. Funds from this Cooperative Agreement will assist in the implementation of the Pine Rocklands Initiative. The primary goal of this project is to restore pine rocklands across Miami-Dade County in ordrder to enhance and expand h... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/19/2009 |
FISH & WILDLIFE RESOURCES, KENTUCKY DEPARTMENT OF | $25,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This Cooperative Agreement is being implemented in order to implement the John's Creek In-Stream Habitat Enhancement Project in the state of Kentucky to do the following: ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/21/2009 |
GAME & FISH COMMISSION, ARKANSAS | $250,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This project will be used to remove artificial fish migration barrier on a smallmouth bass fishery. The barrier removal and subsequent habitat improvement will vastly improve the fishery on samllmouth bass in Crooked Creek. This s has historically been a su... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/19/2009 |
GAME & FISH COMMISSION, ARKANSAS | $110,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Habitat improvement on Beaver Tailwater | Interior, Department of / U.S. Fish and Wildlife Service | 10/19/2009 |
LOWER MISSISSIPPI RIVER CONSERVATION COMMITTEE | $96,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Construct fish passage project through Lower Mississippi River-Robinson Bayou Dikes to restore aquatic habitat for federal trust species and stimulate natural resource-based economic development. | Interior, Department of / U.S. Fish and Wildlife Service | 10/22/2009 |
HANSEN WEATHER-PORT CORP. | $15,382 | Contract | : 18'W x 52'L SQ Replacement Cover Panels 1800 SQ Replacement End Panels Freight to Erwin NFH | Interior, Department of / U.S. Fish and Wildlife Service | 8/05/2009 |
HANSEN WEATHER-PORT CORP. | $7,570 | Contract | : Replace 4 main cover panels; replace eight end panels | Interior, Department of / U.S. Fish and Wildlife Service | 7/28/2009 |
BEST-WADE PETROLEUM, INC. | $20,000 | Contract | : Service hired us to fuel their fuel tanks. | Interior, Department of / U.S. Fish and Wildlife Service | 10/26/2009 |
SOUTHEASTERN PIPE & DRAIN SYSTEMS, INC. | $11,233 | Contract | : Water Control Structures | Interior, Department of / U.S. Fish and Wildlife Service | 8/30/2009 |
AQUATIC HABITATS, INC. | $19,646 | Contract | : Heaters for the Bears Bluff National Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 9/10/2009 |
WEST MEMPHIS STEEL CORPORATION | $6,433 | Contract | : polymer coated culvert | Interior, Department of / U.S. Fish and Wildlife Service | 9/09/2009 |
JOHNSVILLE COMPANY LLC | $63,727 | Contract | : 5,000 tons class 2 sand clay gravel | Interior, Department of / U.S. Fish and Wildlife Service | 9/09/2009 |
AQUATIC VEGETATION CONTROL, INC. | $1,250,000 | Contract | : TREATMENT OF CATEGORY I & II EXOTIC PLANT SPECIES LOXAHATCHEE NWR | Interior, Department of / U.S. Fish and Wildlife Service | 12/10/2009 |
R & L TRANSPORT COMPANY | $148,526 | Contract | : We are delivering gravel to build a road in a soggy bottom of the refuge. The expected outcome is a gravel road in the refuge. The overall purpose is to build the road on the refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 10/22/2009 |
BEST-WADE PETROLEUM, INC. | $22,800 | Contract | : Fueling fuel tanks | Interior, Department of / U.S. Fish and Wildlife Service | 10/26/2009 |
CHRISTIE BROTHERS HEAT & AIR, LLC | $24,522 | Contract | : Replace 5 HVAC units | Interior, Department of / U.S. Fish and Wildlife Service | 11/05/2009 |
VALOR CONSTRUCTION MANAGEMENT, LLC | $34,268 | Contract | : Install energy efficient lights in maintenance shop and install windows in house | Interior, Department of / U.S. Fish and Wildlife Service | 11/16/2009 |
SLH MOTORSPORTS, INC. | $4,880 | Contract | : Ship ARRA signage to various locations | Interior, Department of / U.S. Fish and Wildlife Service | 11/20/2009 |
JPV INTERNATIONAL MACHINERY, INC. | $12,000 | Contract | : Equipment rental w/operator for vegetation control within the Providence Ponds Project at Morgan Brake NWR | Interior, Department of / U.S. Fish and Wildlife Service | 11/24/2009 |
BOC & ASSOCIATES, INC. | $188,239 | Contract | : Temporary Services of Contract Specialist 1 year with option for 1 additional year | Interior, Department of / U.S. Fish and Wildlife Service | 11/30/2009 |
RIVERFRONT LIMESTONE | $122,778 | Contract | : Gravel & stone supplier | Interior, Department of / U.S. Fish and Wildlife Service | 9/17/2009 |
DELL MARKETING L.P. | $6,066 | Contract | : Non_Tied Peripherals, Notebooks | Interior, Department of / U.S. Fish and Wildlife Service | 6/17/2009 |
DELL MARKETING L.P. | $8,686 | Contract | : Non_Tied Peripherals, Notebooks | Interior, Department of / U.S. Fish and Wildlife Service | 7/21/2009 |
MCP COMPUTER PRODUCTS INC | $21,467 | Contract | : DELL PRECISION M6400 | Interior, Department of / U.S. Fish and Wildlife Service | 8/24/2009 |
MWH CONSTRUCTORS, INC. | $1,826,519 | Contract | : MWH is performing the Design/Build of an effluent wastewater treatment system at the Dale Hollow National Fish Hatchery in Celina, TN. The purpose of the system, once installed, is to improve discharge water quality by reducing the concentration of total | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
BURGESS & NIPLE, INC | $32,383 | Contract | : Design new geothermal heating and cooling system for visitors center. | Interior, Department of / U.S. Fish and Wildlife Service | 10/15/2009 |
MWH AMERICAS, INC. | $14,710 | Contract | : Electrical rehabilitation at the White River National Fish Hatchery Windsor County, Vermont | Interior, Department of / U.S. Fish and Wildlife Service | 11/24/2009 |
BURGESS & NIPLE, INC | $26,785 | Contract | : Construct Visitor Facility airlock foyers | Interior, Department of / U.S. Fish and Wildlife Service | 10/28/2009 |
OAK POINT ASSOCIATES | $17,639 | Contract | : Value Engineering Analysis - A/E Design Services | Interior, Department of / U.S. Fish and Wildlife Service | 11/09/2009 |
BURGESS & NIPLE, INC | $29,093 | Contract | : Evaluate alternate energy strategies for the Williamstown Center. | Interior, Department of / U.S. Fish and Wildlife Service | 12/07/2009 |
BURGESS & NIPLE, INC | $1,180,532 | Contract | : New Admin Bldg for Wing Bee function | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
FRIENDS OF THE WINOOSKI RIVER, INCORPORATED | $40,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The purpose of this project is to provide passage for all life stages of Eastern Brook trout and other aquatic species through a series of three culverts on Great Brook in Plainfield Vermont. The objective is to restore connectivivity on Great Brook by retr... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/23/2009 |
PENINSULA OPEN SPACE TRUST | $55,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Natural resource habitat restoration projects on POST's Cloverdale Ranch in San Mateo County, California | Interior, Department of / U.S. Fish and Wildlife Service | 7/30/2009 |
ESTES, INC. | $24,365 | Contract | : SOLD HERBICIDE TO US FISH AND WILDLIFE REFUGE | Interior, Department of / U.S. Fish and Wildlife Service | 6/10/2009 |
HARDRIVES CONSTRUCTION INC | $921,711 | Contract | : Replace pond liners at the Garrison Dam in North Dakota. | Interior, Department of / U.S. Fish and Wildlife Service | 6/23/2009 |
FORMATIONS INC | $51,067 | Contract | : Design, Fabrication and Installation of Long Lake Entrance and Information Signs | Interior, Department of / U.S. Fish and Wildlife Service | 7/22/2009 |
FORMATIONS INC | $211,000 | Contract | : Design Fabrication and Installation of New Exhibits at National Elk Refuge, Jackson Hole, and Greater Yellowstone Visitor Center, Wyoming | Interior, Department of / U.S. Fish and Wildlife Service | 8/21/2009 |
YERBA BUENA ENGINEERING & CONSTRUCTION, INC. | $4,474,448 | Contract | : NATIONAL ELK REFUGE: JACKSON IRRIGATION PROJECT. | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
FORMATIONS INC | $16,929 | Contract | : Final Design and Fabrication of 28 Duplicate Recovery Act Panels | Interior, Department of / U.S. Fish and Wildlife Service | 11/17/2009 |
FORMATIONS INC | $9,716 | Contract | : Final Design and Fabrication of Informational Signs | Interior, Department of / U.S. Fish and Wildlife Service | 11/19/2009 |
STONE GROUP ENTEPRISES INC | $3,600 | Contract | : Tankless Hot water Heaters | Interior, Department of / U.S. Fish and Wildlife Service | 12/10/2009 |
A & L CONSTRUCTION, INC. | $785 | Contract | : Replace a storm door | Interior, Department of / U.S. Fish and Wildlife Service | 12/08/2009 |
L AND I FENCE CONSTRUCTION, INC. | $184,750 | Contract | : Fort Niobrara Boundary Fence | Interior, Department of / U.S. Fish and Wildlife Service | 8/04/2009 |
TUFF TRUCKS, INC. | $11,240 | Contract | : Polyurethaen Foam Inuslation installed. Job has not started | Interior, Department of / U.S. Fish and Wildlife Service | 11/24/2009 |
PROTECTION SHELTERS, L.L.C. | $9,825 | Contract | : Build and construct an 8 x 10 tornado shelter and deliver to site. | Interior, Department of / U.S. Fish and Wildlife Service | 11/24/2009 |
PROTECTION SHELTERS, L.L.C. | $9,825 | Contract | : Build and construct an 8 x 10 tornado shelter and deliver to site. | Interior, Department of / U.S. Fish and Wildlife Service | 11/19/2009 |
PROTECTION SHELTERS, L.L.C. | $9,825 | Contract | : Build and construct an 8 x 10 tornado shelter and deliver to site. | Interior, Department of / U.S. Fish and Wildlife Service | 11/19/2009 |
ELMBROOK CORPORATE SERVICES INC | $5,536 | Contract | : 7 EB9SHKXVQ REFRIGERATORS | Interior, Department of / U.S. Fish and Wildlife Service | 11/20/2009 |
ELLIS, WAYNE | $8,241 | Contract | : Replacement of tank type water heaters with high effeciency propane fired tankless water heaters. With all associated work with retrofit. | Interior, Department of / U.S. Fish and Wildlife Service | 12/28/2009 |
ERIK NELSON HVAC, INC. | $4,000 | Contract | : install energy efficient heaters | Interior, Department of / U.S. Fish and Wildlife Service | 12/16/2009 |
SUBZERO REFRIGERATION HEATING & AIR CONDITIONING, LLC | $5,748 | Contract | : No work was performed during the 4th quarter of 2010 | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
SOUTH CENTRAL PUBLIC POWER DISTRICT INC | $11,440 | Contract | : BUILD A POWER LINE TO SERVE A WELL FOR FISH AND WILDLIFE SERVICE | Interior, Department of / U.S. Fish and Wildlife Service | 12/09/2009 |
FIRST SERVICE LLC | $7,337 | Contract | : Job not started. | Interior, Department of / U.S. Fish and Wildlife Service | 12/22/2009 |
KIMMEL MECHANICAL, INCORPORATED | $3,958 | Contract | : Remove and replace furnace and coil | Interior, Department of / U.S. Fish and Wildlife Service | 11/05/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $4,300 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Huron Wetland Management District from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation s service projects. One SCA i... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 9/01/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $4,300 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Ouray National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation servrvice projects. One SCA inte... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/27/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $4,300 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The award funds services to the Browns Park National Wildlife Refuge from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservatioion service projects. One SC... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 11/09/2009 |
ESTES, INC. | $24,365 | Contract | : HERBICIDE FOR US FISH AND WILDLIFE SERVICE- TO BE USED ON A REFUGE | Interior, Department of / U.S. Fish and Wildlife Service | 6/12/2009 |
ESTES, INC. | $26,340 | Contract | : HERBICIDE FOR FISH AND WILDLIFE REFUGE | Interior, Department of / U.S. Fish and Wildlife Service | 7/02/2009 |
CORE ENGINEERED SOLUTIONS INC | $41,154 | Contract | : Fuel storage tank & accessories | Interior, Department of / U.S. Fish and Wildlife Service | 11/09/2009 |
ESTES, INC. | $14,487 | Contract | : SOLD HERBICIDE TO US FISH AND WILDLIFE REFUGE SYSTEM- UNDER AN EXISTING 5 YEAR CONTRACT | Interior, Department of / U.S. Fish and Wildlife Service | 7/30/2009 |
ESTES, INC. | $23,679 | Contract | : SOLD HERBICIDE TO US FISH AND WILDLIFE REFUGE | Interior, Department of / U.S. Fish and Wildlife Service | 6/12/2009 |
PRICEWATERHOUSECOOPERS LLP | $206,066 | Contract | : Reporting is integral to communicating the success of FWS programs funded through the Recovery Act; transparency and accountability must guide these efforts. External Affairs (EA) will achieve increased transparency and accountability by maintaining a use | Interior, Department of / U.S. Fish and Wildlife Service | 10/27/2009 |
CONFEDERATED SALISH & KOOTENAI TRIBES | $50,200 | Contract | : Wildlife Extension Agreement between CS&KT and the U.S. Fish and Wildlife Services (FW) to perform wildlife habitat development through stream restoration olong the Squeque Reach of the Jocko River | Interior, Department of / U.S. Fish and Wildlife Service | 9/16/2009 |
HOLMQUIST CONSTRUCTION CO | $2,050 | Contract | : Furnish and install blow-in insulation in office area ceiling | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
ALPHA SALES TECHNOLOGIES LLC | $124,015 | Contract | : replace fuel tanks in several locations | Interior, Department of / U.S. Fish and Wildlife Service | 7/16/2009 |
GLACIER ELECTRIC CONSTRUCTION, INC. | $88,075 | Contract | : Install security gates and fencing at KNWR on Ski Hill Road, Soldotna, Alaska. | Interior, Department of / U.S. Fish and Wildlife Service | 6/29/2010 |
KOMAN, INC. | $24,954 | Contract | : Supply and install approximatley 300yds of gravel and compact for new road surfaces. | Interior, Department of / U.S. Fish and Wildlife Service | 11/02/2009 |
MARSH CREEK, LLC | $3,194,985 | Contract | : Feasibility study,Preliminary Design and Construction of Wind Turbines at King Salmon & Cold Bay.The installation of wind turbines will help reduce the refuge's greenhouse gas emissions and could decrease utility costs. | Interior, Department of / U.S. Fish and Wildlife Service | 12/18/2009 |
REDOUBT INDUSTRIES INC | $682,908 | Contract | : Kenai Visitor Center HVAC Rehab. Base Bid ($56,935.50): The base bid shall consist of the contractor performing a site reconnaissance and preparing a work plan and cost proposal. Contractors work plan and proposal shall consist of the following: 1). | Interior, Department of / U.S. Fish and Wildlife Service | 12/18/2009 |
NOMAD SHELTER INC. | $4,740 | Contract | : rental contract | Interior, Department of / U.S. Fish and Wildlife Service | 6/12/2009 |
SYBRANT CONSTRUCTION, LLC | $95,241 | Contract | : Solar Water Wells@ Stone Lakes NWR, Elk Grove CA | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
GOOSE VALLEY FARMING, INC. | $167,210 | Contract | : LEVEE CONSTRUCTION FOR WALKING WETLANDS PROJECT | Interior, Department of / U.S. Fish and Wildlife Service | 10/29/2009 |
SCHNEIDER, RYAN CONSTRUCTION | $99,445 | Contract | : INSTALL 48 HDPE CULVERT LINERS. rEPLACE THREE FLAP GATES AND TWO SCREW GATES | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
CARSON PUMP, LLC | $299,960 | Contract | : Lahontan National Fish Hatchery Rehabilitation of Wells #1,2,6 &7 | Interior, Department of / U.S. Fish and Wildlife Service | 12/22/2009 |
HOWARD CONSTRUCTION | $5,558 | Contract | : Install solar window films and window awnings on two buildings at the Coleman Fish Hatchery/CA-NV Fish Health Center. | Interior, Department of / U.S. Fish and Wildlife Service | 10/22/2009 |
HOWARD CONSTRUCTION | $3,360 | Contract | : Installed necessary attic insulation in two buildings of the Coleman Fish Hatchery. | Interior, Department of / U.S. Fish and Wildlife Service | 10/22/2009 |
DEER CREEK HEATING & AIR | $5,330 | Contract | : Removal and replacment of split system Heat Pump and associated return ducting.. | Interior, Department of / U.S. Fish and Wildlife Service | 7/01/2009 |
HOWARD CONSTRUCTION | $14,925 | Contract | : Installed seven (7) ten foot tall garage doors.Old roors removed and disposed of.Install new sheet metal trim and interior locks. | Interior, Department of / U.S. Fish and Wildlife Service | 8/11/2009 |
MACHADO BACKHOE, INC. | $10,600 | Contract | : REMOVAL OF SEDIMENT AND VEGETATION FROM THE 200' CANAL BOTTOM BEFORE THE PLACEMENT OF RIP-RAP ALONG THE CANAL. THIS TOOK PLACE ON THE DEADMANS CREEK ON THE MERCED NWR | Interior, Department of / U.S. Fish and Wildlife Service | 9/01/2009 |
AMERICAN BUILD & DESIGN, INC | $556,167 | Contract | : REPLACE AN OLD MAINTENANCE SHOP MODOC WITH A NEW 60' X 120' PRE-ENGINEERED STEEL MAINTENANCE SHOP AT THE MODOC NATIONAL WILDLIFE REFUGE P.O. BOX 1610 ALTURAS, CA 96101 | Interior, Department of / U.S. Fish and Wildlife Service | 12/22/2009 |
AMERICAN BUILD & DESIGN, INC | $591,757 | Contract | : Replace old Maintenance Shop Ruby Lake with a new 50' x 150' Maintenance Shop at the Ruby Lake National Wildlife Refuge HC 60, Box 860 Ruby Valley, Nevada 89833 | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
ROMTEC, INC. | $77,679 | Contract | : MARBLE BLUFF FISH FACILITY RESTROOM | Interior, Department of / U.S. Fish and Wildlife Service | 11/30/2009 |
LINE AND SPACE LLC | $708,484 | Contract | : Design for a new Administrative Headquarters Office for the San Diego National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 6/01/2009 |