Listing all stimulus spending by amount, in descending order. Return to U.S. Fish and Wildlife Service page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
RPR ARCHITECTS | $8,972 | Contract | : Architectural design services for the Modoc Bunkhouse/ Quarters Replacement. | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
SANSONE COMPANY, INC. | $35,870 | Contract | : Remove / replace flooring and tile at Kern NWR | Interior, Department of / U.S. Fish and Wildlife Service | 12/16/2009 |
CATALYST ARCHITECTURE, LLC | $1,315,784 | Contract | : On 5/30/2009 the U.S. Fish and Wildlife Service awarded Catalyst Architecture, LLC a contract to provide planning, design, construction management and inspection services for a new Administrative Headquarters and Visitor Center for the San Luis National W | Interior, Department of / U.S. Fish and Wildlife Service | 5/30/2009 |
SANTA CATALINA ISLAND CONSERVANCY | $211,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This project offsets the loss and alteration of important habitats in California and provides jobs as required by ARRA. The project objective is to improve habitat values for wildlife and plants, both in quantity and quality, ththrough restoration, enhance... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 8/11/2009 |
SANTA CRUZ COUNTY RESOURCE CONSERVATION DISTRICT | $170,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Support voluntary habitat improvement actions on privately-owned properties associated with West Branch Soquel Creek and Shingle Mill Gulch. | Interior, Department of / U.S. Fish and Wildlife Service | 8/05/2009 |
BARRICK GOLD OF NORTH AMERICA, INC. | $133,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Willow Creek Sagegrouse Habitat Enhancement | Interior, Department of / U.S. Fish and Wildlife Service | 9/16/2009 |
RESOURCE CONCEPTS, INC. | $100,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Work collaboratively with area landowners to plan and implement priority habitat enhancement projects for Greater Sage-grouse on private lands located in the Bodie Hills, California. | Interior, Department of / U.S. Fish and Wildlife Service | 9/15/2009 |
APRISA TECHNOLOGY,LLC | $1,214 | Contract | : MISCELLANEOUS AUDIO VISUAL ITEMS | Interior, Department of / U.S. Fish and Wildlife Service | 8/13/2009 |
SAYBR CONTRACTORS, INC. | $29,286 | Contract | : Remove Evergreen dairy barn and shed at Nisqually NWR, WA | Interior, Department of / U.S. Fish and Wildlife Service | 9/18/2009 |
MARSHALL UNIVERSITY RESEARCH CORPORATION | $19,971 | Grant | Endangered Species Conservation ? Recovery Implementation Funds: The purpose of this study is to conduct a survery for the Maryland darter (Etheostoma sellare) with primary emphasis on electrotrawling, to evaluate the continued survival of the Maryland darter. This will complement ongoing survey efffforts using more tra... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/30/2009 |
RMC CONSULTANTS, INC. | $20,000 | Contract | : Historic Structures Assessment to include three buildings at Lost Trail NWR. This will include fieldwork and report of findings. | Interior, Department of / U.S. Fish and Wildlife Service | 9/24/2009 |
DEERE & COMPANY | $19,283 | Contract | : CX20 Flex Wing Rotary Cutter | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2009 |
DOYON PROJECT SERVICES LLC | $2,435,101 | Contract | : Relocation of Existing 25kv Transmission Line crossing Coquille River and floodplain - Restoration of 400 acres of tidal marshlands along the Coquille River, near Bandon, Oregon. An existing 25kV line will be relocated from an overhead line to below groun | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
NORTHCON, INC. | $2,273,880 | Contract | : Construct fish passages and screen at Malheur National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
URS GROUP, INC. | $301,497 | Contract | : TAS::14 1610::TAS IRRIGATION IMPROVEMENTS. Conceptul and final designs for the irrigation improvements at Topock Marsh on the Havasu National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 11/12/2009 |
STANLEY CONSULTANTS, INC. | $12,326 | Contract | : RECOVERY: FFS PROJECT R3GW AND R3GG, TAS::14 1610::TAS. A/E SERVICES, PHASE I FOR CHATAUQUA LAKE PERIMETER LEVEE REPAIR, HAVANA, IL AND GILBERT LAKE OUTLET DITCH CLEANOUT, BRUSSELS, IL. | Interior, Department of / U.S. Fish and Wildlife Service | 11/16/2009 |
ALECKSON FABRICATION | $2,550 | Contract | : built 3 woodstoves for FWS Kenai National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 5/12/2009 |
JS MECHANICAL, INC. | $6,828 | Contract | : replace HVAC in lab building Nevada Fish Health in Anderson ,CA | Interior, Department of / U.S. Fish and Wildlife Service | 8/21/2009 |
PRECAST CONCEPTS, LLC | $38,208 | Contract | : Manufacture and deliver 96 ft 8' x 8' precast concrete box culvert | Interior, Department of / U.S. Fish and Wildlife Service | 9/08/2009 |
COMPUTER CITE | $113,173 | Contract | : Temporary Hire-Contract Specialist | Interior, Department of / U.S. Fish and Wildlife Service | 2/11/2010 |
WARREN, COUNTY OF | $50,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This project entails the replacement of four existing stream culverts and the retrofitting of two existing stream culverts to eliminate barriers to fish migration. Four culverts are located in the Town of Hague, NY, and the oterer two are in the Townm of L... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/19/2009 |
HURRICANE FENCE CO. | $113,760 | Contract | : Multiple gate replacements at Patuxent River Research Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
HARDRIVES CONSTRUCTION INC | $73,206 | Contract | : Remove existing Transite siding and replace with historically compatible siding. | Interior, Department of / U.S. Fish and Wildlife Service | 3/12/2010 |
RODNEY BELL ENTERPRISES, LLC | $25,206 | Contract | : Bridge reapir/Maintenance | Interior, Department of / U.S. Fish and Wildlife Service | 12/02/2009 |
FISHAMERICA FOUNDATION | $97,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To provide the necessary personnel, materials, services, facilities, funds, and otherwise perform all things necessary for or incidental to the performance of the construction of piers and approaches for the Wiley Drive Upstreamam Low Water Bridge Replacem... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/19/2009 |
TALL TIMBERS RESEARCH, INC. | $200,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Habitat restoration projects will be supported on the biologically rich lands in the Red Hills region of Florida and Georgia. Restoration projects will focus on restoration of longleaf pine habitat and conservation of federally y listed species such as Red... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 10/21/2009 |
A C S FENCING, INC | $117,552 | Contract | : remove/replace v mesh fence | Interior, Department of / U.S. Fish and Wildlife Service | 12/09/2009 |
PRAIRIE ENTHUSIASTS, INC., THE | $25,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Wildlife habitat restoration. Primarily clearing of trees and brush. | Interior, Department of / U.S. Fish and Wildlife Service | 1/08/2010 |
REDOUBT INDUSTRIES INC | $294,866 | Contract | : Innoko Snow House Renovation: Site Visit and Base Bid of $20,672.85 consists of contractor and engineer traveling to McGrath to verify the scope of work and performing a site reconnaissance and to prepare a work plan and cost proposal for Line Item 0002 | Interior, Department of / U.S. Fish and Wildlife Service | 1/11/2010 |
HOLM, BERKLEE | $88,700 | Contract | : Install new pavement and gravel on existing dirt trail near Stafford, KS | Interior, Department of / U.S. Fish and Wildlife Service | 2/03/2010 |
PURLIN CONSTRUCTION & MANAGEMENT, INC. | $178,500 | Contract | : Rehabilitate Foot Trail (Phase II) at the Bombay Hook National Wildlife Refuge, Smyrna, Delaware | Interior, Department of / U.S. Fish and Wildlife Service | 2/22/2010 |
BLUESCOPE CONSTRUCTION, INC. | $586,350 | Contract | : Construct Two Family Homes | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
BEAMES, BILL | $61,312 | Contract | : Tishomingo NWR Road and Parking | Interior, Department of / U.S. Fish and Wildlife Service | 12/31/2009 |
COOPER ZIETZ ENGINEERS, INC | $264,899 | Contract | : Provide Construction Management services for construction of administrative offices and visitor center for Los Banos National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
INDUSTRIAL ROOFING CO. | $149,827 | Contract | : Replace Roof and Construction of New Roofing Canopies | Interior, Department of / U.S. Fish and Wildlife Service | 1/04/2010 |
HABITAT RESTORATION RESOURCES, INC. | $100,000 | Contract | : Reduce pine density on 855 acres of Florida Scrub Jay habitat on Merritt Island NWR. Contractor will cut pines using chainsaws throughout the project area. Pine density will be reduced to 2-4 trees per acre. This project is within the Scrub Jay Reserve Un | Interior, Department of / U.S. Fish and Wildlife Service | 3/11/2010 |
RESOURCE-TRAC, INC | $8,697 | Contract | : Contract Specialist Services | Interior, Department of / U.S. Fish and Wildlife Service | 2/04/2010 |
COMBINED EFFORT, INC. | $175,418 | Contract | : Remove and replace steel walkways with aluminum walkways at Eagle Creek Hatchery. | Interior, Department of / U.S. Fish and Wildlife Service | 12/01/2009 |
PAUL'S ELECTRIC, INC. | $7,179 | Contract | : Materials and labor to complete the following work: MAIN SHOP: Remove 4 existing metal halide fixtures and install 4 6-lamp high-bay T-8 flxtures. Move existing fixtures that are still working to other parts of shop to replace non-working ones. FIRE CA | Interior, Department of / U.S. Fish and Wildlife Service | 12/15/2009 |
LANPACIFIC, INC. | $431,700 | Contract | : Services Provided: Screen chamber remediation, piping and design including wall reconstruction. | Interior, Department of / U.S. Fish and Wildlife Service | 12/16/2009 |
STANLEY CONSULTANTS, INC. | $53,149 | Contract | : TAS::14 1610::TAS, FFS PROJECT R3GW. A/E SERVICES. HENNEPIN PHASE II AND PHASE III, GILBERT LAKE OUTLET DITCH CLEANOUT PROJECT LOCATED AT THE TWO RIVERS NWR, BRUSSELS, IL. | Interior, Department of / U.S. Fish and Wildlife Service | 3/10/2010 |
DUCKS UNLIMITED, INC. | $448,147 | Contract | : Restoration and enhancement work on Theodore Roosevelt NWR | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
CHEROKEE GENERAL CORPORATION | $60,600 | Contract | : ARRA Reroof low slope of hatchery building at Makah, Neah Bay, Wa. Remove and Dispose of Old Roof at Low Slope Section of Hatchery Building. Install New Roof at Low Slope Section of Hatchery Building | Interior, Department of / U.S. Fish and Wildlife Service | 3/24/2010 |
PALMER, PAUL | $149,000 | Contract | : clear mesquite trees from 2000 acres on federal land | Interior, Department of / U.S. Fish and Wildlife Service | 2/25/2010 |
RIDGWAY VALLEY ENTERPRISES, INC. | $326,242 | Contract | : Rehab/Retrofit office heating and Photovoltaic, San Luis Valley National Wildlife Refuge, Alamosa, Baca, and Monte vista | Interior, Department of / U.S. Fish and Wildlife Service | 2/12/2010 |
MCMILLEN, LLC | $72,772 | Contract | : ARRA - CONSTRUCTION MANAGEMENT OF THE WATER RECIRC PROJECT AT KOOSKIA NFH, KOOSKIA, IDAHO | Interior, Department of / U.S. Fish and Wildlife Service | 3/17/2010 |
NOMAD CONSTRUCTION, INC. | $1,125,653 | Contract | : Project consists of construction of buildings over Raceways at Pendills Creek NFH and Jordan NFH. | Interior, Department of / U.S. Fish and Wildlife Service | 1/28/2010 |
3-J VENTURES, LLC | $28,850 | Contract | : 1.)Rehabilitate Lighting Fixtures in the Hatchery Building. 2.) Remove and Replace Door Frames and Doors in the Hatchery Building. 3.) Rehabilitate Lighting Fixtures in the Maintenance Building. | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
BLUESCOPE CONSTRUCTION, INC. | $62,630 | Contract | : Electrical Upgrade at Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 3/23/2010 |
HERRERA CONSTRUCTION COMPANY, THE | $198,737 | Contract | : Install 10KW Solar System at Warm Springs National Fish Hatchery, Warm Springs, GA. | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
NORTHLAND GENERAL LLC. | $37,604 | Contract | : Remove and replace approx. 10 miles of fence | Interior, Department of / U.S. Fish and Wildlife Service | 3/28/2010 |
K-CON, INC. | $2,925,148 | Contract | : Construction of (3) Visitor Contact Stations (Bald Knob NWR, Big Lake NWR and Wapanocca NWR) and construction of (1) Shop Building at Big Lake NWR, Arkansas. | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
BURTON CONSTRUCTION, INC. | $1,007,771 | Contract | : Rehabilitate Water Pumps and Motors at Warm Springs NFH. Replace existing Motor Starters with Variable Frequency Drives. Replacement of the main service switchboard (in place) adn switchoard B&C. Replacement of the generator paralleling/synchronizing g | Interior, Department of / U.S. Fish and Wildlife Service | 3/23/2010 |
CATERPILLAR INC. | $18,536 | Contract | : Purchase of Caterpillar Work Tools: 1 x 84 grapple (attachment for Caterpillar compact track loaders); 1 x backhoe, BH160 w/auxiliary (attachment for Caterpillar loaders); 1 x backhoe mounting for Caterpillar loaders; and Auger w/bits for Caterpillar loa | Interior, Department of / U.S. Fish and Wildlife Service | 3/09/2010 |
BARLOVENTO, L.L.C. | $677,553 | Contract | : Design/Build of New Merritt Island Office Building | Interior, Department of / U.S. Fish and Wildlife Service | 3/16/2010 |
FIREGUARD, INC. | $164,404 | Contract | : Replacement of existing Halon Fire Suppression System with a new Sapphire (NOVEC 1230) Fire Suppression System. | Interior, Department of / U.S. Fish and Wildlife Service | 3/12/2010 |
PENINSULA OPEN SPACE TRUST | $55,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Peninsula Open Space Trust Cloverdale Coastal Ranches Habitat Restoration Projects | Interior, Department of / U.S. Fish and Wildlife Service | 7/30/2009 |
AIRBORNE VETERANS SERVICES, INC. | $22,700 | Contract | : INSTALL COOLING COIL IN EXISTING VENTILATION SYSTEM | Interior, Department of / U.S. Fish and Wildlife Service | 3/08/2010 |
LDKC, INC. | $765,513 | Contract | : New Building in Deep Fork NWR | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
AIRBORNE VETERANS SERVICES, INC. | $13,719 | Contract | : rEPLACE dOORS AT THE mORA fISH hATCHERY | Interior, Department of / U.S. Fish and Wildlife Service | 1/11/2010 |
CIMETRIC ENGINEERING AND CONTRACTOR SERVICES, CORP. | $113,400 | Contract | : Restoration for existing trails (Long Trail, Mariposa Trail and Aves Trail) and provide/install signage and benches for trails. | Interior, Department of / U.S. Fish and Wildlife Service | 3/05/2010 |
SENECA CONSTRUCTION MANAGEMENT, LLC | $174,666 | Contract | : Replace exitting HVAC system with a new water-source heat pump HVAC system. Modify exiditng electrical power distribution by supplying and installing new electrical equipment associated the the HVAC repalcement. Replace light fixtures, light bulbs and s | Interior, Department of / U.S. Fish and Wildlife Service | 2/18/2010 |
T.G. NICKEL & ASSOCIATES, LLC | $7,921,917 | Contract | : U.S. Fish and Wildlife visitor center in Shirley, NY | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
AIA ENGINEERS, LTD. | $62,040 | Contract | : Professional construction inspection for Laguna Bahia Grande Bridges. | Interior, Department of / U.S. Fish and Wildlife Service | 2/23/2010 |
WN HOLDINGS, LLC | $548,039 | Contract | : Design, fabricate and install exhibits for USFW Upper MS Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 3/25/2010 |
ALSTEAD,TOWN OF | $242,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Instream and riparian restoration of 900 linear feet of Warren Brook between Route 123 and Griffin Hill Road, Alstead, New Hampshire. The project will restore the natural channel morphologies and processes in the reach, which wiwill allow Warren Brook to d... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 3/08/2010 |
AMERICAN CONTRACTING, LLC | $472,581 | Contract | : Install new shelter cover over raceways. | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
PATRICK ALBIN CARLSON JOINT VENTURE, LLC | $379,000 | Contract | : Chautauqua Lake Perimeter Levee Repair including mobilization and demobilization, Site work and control of water, Quiver Creek Culvert Replacement, North Levee Scour Protection, Tree Removal and Levee improvements on both the north and south levees. The w | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
TETRA TECH, INC. | $52,800 | Contract | : Comprehensive Energy & Water Evaluation Study - U.S. Fish and Wildlife Service, Region One. This study includes evaluations for multiple complexes within the states of Oregon, Washington, Idaho, and the Pacific Islands. | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
BIG MOUNTAIN GLASS & WINDOWS, LLC | $42,000 | Contract | : Replace old windows with new at the Creston Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 2/17/2010 |
EDL CONSTRUCTION, INC. | $133,015 | Contract | : REMOVE EXISTING TRAILER AND DELIVER PRE ENGINEERED METAL BUILDING. NEW BUILDING TO INCLUDE HVAC SYSTEM AND UTILITY HOOK UPS TO INCLUDE ELECTRICAL, WATER AND WASTE. | Interior, Department of / U.S. Fish and Wildlife Service | 12/01/2009 |
FIRE AND SECURITY, INC. | $585,797 | Contract | : Fsi will provide all materials, labor,equipment and services to replace/repair roof, roof decking, fascia, insulation, windows, doors, siding, flooring, sheetrock, electrical, plumber, lighting, HVAC systems, water heater, and interior painting to thenoff | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
OTIS BAY, INC. | $157,000 | Contract | : McDermitt Creek Fish Barrier OBEC is building a concrete fish barrier to prevent migration of non-native fish into the habitat of endemic Lahontan cutthroat trout. Should this evasion occur, the two fish species would hybridize and the native fish would | Interior, Department of / U.S. Fish and Wildlife Service | 3/08/2010 |
C3 LIMITED LIABILITY COMPANY | $3,214,590 | Contract | : CONSTRUCT CANAL INLET AND FIRE BREAK AT TOPOCK HAVASU NATIONAL WILDLIFE REFUGE. | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
FOREST SERVICE | $65,697 | Contract | : Direct a crew of SCA interns in completion of cultural resource surveys of up to 12000 acres of the Buenos Aires National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 12/14/2009 |
L AND I FENCE CONSTRUCTION, INC. | $184,750 | Contract | : Refuge Fence Construction | Interior, Department of / U.S. Fish and Wildlife Service | 8/04/2009 |
PREMIER WEST CONTRACTORS, INC. | $328,818 | Contract | : Installation of Solar Panels at Sonny Bono and Hopper Mountain | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
PANGEA INC | $2,168,946 | Contract | : Effluent Treatment System project, Jordan River National Fish Hatchery, Elmira, MI | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
PUBLIC ARCHAEOLOGY LABORATORY, INCORPORATED, THE | $69,067 | Contract | : Archaeological Services | Interior, Department of / U.S. Fish and Wildlife Service | 6/11/2009 |
A&P DEVELOPMENT & CONSTRUCTION, INC. | $233,899 | Contract | : Survey Boundry and fencing | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
GUTIERREZ PACHECO, JOSE W | $133,900 | Contract | : Shadehouses construction | Interior, Department of / U.S. Fish and Wildlife Service | 3/08/2010 |
DEERFIELD CORPORATION | $578,563 | Contract | : Construct Irrigation System Center located at Las Vegas National Wildlife Refuge, Las Vegas, New Mexico | Interior, Department of / U.S. Fish and Wildlife Service | 3/08/2010 |
STANLEY CONSULTANTS, INC. | $67,354 | Contract | : TAS::14 1610::TAS, FFS PROJECT R3GG. A/E SERVICES, PHASE II AND PHASE III, CHAUTAUQUA LAKE PERIMETER LEVEE REPAIR PROJECT, CHAUTAUQUA NATIONAL WILDLIFE REFUGE, HAVANA, IL. | Interior, Department of / U.S. Fish and Wildlife Service | 2/11/2010 |
DUCKS UNLIMITED, INC. | $247,153 | Contract | : NORTH CAROLINA MACKAY ISLAND NWR | Interior, Department of / U.S. Fish and Wildlife Service | 1/14/2010 |
GLENN HOWARD | $76,874 | Contract | : To Supply, Deliver, and Place Gravel (road rehab) at Lower Klamath National Wildlife Refuge, California | Interior, Department of / U.S. Fish and Wildlife Service | 7/27/2009 |
CREW CONSTRUCTION LLC | $55,051 | Contract | : Supply and install pond liners, Dexter NFH&TC Ponds C5 & C6 Rehab | Interior, Department of / U.S. Fish and Wildlife Service | 3/12/2010 |
LAWSON RIDGE INC | $10,450 | Contract | : boimass reduction. Post logging. Savanna Restoration | Interior, Department of / U.S. Fish and Wildlife Service | 9/02/2010 |
EASTHAMPTON, CITY OF | $909,998 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Provide fish passage on the Manhan River for spawning Atlantic salmon, Blueback herring and other fish by constructing fish ladder. Project provides access to 11 miles of river. | Interior, Department of / U.S. Fish and Wildlife Service | 2/03/2010 |
GRUBB, RICHARD & ASSOCIATES INC | $111,663 | Contract | : Phase I Archaeological Identification Surveys for Areas 3 and 4 and Supplemental Area 3 in the Patuxent Research Refuge. The purpose of the Phase I archaeological identification survey is to determine if any archaeological sites lie within the project sit | Interior, Department of / U.S. Fish and Wildlife Service | 1/06/2010 |
AHTNA ENGINEERING SERVICES, LLC | $21,300 | Contract | : Remove asbestos, lead-based paint and fluorescent lights prior to demolition and replacement of seismically unsafe maintenance shop at the Sacramento NWR, Willows, CA. | Interior, Department of / U.S. Fish and Wildlife Service | 2/18/2010 |
BRIX CORPORATION | $440,695 | Contract | : South Boundary Dike Report at the Cedar Pointe National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
BODELL CONSTRUCTION COMPANY INC | $5,079,867 | Contract | : The project award includes the construction of the Headquarters / Visitor Center (7500 SF), Environmental Education Shelter (960 SF), Landscaping, PV panels and two supporting structures, and land clearing (50 FT perimeter around landscaped areas) for the | Interior, Department of / U.S. Fish and Wildlife Service | 3/19/2010 |
ASTENIUS, BENNETT | $76,950 | Contract | : Bobwhite quayle revegatation | Interior, Department of / U.S. Fish and Wildlife Service | 12/15/2009 |
CONCO CONCRETE SPECIALISTS, L.L.C. | $213,600 | Contract | : Pipeline replacement and paving | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
EXPRESS SERVICES, INC. | $131,000 | Contract | : professional services; Administrative Assistant responsible for working with grants. | Interior, Department of / U.S. Fish and Wildlife Service | 12/16/2009 |
NORTH STATE ENVIRONMENTAL, INC. | $523,440 | Contract | : Sub Recipient will prepare a design for the project. This will include site assessment, reach analysis, reference reach identification and analysis, establishment of survey control, survey data collection, hydro data collection, data development, data ana | Interior, Department of / U.S. Fish and Wildlife Service | 11/03/2009 |
SPAEDER, WM. T. CO., INC. | $1,216,837 | Contract | : Furnish all labor, materials, and equipment to construct Aeration (Degasser) Building at the Allegheny National Fish Hatchery, Warren, PA | Interior, Department of / U.S. Fish and Wildlife Service | 3/12/2010 |
HAROLD COFFEY CONSTRUCTION CO., INC. | $22,778 | Contract | : Rock sales | Interior, Department of / U.S. Fish and Wildlife Service | 10/01/2009 |
PROGRESSIVE CONSULTING ENGINEERS INC | $140,439 | Contract | : Contractor shall provide all tools, equipment, materials, labor, supervision and Transportation for Phase 111. FWS Region 3, requires A-E services for the final design of improvements to existing dikes, ditches and roadways within the Agassiz National Wi | Interior, Department of / U.S. Fish and Wildlife Service | 1/29/2010 |
SUN SPOT SOLAR, LLC | $204,130 | Contract | : Provide all equipment, labor, and material to install a grid tied photovoltaic system and a wind turbine system. | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
DUCKS UNLIMITED, INC. | $781,881 | Contract | : SOUTH CAROLINA SANTEE NWR-BLUFF UNIT, CUDDO UNIT, AND CUDDO UNIT TIMBER ISLAND FIELDS | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
SANSONE COMPANY, INC. | $228,673 | Contract | : Design-build/renovate construction of various water pump stations | Interior, Department of / U.S. Fish and Wildlife Service | 3/23/2010 |
STANLEY CONSULTANTS, INC. | $59,545 | Contract | : TAS::14 1613::TAS, FFS PROJECT R3BC. A/E SERVICES, PHASE II AND PHASE II, EROSION REPOAIR, GUTTENBURG MOIST SOIL UNIT DIKES, UPPER MISSISSIPPI RIVER MCGREGOR DISTRICT, MCGREGOR, IA. | Interior, Department of / U.S. Fish and Wildlife Service | 1/30/2010 |
FIVE RIVERS CONSTRUCTION, INC. | $242,406 | Contract | : Design build HVAC Upgrade at Oregon Coast NWR in Newport OR | Interior, Department of / U.S. Fish and Wildlife Service | 3/22/2010 |
L & J CONSTRUCTION INC | $210,000 | Contract | : East Boundary Fencing Demo & Rebuild: construction and installation of approximately 12.5 miles of fence, install 11 gates, 3 cattle guards and 7 L-Shaped walkthrough areas, and removing approximately 6.60 miles of existing fencing at Pahranagat National | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
NOGUERA, JORGE J. | $109,450 | Contract | : Remove and replace the boundary fence at Laguna Cartagena NWR | Interior, Department of / U.S. Fish and Wildlife Service | 2/18/2010 |
STV GROUP, INC. | $345,698 | Contract | : 100% completed the Install Sevilleta Boundry fence. Final inspection and payment have been completed. | Interior, Department of / U.S. Fish and Wildlife Service | 11/27/2009 |
ROCKY MOUNTAIN FENCE COMPANY, LLC | $113,804 | Contract | : Rehab Hackley Fence Tract 1.01 WORK UNDER THIS CONTRACT A. This project includes providing all labor, equipment, and materials to rehabilitate refuge fences in accordance with attached specifications, drawings, and bid schedule. 1. Project includes remov | Interior, Department of / U.S. Fish and Wildlife Service | 1/22/2010 |
PHEASANTS FOREVER, INC. | $184,235 | Contract | : Design and construction services to restore approximately 75 acres of upland habitat on the former Forked River Game Farm property in Lacey Township, Ocean County, NJ. | Interior, Department of / U.S. Fish and Wildlife Service | 2/03/2010 |
SPECPRO ENVIRONMENTAL SERVICES LLC | $536,577 | Contract | : Chanel Clearing, Bulkhead Installation, and Dock Repairs. | Interior, Department of / U.S. Fish and Wildlife Service | 1/28/2010 |
TOWN OF FRONT ROYAL | $41,000 | Grant | Fish and Wildlife Coordination Act: Removal of Riverton Dam | Interior, Department of / U.S. Fish and Wildlife Service | 3/08/2010 |
AMIGO LLC | $251,670 | Contract | : Skilak Loop Mechanical Vegitation Treatment - purpose of this project is to mechanically treat(hydro-ax) approximately 123 acres of forested land in the Kenai Wildlife Refuge, to improve habitat conditions for wildlife and increase opportunities for wildl | Interior, Department of / U.S. Fish and Wildlife Service | 1/13/2010 |
GEOTECH ENVIRONMENTAL SERVICES, INC. | $271,445 | Contract | : Water Supply Connection | Interior, Department of / U.S. Fish and Wildlife Service | 3/20/2010 |
KARUK TRIBE | $54,969 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Fish Passage Treatment on tributary to Klamath River- Seiad Creek. | Interior, Department of / U.S. Fish and Wildlife Service | 3/22/2010 |
SK QUALITY CUSTOMS BUILDERS | $335,208 | Contract | : Greenhouse Expansion with Office and Storage Area | Interior, Department of / U.S. Fish and Wildlife Service | 2/09/2010 |
SHUCK DRILLING COMPANY INC | $42,377 | Contract | : Construct new water well and pumping system @ Massie Waterfowl Production Area | Interior, Department of / U.S. Fish and Wildlife Service | 1/29/2010 |
NORTH CENTRAL WILD FIRE LLC | $31,500 | Contract | : Commercial logging service for havardous fuel reduction ay the MN Valley National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
RAY LAVOIE CONSTRUCTION | $50,751 | Contract | : Contractor shall furnish all materials, labor, transportation and equipment necessary to design and construct an accessible sampling deck with ramp off of an existing trail, including rails, foundations, gravel bases, and reconditioning and seeding at Bea | Interior, Department of / U.S. Fish and Wildlife Service | 1/26/2010 |
WEST COAST CONTRACTORS OF NEVADA, INC. | $7,368,625 | Contract | : ENVIRONMENTAL DESIGN (LEED) NC VERSION 2009 RATING SYSTEM, AS SPECIFIED . | Interior, Department of / U.S. Fish and Wildlife Service | 3/25/2010 |
BURTON CONSTRUCTION, INC. | $607,549 | Contract | : Hatchery Building Seismic Safety Upgrades. Upgrades include seismic and acial load improvements, exiting, electtical and fire alarm improvements, energy efficiency improvements for lighting and exterior windows, removal of architectural barriers for ABA | Interior, Department of / U.S. Fish and Wildlife Service | 3/12/2010 |
HARNEY COUNTY GYPSUM, LLC | $62,536 | Contract | : Unit 8 Water Delivery System | Interior, Department of / U.S. Fish and Wildlife Service | 12/18/2009 |
DEVERE CONSTRUCTION COMPANY, INC | $669,000 | Contract | : C-2 and Upper Goose Pen Water Control Structures, Seney National Wildlife Refuge, Seney, MI | Interior, Department of / U.S. Fish and Wildlife Service | 3/23/2010 |
DUCKS UNLIMITED, INC. | $811,750 | Contract | : NORTH CAROLINA MATTAMUSKEET NWR | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
BAKER PROJECT CONSULTING, LLC | $42,585 | Contract | : The U.S. Fish and Wildlife Service, Region 2 work is to provide part-time construction inspection services during construction of a 7,200 sf pre-engineered metal building to be used as a repair shop and storage and a 1,500 sf bunkhouse. | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
SCHROEDER CONSTRUCTION MANAGEMENT INC. | $198,724 | Contract | : Supply and install replacement Window wall panels at Green Lake Fish Hatchery, Ellsworth, ME | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
NOEL-RAND, INCORPORATED | $617,445 | Contract | : Replace propane fired boiler HVAC system with Geothermal HVAC system | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
GLACIER ELECTRIC CONSTRUCTION, INC. | $98,500 | Contract | : Design and install solar powered pumps at Skilak Lake on KNWR. | Interior, Department of / U.S. Fish and Wildlife Service | 4/29/2010 |
CORE ENGINEERED SOLUTIONS, INC. | $41,154 | Contract | : Fuel Storage Tank & Accessories | Interior, Department of / U.S. Fish and Wildlife Service | 11/09/2009 |
BECK-REIT & SONS, LTD. | $385,032 | Contract | : Renovation of Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 5/10/2010 |
HYDRO ELECTRIC LLC | $239,499 | Contract | : Installation of photovoltaics throughout the ANWR Facility. | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
OAK POINT ASSOCIATES | $26,717 | Contract | : Value Engineering Study - Patuxent Research Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
STANTEC CONSULTING SERVICES INC. | $32,500 | Contract | : The Contractor shall provide A/E Design Services Phase IA, IB, and II for the Rehab of Outer island Seawall and Pier Stabilization and Island Improvements at the S.B. McKinney National Wildlife Refuge, Middlesex County, Wesbrook, Connecticut in accordance | Interior, Department of / U.S. Fish and Wildlife Service | 1/29/2010 |
SMITH-ROOT, INC. | $99,999 | Contract | : Design, Fabricate ad Install an new Electro-Anthesia Unit at Lt White Salmon Fish Hatchery. Deliverables include an EA-1000A systems, A refurbished Basket system and interial buidling improvements - Electrical and mechanical to support the new system. | Interior, Department of / U.S. Fish and Wildlife Service | 3/23/2010 |
IOWA NATURAL HERITAGE FOUNDATION | $150,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Wildlife Habitat Restoration for the federally endangered Topeka Shiner | Interior, Department of / U.S. Fish and Wildlife Service | 3/05/2010 |
AQUA CURE LTD | $67,700 | Contract | : 0001 DWS Series Ultraviolet Water Sterlization system Delivery to Mora NM 87732 | Interior, Department of / U.S. Fish and Wildlife Service | 11/17/2009 |
MCMILLEN, LLC | $710,883 | Contract | : Rehabilitate Office/Visitor Center at Quivira NWR KS | Interior, Department of / U.S. Fish and Wildlife Service | 3/25/2010 |
MCMILLEN, LLC | $431,200 | Contract | : There were four major parts to this contracat: 1.) Provide the best alternate technology for reducing energy usage / \improving efficiencies for ambient air-heating of the domestic residences and main office building. 2.)Provide the best alternate technol | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
GENESIS CONTRACTING, INC. | $69,975 | Contract | : Remove two 10,000 gallon water tanks. Install one new 10,000 gallon water tank. | Interior, Department of / U.S. Fish and Wildlife Service | 1/30/2010 |
ALCHEMY CONSTRUCTION | $170,616 | Contract | : All work to be completed for U.S. Fish and Wildlife Service at Humboldt Bay National Wildlife Refuge in Loleta, California. Replace propane fueled HVAC unit (aka boiler) at Visitor Center, and also provide two gas meters; one each at Visitor Center and B | Interior, Department of / U.S. Fish and Wildlife Service | 3/15/2010 |
ROBIN BENNETT | $50,224 | Contract | : water control structures | Interior, Department of / U.S. Fish and Wildlife Service | 10/09/2009 |
BLUE RIDGE RESOURCE CONSERVATION AND DEVELOPMENT COUNCIL | $150,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: 15.656 Recovery Act Funds - Habitat Enhancement, Restoration and Improvement | Interior, Department of / U.S. Fish and Wildlife Service | 10/21/2009 |
SPECPRO ENVIRONMENTAL SERVICES LLC | $1,158,357 | Contract | : Replace multiple water control structures and rehab ponds. | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
BLUESCOPE CONSTRUCTION, INC. | $633,200 | Contract | : Rehab the Second Floor at the Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
S&M AND ASSOCIATES, INC. | $40,471 | Contract | : HVAC Removal Replacement and Engery Retrofit | Interior, Department of / U.S. Fish and Wildlife Service | 4/07/2010 |
EDL CONSTRUCTION, INC. | $211,335 | Contract | : NEW EQUIPMENT STORAGE BUILDING. THE NEW EQUIPMENT STORAGE BLDG WILL BE PRE ENGINEERED METAL BUILDING WITH SERVICES LIMITED TO ELECTRICAL POWER AND LIGHTING. | Interior, Department of / U.S. Fish and Wildlife Service | 7/31/2009 |
NATURE CONSERVANCY, THE | $25,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The project consists of controlling invasive species on native prairie grasslands by removing woody invasive species by cutting or burning, collection of native prairie seed and reseeding old degraded field areas with diverse natative mix to control noxious... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 3/05/2010 |
J G MASTERS INC | $259,418 | Contract | : Contract specialist support for various construction projects and other related procurement actions. | Interior, Department of / U.S. Fish and Wildlife Service | 2/01/2010 |
WN HOLDINGS, LLC | $2,377 | Contract | : Evaluate LED spots to determine suitability for intensity, light color and UV reduction. Deternine which exhibit spots can be eliminated throughout the building and which ones need additional lighting. | Interior, Department of / U.S. Fish and Wildlife Service | 3/04/2010 |
GAME AND FISH, ARIZONA DEPT OF | $139,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The Recipient will use this funding to condnet recovery work for Gila trout, a federally threatened species, on three streams (Frye, Ash, and Marijilda creeks) in the Pinaleno Mountains on the Safford Ranger District of Coronado o National Forest. Funding w... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 3/23/2010 |
FORTRESS HOME IMPROVEMENT | $54,432 | Contract | : Replace Quarters/Garage Shingles | Interior, Department of / U.S. Fish and Wildlife Service | 2/01/2010 |
UNIVERSITY SYSTEM OF NEW HAMPSHIRE | $193,096 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The goal of the Southampton Creek Stream Restoration Project is to restore a section of Southampton Creek in Upper Southampton Township, Bucks County Pennsylvania, to a less degraded and more ecologically dynamic state. This goaoal will be accomplished by ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 3/11/2010 |
SUNWIZE TECHNOLOGIES, INC. | $210,550 | Contract | : Installed solar electric system | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
INNOVATIVE SUPPORT SOLUTIONS | $50,110 | Contract | : Remove approximately 6593 ft. of of existing chain link fence. Construct approximately 4500 ft. of new woven wire wildlife fence. | Interior, Department of / U.S. Fish and Wildlife Service | 2/26/2010 |
CARSON PUMP, LLC | $299,960 | Contract | : Rehabilitation water well pumps #1,2,6,&7 for fish production at the Lahontan National Fish Hatchery, Gardnerville, NV. 89410 | Interior, Department of / U.S. Fish and Wildlife Service | 12/22/2009 |
MCS ENVIRONMENTAL, INC. | $888,059 | Contract | : Construct a four bed room, four bath duplex and separate garage, and repair an existing shop building at Red Rocks Lake NWR. Demolish an existing residence and garage at Lee Metcalf NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 3/23/2010 |
AMEC ENVIRONMENT & INFRASTRUCTURE, INC. | $1,500,000 | Contract | : Rehabilitate infrastructure associated with Patuxent Facilities Modernization program. Rehabilitation of the Nelson Building, Laurel, MD. | Interior, Department of / U.S. Fish and Wildlife Service | 3/19/2010 |
FALCON RIDGE CONSTRUCTION CO. INC. | $97,234 | Contract | : Remove and replace outlet water control structure # 14 at Great Swamp NWR Basking Ridge, NJ | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
DOYLE, DAN R | $55,757 | Contract | : remove and replace 6 miles of boundry fence | Interior, Department of / U.S. Fish and Wildlife Service | 1/28/2010 |
DEVERE CONSTRUCTION COMPANY, INC | $741,000 | Contract | : Ottawa Photo Voltaic System, Oak Harbor, OH | Interior, Department of / U.S. Fish and Wildlife Service | 3/19/2010 |
HOLTVILLE AIR CONDITIONING INC | $44,373 | Contract | : Replace (7) dated HVAC systems with new energy efficient HVAC systems and repair ducting. | Interior, Department of / U.S. Fish and Wildlife Service | 2/11/2010 |
TEPA EC | $34,236 | Contract | : Modification #1 applies to Quarters #1 located at Crescent Lake National Wildlife Refuge, Nebraska. The work includes removal and disposal of windows, interior & exterior window trim, doors and interior & exterior door trim. Install new windows and door | Interior, Department of / U.S. Fish and Wildlife Service | 6/18/2010 |
PUBLIC ARCHAEOLOGY LABORATORY, INCORPORATED, THE | $16,881 | Contract | : Archaeological Survey of Waterline | Interior, Department of / U.S. Fish and Wildlife Service | 11/23/2009 |
ALERT INC | $53,975 | Contract | : Replace windows and doors at the Willow Beach National Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 2/04/2010 |
NATURE CONSERVANCY, THE | $25,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The preserve represents some of the best remaining native prairie habitat in northwest Minnesota. Areas of the preserve have become overgrown with woody vegetation. For the integrity of the prairie ecosystem, the invasive woodydy vegetation needs to be re... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 3/05/2010 |
AIRBORNE VETERANS SERVICES, INC. | $27,853 | Contract | : WINDOW AND DOOR REPLACEMENT AT TISHOMINGO FISH HATCHERY | Interior, Department of / U.S. Fish and Wildlife Service | 1/19/2010 |
1-A CONSTRUCTION & FIRE LLP | $50,825 | Contract | : McCormack Irrigation Line | Interior, Department of / U.S. Fish and Wildlife Service | 3/05/2010 |
BRYACO INC | $397,749 | Contract | : Laguna Altascosa Unit 8 Rehab | Interior, Department of / U.S. Fish and Wildlife Service | 12/31/2009 |
AHTNA ENGINEERING SERVICES, LLC | $551,330 | Contract | : Phase I - Replace old Chevak HQ building. Phase II - Design and materials supply of replacement facilities: provide all materials, labor, equipment, and services necessary to design and provide materails, delivered to Bethel, Alaska for a new bunkhouse/ca | Interior, Department of / U.S. Fish and Wildlife Service | 3/11/2010 |
DUCKS UNLIMITED, INC. | $660,000 | Contract | : Wapanocca NWR | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
CONSERVATION CORPS | $40,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Minnesota Conservation Corps received $40,000 through USFWS to remove undesirable woody vegetation in a Hazardous Fuels Reduction project in an oak savannah community on the Minnesota Valley National Wildlife Refuge in Carver, DaDakota, Hennepin, and Scott ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 2/01/2010 |
REILLY CONSTRUCTION, INC | $150,014 | Contract | : Replace HVAC systems at various locations. Perform misc. electrical upgrades. Perform misc. repairs to doors & windows. | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
MONTERAY CONSTRUCTION COMPANY, INC. | $171,247 | Contract | : furnish and install 50 x 100 pole shed, provide 2 concrete bays, electrical, site work, and overhead doors. | Interior, Department of / U.S. Fish and Wildlife Service | 12/08/2009 |
REI SOLUTIONS, INC. | $729,981 | Contract | : Construct a pre-engineered metal maintenance shop building for reelfoot national wildlife refuge nwr | Interior, Department of / U.S. Fish and Wildlife Service | 3/27/2010 |
DIVERSE CONSTRUCTION GROUP, LLC | $42,400 | Contract | : Water Resource upgrades | Interior, Department of / U.S. Fish and Wildlife Service | 1/12/2010 |
MONTERAY CONSTRUCTION COMPANY, INC. | $172,064 | Contract | : Furnish and install 4 bay equipment storage shed | Interior, Department of / U.S. Fish and Wildlife Service | 10/22/2009 |
BLUESCOPE CONSTRUCTION, INC. | $126,063 | Contract | : Demolition of Quarters 147. | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
CAPITOL EXHIBIT SERVICES, INC. | $446,398 | Contract | : Visitor Center Exhibits in new visitor center at Hagerman National Wildlife Refuge, Texas | Interior, Department of / U.S. Fish and Wildlife Service | 11/16/2009 |
LUMUS CONSTRUCTION, INC. | $97,103 | Contract | : Furnish and install solar laminated panels. | Interior, Department of / U.S. Fish and Wildlife Service | 7/28/2009 |
JIM BUER HAULING AND EXCAVATING, INC. | $33,708 | Contract | : Pelican Lake Structure Rehab | Interior, Department of / U.S. Fish and Wildlife Service | 1/26/2010 |
PATRICK ALBIN CARLSON JOINT VENTURE, LLC | $920,932 | Contract | : This project includes providing all materials, equipment, some minor design, and labor required to completely reconstruct four (4) permanent water pumping stations located on the Green River in Browns Park National Wildlife Refuge, Colorado for use in wet | Interior, Department of / U.S. Fish and Wildlife Service | 1/29/2010 |
NORTH STAR PAVING & CONSTRUCTION INC | $148,900 | Contract | : Rainbow Lake Campground Rehab: 1.Design a disabled campground at Ranbow Lake. 2. Rehab campground to provide ADA compliant rout to outhouse including area resurfacing. 3. Paint interior and exterior of 72 square foot concrete outhouse and replace do | Interior, Department of / U.S. Fish and Wildlife Service | 1/10/2010 |
COLOR-AD INC | $450,000 | Contract | : HISTORICAL EXHIBIT DESIGN | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
MID KLAMATH WATERSHED COUNCIL | $35,031 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Klamath Tributary Fish Passage Improvement Project - Agreement # 81333RJ001 Purpose: Manually improve juvenile and adult salmonid fish passage to tributaries of the middle section of the Klamath River. | Interior, Department of / U.S. Fish and Wildlife Service | 3/22/2010 |
BLUESCOPE CONSTRUCTION, INC. | $421,206 | Contract | : Electrical Upgrade at Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 3/23/2010 |
REILLY CONSTRUCTION, INC | $960,111 | Contract | : Cabo Rojo//repair water control structures, remove dikes from salt flats. Laguna Cartagena/ extend dike 150 meters, clear lagoon of debris, extend canal. | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
HABITAT RESTORATION RESOURCES, INC. | $700,000 | Contract | : Restore wetland swales on approximately 1084 acres within Florida Scrub Jay Habitat at Merritt Island National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 3/11/2010 |
CCI GROUP, LLC | $251,246 | Contract | : WINDOW AND DOOR REPLACEMENTS | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
PIEDMONT ENVIRONMENTAL SCIENCES, INC. | $37,000 | Contract | : Water Well Maintenance at Eishenhower National Fish Hatchery, Pittsford, Vermont. Submersible Well Pump Replacement. | Interior, Department of / U.S. Fish and Wildlife Service | 1/26/2010 |
SAFETY STORAGE, INC. | $150,810 | Contract | : HAZARDOUS STORAGE BUILDING AND SITE WORK | Interior, Department of / U.S. Fish and Wildlife Service | 2/19/2010 |
FOUR HORSEMEN INDUSTRIES (FHI) | $97,827 | Contract | : Servilleta NWR Bountry Signs ARR | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
STANTEC CONSULTING SERVICES INC. | $52,700 | Contract | : Building Engineering Services | Interior, Department of / U.S. Fish and Wildlife Service | 1/09/2010 |
CENTENNIAL CONTRACTORS ENTERPRISES, INC. | $1,262,191 | Contract | : Construction of new administration/visitor center and repair work to the the Fish Hatchery facility in Tupelo, Mississippi | Interior, Department of / U.S. Fish and Wildlife Service | 2/18/2010 |
COMBINED EFFORT, INC. | $42,420 | Contract | : Remove and replace boundary fence at the Salinas National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 11/25/2009 |
PERINI MANAGEMENT SERVICES INC | $1,283,830 | Contract | : Design, purchase, and installation of a 120kw photovoltaic system at the maintenance shop. Design, purchase, and installation of a 1.5kw wind system at the maintenance shop. Design, purchase, and installation of a 75kw tecogen or approved equal generato | Interior, Department of / U.S. Fish and Wildlife Service | 4/13/2010 |
PROFESSIONAL SERVICE INDUSTRIES, INC. | $4,390 | Contract | : Geotechnical Investigation and Soils Report: Brezoria NWR - Headquarters Building Site | Interior, Department of / U.S. Fish and Wildlife Service | 2/05/2010 |
NATURE CONSERVANCY, THE | $25,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This project consists of restoring ephermal wetland habitat by re-filling approximately 5.5 miles of existing drainage ditches. This action will restore the wetland hydrology and upland connectivity. | Interior, Department of / U.S. Fish and Wildlife Service | 3/05/2010 |
UNDERWOOD CONSERVATION DISTRICT | $30,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Riparian habitat and water quality and quantity are being restored through plantings and check dams along upper Rattlesnake Creek, Castle Springs area. | Interior, Department of / U.S. Fish and Wildlife Service | 10/01/2009 |
HERRERA CONSTRUCTION COMPANY, THE | $150,119 | Contract | : Rehabilitate Visitor Contact Station Exhibit Building, Welaka Florida | Interior, Department of / U.S. Fish and Wildlife Service | 1/26/2010 |
MEP ASSOCIATES, LLC | $177,949 | Contract | : A/E Services - Mingo NWR and Upper Missisippi NWFR | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
BAKER PROJECT CONSULTING, LLC | $65,688 | Contract | : The U.S. Fish and Wildlife service, Region 2, Division of Engineering needs temporary inspection of building construction at Texas Chenier Plain Office/Visitor Center on Anahuac National Wildlife Refuge near Anahuac, TX. | Interior, Department of / U.S. Fish and Wildlife Service | 3/08/2010 |
MOUCHA, CODY | $82,851 | Contract | : Fence removal and reinstallation along refuge boundary--7.4 miles | Interior, Department of / U.S. Fish and Wildlife Service | 3/16/2010 |
GENERAL PAVING & CONTRACTING INC | $223,153 | Contract | : Demolition of Stickel Laboratory at Patuxent Research Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 3/01/2010 |
LDT, LTD | $33,084 | Contract | : Replace existing interior flourescent light fixtures at National Fish Hatchery in Bethel, Vermont | Interior, Department of / U.S. Fish and Wildlife Service | 2/18/2010 |
DILLON CONSTRUCTION CO | $86,520 | Contract | : Tishomingo NFH&TC Feed Storage Building Rehab | Interior, Department of / U.S. Fish and Wildlife Service | 3/12/2010 |
LVI ENVIRONMENTAL SERVICES INC. | $715,890 | Contract | : LVI was contracted to demolish 45 single family cottages located on an archepelago in Stratford CT. To access the property, a temporary haul road is to be constructed atop beach dunes stretching approx 3/4 mile from the parking lot area of a local beach a | Interior, Department of / U.S. Fish and Wildlife Service | 1/30/2010 |
AIA ENGINEERS, LTD. | $250,250 | Contract | : Professional construction inspection services for the Texas Chenier Plain National Wildlife Refuge Complex. | Interior, Department of / U.S. Fish and Wildlife Service | 2/22/2010 |
CAMPBELL CONSTRUCTION GROUP, LLC | $1,238,820 | Contract | : Rehabilitation of the Lighthouse & Lightkeeper's House on Monomoy Island - Chatham, MA | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
THORNTON, ROBERT L | $126,813 | Contract | : Remodel | Interior, Department of / U.S. Fish and Wildlife Service | 9/17/2009 |
MEP ASSOCIATES, LLC | $59,765 | Contract | : A/E Services Sherburne NWR HVAC Upgrades | Interior, Department of / U.S. Fish and Wildlife Service | 2/18/2010 |
PALMER, PAUL | $19,885 | Contract | : clean out stock ponds on Buenos Aires Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 12/05/2009 |
R & L TRANSPORT COMPANY | $174,360 | Contract | : Expecting to deliver 8,250 tons of gravel. | Interior, Department of / U.S. Fish and Wildlife Service | 2/09/2010 |
DEVERE CONSTRUCTION COMPANY, INC | $645,000 | Contract | : Cedar Point Drainage Ditch Cleanout, Cedar Point National Wildlife Refuge, Oak Harbor, OH | Interior, Department of / U.S. Fish and Wildlife Service | 3/06/2010 |
DBA CONSTRUCTION, INC. | $328,442 | Contract | : The project is located at the Alchesay/Williams Creek Fish Hatchery in Whiteriver, AZ. The labor requirement per the contract requires participation of the local White Mountain Apache Tribe. Therefore, the project is subject to the guidelines as set for | Interior, Department of / U.S. Fish and Wildlife Service | 2/05/2010 |
PRICEWATERHOUSECOOPERS LLP | $199,270 | Contract | : PwC supports the FWS Region 1/8 regional office with program monitoring related to the Recovery Act. Specific tasks include planning activities, and the documentating and testing of internal controls related to financial and acquisition activities in the | Interior, Department of / U.S. Fish and Wildlife Service | 3/09/2010 |
CHEROKEE GENERAL CORPORATION | $89,593 | Contract | : ARRA Rehabilitate valves and water pipeline at Makah National Fish Hatchery, Neah Bay, WA. Replace various valves and perform maintenance on its aging plumbing system. | Interior, Department of / U.S. Fish and Wildlife Service | 3/24/2010 |
WILDLAND SERVICES, INC. | $200,000 | Contract | : Cabbage palm removal service | Interior, Department of / U.S. Fish and Wildlife Service | 9/09/2009 |
NATURE CONSERVANCY, THE | $25,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Manage the Botham tract as dry-mesic and mesic prairie by invasive species removal, brush removal, ands tree removal to benefit grassland birds and several state-threatened species, including red-tailed prairie leafhopper, regal l fritillary butterfly, and ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 2/01/2010 |
TP ENVIRONMENTAL & PIPELINE SERVICES LLC | $104,550 | Contract | : In essence, our duties to the U.S. Fish and Wildlife Service, under contract number 20181RC032, are to re-grade pond, remove vegitation, and install liner. This work will consist of sculpting, if you will, the pond sides and bottom to allow for the proper | Interior, Department of / U.S. Fish and Wildlife Service | 1/29/2010 |
SOMMERVILLE-WILSON, INC. | $90,000 | Contract | : interpretive exhibits | Interior, Department of / U.S. Fish and Wildlife Service | 9/03/2009 |
SUMMIT HELICOPTERS, INC. | $175,000 | Contract | : Aerial Application to restore Wet land Swales at Merritt Island National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 3/17/2010 |
KEY CONSTRUCTION, INC. | $390,154 | Contract | : Replace Rattlesnake Canal diversion structure D at Quivira NWR, KS | Interior, Department of / U.S. Fish and Wildlife Service | 4/14/2010 |
NORTHERN MANAGEMENT SERVICES, INC. | $234,455 | Contract | : The purpose of this project is to install a by-pass system that will allow the hatchery to divert the water supply for the hatchery around the hatchery's sediment settling pond. To accomplish this, the incoming 48 inch water line that supplies water to t | Interior, Department of / U.S. Fish and Wildlife Service | 2/19/2010 |
CONTRACTING AND FACILITIES MANAGEMENT, DIVISION OF | $630,000 | Contract | : Replace West Mission Creek bridge on the National Bison Range National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 6/15/2009 |
CASCADE DESIGN PROFESSIONALS, INC | $36,880 | Contract | : Abernathy Earthen Basin Repair - AE Planning and Design Services | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
PERINI MANAGEMENT SERVICES INC | $74,367 | Contract | : Retro-commissioning services for existing equipment at Salt Pond Visitor Center and the Atlantic Research Lab, Cape Cod, MA | Interior, Department of / U.S. Fish and Wildlife Service | 5/11/2010 |
CIVIL ENGINEERING CONSULTANTS DON DURDEN INC | $45,888 | Contract | : Perform topographic site survey and provide map and data of Paso Corvinas and adjacent highway bordering Refuge boundary at the Bahia Grande on the Laguna Atascosa National Wildlife Refuge near Port Isabel, Texas. | Interior, Department of / U.S. Fish and Wildlife Service | 2/05/2010 |
RMD HOLDINGS, LTD. | $343,322 | Contract | : Construction services for the site development in support of an addition to the Detroit Lakes Wetlands Division HeadQuarters building. | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
PROGRESSIVE CONSTRUCTION COMPANY, INC. | $399,722 | Contract | : Misc Road & Parking Lot Repairs | Interior, Department of / U.S. Fish and Wildlife Service | 3/25/2010 |
RIVERFRONT LIMESTONE | $122,778 | Contract | : Rock sales | Interior, Department of / U.S. Fish and Wildlife Service | 10/01/2009 |
LYONS/ZAREMBA INC. | $450,000 | Contract | : Design, Fabrication and Installation of interpretive exhibits, audio/visual, store design, interior and exterior exhibits at USFW Region 3 Mingo National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
SAFETY STORAGE, INC. | $206,425 | Contract | : HAZARDOUS STORAGE BUILDING AND SITE WORK | Interior, Department of / U.S. Fish and Wildlife Service | 6/25/2009 |
BAKER PROJECT CONSULTING, LLC | $50,144 | Contract | : The U.S. Fish and Wildlife Service, Region 6 requirement is to provide construction inspection services associated with the construction of three modular residences and a modular bunkhouse at Seedskadee NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 3/15/2010 |
PREMIER WEST CONTRACTORS, INC. | $261,448 | Contract | : Photovoltaic installation at Ash Meadows NWR Nevada | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
ASPEN CONSTRUCTION COMPANY | $89,709 | Contract | : Repair unsafe shorline main entrance road, Waubay, SD | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
AHTNA ENGINEERING SERVICES, LLC | $424,124 | Contract | : Provide all labor, materials, equipment and services necessary to complete demolition of existing wood decks and furnish and install six new decks, handrails and stairs, two each on three residences at King Salmon, Alaska; demolition of carpet, pad, resil | Interior, Department of / U.S. Fish and Wildlife Service | 1/11/2010 |
PENNS CONTRACTING INC | $27,650 | Contract | : RECOVERY: Remove asbestos from Beane Cabin then remove cabin. Remove asbestos from Bickford Camp then remove camp. Remove Oulette Cabin. Remove garage Oulette Camp. | Interior, Department of / U.S. Fish and Wildlife Service | 3/25/2010 |
APPLIED ENERGY MANAGEMENT, INC. | $80,884 | Contract | : Field Station Energy Audits for 28 sites (147 buildings) approximately 349,000 sq ft. preliminary analysis to be performed | Interior, Department of / U.S. Fish and Wildlife Service | 1/21/2010 |
TOTAL TEAM CONSTRUCTION SERVICES, INC | $58,016 | Contract | : Relpace sideing and insulation on 2 buildings. | Interior, Department of / U.S. Fish and Wildlife Service | 12/23/2009 |
JACKSON'S HEATING & AIR CONDITIONING COMPANY | $31,405 | Contract | : REPLACE EXISTING HEAT AND COOLING UNIT WITH NEW WATER SOURCE SYSTEM | Interior, Department of / U.S. Fish and Wildlife Service | 2/09/2010 |
HEALTHEON, INC. | $173,380 | Contract | : NUNLEY BUNKHOUSE GREEN ENERGY PROJECT - BON SECOUR NATIONAL WILDLIFE REFUGE | Interior, Department of / U.S. Fish and Wildlife Service | 1/12/2010 |
NATURE CONSERVANCY, THE | $25,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The purpose of this agreement is to complete exotic and invasive species (brush) removal at Pankratz Prairie. This project will rehabilitate prairie components degraded by brush and trees in an effort to increase and maintain bibiodiversity of prairie spec... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 3/05/2010 |
D. G. GRANADE, INC. | $738,731 | Contract | : Demolish/Construct Maintenance Building at the Sacramento NWR located in Willows, California. | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
CATERPILLAR INC. | $113,423 | Contract | : Purchase of 1 x 257B2 and 1 x 277C Caterpillar multi terrain loaders. | Interior, Department of / U.S. Fish and Wildlife Service | 2/18/2010 |
PRECISION RECRUITING, INC | $82,598 | Contract | : Administrative Support and Oversight. Working on administering the current ARRA agreements. I also contact ARRA project officers to retrieve reports for these agreements. | Interior, Department of / U.S. Fish and Wildlife Service | 3/09/2010 |
CCI GROUP, LLC | $98,643 | Contract | : REPLACE EXISTING WATER TREATMENT PLANT GENERATOR | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
WILDERNESS GRAPHICS INC | $818,130 | Contract | : Design, fabrication, and installation of interpretive exhibits for Coastal North Carolina National Wildlife Refuges Gateway Visitor Center | Interior, Department of / U.S. Fish and Wildlife Service | 1/29/2010 |
PRICEWATERHOUSECOOPERS LLP | $317,863 | Contract | : ARRA Program Management Support to include: - Document management - updating / maintaining the sharepoint site and providing user support in updating the system with project information - Risk management - planning and monitoring the regions' work in do | Interior, Department of / U.S. Fish and Wildlife Service | 1/26/2010 |
MONTERAY CONSTRUCTION COMPANY, INC. | $458,529 | Contract | : Remove and replace existing bunkhouse with pre-engineered metal structure, including porch, parking and electrical | Interior, Department of / U.S. Fish and Wildlife Service | 12/15/2009 |
PRICEWATERHOUSECOOPERS LLP | $212,000 | Contract | : PwC was engaged to assist the FWS Region 3 regional office with program monitoring related to the Recovery Act. Specific tasks include planning, documentating and testing of internal controls related to financial and acquisition activities in the region. | Interior, Department of / U.S. Fish and Wildlife Service | 3/09/2010 |
DUCKS UNLIMITED, INC. | $414,921 | Contract | : Ace Basin National Wildlife Refuge, South Carolina Levee and Water Control Structure work. | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
HOMEPRO, INC. | $335,308 | Contract | : Furnish and Install gravel, culverts, and rip rap for completion of road surface. | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
FORMATIONS INC | $13,164 | Contract | : Design and Fabricate Replacement interpretive panels for Leadville National Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 6/10/2010 |
BURGESS & NIPLE, INC | $75,498 | Contract | : Geothermal design for visitor center at Blackwater Refuge in Cambridge, MD | Interior, Department of / U.S. Fish and Wildlife Service | 2/09/2010 |
BURGESS & NIPLE, INC | $316,861 | Contract | : Renovation of Snowden Hall, a historic residence at Patuxent Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 3/15/2010 |
BURGESS & NIPLE, INC | $715,864 | Contract | : Renovation of four facilities at Patuxent Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 3/15/2010 |
BURGESS & NIPLE, INC | $669,543 | Contract | : The project is the renovation of Merriam Hall at Patuxent Refuge from a histroic laboratory facility into an office. | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
MENDEZ WELDING & CONTRACTING, LLC | $75,143 | Contract | : Replace three culverts and stabilize soil with cement. | Interior, Department of / U.S. Fish and Wildlife Service | 4/30/2010 |
JOHN MILNER ASSOCIATES, INC. | $28,500 | Contract | : Historic structure recordation of 12 historic buildings at Patuxent scheduled for demolition. | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
N-POWELL COMPANY, INC. | $51,672 | Contract | : Replace Ceiling Tiles | Interior, Department of / U.S. Fish and Wildlife Service | 3/22/2010 |
BURGESS & NIPLE, INC | $269,718 | Contract | : The project entails site design and survey/stakeout for the construction of 8 residences at Patuxent Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
VOLUNTEER READY MIX LLC | $6,640 | Contract | : 80 yard 3000 psi cocrete | Interior, Department of / U.S. Fish and Wildlife Service | 10/08/2009 |
VOLUNTEER READY MIX LLC | $6,640 | Contract | : 80 yard 3000 psi cocrete | Interior, Department of / U.S. Fish and Wildlife Service | 10/08/2009 |
LHB, INC. | $7,663 | Contract | : A-E Services for Photo Voltaic submittal review and inspection services for Ottawa NWR, Oak Harbor OH Photo Voltaic system project | Interior, Department of / U.S. Fish and Wildlife Service | 4/30/2010 |
SAYBR CONTRACTORS, INC. | $144,835 | Contract | : Replace rood on the hatchery feed storage building - includes change orders for 22,277.00 | Interior, Department of / U.S. Fish and Wildlife Service | 12/07/2009 |
MCS ENVIRONMENTAL, INC. | $937,418 | Contract | : RECOVERY: REPLACE STAFF QUARTERS, ARRA FUNDED FFS PROJECT NUMBER R6BE, TAS::14 1613::TAS. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO CONSTRUCT A WOOD-FRAMED, FOUR BEDROOMS, FOUR BATH DUPLEX, READY FOR OCCUPANCY. WORK SHALL INCLUDE EARTHWORK, | Interior, Department of / U.S. Fish and Wildlife Service | 3/23/2010 |
HAYRE MCELROY & ASSOCIATES LLC | $175,378 | Contract | : Provide inspection services for construction of headquarters and visitors center at Kealia Pond National Wildlife Refuge Complex, Kihei, Hawaii. | Interior, Department of / U.S. Fish and Wildlife Service | 5/17/2010 |
MICROPACT ENGINEERING, INC. | $122,387 | Contract | : Furnish all labor, materials, and equipment for the rehabilitation of the HVAC system at the Eastern Shore of Virginia National Wildlife Refuge, Cape Charles, VA | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
RILEY INDUSTRIAL SERVICES, INC. | $16,491 | Contract | : Mobilize to the Mora Fish Hatchery and perform spot patching and surface preparation to the tank. After that was complete, painting services were performed to the 140,000 Gallon Water Tank. Once project was complete, we demobilized back to our Farmingto | Interior, Department of / U.S. Fish and Wildlife Service | 3/02/2010 |
VENTURO MANUFACTURING, INC. | $40,535 | Contract | : Upfit customer supplied chassis with service body and crane | Interior, Department of / U.S. Fish and Wildlife Service | 6/11/2010 |
VERMEJO PARK, L.L.C. | $35,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: This is a grant to support native fish conservation and restoration in New Mexico. Vermejo Park Ranch and other partners have initiated a multi-year effort to restore, conserve, and manage native Rio Grande cutthroat trout in the upper Vermemejo River wate... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/29/2009 |
C3 LIMITED LIABILITY COMPANY | $732,817 | Contract | : HARRISON CREEK RECLAMATION | Interior, Department of / U.S. Fish and Wildlife Service | 6/22/2010 |
PANGEA INC | $178,279 | Contract | : Gilbert Lake Ditch Cleanout | Interior, Department of / U.S. Fish and Wildlife Service | 5/28/2010 |
C3 LIMITED LIABILITY COMPANY | $291,656 | Contract | : WORLAND SECURITY FENCE AND PARKING LOT | Interior, Department of / U.S. Fish and Wildlife Service | 6/07/2010 |
ULTEIG ENGINEERS, INC. | $63,787 | Contract | : Construction Inspection Services | Interior, Department of / U.S. Fish and Wildlife Service | 4/19/2010 |
MONTERAY CONSTRUCTION COMPANY, INC. | $172,064 | Contract | : furnish and install 4 bay equipment storage shed | Interior, Department of / U.S. Fish and Wildlife Service | 10/22/2009 |
PERINI MANAGEMENT SERVICES INC | $1,357,296 | Contract | : Fire Protection System installation and HVAC System at Fredericksburg/Spotsylvania Military National Park. | Interior, Department of / U.S. Fish and Wildlife Service | 5/11/2010 |
MCS ENVIRONMENTAL, INC. | $257,557 | Contract | : Provide all equipment. Labor and material to install a 5KW grid tied Vertical Axis Wind Turbine serving the Office Building. A 5KW grid tied Vertical Axis Wind Turbine serving the Shop Building and a new geothermal heating system for the Shop Building. | Interior, Department of / U.S. Fish and Wildlife Service | 5/13/2010 |
PERINI MANAGEMENT SERVICES INC | $1,584,346 | Contract | : Rehabilitate historic upper and middle dams and rehabilitate historic stone walls and the Ice Pond Dam at the Vanderbilt Mansion National Historic Site in Hyde Park, New York. | Interior, Department of / U.S. Fish and Wildlife Service | 5/13/2010 |
K-CON, INC. | $74,310 | Contract | : site work which includes clearing, grubbing, earthwork and cast in place concrete slab on grade for the Lower Suwannee National Wildlife Refuge. This contract had a short duration, project is fully complete. | Interior, Department of / U.S. Fish and Wildlife Service | 5/24/2010 |
PERINI MANAGEMENT SERVICES INC | $323,866 | Contract | : Maintenance and conversion of a lighthouse keeper's cottage near Jupiter, Florida. | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
URS GROUP, INC. | $304,106 | Contract | : Removing an existing wooden bridge, installing a new precast concrete box culvert, and resurfacing the existing road with either gravel or asphalt. | Interior, Department of / U.S. Fish and Wildlife Service | 5/24/2010 |
PUBLIC ARCHAEOLOGY LABORATORY, INCORPORATED, THE | $9,930 | Contract | : Large Format Photography of Three Cabins | Interior, Department of / U.S. Fish and Wildlife Service | 4/26/2010 |
PCL CONSTRUCTION SERVICES, INC | $4,823,606 | Contract | : Construction of Fish & Wildlife Complex. Project includes an administration/visitor center, service building, resource room, an underground sanitary tank, and landscaping for a site trail. A parking lot is also being constructed. Number of subcontracts i | Interior, Department of / U.S. Fish and Wildlife Service | 5/26/2010 |
NORTH CENTRAL WILD FIRE LLC | $31,500 | Contract | : Hazardous Fuel Reduction in MN Valley National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 9/25/2009 |
PANGEA INC | $938,153 | Contract | : Repair erosion on Guttenberg Moist Soil Unit Dike and Dike repair and improvements. | Interior, Department of / U.S. Fish and Wildlife Service | 5/14/2010 |
CREW CONSTRUCTION LLC | $59,896 | Contract | : Dexter NFH&TC Ponds 5C & 6C Lining | Interior, Department of / U.S. Fish and Wildlife Service | 6/28/2010 |
DIVERSE CONSTRUCTION GROUP, LLC | $62,000 | Contract | : design, construction of accessible, reinforced concrete trail to replace existing trail | Interior, Department of / U.S. Fish and Wildlife Service | 1/29/2010 |
C & S ENGINEERS, INC. | $7,270 | Contract | : Engineering Services in conjunction with a study of the electrical distribution system at the Two Mile Beach unit, Cape May National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 3/03/2010 |
FIVE RIVERS CONSTRUCTION, INC. | $54,572 | Contract | : Renovate and complete construction of previously started fish crowder project this is Phase 1. | Interior, Department of / U.S. Fish and Wildlife Service | 5/17/2010 |
PARKER TIDE CORP. | $61,904 | Contract | : Provide contract specialist support for various construction projects and other related procurement actions. | Interior, Department of / U.S. Fish and Wildlife Service | 6/10/2010 |
TALL TIMBERS RESEARCH, INC. | $200,000 | Contract | : Habitat restoration projects will be supported on the biologically rich lands in the Red Hills region of Florida and Georgia. Restoration projects will focus on restoration of longleaf pine habitat and conservation of federally listed species such as Red | Interior, Department of / U.S. Fish and Wildlife Service | 10/21/2009 |
C3 LIMITED LIABILITY COMPANY | $123,650 | Contract | : CREEK ROAD REPAIR | Interior, Department of / U.S. Fish and Wildlife Service | 6/28/2010 |
TEPA EC | $52,209 | Contract | : Modification No. 0001 is ARRA Funded. Scope of work includes supply and install (1) 100KW Cummins Natural Gas Backup Generator and install (1) 400A NEMA1, single-phase automatic transfer switch inside the building; install (1) 250 gallon propane tand wit | Interior, Department of / U.S. Fish and Wildlife Service | 5/07/2010 |
DEVERE CONSTRUCTION COMPANY, INC | $332,000 | Contract | : Filtration Building Rehabilitation Project, Pendills Creek Natl. Fish Hatchery, Brimley, MI | Interior, Department of / U.S. Fish and Wildlife Service | 5/26/2010 |
HERMAN MILLER, INC. | $33,163 | Contract | : Office Furniture | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
F&D INTERNATIONAL, LLC | $71,680 | Contract | : Construction inspection services for the construction of the new Deep Fork Wildlife Headquarters located near Okmulgee, OK. | Interior, Department of / U.S. Fish and Wildlife Service | 4/27/2010 |
SACRED POWER, CORPORATION | $139,197 | Contract | : Installa 16.2kW DC Array PV system at the Mora Fish Hatchery at the technical Center 434 mile marker 2, mora nm 87732 | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
BECK-REIT & SONS, LTD. | $234,426 | Contract | : Replace drain and water line at Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 5/10/2010 |
OAK POINT ASSOCIATES | $87,274 | Contract | : A/E Administrative Services - Phase II and Phase III | Interior, Department of / U.S. Fish and Wildlife Service | 4/01/2010 |
C3 LIMITED LIABILITY COMPANY | $487,524 | Contract | : REPLACE BRIDGE CROSSING AT CEBOLLA CREEK. | Interior, Department of / U.S. Fish and Wildlife Service | 6/01/2010 |
RMD HOLDINGS, LTD. | $361,273 | Contract | : Building rehab for energy Upgrades including Roof / Siding / Insulation / Geothermal HVAC / Lighting & Controls | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
STANTEC CONSULTING SERVICES INC. | $32,500 | Contract | : Building engineering services | Interior, Department of / U.S. Fish and Wildlife Service | 1/29/2010 |
AUBURN UNIVERSITY | $80,640 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: The Red Hills salamander, listed as federally threatened in 1976, lives underground in burrows and because of this its basic biology is still very poorly known. This award will derive a burrow occupancy rate for the Red Hills S Salamander at Haines Island... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 4/07/2010 |
JOHNSON CONTROLS INTERIORS L.L.C. | $457,375 | Contract | : Retrofit and upgrades of baseboard heating equipment, controls and air distribution systems at the National Conservation Training Center in Shepherdstown WV. | Interior, Department of / U.S. Fish and Wildlife Service | 6/14/2010 |
BLUESCOPE CONSTRUCTION, INC. | $483,108 | Contract | : 30-Ton Lifting Beam with 10' Spread, 20-Ton Beam with 4'-8 Spread, 15-Ton Beam with 10 Spread, 2-Ton Beam with 4'-8 Spread, 30-Ton Load Readout, 5-Ton Load Readout, Required Repairs | Interior, Department of / U.S. Fish and Wildlife Service | 5/19/2010 |
BURTON CONSTRUCTION, INC. | $53,326 | Contract | : Provide Little Pend Orielle National Wildlife Refuge a series of Tier 1 energy upgrades to several buildings at the Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 6/10/2010 |
EARTH WORKS INSTITUTE | $19,300 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This cooperative agreement is for the purpose of developing and implementing several site specific cooperative partnership projects for the enhancement of wildlife habitat.Project focus on increasing the resilience of habitats ththrough native species plant... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/21/2009 |
NATIONAL SUPPLY & INSTALLATION | $24,210 | Contract | : Furnish and deliver culvert pipe. | Interior, Department of / U.S. Fish and Wildlife Service | 4/22/2010 |
MOON LAKE ELECTRIC ASSOCIATION, INC. | $177,962 | Contract | : New electrical facilities to be installed and existing electrical facilities to be upgraded in the Browns Park National Wildlife Refuge at the Butch Cassidy site and the Grimes Unit. | Interior, Department of / U.S. Fish and Wildlife Service | 12/15/2009 |
URS GROUP, INC. | $240,202 | Contract | : Rebuilding 1.5 miles of Red Gulch Road by; testing the existing soil, engineering an approach to stabilize the top 6 inches of road base, reshaping the road and ditches, mixing the stabilizer into the soil within the travelway and compacting the soil to a | Interior, Department of / U.S. Fish and Wildlife Service | 6/01/2010 |
C & S ENGINEERS, INC. | $109,924 | Contract | : Construction Administration Services for new Aeration (Degasser) Building at the Allegheny NFH | Interior, Department of / U.S. Fish and Wildlife Service | 5/28/2010 |
URS GROUP, INC. | $202,441 | Contract | : Trash removal, installing new barbed wire fencing, panels, corners, gates, hitching rails, highline posts and demo of existing fence. | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
FIVE RIVERS CONSTRUCTION, INC. | $21,587 | Contract | : Supply and install new water meters at Little White Salmon Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 4/01/2010 |
COLOR-AD INC | $450,000 | Contract | : HISTORICAL EXHIBIT DESIGN | Interior, Department of / U.S. Fish and Wildlife Service | 3/20/2010 |
ERICKSON BUILDERS & CO. INC. | $24,951 | Contract | : Installing snow guards, gutters, downspouts, gutter guards, and downspout drains to the maintenance building. | Interior, Department of / U.S. Fish and Wildlife Service | 2/11/2010 |
BARLOVENTO, L.L.C. | $466,746 | Contract | : Pocosin Lake - canal Rehabilitations | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
WYCLIFFE ENTERPRISES, INC. | $415,745 | Contract | : Replacement of restroom fixtures. Completion in 120 days. | Interior, Department of / U.S. Fish and Wildlife Service | 6/03/2010 |
H O C SERVICES INC | $8,600 | Contract | : vessel transportation to Sud Island | Interior, Department of / U.S. Fish and Wildlife Service | 4/27/2010 |
SES CONSTRUCTION AND FUEL SERVICES LLC | $632,409 | Contract | : REHABILITATE ROADE ROUTE 010 AND LEAKING DAM/POND WHITE RIVER NATIONAL WILDLIFE REFUGE, ST. CHARLES, AR. | Interior, Department of / U.S. Fish and Wildlife Service | 5/28/2010 |
AIA ENGINEERS, LTD. | $75,600 | Contract | : Construction inspection services. | Interior, Department of / U.S. Fish and Wildlife Service | 4/27/2010 |
FIVE RIVERS CONSTRUCTION, INC. | $34,821 | Contract | : Insulation renovations andenergy updates at the little White Salmon Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 4/01/2010 |
J D SUNNYISLE INC | $39,974 | Contract | : Fill Dirt for the Merritt Island Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 3/22/2010 |
THE STUDENT CONSERVATION ASSOCIATION INC | $33,394 | Contract | : The award funded services to the Innoko National Wildlife Refuge in McGrath, Alaska, United States from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conserv | Interior, Department of / U.S. Fish and Wildlife Service | 6/01/2010 |
MACTEC ENGINEERING AND CONSULTING, INC. | $556,364 | Contract | : CREATION OF TRAIL AND VIEWING PLATFORM AT THE JUPITER INLET LIGHTHOUSE OUTSTANDING NATURAL AREA NEAR JUPITER, FL. PROJECT IDENTIFICATION NUMBER: LDTDF0330000 | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
CASCADE DESIGN PROFESSIONALS, INC | $16,308 | Contract | : Providing Construction Assistance and Sediment Sampling for the Effluent Pond Rehabilitation at Abernathy Fish Technology Center | Interior, Department of / U.S. Fish and Wildlife Service | 2/26/2010 |
AMEC ENVIRONMENT & INFRASTRUCTURE, INC. | $367,483 | Contract | : Hydroelectric Power Installation and Design-Build of Small Structure- Marsh, Billings, Rockefeller NHP (National Historic Park), Woodstock, VT. | Interior, Department of / U.S. Fish and Wildlife Service | 5/12/2010 |
AMEC E&I, INC | $576,297 | Contract | : Provide design build contract energy and water audit services at 63 National Park Sites. Largest site funding went to Jamaica Bay, NY site (Staten Island) for ARRA (American Recovery and Reinvestment Act) reporting purposes (Zipcode 10305-1224) . | Interior, Department of / U.S. Fish and Wildlife Service | 5/11/2010 |
SHAW ENVIRONMENTAL & INFRASTRUCTURE, INC. | $1,282,500 | Contract | : Design and rehabilitate refuge road, route 113 - Cuddo Unit, Santee National Wildlife Refuge (NWR), Design and rehabilitate refuge road, route 101 - Pine Island Unit, Santee NWR, Design and rehabilitate well at the Holding House, Orangeburg National Fish | Interior, Department of / U.S. Fish and Wildlife Service | 4/29/2010 |
C3 LIMITED LIABILITY COMPANY | $843,056 | Contract | : REMOVE ROCK OUTCROPPINGS | Interior, Department of / U.S. Fish and Wildlife Service | 6/01/2010 |
B&M PHIPPS | $3,234,284 | Contract | : Construction of Visitors Center | Interior, Department of / U.S. Fish and Wildlife Service | 4/21/2010 |
MINORITY ADVANCEMENT IN CORPORATIONS, INC. | $97,041 | Contract | : Provide Acquisition Support | Interior, Department of / U.S. Fish and Wildlife Service | 3/15/2010 |
FIVE RIVERS CONSTRUCTION, INC. | $190,769 | Contract | : Renovations and energy updates to various refuge buildings. | Interior, Department of / U.S. Fish and Wildlife Service | 4/16/2010 |
SUNWIZE TECHNOLOGIES, INC. | $210,550 | Contract | : Design and installation of Photovoltaic electric system. | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
DEERE & COMPANY | $19,283 | Contract | : Purchase of a John Deere CX20 Flex Wing Rotary Cutter. | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2010 |
REI SOLUTIONS, INC. | $340,000 | Contract | : CONSTRUCT A PRE-ENGINEERED METAL EQUPMENT SHED | Interior, Department of / U.S. Fish and Wildlife Service | 5/25/2010 |
DUCKS UNLIMITED, INC. | $203,009 | Contract | : ARRA Project R3BB, Replace Deficient WCS at Swan Lake/Sny Outlet. Amount awarded was $203,000.00 The additional amount recored is interest received because payment was made late. | Interior, Department of / U.S. Fish and Wildlife Service | 5/28/2010 |
C3 LIMITED LIABILITY COMPANY | $299,389 | Contract | : EAST CROSS MOUNTAIN | Interior, Department of / U.S. Fish and Wildlife Service | 6/01/2010 |
RON ANDERSON CONSTRUCTION, INC | $152,111 | Contract | : Replace Deteriorated Pond Kettles | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
JENKS, INC. | $30,649 | Contract | : GSA CATEGORY 56, BUIDLING SUPPLIES 51V HARDWARE SUPERSTORE | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
C3 LIMITED LIABILITY COMPANY | $211,574 | Contract | : CONTINENTAL DIVIDE NATIONAL SCENIC TRAIL. | Interior, Department of / U.S. Fish and Wildlife Service | 6/16/2010 |
C3 LIMITED LIABILITY COMPANY | $327,000 | Contract | : WIDEN AND RESURFACE ROAD, REPLACE OLD CULVERTS AND INSTALL NEW CULVERTS AT FORT MEADE BYWAY NEAR STURGIS, SOUTH DAKOTA. | Interior, Department of / U.S. Fish and Wildlife Service | 6/01/2010 |
COOS-CURRY ELECTRIC COOPERATIVE INC | $85,092 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To provide administrative oversigt for the Bandon Marsh National Wildlife Refuge, Ni-les'tun Unit American Recovery and Reinvestment Act (ARRA) construction project(Project Number 101814RC122) conversion of an existing 25kV Overhrhead Transmission Line to U... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 5/05/2010 |
AMEC E&I, INC | $1,729,229 | Contract | : Rehabilitate existing Geothermal system at Longfellow National Historic site in Cambridge, MA. | Interior, Department of / U.S. Fish and Wildlife Service | 5/13/2010 |
AMEC E&I, INC | $188,297 | Contract | : Resident Engineer/inspection services for construction of the ARRA funded San Diego National Wildlife Refuge Complex Visitor Contact/Administration Headquarters and Service Building. | Interior, Department of / U.S. Fish and Wildlife Service | 6/21/2010 |
DUCKS UNLIMITED, INC. | $415,000 | Contract | : Ace Basin National Wildlife Refuge, South Carolina | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
DBA CONSTRUCTION, INC. | $183,717 | Contract | : The project is located at the Williams Creek Fish Hatchery in Whiteriver, AZ. The labor requirement per the contract requires participation of the local White Mountain Apache Tribe. Therefore, the project is subject to the guidelines as set forth by the | Interior, Department of / U.S. Fish and Wildlife Service | 4/09/2010 |
C3 LIMITED LIABILITY COMPANY | $585,754 | Contract | : KREMLING BUNKHOUSE | Interior, Department of / U.S. Fish and Wildlife Service | 6/22/2010 |
ROCKY MOUNTAIN FENCE COMPANY, LLC | $106,707 | Contract | : Rehab Hackley Fence Tract 1.01 WORK UNDER THIS CONTRACT A. This project includes providing all labor, equipment, and materials to rehabilitate refuge fences in accordance with attached specifications, drawings, and bid schedule. 1. Project includes remov | Interior, Department of / U.S. Fish and Wildlife Service | 1/22/2010 |
C & S ENGINEERS, INC. | $13,200 | Contract | : EN Services for modifications to the Geothermal Heat Pump System at J. Heinz NWR | Interior, Department of / U.S. Fish and Wildlife Service | 2/21/2010 |
KUPU | $46,956 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To provide on-site activities to introduce America's youth to natural resource careers through hands-on work with nature resource professionals employed by the USFWS and to further the development and maintenance of nature resoururces of the United States b... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 4/08/2010 |
JUNIOR COLLEGE DISTRICT OF NEWTON-MC DONALD COUNTIES | $191,182 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Design and installation of solar water heating system for sturgeon building at Neosho National Fish Hatchery. | Interior, Department of / U.S. Fish and Wildlife Service | 4/02/2010 |
CONSERVATION & NATURAL RESOURCES, ALABAMA DEPT OF | $64,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This study will provide an estimate of habitat available to the Federally endangered Tulotoma Snail as well as qualitative estimates of Tulotoma Snail populations and distribution throughout the Alabama River. | Interior, Department of / U.S. Fish and Wildlife Service | 5/03/2010 |
URS GROUP, INC. | $361,142 | Contract | : Construct new water systems at various BLM sites including well construction, abandonment of existing well, relocation of existing photovoltaic system, installation of heat trace, construction of a stainless steel water storage tank. | Interior, Department of / U.S. Fish and Wildlife Service | 6/15/2010 |
LEE CONSTRUCTION AND MAINTENANCE COMPANY | $736,790 | Contract | : The project consisted of the New construction of a 2,800 sq. ft. office building. The building is a Single story, wood framed structure with a 12,000 sq. ft. parking area. The work included, but was not limited to site preparation, earth work, underground | Interior, Department of / U.S. Fish and Wildlife Service | 5/17/2010 |
FALL RIVER ELECTRICAL ASSOCIATES INC | $85,644 | Contract | : Furnish and Install a pre-engineered Turnkey, Photovoltaic System as Specified. | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
JOHN W. EGAN CO, INC. | $71,544 | Contract | : Contract No. 50181RC037 This contract is for the resurfacing of five concrete fish rearing pools with a FRP lining system at the North Attleboro National Fish Hatchery, No. Attleboro, MA | Interior, Department of / U.S. Fish and Wildlife Service | 5/26/2010 |
LOWER MISSISSIPPI RIVER CONSERVATION COMMITTEE | $29,981 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Implement a Fish Passage Project for the restoration of natural water levels in Lake Perry Martin located in Rosedale, MS. | Interior, Department of / U.S. Fish and Wildlife Service | 4/19/2010 |
SAYBR CONTRACTORS, INC. | $55,631 | Contract | : William Finley NWR: Windows, doors, lighting & heating controls Ankeny NWR: doors Baskett Slough NWR: Doors | Interior, Department of / U.S. Fish and Wildlife Service | 6/01/2010 |
HDR ENGINEERING, INC. | $194,020 | Contract | : Manage a subconsultant responsible for providing construction administration for various construction projects at USFWS refuge facilities. | Interior, Department of / U.S. Fish and Wildlife Service | 4/10/2010 |
LINDAL CONSTRUCTION MANAGEMENT, INC. | $71,925 | Contract | : General inspection services for construction of U.S. Fish & Wildlife Service Hagerman Headquarters/Visitor Building at the Hagerman National Wildlife Refuge in Sherman, Texas. | Interior, Department of / U.S. Fish and Wildlife Service | 5/24/2010 |
C3 LIMITED LIABILITY COMPANY | $3,083,114 | Contract | : EAST WEST TWIN CREEK CROSSING REHABILITATION. | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
FIVE RIVERS CONSTRUCTION, INC. | $296,386 | Contract | : Specific work tasks for energy upgrades at various designated facilities. | Interior, Department of / U.S. Fish and Wildlife Service | 6/11/2010 |
BLUESCOPE CONSTRUCTION, INC. | $126,063 | Contract | : Demolition of Quarters 147 Single Family Residences - Laurel MD | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
C & S ENGINEERS, INC. | $11,020 | Contract | : EN Services for the Installation of a Photovoltaic System @ TMBU | Interior, Department of / U.S. Fish and Wildlife Service | 2/21/2010 |
1-A CONSTRUCTION & FIRE LLP | $64,655 | Contract | : USFW Umatilla National Refuge, McCormack Pipeline. Near Irrigon, Oregon. Remove underground line and install new T from pump and then a new line to each circle. Remove electrical line from S circle and install a new electrical line to S circle. | Interior, Department of / U.S. Fish and Wildlife Service | 3/05/2010 |
URS GROUP, INC. | $328,345 | Contract | : Improving 1.4 miles of gravel road and installing a pre-cast concrete box culvert. | Interior, Department of / U.S. Fish and Wildlife Service | 6/01/2010 |
PERINI MANAGEMENT SERVICES INC | $1,182,594 | Contract | : Geothermal System Fort Necessity/Johnstown Flood | Interior, Department of / U.S. Fish and Wildlife Service | 5/12/2010 |
FORMATIONS INC | $56,439 | Contract | : Design Fabrication and Installation Exhibits for the Jackson Hole, and Greater Yellowstone Visitor Center, Wyoming | Interior, Department of / U.S. Fish and Wildlife Service | 6/30/2010 |
BARBATO CONSTRUCTION CO.,INC. | $61,000 | Contract | : Replace Water Delivery System - Rehab Fish Rearing Ponds, North Attleboro National Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 6/25/2010 |
AMEC ENVIRONMENT & INFRASTRUCTURE, INC. | $358,448 | Contract | : Restoration of the Fire Island National Seashore Historic Lighthouse Lens in Captree Island, NY. | Interior, Department of / U.S. Fish and Wildlife Service | 5/12/2010 |
AMEC E&I, INC | $9,350 | Contract | : Energy Audits at Patuxent Research Refuge in Laurel, MD. | Interior, Department of / U.S. Fish and Wildlife Service | 4/20/2010 |
KMK CONSTRUCTION, INC. | $179,500 | Contract | : Rehabilitation of Outer Island Seawall | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
C3 LIMITED LIABILITY COMPANY | $2,771,016 | Contract | : CONSTRUCT INLET CANAL AT TOPOCK MARSH AT HAVASU NWR | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
BLUESCOPE CONSTRUCTION, INC. | $895,503 | Contract | : Design/Build Two Single Family Residences - Laurel MD | Interior, Department of / U.S. Fish and Wildlife Service | 5/26/2010 |
C3 LIMITED LIABILITY COMPANY | $125,081 | Contract | : Assess building and site and make recommendation for stabilization of the building. | Interior, Department of / U.S. Fish and Wildlife Service | 6/09/2010 |
NATURE'S ENHANCEMENT INC | $50,667 | Contract | : Green River Riparian-Cottonwood Restoration - Purchase and Plant Cottonwood Trees | Interior, Department of / U.S. Fish and Wildlife Service | 4/13/2010 |
IMPERIAL CONSTRUCTION, INC. | $2,930,366 | Contract | : Construction of New Headquarters/Admin Facility/Visitor Center at Hagerman National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 5/03/2010 |
PUENTE CONSTRUCTION ENTERPRISES INC. | $141,643 | Contract | : CONSTRUCTION OF NEW METAL 40' X 26' METAL STORAGE BUILDING @ DAHOMEY NWR & REHABILITATION OF HISTORIC OIL SHED @ WHITE RIVER NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
ULTEIG ENGINEERS, INC. | $21,697 | Contract | : Construction Inspection Services | Interior, Department of / U.S. Fish and Wildlife Service | 4/19/2010 |
PERINI MANAGEMENT SERVICES INC | $177,597 | Contract | : Assateague Island National Seashore Fire Suppression System | Interior, Department of / U.S. Fish and Wildlife Service | 5/12/2010 |
LHB, INC. | $3,008 | Contract | : Site Visit for Desoto NWR Missouri Valley IA Visitor Center lighting upgrade project | Interior, Department of / U.S. Fish and Wildlife Service | 3/19/2010 |
CONSERVATION & NATURAL RESOURCES, ALABAMA DEPT OF | $76,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: This study will provide a baseline for routine monitoring of the federally endangered Heavy Pigtoe mussel. The Selma, AL is the only area that this mussel is known to exist. | Interior, Department of / U.S. Fish and Wildlife Service | 5/03/2010 |
JOINT FINANCE OFFICE | $30,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: grant - wildlife extension agreement | Interior, Department of / U.S. Fish and Wildlife Service | 11/27/2009 |
RIESBECK CONTRACTING, INC | $90,097 | Contract | : Work consists of adding (2) two new vestibules to the existing facility. Minor site demolition will be required to facilitate positive drainage from the existing building and construction of the new entry structures. Careful coordination of work is necess | Interior, Department of / U.S. Fish and Wildlife Service | 5/28/2010 |
WASATCH ENVIRONMENTAL, INC. | $62,660 | Contract | : Inspect and Evaluate Irrigation System | Interior, Department of / U.S. Fish and Wildlife Service | 6/17/2010 |
LOWER MISSISSIPPI RIVER CONSERVATION COMMITTEE | $114,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Construct fish passage project through Lower Mississippi River - Island 15 Dikes to restore aquatic habitat for federal trust species and stimulate natural resource-based economic development. | Interior, Department of / U.S. Fish and Wildlife Service | 4/19/2010 |
PUBLIC ARCHAEOLOGY LABORATORY, INCORPORATED, THE | $31,880 | Contract | : Phase I Archaeological Identification Survey | Interior, Department of / U.S. Fish and Wildlife Service | 2/10/2010 |
URS GROUP, INC. | $417,452 | Contract | : Placing aggregate base course, installing vehicle barriers and renovating multiple parking lots. | Interior, Department of / U.S. Fish and Wildlife Service | 6/07/2010 |
ROSCOE STEEL AND CULVERT CO. | $38,800 | Contract | : Water Control Structures, Cokeville National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 5/19/2010 |
BARLOVENTO, L.L.C. | $280,000 | Contract | : Design/Build for Ponds 1 through 12 Drain Replacement, Edenton National Fish Hatchery, Edenton, NC | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
ALCHEMY CONSTRUCTION | $178,002 | Contract | : All work to be completed for U.S. Fish and Wildlife Service at Humboldt Bay National Wildlife Refuge in Loleta, California. Replace propane fueled HVAC unit (aka boiler) at Visitor Center, and also provide two gas meters; one each at Visitor Center and B | Interior, Department of / U.S. Fish and Wildlife Service | 3/15/2010 |
BURTON CONSTRUCTION, INC. | $53,748 | Contract | : Energy Efficiency project for multiple buildings on the Refuge shop site at the Columbia River National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 6/11/2010 |
BARNHART ELECTRIC SERVICE INC | $91,500 | Contract | : Recovery - NCTC Lighting Occupancy Sensors Install automatic lighting controls to minimize the lighting power consumption when spaces are not occupied. | Interior, Department of / U.S. Fish and Wildlife Service | 4/16/2010 |
FULLER CONSTRUCTION COMPANY, INC | $55,816 | Contract | : The work includes but is not limited to providing all material, equipment and labor required to provide the following: a) Removing six (6) existing skylights and replacing the affected roof panels. The new sheet metal panels shall have a factory applied | Interior, Department of / U.S. Fish and Wildlife Service | 4/07/2010 |
JPV INTERNATIONAL MACHINERY, INC. | $15,999 | Contract | : Equipment rental w/operator for vegetation control within the Providence Ponds Project at Morgan Brake NWR | Interior, Department of / U.S. Fish and Wildlife Service | 5/19/2010 |
C3 LIMITED LIABILITY COMPANY | $476,816 | Contract | : ZAPATA FALLS CAMPGROUND | Interior, Department of / U.S. Fish and Wildlife Service | 6/18/2010 |
EAGLE RIVER CONSTRUCTION OF KINSALE, INC. | $90,908 | Contract | : Remodel Laurel Grove House | Interior, Department of / U.S. Fish and Wildlife Service | 10/23/2009 |
KEPLIN-GRACON JV | $5,566,307 | Contract | : Arrowwood NWR Design Build New Headquarters Building. This project includes a new building with visitor contact area, site improvements of sidewalks, parking areas and extending existing utilities. The new building is part of the rebuilding of the Arroww | Interior, Department of / U.S. Fish and Wildlife Service | 4/06/2010 |
SK QUALITY CUSTOMS BUILDERS | $351,916 | Contract | : Construct a Greenhouse 30 X 60 Expansion with an office and storage area attached. Provide fiberglass tanks and pumping system for water circulation. | Interior, Department of / U.S. Fish and Wildlife Service | 2/24/2010 |
DRS VETERAN ENTERPRISES LLC | $126,766 | Contract | : All 210 dormitory toilets for the Fish and Wildlife have been replaced. | Interior, Department of / U.S. Fish and Wildlife Service | 5/18/2010 |
PRO 1 ELECTRIC LLC | $89,369 | Contract | : SOLAR POWER INSTALLATION | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
HUDSON HIGHLANDS CORPORATION | $44,500 | Contract | : Harrison Lake NFH Office Rehab | Interior, Department of / U.S. Fish and Wildlife Service | 5/25/2010 |
SCHLECHT CONSTRUCTION, INC | $142,719 | Contract | : Tier 1 Energy Upgrades at Ridgefield Wildlife Refuge Complex in Ridgefield, WA. | Interior, Department of / U.S. Fish and Wildlife Service | 6/07/2010 |
TETRA TECH, INC. | $52,927 | Contract | : Construction Observation/Inspection of a new pre-engineered metail building shop facility and HVAC replacements a various buildings - Ruby Lake National Wildlife Refuge, U.S. Fish and Wildlife Service. | Interior, Department of / U.S. Fish and Wildlife Service | 3/26/2010 |
MCS ENVIRONMENTAL, INC. | $321,641 | Contract | : Provide all equipment, labor and materials to install a new geothermal heating and cooling system for Quarters 124. New geothermal hydronic heating system for the Fire Cache and 20KW field mounted Photovoltaic System (PV) | Interior, Department of / U.S. Fish and Wildlife Service | 5/13/2010 |
BIG MOUNTAIN GLASS & WINDOWS, LLC | $40,530 | Contract | : REPLACE EXISTING WINDOWS AT CRESTON FISH HATCHERY | Interior, Department of / U.S. Fish and Wildlife Service | 2/17/2010 |
K PODS HEATING & COOLING | $28,764 | Contract | : Geothermal installation | Interior, Department of / U.S. Fish and Wildlife Service | 6/10/2010 |
L. S. BLACK CONSTRUCTORS, INC. | $585,000 | Contract | : Light Fixture Replacement & Upgrade | Interior, Department of / U.S. Fish and Wildlife Service | 5/25/2010 |
USU ARCHEOLOGICAL SERVICES, INC | $28,000 | Contract | : Section 106 cultural resource survey for irrigation project on National Elk Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 4/19/2010 |
EMPIRE PUMP CORPORATION | $128,929 | Contract | : Provide and install water well systems: electric and solar | Interior, Department of / U.S. Fish and Wildlife Service | 12/24/2009 |
INNOVATIVE CONSTRUCTION & DESIGN SOLUTIONS, LLC | $34,375 | Contract | : Flow Meter Operational Issues We understand that the existing well flow meters are not functioning properly. Our service will include a thorough review of the existing installation and troubleshoot the problems with the remaining flow meters. Degasser | Interior, Department of / U.S. Fish and Wildlife Service | 5/20/2010 |
SENS MECHANICAL, INC. | $111,147 | Contract | : Rehabilitation of HVAC system at Prime Hook National Wildlife Refuge in Milton, DE | Interior, Department of / U.S. Fish and Wildlife Service | 6/03/2010 |
NORTHERN MANAGEMENT SERVICES, INC. | $36,550 | Contract | : The purpose of this project is to install Tier I energy upgrade to various buildings at the Tualatin River NWR> The scope of the work includes: installing new entrance doors, windows and insulation to two residence quarters and installing high efficiency | Interior, Department of / U.S. Fish and Wildlife Service | 6/30/2010 |
CADRESOURCES LLC, THE | $25,453 | Contract | : This project is a requirement contractor for Computer Aided Drafting (CAD)service. For the Department of Interior-Fish and Wild Life Division. | Interior, Department of / U.S. Fish and Wildlife Service | 7/06/2010 |
GOVERNMENT SALES INC | $69,797 | Contract | : Grill Station and Kitchen Equipment in Commons area | Interior, Department of / U.S. Fish and Wildlife Service | 5/13/2010 |
PERINI MANAGEMENT SERVICES INC | $494,325 | Contract | : Rehabilitate historic barn at the Frederick Law Olmstead National Historic Site in Brookline, Massachusetts. | Interior, Department of / U.S. Fish and Wildlife Service | 5/12/2010 |
SRS CRISAFULLI, INC. | $44,990 | Contract | : Recovery - Pump and Power Unit | Interior, Department of / U.S. Fish and Wildlife Service | 5/05/2010 |
RMD HOLDINGS, LTD. | $1,444,699 | Contract | : Rehabilitation of wetland maintenance control ditching and access road levees. | Interior, Department of / U.S. Fish and Wildlife Service | 5/26/2010 |
CH2M HILL CONSTRUCTORS, INC. | $536,394 | Contract | : Rehabilitation of various parking lots and associated work at Fort Wainwright | Interior, Department of / U.S. Fish and Wildlife Service | 6/23/2010 |
AMERICAN MAINTENANCE AND ENGINEERING, INC. | $44,380 | Contract | : Millar Ranch Road Drainage Repair | Interior, Department of / U.S. Fish and Wildlife Service | 6/21/2010 |
FAR EAST CONSTRUCTION CORPORATION | $1,169,649 | Contract | : construction of a new environmental building, rehabilitation of the existing saltwater boat ramp at St. Marks National Wildlife Refuge and construction, installation, and/or replacement of a solar engery system and the removal, installation, and/or replac | Interior, Department of / U.S. Fish and Wildlife Service | 6/03/2010 |
INTERMOUNTAIN WIND AND SOLAR, LLC | $430,846 | Contract | : Bear River Photovoltaic System | Interior, Department of / U.S. Fish and Wildlife Service | 4/27/2010 |
MAINE ELECTRIC CO INC | $106,171 | Contract | : Security and alarm upgrade at Green Lake National Fish Hatchery, Ellsworth, Maine. | Interior, Department of / U.S. Fish and Wildlife Service | 6/02/2010 |
LINDAL CONSTRUCTION MANAGEMENT, INC. | $80,103 | Contract | : General inspection services for construction of U.S. Fish & Wildlife Service New Headquarters/Visitor Center at Arrowwood National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 5/29/2010 |
LAUNDERDALE TRUCKING LLC | $164,695 | Contract | : ROCK | Interior, Department of / U.S. Fish and Wildlife Service | 11/09/2009 |
JOHNSON CONTROLS GOVERNMENT SYSTEMS LLC | $69,002 | Contract | : New alarm system for Berkshire Trout Hatchery, New Marlborough, MA and alarm system additions for Richard Cronin National Salmon Station, Sunderland, MA | Interior, Department of / U.S. Fish and Wildlife Service | 5/20/2010 |
REDSTICK INC | $440,000 | Contract | : The job was to remove dirt from a levee and return the flow of water back to its original condition in the okefenokee swamp. | Interior, Department of / U.S. Fish and Wildlife Service | 6/28/2010 |
HARDRIVES CONSTRUCTION, INC. | $211,196 | Contract | : Seismic Rehab Creston National Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 5/27/2010 |
SETH MCCOY'S TRUCKING & EXCAVATING, LLC | $86,000 | Contract | : Replace observation platform on Carson trail | Interior, Department of / U.S. Fish and Wildlife Service | 5/17/2010 |
CATERPILLAR INC. | $204,953 | Contract | : Purchase of 1 x D6K Caterpillar dozer. | Interior, Department of / U.S. Fish and Wildlife Service | 4/20/2010 |
SULLIVAN AND MERRITT CONSTRUCTORS, INC. | $499,183 | Contract | : The work under this project consists of furnishing all labor, equipment, materials and supplies necessary to result in a complete and usable hydropower turbine. Work includes but is not limited to construction of a pre-engineered metal building, furnishi | Interior, Department of / U.S. Fish and Wildlife Service | 5/26/2010 |
HDR ENGINEERING, INC. | $103,492 | Contract | : Residential soil investigations, site layouts, and foundation designs - Innoko National Wildlife Refuge - McGrath, Alaska | Interior, Department of / U.S. Fish and Wildlife Service | 9/14/2009 |
N-POWELL COMPANY, INC. | $197,613 | Contract | : Generator Replacement | Interior, Department of / U.S. Fish and Wildlife Service | 3/29/2010 |
HOMEPRO, INC. | $409,660 | Contract | : Furnish and Install gravel, culverts, and rip rap for completion of road surface. | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
DYNAMIC CONTROL SYSTEMS INC | $70,651 | Contract | : PROVIDE ALL PLANT OPERATIONS, LABOR, EQUIPMENT AND MATERIALS NECESSARY IN CONJUNCTION WITH THE INSTALLATION OF A VFD AND CONTROL MODIFICATIONS TO A GEOTHERMAL HEAT PUMP SYSTEM LOCATED AT JOHN HEINZ IN TINICUM NATIONAL WILDLIFE REFUGE, PHILA PA | Interior, Department of / U.S. Fish and Wildlife Service | 7/06/2010 |
NATURE CONSERVANCY, THE | $37,470 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: A diverse team of natural resource agencies, non-profit organizations, and hydrologic engineers has been assembled to address long-term and short-term restoration needs of the Campbell Valley, located in the Laramie Foothills of f Colorado, to draft a compr... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 5/03/2010 |
ALL STAR FENCE & CONSTRUCTION, LLC | $27,339 | Contract | : Replace Gate 241 Pleasant Plains Road-South Great Swamp-NWR | Interior, Department of / U.S. Fish and Wildlife Service | 3/05/2010 |
HORNE CONSTRUCTION COMPANY INC | $622,520 | Contract | : Construction of a seasonal housing facility located at the Rachel Carson National Wildlife Refuge | Interior, Department of / U.S. Fish and Wildlife Service | 4/23/2010 |
JKM GENERAL CONTRACTORS, LLC | $288,703 | Contract | : INSTALL FOUNDATIONS | Interior, Department of / U.S. Fish and Wildlife Service | 4/28/2010 |
NORTHWOODS STEWARDSHIP CENTER | $60,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: PURPOSE: 1. Promote and stimulate public purposes such as education, job training, development of responsible citizenship, productive community involvement, and furthering the understanding and appreciaiton of natural and culturaral resources through the in... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 6/17/2010 |
S.V. III GENERAL CONTRACTOR, INC. | $7,305 | Contract | : building repair | Interior, Department of / U.S. Fish and Wildlife Service | 6/04/2010 |
ROBIN BENNETT | $48,999 | Contract | : replace 4 water control structures | Interior, Department of / U.S. Fish and Wildlife Service | 9/21/2009 |
COLSTRIP ELECTRIC INC | $642,396 | Contract | : The contract award is for the design and contruction of five photovoltaic power systems at the Sand Lake & Waubay National Wildlife Refuges; totaling 70KW of power. | Interior, Department of / U.S. Fish and Wildlife Service | 5/13/2010 |
NORTHERN MANAGEMENT SERVICES, INC. | $81,859 | Contract | : The purpose of this project is ton construct Tier I energy upgrades to various buildings of the Deer Flat NWR (National Wildlife Refuge). The scope of work includes installing insulation in six buildings, provide and install energy efficient lighting syst | Interior, Department of / U.S. Fish and Wildlife Service | 6/24/2010 |
BLUE DIAMOND BUILDERS | $30,891 | Contract | : The resulting 6 awwards were for asbestos testing, equipment hauling, building demolition, and debris hauling | Interior, Department of / U.S. Fish and Wildlife Service | 3/30/2010 |
ALL ABOUT PEOPLE INC | $60,195 | Contract | : Modification of existing award to extend order end date and increase funding amount. | Interior, Department of / U.S. Fish and Wildlife Service | 4/05/2010 |
NATIONAL COUNCIL FOR SCIENCE AND THE ENVIRONMENT, THE | $67,500 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: to introduce culturally-diverse college students to natural resource careers through internships with the U. S. Fish and Wildlife Service in the Midwest Region (also known as Region 3 ofFWS). | Interior, Department of / U.S. Fish and Wildlife Service | 5/11/2010 |
URS GROUP, INC. | $354,124 | Contract | : Building improvements including roofing, ventilation and insulation. | Interior, Department of / U.S. Fish and Wildlife Service | 6/25/2010 |
C3 LIMITED LIABILITY COMPANY | $3,354,562 | Contract | : ROCKY MOUNTAIN ARSENAL DESIGN / BUILD AUTO TOUR ROUTE | Interior, Department of / U.S. Fish and Wildlife Service | 8/12/2010 |
INTELLIGENT DECISIONS, INC. | $688 | Contract | : TAS, FFS# R4AA, PROJ# 97110122, MONITORS | Interior, Department of / U.S. Fish and Wildlife Service | 8/31/2010 |
BIG MOUNTAIN GLASS & WINDOWS, LLC | $42,000 | Contract | : Replace old windows in Creston Fish Hatchery | Interior, Department of / U.S. Fish and Wildlife Service | 2/17/2010 |
DILLON CONSTRUCTION CO | $86,520 | Contract | : Feed Storage Building Rehab Phase II | Interior, Department of / U.S. Fish and Wildlife Service | 3/12/2010 |
SOUTHERN CUSTOM EXHIBITS OF ALABAMA, INC. | $82,555 | Contract | : Interpretive Planning and Design, Fabrication, Transportation and Installlation of exhibits for Big Lake NWR | Interior, Department of / U.S. Fish and Wildlife Service | 7/30/2010 |
ENGINEERING SCIENCE & CONSTRUCTION L.L.C. | $84,390 | Contract | : This award is for the design of refurbishing of Page Springs Dam at Malheur NWR. This includes design of new automatic control gates, concrete cracking repair and addition of a cutoff wall at the toe of the dam. New rip rap will be added to prevent unde | Interior, Department of / U.S. Fish and Wildlife Service | 8/19/2009 |
SETH MCCOY'S TRUCKING & EXCAVATING, LLC | $88,055 | Contract | : Replace Carson Trail observation platform | Interior, Department of / U.S. Fish and Wildlife Service | 5/17/2010 |
SOUTHERN CUSTOM EXHIBITS OF ALABAMA, INC. | $57,563 | Contract | : Interpretive planning and design, fabrication, transportation and installation of exhibits for Bald Knob NWR. | Interior, Department of / U.S. Fish and Wildlife Service | 7/30/2010 |
NATIONAL BUSINESS FURNITURE, LLC | $40,468 | Contract | : Purchase of assorted furniture to include conference tables, chairs and casegoods to be delivered and installed | Interior, Department of / U.S. Fish and Wildlife Service | 8/19/2010 |
HAWORTH, INC. | $126,648 | Contract | : Furnishings for Headquartesr and Visitor Center at the Kealia Pond NWR in Kihei, HI | Interior, Department of / U.S. Fish and Wildlife Service | 9/15/2010 |
URS GROUP, INC. | $1,202,335 | Contract | : Design and construct solar wildlife water collection system including water well pumps and booster stations, numerous tanks, localized fencing. Over 33 miles of small-diameter (1.5) water line and tanks for multiple systems in various locations. | Interior, Department of / U.S. Fish and Wildlife Service | 7/19/2010 |
URS GROUP, INC. | $2,899,845 | Contract | : Extend utilities to and within the site and to construct an Administrative Facility including an Administrative Building, Crew Quarters, and Storage Building along with miscellaneous site improvements including utilities, trash pad, decks, drives, walks, | Interior, Department of / U.S. Fish and Wildlife Service | 8/02/2010 |
ATA SERVICES INC | $38,207 | Contract | : Award for temporary mechanical/electrical engineer | Interior, Department of / U.S. Fish and Wildlife Service | 3/11/2010 |
C3 LIMITED LIABILITY COMPANY | $291,276 | Contract | : DEMOLITION OF EXISTING STRUCTURE AND REPLACE WITH MODULAR BUILDING AT KING MOUNTAIN. | Interior, Department of / U.S. Fish and Wildlife Service | 8/04/2010 |
A&P DEVELOPMENT & CONSTRUCTION, INC. | $233,899 | Contract | : San Diego Wildlife & Refuge Perimiter Fencing | Interior, Department of / U.S. Fish and Wildlife Service | 12/30/2009 |
DUCKS UNLIMITED, INC. | $55,181 | Contract | : Restoration of Long Beach West, this will involve the removal of invasive species and habitat improvements for State and Federally protected species at the former cottage site. | Interior, Department of / U.S. Fish and Wildlife Service | 8/27/2010 |
C3 LIMITED LIABILITY COMPANY | $945,868 | Contract | : NOME CREEK ADMIN SITE IMPROVEMENTS | Interior, Department of / U.S. Fish and Wildlife Service | 7/15/2010 |
URS GROUP, INC. | $1,915,817 | Contract | : Extend utilities into the new building and construct a Hotshots Fire Facility along with the specified site improvements of landscaping. | Interior, Department of / U.S. Fish and Wildlife Service | 7/22/2010 |
CASCADE DESIGN PROFESSIONALS, INC | $16,494 | Contract | : U.S. Fish and Wildlife Service - Quilcene National Fish Hatchery - Headbox Construction Inspection | Interior, Department of / U.S. Fish and Wildlife Service | 6/15/2009 |
INTELLIGENT DECISIONS, INC. | $688 | Contract | : TAS, FFS# R4AA, PROJ# 97110122, MONITORS | Interior, Department of / U.S. Fish and Wildlife Service | 8/31/2010 |
C3 LIMITED LIABILITY COMPANY | $732,150 | Contract | : Design-Build recreation facilities at the KKTR Veterans Memorical Overlook Recreation Area in Sandoval County, NM | Interior, Department of / U.S. Fish and Wildlife Service | 7/23/2010 |
TEAMSTAFF GOVERNMENT SOLUTIONS, INC. | $65,125 | Contract | : This position reports to the Chief, Construction and Acquisition Division, but works directly with other program managers and regional staff, in order to coordinate and facilitate the conversion of on-site records to an off-site location. | Interior, Department of / U.S. Fish and Wildlife Service | 7/29/2010 |
SANSONE COMPANY, INC. | $31,690 | Contract | : Create more parking at a wildlife refuge | Interior, Department of / U.S. Fish and Wildlife Service | 9/20/2010 |
REILLY CONSTRUCTION, INC | $2,768,689 | Contract | : Construct a Visitor Center at the Mammoth Spring National Fish Hatchery, Mammoth Spring, Arkansas | Interior, Department of / U.S. Fish and Wildlife Service | 9/08/2010 |
YERBA BUENA ENGINEERING & CONSTRUCTION, INC. | $427,600 | Contract | : Project Name: RECOVERY-IRRIGATION SYSTEM REHABILITATION-FFS#Z601/ Contractor Furnish all Labor, materials, and equipment, and services required to abandon and replace two(2) wells (Thornock#1 and Beckwith #1) in the Irrigation system | Interior, Department of / U.S. Fish and Wildlife Service | 9/20/2010 |
FORMATIONS INC | $827,500 | Contract | : Design / Fabricat and Install exhibits at San Luis Visitor Center | Interior, Department of / U.S. Fish and Wildlife Service | 7/16/2009 |
SITESOURCE LLC | $153,406 | Contract | : To Supply New Office Furniture | Interior, Department of / U.S. Fish and Wildlife Service | 8/02/2010 |
NATIONAL BUSINESS FURNITURE, LLC | $43,926 | Contract | : PURCHASE OF ASSORTED TYPES OF FURNITURE TO INCLUDE: ASSORTED CHAIRS,STORAGE, BOOKCASES,AND CASEGOODS TO BE DELIVERED AND INSTALLED BY OUR INSTALLER | Interior, Department of / U.S. Fish and Wildlife Service | 8/13/2010 |
KIMRICK PERFORMANCE GROUP LLC | $15,461 | Contract | : San Marcos NFH&TC McCarty Pump House Rehab | Interior, Department of / U.S. Fish and Wildlife Service | 2/23/2010 |
JOHNSON-MCADAMS FIRM, P.A., THE | $369,277 | Contract | : ARRA Construction Inspection Projects (4) Sites Port John Allen, Dale Hollow, Mammoth Springs, Cape Romain | Interior, Department of / U.S. Fish and Wildlife Service | 8/06/2010 |
LINDAL CONSTRUCTION MANAGEMENT, INC. | $80,103 | Contract | : General inspection services for construction of U.S. Fish & Wildlife Service New Headquarters/Visitor Center at Arrowwood National Wildlife Refuge. | Interior, Department of / U.S. Fish and Wildlife Service | 5/29/2010 |
BABBITT, TIMOTHY | $292,125 | Contract | : Geothermal HVAC modifications | Interior, Department of / U.S. Fish and Wildlife Service | 7/08/2010 |
BLUESCOPE CONSTRUCTION, INC. | $586,350 | Contract | : Design/Build A Single Family Residence - Laurel MD | Interior, Department of / U.S. Fish and Wildlife Service | 5/26/2010 |
TROUT UNLIMITED, INC. | $50,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: Timber Creek Fish Passage and Riparian Restoration Project. This project replaced a road crossing which acted as a fish barrier with a bottomless culvert to allow fish passage while accomodating road use needs. Riparian fencingng was also installed to res... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 5/22/2010 |
AUBURN UNIVERSITY | $20,000 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: To conduct a detailed systematice inventory of the Price's potato-bean, the Georgia rockcress, Pondberry, the Cobblestone Tiger Beetle, adn other federally protected and globally sensitive species on landholdings owned and managaged by the U. S. Army Corp ... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 7/21/2010 |
FACILITY ENGINEERING ASSOCIATES, P.C. | $20,600 | Contract | : This work consists of performing energy audit/evaluations. The purpose is to assist the service in ensuring the effective energy management at the facilities. The work shall include: pre-site analysis, onsite surveys, assessments, evaluations, post site | Interior, Department of / U.S. Fish and Wildlife Service | 7/02/2010 |
TIGHE & BOND, INC. | $44,800 | Contract | : Hazardous Materials Abatement Monitoring at the Long Beach West Barrier Beach, Stratford, CT | Interior, Department of / U.S. Fish and Wildlife Service | 11/02/2009 |
FRANKIE FRIEND & ASSOCIATES, INC. | $157,143 | Contract | : Contract Specialist support services. | Interior, Department of / U.S. Fish and Wildlife Service | 5/12/2010 |
MCS ENVIRONMENTAL, INC. | $212,590 | Contract | : Provide all equipment, labor and mateials to install a 20KW pole mounted PV system for visitor center. | Interior, Department of / U.S. Fish and Wildlife Service | 9/13/2010 |
C3 LIMITED LIABILITY COMPANY | $1,499,301 | Contract | : REPAIR DRAINAGE CULVERTS ON THE NATCHEZ TRACE PARKWAY | Interior, Department of / U.S. Fish and Wildlife Service | 9/07/2010 |
HERMAN MILLER, INC. | $33,163 | Contract | : Office Seating | Interior, Department of / U.S. Fish and Wildlife Service | 3/31/2010 |
NORTHWOODS STEWARDSHIP CENTER | $17,371 | Grant | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement.: PURPOSE: 1. Promote and stimulate public purposes such as education, job training, development of responsible citizenship, productive community involvement, and furthering the understanding and appreciaiton of natural and culturaral resources through the in... Show more | Interior, Department of / U.S. Fish and Wildlife Service | 6/17/2010 |
C3 LIMITED LIABILITY COMPANY | $258,773 | Contract | : CALIFORNIA NATIONAL HISTORIC TRAIL | Interior, Department of / U.S. Fish and Wildlife Service | 8/02/2010 |
PRICEWATERHOUSECOOPERS LLP | $143,210 | Contract | : Reporting is integral to communicating the success of FWS programs funded through the Recovery Act; transparency and accountability must guide these efforts. External Affairs (EA) will achieve increased transparency and accountability by maintaining a use | Interior, Department of / U.S. Fish and Wildlife Service | 9/21/2010 |
GROUPE LACASSE LLC | $37,945 | Contract | : FEDERALLY AWARDED CONTRACT NOT APPLICABLE | Interior, Department of / U.S. Fish and Wildlife Service | 7/27/2010 |
HERMOSA CONSTRUCTION GROUP, LLC | $695,440 | Contract | : Provide material, labor, equipmen and services to replace / repair roof, roof decking, fascia, insulation, windows, doors, siding, flooring, sheetrock, electrical, plumbing, lighting, HVAC Systems, water heater, and interior and exterior painting to the o | Interior, Department of / U.S. Fish and Wildlife Service | 8/09/2010 |
SANSONE COMPANY, INC. | $823,500 | Contract | : Upgrade of National Wildlife Refuge, well removal, building demo, new well and new storage building. | Interior, Department of / U.S. Fish and Wildlife Service | 8/23/2010 |
URS GROUP, INC. | $267,487 | Contract | : Design and construct an existing campground facility at the Rhyolite Recreation Site including modifying existing recreational vehicle (RV) pad, sewage system, potable water system, electrical system and telephone lines to RV pads. | Interior, Department of / U.S. Fish and Wildlife Service | 7/28/2010 |
PROCUREVIS, INC. | $180,208 | Contract | : The purpose of this contract, funded by the Recovery Act, is to provide work for one specialist as a contractor employee. The specialist is required to provide simplified acquisition support services for the Region 5 Division of Contracting & General Serv | Interior, Department of / U.S. Fish and Wildlife Service | 10/01/2010 |
BLUE HERON CONSERVATION DESIGN AND PRINTING LLC | $80,000 | Contract | : Hydrogeomorphic evaluation of ecosystem restoration and management options for Seedskadee National Wildlife Refuge, WY | Interior, Department of / U.S. Fish and Wildlife Service | 8/01/2010 |
PRECISION RECRUITING, INC | $103,000 | Contract | : Provide administrative support to contracting officers and managers who are processing ARRA funded projects. Telephone and written communication with vendors for these projects. Procurement Technician for computer, radio and relocation expenses. Clos | Interior, Department of / U.S. Fish and Wildlife Service | 8/10/2010 |
LINDAL CONSTRUCTION MANAGEMENT, INC. | $71,925 | Contract | : General inspection services for construction of U.S. Fish & Wildlife Service Hagerman Headquarters/Visitor Building at the Hagerman National Wildlife Refuge in Sherman, Texas. | Interior, Department of / U.S. Fish and Wildlife Service | 5/24/2010 |