Listing all stimulus spending by amount, in descending order. Return to Public Buildings Service page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
GHAFARI ASSOCIATES, L.L.C. | $3,153,583 | Contract | : The Project is the restoration of the Chicago Federal Center (CFC) Plaza. The plaza is surrounded by the Dirksen Federal Courthouse, Kluczynski Federal Building and the United States Postal Service Loop Station. The three buildings and plaza were designed | General Services Administration / Public Buildings Service | 6/11/2009 |
STL ARCHITECTS, INC. | $204,634 | Contract | : Planning and designing for the recommissioning and retro-commissioning of the existing US Courthouse Building in order to improve the energy efficiency and minimize the environmental impact of the existing building. This work includes a pre-design report | General Services Administration / Public Buildings Service | 7/24/2009 |
STL ARCHITECTS, INC. | $17,822 | Contract | : Study to investigate three existing 300 ton chillers with one that will be more fuel efficient. | General Services Administration / Public Buildings Service | 7/23/2009 |
C H GARMONG & SON INC | $362,000 | Contract | : Replace curtain wall windows, Federal Building, Mt. Vernon, IL | General Services Administration / Public Buildings Service | 9/24/2009 |
RAND CONSTRUCTION COMPANY | $1,381,903 | Contract | : Robert J. Dole US Courthouse ARRA roof. | General Services Administration / Public Buildings Service | 7/29/2009 |
TEAM FOUR INC | $1,619,823 | Contract | : A/E Services under ARRA funding for the Robert A. Young Federal Building in St. Louis, MO include: new advance metering, total building re-commissioning/retro-commissioning assistance, window replacement, fa+?ade repair and restoration, cafeteria remodel | General Services Administration / Public Buildings Service | 3/23/2011 |
AECOM SERVICES, INC. | $6,552,255 | Contract | : Building Information Model support and mechanical and electrical rennovations to an existing federal office building in Jackson MS | General Services Administration / Public Buildings Service | 7/24/2009 |
KIMBALL, RICHARD D. CO. | $104,129 | Contract | : Provide engineering services for the retro-commisiioning of building systems at McMaddon Couthouse Building in Bridgport CT, Giamo Fedeal Building in New Haven, the Federal Courthouse and Pastpre Federal Building in Providence. The intent of the project i | General Services Administration / Public Buildings Service | 7/15/2009 |
GRUZEN SAMTON ARCHITECTS PLANNERS & INTERIOR DESIGNERS LLP | $765,756 | Contract | : Continuing construction administration services for the renovation of Emanuel Celler Courthouse. **Although the stimulus money received did not provide full time employment for the job descriptions listed under Description of Jobs Created, it did provide | General Services Administration / Public Buildings Service | 5/20/2009 |
VOLMAR CONSTRUCTION INC. | $5,584,325 | Contract | : Building renovation of half of the building at the Emanuel Celler US Courthouse. | General Services Administration / Public Buildings Service | 5/28/2009 |
HEERY INTERNATIONAL, INC. | $622,824 | Contract | : Provide on site technical support, contract administration and project management services on minor and major recovery funded projects to the General Services Administration (GSA) Regional Office in Philadelphia, PA through all project phases, including | General Services Administration / Public Buildings Service | 7/10/2009 |
ALPHA CONSTRUCTION AND ENGINEERING CORPORATION | $65,441 | Contract | : The objective of this project is to install a large Photo Voltaic Panel array on the roof of the Spotsylvania W. Robinson III and Robert R. Merhige, Jr.. United States Courthouse in Richmond, Virginia. The project will supplement the electrical system wh | General Services Administration / Public Buildings Service | 7/02/2009 |
BOYNTON, ROTHSCHILD, ROWLAND ARCHITECTS, PC | $29,647 | Contract | : Bidding and Construction phase Architectural services for reroofing of the Abingdon, VA courthouse; including 2 site visits, review of Contractor's submittals, response to Contractor questions, and response to questions from the Owner's Representative. | General Services Administration / Public Buildings Service | 9/29/2009 |
BREAKELL, INC. | $504,635 | Contract | : Renovation of the 1st and 2nd Floor Restrooms in the Elizabeth Kee Federal Building, Bluefield, WV | General Services Administration / Public Buildings Service | 9/18/2009 |
HEERY INTERNATIONAL, INC. | $1,148,182 | Contract | : Heery International is providing Construction Manager as Agent (CMa) services for the renovation of the George C. Young Federal Building and Courthouse located in Orlando, FL. The services include; attending design meetings and preparing agendas and minu | General Services Administration / Public Buildings Service | 9/03/2009 |
SKANSKA USA BUILDING INC. | $72,509,875 | Contract | : The project consist of the renovation / modernization of the Dr. A.H. McCoy Federal Building located in Jackson, MS. The scope of work includes a complete renovation of the building's 15 floors plus the basement. The project also consist of replacing al | General Services Administration / Public Buildings Service | 7/24/2009 |
HOAR-CHRISTMAN, LLC | $38,978,815 | Contract | : The award of Construction Manager as Constructor includes providing all professional, technical, administrative and clerical personnel as needed to perform Design Phase Services and Construction Phase Work for the full modernization of the Robert Smith Va | General Services Administration / Public Buildings Service | 7/23/2009 |
TEAM FOUR INC | $26,588 | Contract | : Federal Center - Sewer System | General Services Administration / Public Buildings Service | 4/22/2009 |
GENLYTE THOMAS GROUP LLC | $4,346,410 | Contract | : Recovery lghting replacement at The Ronald Dellums Federal Building, 1301 Clay Street, Oakland, CA. Furnish and install lighting fixtures. | General Services Administration / Public Buildings Service | 9/09/2009 |
TREMCO INCORPORATED | $3,891,154 | Contract | : Project is to remove and replace approximately 48,000 Square Feet of deteroriated roof system and install new cool roof system meeting Energy Star requirements. | General Services Administration / Public Buildings Service | 7/24/2009 |
RICHTER ASSOCIATES ARCHITECTS INCORPORATED | $479,671 | Contract | : Architectural/Engineering Design Services for Land Port of Entry at Columbus, New Mexico. The goal of the project is to design a Net Zero Energy Facility. | General Services Administration / Public Buildings Service | 7/27/2009 |
CTA INC. | $10,146 | Contract | : Other Architects & Engin Gen-Document the hisstorical significance of the Montana Dakota Utility Building in accordance with Montana State Historic Preservation office guidelines and regulations. | General Services Administration / Public Buildings Service | 8/21/2009 |
SAMUEL ENGINEERING, INC. | $6,415 | Contract | : Coordinated effort between structural roof studies and electrical study to generate drawings for the design/build project to install new solar panels on a series of buildings at the DFC | General Services Administration / Public Buildings Service | 8/21/2009 |
ANDREWS AND ANDERSON ARCHITECT PC | $114,127 | Contract | : The David Skaggs Research Center is located at 325 Broadway in Boulder, Colorado. It is 415,000 sf. And completed in 1999. The building's exterior construction has a concrete superstructure, applied precast concrete and native sandstone with a nominal R | General Services Administration / Public Buildings Service | 6/09/2009 |
PLANT ENGINEERING CONSULTANTS INC | $38,438 | Contract | : Retro-Commissioning Services at the Fort Collins Federal Building. | General Services Administration / Public Buildings Service | 6/09/2009 |
ERO RESOURCES CORPORATION | $9,958 | Contract | : Environmental studies for proposed lease site in Billings MT. | General Services Administration / Public Buildings Service | 6/22/2009 |
AT YOUR SERVICE HEATING & COOLING, LLC | $53,021 | Contract | : BUILDING ESCORTING SERVICE | General Services Administration / Public Buildings Service | 7/02/2009 |
RAW INTERNATIONAL, INC. | $34,561 | Contract | : IDIQ Contrat for A-E Services to perform ALTA Survey for the New Courthouse located in Bakersfield, CA. | General Services Administration / Public Buildings Service | 7/13/2009 |
PARSONS GOVERNMENT SERVICES INC. | $508,847 | Contract | : Parsons is under contract through the General Services Administration to perform Construction Management services throughout the design and construction of the Otay Mesa Land Port of Entry Expansion & Modernization Project in San Diego, California. Such | General Services Administration / Public Buildings Service | 7/24/2009 |
TERRACON CONSULTANTS, INC. | $34,292 | Contract | : Preparation for Data Center Construction Project. Scope of work modified 9/25/09 to include an additional 7 borings for the relocation of the Army Reserve garage/storage building. Other services include soil sampling, piezometer installation and groundw | General Services Administration / Public Buildings Service | 9/04/2009 |
E M C ENGINEERS, INC. | $275,307 | Contract | : This work is in support of the energy conservation and sustainability measures to be implemented as part of the American Recovery and Reinvestment Act of 2009. This stage is for a study to determine both low-cost control system modifications and equipment | General Services Administration / Public Buildings Service | 7/23/2009 |
HNTB DISTRICT OF COLUMBIA ARCHITECTURE, P.C. | $2,525,000 | Contract | : The purpose of this modification is to: 1) ADD funding for Architect/Engineering Design Services on Phase 2 of the Mary E. Switzer Building Modernization Project in Washington, DC. 2) INCORPORATE the attached mandated American Recovery and Reinvestment | General Services Administration / Public Buildings Service | 7/24/2009 |
DMJM DESIGN/MCCLIER, A JOINT VENTURE | $4,062,378 | Contract | : Architectural and Engineering (Mechanical, Electrical, Plumbing) / Design Plans, Cost Estimate and Specifications for Lafayette Modernization Washington, DC. Construction Management. | General Services Administration / Public Buildings Service | 6/05/2009 |
JACOBS PROJECT MANAGEMENT CO. | $348,864 | Contract | : ARRA MAIN STATE PHASE 1C DESIGN and COMMISSIONING Construction Management Services for the Design of Phase 1C Demolition, Abatement and Construction of theHarry S Truman Building(US Department of State Headquarters). Jacobs will conduct design reviews, co | General Services Administration / Public Buildings Service | 8/04/2009 |
ASPEN OF D.C., INC. | $669,551 | Contract | : The overall purpose of this award is to provide additional security assistance support to implement and maintain the information security program within the division. To assist in the additional requirement to process Federal and Contractors in the online | General Services Administration / Public Buildings Service | 6/19/2009 |
ALLIANCE ROOFING LLC | $1,589,596 | Contract | : Installation of an Intergraded PV & TPO Roofing system | General Services Administration / Public Buildings Service | 9/29/2009 |
DIAMOND RIDGE DEVELOPMENT CORPORATION | $7,984 | Contract | : SUPPLY NECESSARY MATERIAL, LABOR AND SUPERVISION TO REPLACE THE EXISTING PLEXY GLASS WINDOWS WITH NEW TEMPER GLASS ON THE 1ST FLOOR AT 230 N. 1ST AVE. PHOENIX, AZ 85003 | General Services Administration / Public Buildings Service | 9/14/2009 |
APSI CONSTRUCTION MANAGEMENT | $2,130,426 | Contract | : Construction Management Services for Federal Courthouse in Bakersfield, CA. | General Services Administration / Public Buildings Service | 9/24/2009 |
TISHMAN CONSTRUCTION CORPORATION OF D.C. | $1,351,186 | Contract | : The goal of the base contract work is to improve the energy efficiency of federal buildings and minimize their environmental impact through the retro-commissioning/re-commissioning process. Building systems are evaluated to verify if they are operating pe | General Services Administration / Public Buildings Service | 7/24/2009 |
JACOBS FACILITIES INC. | $64,460 | Contract | : Construction Management (Agency) Services for Construction of new federal Courthouse in Billings, Montana. Project will provide Construction Management (CM) Services to assist in development of a solicitation for Design-Build project for a new US Federal | General Services Administration / Public Buildings Service | 4/17/2009 |
PAGE CONSERVATION, INC. | $5,944 | Contract | : Condition Assessment of (15) Fresco Murals by Cook. Located in U.S. Post Office and Courthouse, San Antonio, Texas prior to construction in the facility. Based on our assessment and understanding of the construction project, guidelines for artwork prote | General Services Administration / Public Buildings Service | 9/16/2009 |
SETTY & ASSOCIATES, LTD. | $698,803 | Contract | : Engineering and Commissioning expertise to conduct re-commissioning / retro-commissioning planning, identify energy and water conservation, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, and report writing services f | General Services Administration / Public Buildings Service | 8/14/2009 |
BBIX, LLC | $160,196 | Contract | : The scope of work is focused on building systems affecting energy use and indoor environment, including shell infiltration and heat loss for the Moakley Federal Courthouse loacted in Boston, MA. | General Services Administration / Public Buildings Service | 8/18/2009 |
CCB, INC. | $278,251 | Contract | : 11th Floor renovation at the TP O'Neil Federal Building. | General Services Administration / Public Buildings Service | 9/10/2009 |
GARLAND COMPANY INC, THE | $255,749 | Contract | : Remove and replace approximately 13,000 square feet of bituminous built-up roofing, add new insulation to create an R-50 insulation value when complete, and install architectural metal at all parapet and coping locations. The project shall include all lo | General Services Administration / Public Buildings Service | 9/21/2009 |
WANK ADAMS SLAVIN ASSOCIATES LLP | $1,940,395 | Contract | : Recipient has been retained by the United States General Services Administration to analyze and design a solution to a chronic water-leakage problem existing at the Jacob K Javitz Federal Building located in Downtown Manhattan. Specifically, the outside | General Services Administration / Public Buildings Service | 8/26/2009 |
INTEGRA REALTY RESOURCES DFW LLP | $7,000 | Contract | : Apprisal and Market Valuation of 9.93-? acre, vacant industrial site located at 9851-9917 Via de la Amistad, Otay Mesa, San Diego County, California. This property is immediately adjacent to the existing commercial border crossing facility identified as t | General Services Administration / Public Buildings Service | 4/16/2009 |
GRUNLEY CONSTRUCTION CO., INC. | $62,513,835 | Contract | : 1. EXERCISE OPTION 1, PHASE 2 G?? Construction services in the amount of $34,914,000.00. 2. EXERCISE OPTION 1, PHASE 2, ALTERNATE No. 7 G?? Blast Windows in the amount of $1,400,000.00. 3. Provide all labor, materials and equipment for additional services | General Services Administration / Public Buildings Service | 6/30/2009 |
TENG & ASSOCIATES, INC. | $6,704,106 | Contract | : M.C. Smith Federal Building. Schematic design for all discipline for building shell & core and tenant spaces for the building. Design excellence program concept design related to a new building entry, security screening, physical security, Mechanical, | General Services Administration / Public Buildings Service | 6/24/2009 |
J & J CONTRACTORS, INC. | $5,278,055 | Contract | : Change order work associated with construction of New Land Port of Entry | General Services Administration / Public Buildings Service | 4/27/2009 |
CAULDWELL-WINGATE COMPANY, LLC | $64,000,000 | Contract | : The Thurgood Marshall Courthouse infrastructure upgrade. | General Services Administration / Public Buildings Service | 4/15/2009 |
GRUZEN SAMTON ARCHITECTS PLANNERS & INTERIOR DESIGNERS LLP | $1,705,131 | Contract | : This contract is a for Architectural/Engineering services for the design of a federal employee parking garage and a master plan for the San Juan, PR Federal Bureau of Investigations Field Office Consolidation project. The project as a whole will result i | General Services Administration / Public Buildings Service | 7/02/2009 |
JACOBS PROJECT MANAGEMENT CO. | $1,413,916 | Contract | : The purpose of this scope of work is to assist GSA by providing the Construction Mangement as Agent (CMa) Services necessary for pre-award, procurement, design, construction and commissioning phase services for the Huntington, WV Federal Building Energy R | General Services Administration / Public Buildings Service | 7/31/2009 |
URS GROUP, INC. | $3,360,763 | Contract | : TAS::47 4543::TAS. CONSTRUCTION MANAGEMENT AS AGENT SERVICES THROUGH THE PROCUREMENT AND DESIGN PHASES. THIS WORK IS IN SUPPORT OF THE MODERNIZATION PROJECT AT THE RICHARD POFF FEDERAL BUILDING IN ROANOKE, VA. Construction management, move coordination, | General Services Administration / Public Buildings Service | 7/30/2009 |
SHALOM BARANES ASSOCIATES P C | $2,290,034 | Contract | : Design, LEED, and construction administration services for Renovations to the Department of the Interior Headquarters building located in Washington, DC relating to the following areas: 1.) Replacement Bollard System 2.) Lessons Learned Bulletin for S | General Services Administration / Public Buildings Service | 7/24/2009 |
WORKING BUILDINGS, LLC | $111,700 | Contract | : Retro-commissioning study of Federal buildings in Auburn Washington and Anchorage Alaska | General Services Administration / Public Buildings Service | 7/23/2009 |
WHPACIFIC, INC. | $95,323 | Contract | : Provide Retro Commissioning services at the specificed locations - Albuquerque, NM; Gallup, NM; Las Cruces, NM; and Santa Fe, NM | General Services Administration / Public Buildings Service | 8/27/2009 |
TRANSYSTEMS CORPORATION | $610,839 | Contract | : Poff Federal Building in Roanoke, VA - Energy Renovation, A/E Study | General Services Administration / Public Buildings Service | 4/16/2009 |
NOAH ENTERPRISES, INC. | $380,436 | Contract | : The objective of this project is to renovate existing bathrooms located in the 1st, 2nd, 3rd and 6th floor of the Annex building. The renovation will include the installation of energy efficient plumbing and electrical fixtures to meet the Federal Energy | General Services Administration / Public Buildings Service | 8/21/2009 |
QUINN EVANS ARCHITECTS INC | $4,849,867 | Contract | : Comprehensive interior /exterior rehabilitation of the Robert S. Vance Fed. Bldg. and Courthouse located at 1800 5th Avenue North in Birmingham, AL. The Scope Of Work for the Project is based upon the following documents: 1. ?Architect-Engineer Scope | General Services Administration / Public Buildings Service | 7/27/2009 |
JACOBS FACILITIES INC. | $50,582 | Contract | : Construction Management Services for Judges' Swing Space at Samuel M. Gibbons Federal Courthouse The purpose of this scope of work is to provide GSA guidance and direction as the Construction Manager as Advisor (CMa) Contractor who will be the government' | General Services Administration / Public Buildings Service | 7/23/2009 |
AMERICAN RESTORATION, INC. | $13,596,465 | Contract | : This project is the second phase of the water intrusion repairs for the Sam M. Gibbons United States Courthouse, which includes the following activities. On the west elevation, floors 1-5, we will be repairing the curtainwall windows, curtainwall sills, | General Services Administration / Public Buildings Service | 7/28/2009 |
KUBALA WASHATKO ARCHITECTS INC | $56,668 | Contract | : Architect-Engineer Services, Madison, Wisconsin High Performance Green Building at the Kastenmeier U.S. Courthouse | General Services Administration / Public Buildings Service | 7/24/2009 |
URS GROUP, INC. | $154,108 | Contract | : Design services, Post Construction Award Contract Services, Record Docs and Construction Inspection Services for recommissioning and building tuneup for the ARRA project at Stokes Federal Building | General Services Administration / Public Buildings Service | 7/23/2009 |
WESTLAKE, REED, LESKOSKY, LTD. | $41,651 | Contract | : The objective of this work order is to achieve the re-commissioning and retro-commissioning goals set forth in the ARRA (American Recovery and Re-investment Act) for the Howard M. Metzenbaum USCH (United states Court House) Cleveland, Ohio by creating bid | General Services Administration / Public Buildings Service | 7/24/2009 |
TENG & ASSOCIATES, INC. | $4,101,196 | Contract | : Provide architectural and engineering services for ARRA energy and water conservation measures. Work includes meetings, site visits, calculations, reports, drawings and construction estimates. Provide art conservator services for existing wall mural incl | General Services Administration / Public Buildings Service | 5/05/2009 |
C H M P INC | $164,124 | Contract | : This award supports the upgrades to the lighting and building automation systems at the Federal Building and U.S. Courthouse in Ann Arbor, Michigan by providing construction documents, submittal review and record documents. The upgrades to the Heating, V | General Services Administration / Public Buildings Service | 7/24/2009 |
DEWBERRY ARCHITECTS INC. | $7,913,967 | Contract | : The primary purpose of this project is to install an array of solar panels on the roof of the Major General Emmett J. Bean Center Indianapolis, IN 46249. The goal is to install the most energy-efficient systems available and to reduce the building's oper | General Services Administration / Public Buildings Service | 6/18/2009 |
GHAFARI ASSOCIATES, L.L.C. | $9,041 | Contract | : This lighting study is being prepared to serve as a basis for design recommendations for the replacement of the existing lighting system which will provide improved lighting control and energy efficiency. The subject of the study is the Ground Floor Lobby | General Services Administration / Public Buildings Service | 9/17/2009 |
HAMMEL, GREEN AND ABRAHAMSON, INC. | $14,242,017 | Contract | : Provide architectural and engineering services for the modernization of the Whipple Building at Fort Snelling, Minnesota. The building has over 617,000 gross square feet. The facility has a basement, ground level and first through sixth floors. The bui | General Services Administration / Public Buildings Service | 6/30/2009 |
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. | $20,811 | Contract | : Pre-design to install roof photovoltaic system. | General Services Administration / Public Buildings Service | 6/30/2009 |
SUBSTANCE, LLC | $3,528,766 | Contract | : A Pre-design study was completed to evaluate a 'retro-commissioning' report prepared by Teng Associates. This study summarized possible energy conservation and monitoring measures to be implemented at the Neal Smith Federal Building in Des Moines, Iowa. | General Services Administration / Public Buildings Service | 8/04/2009 |
SFS ARCHITECTURE, INC. | $292,156 | Contract | : This work order was a follow-on to a previous work order and is for pre-design development, additional site investigation and design services for replacement of the basement Air Handling Units, outdoor air intake threat mitigation and basin heaters and he | General Services Administration / Public Buildings Service | 5/04/2009 |
SFS ARCHITECTURE, INC. | $254,054 | Contract | : The Architect/Engineer is required to participate in the Commissioning Kick-Off Meeting, and review, provide written commentary, and participate in on site review meetings for both the Go/No Go Analysis and the Energy Management Control System/Metering Re | General Services Administration / Public Buildings Service | 8/06/2009 |
JACOBS PROJECT MANAGEMENT CO. | $598,773 | Contract | : GOODFELLOW SANITARY AND STORM SEWER PROJECT - The Federal Center at Goodfellow sanitary and storm system is to be separated and reconstructed to meet local Metropolitan Sewer District (MSD) drainage regulations. Underground detention facilities are to be | General Services Administration / Public Buildings Service | 7/29/2009 |
JACOBS PROJECT MANAGEMENT CO. | $1,003,718 | Contract | : During the Preconstruction Phase, obtain information from the Government database and perform the following tasks: a) Attend and be prepared to comment on bi-weekly design meetings (every two weeks) starting in Mid Sep. 2009 through Feb. 2010. b) Review t | General Services Administration / Public Buildings Service | 9/23/2009 |
EATON ENERGY SOLUTIONS, INC. | $125,448 | Contract | : Retro-commissioning Services for Robert V. Denney Federal Building (Lincoln, NE) along with investigating the existing Energy Management Controls System and Advanced Metering Systems for the Robert V. Denney Federal Building and U.S. Courthouse under the | General Services Administration / Public Buildings Service | 9/10/2009 |
PDG, INC. | $55,098 | Contract | : Wind Tunnel Testing Structural Study for the Micky Leland FOB (TX0298ZZ located at 1919 Smith Street, Houston, TX 77002). Provide engineering testing and analysis services for the site, as well as, to determine building cladding design loads. | General Services Administration / Public Buildings Service | 7/20/2009 |
TRIVERS ASSOCIATES, INC | $1,967,809 | Contract | : MOD12 - Contract Administration for Renovation of San Antonio Post Office & Courthouse MOD14 - Design of temporary space for tenants who must move during selected construction phases. Also, design for lease space for four new tenants moving into the buil | General Services Administration / Public Buildings Service | 7/29/2009 |
GRUNLEY CONSTRUCTION CO., INC. | $54,534,342 | Contract | : The purpose of the award is to Modernize Wing 2 of the Department of the Interior Main Interior Building. Work started in March 2010. The current delivery date for all remaining contract work is September 30, 2012. Change order projects awarded under | General Services Administration / Public Buildings Service | 7/27/2009 |
CHARLES N. WHITE CONSTRUCTION COMPANY | $106,581,366 | Contract | : This is a 237,000 square feet United States Courthouse Austin Texas. We have had a very successful preconstruction phase of work and see no reason why will not have a great construction project with a successful completion. We have completed numerous pr | General Services Administration / Public Buildings Service | 7/31/2009 |
HCBECK LTD | $50,348,552 | Contract | : Construction contract for remodel of Post Office/Courthouse located in San Antonio, Texas. | General Services Administration / Public Buildings Service | 7/24/2009 |
DESIGN EDGE PC | $80,977 | Contract | : Recommissioning/retro-commissioning of the Byron White Courthouse with the objective of reducing energy consumption to the greatest extent possible within the funding limitation. Deliverables will be a list of Energy Conservation Measures recommendation, | General Services Administration / Public Buildings Service | 6/08/2009 |
SAMUEL ENGINEERING, INC. | $43,419 | Contract | : Design study with a scalable range of power delivery along with a transformer design specification for the construction of a new Tier III data center facility at Denver Federal Center | General Services Administration / Public Buildings Service | 9/10/2009 |
SBH, LLC | $1,630,195 | Contract | : Perform the demolition design, asbestos abatement design, asbestos abatement and demolition of the existing Montana-Dakota Utilities building and the former TCFB Twin Cities Federal Bank buildings, in Billings, Montana. Deliverables to include: demolitio | General Services Administration / Public Buildings Service | 8/27/2009 |
STRONGHOLD ENGINEERING INCORPORATED | $13,128,830 | Contract | : 'PS58 - Scope of work includes demolition, removal, and disposal of existing Heating, Ventilation and Air Conditioning ductwork, installation and appunenances on Floors 5, 6, 8, 1 South and Passenger Elevator Lobbies in conjunction with the ''Recovery'' U | General Services Administration / Public Buildings Service | 5/29/2009 |
K R ENVIRONMENTAL SERVICES INC | $151,140 | Contract | : Asbestos and lead abatement monitoring of the removal of the air handling system (ducts) of the three and a half remaining floors (5,6,8,and half of the 1st) of the Federal Building at 300 N. Los Angeles St. Los Angeles Ca. This includes the elevator lobb | General Services Administration / Public Buildings Service | 6/26/2009 |
BOYKEN INTERNATIONAL, INC. | $1,428,524 | Contract | : The Award is for Construction Manager as Agent (CMa) to provide oversight and support in the management of the modernization and renovation effort at the Robert Smith Vance Federal Building and United States Courthouse in Birmingham, Alabama. Additionally | General Services Administration / Public Buildings Service | 7/28/2009 |
J.E. DUNN NORTHWEST, INC | $26,284,708 | Contract | : For the construction of the new Land Port of Entry (LOPE) in Blaine, Washington in order to construct a portion of the facility (new administration building) GSA had to remove an existing 2 lane interstate and construct a new bridge. The bridge and conne | General Services Administration / Public Buildings Service | 4/27/2009 |
HANNAH & ASSOCIATES, INC. | $14,031 | Contract | : The Architect-Engineer (A/E) shall perform all professional services necessary for planning and designing of this project in accordance with the program and GSA standards. The professional services for this Work Order shall consist of, but not be limited | General Services Administration / Public Buildings Service | 7/24/2009 |
GHAFARI ASSOCIATES, L.L.C. | $95,357 | Contract | : The Project is divided into two phases. A lighting study and the design of the United States Postal Service Loop Station ground floor lobby lighting system. The lighting study is being prepared to serve as a basis for design recommendations for the replac | General Services Administration / Public Buildings Service | 7/23/2009 |
INTERACTIVE DESIGN INC | $7,637,166 | Contract | : AJ Celebrezze Federal Building in CLeveland, Ohio - Replacement of the building curtainwall and roofing system. The skin replacement will attempt to reverse a significant energy loss in the existing structure. This work will impact related building system | General Services Administration / Public Buildings Service | 8/13/2009 |
SMITHGROUP, INC. | $4,181,414 | Contract | : Design task order related to the Federal Bureau of Investigation Office build out and fire alarm replacement | General Services Administration / Public Buildings Service | 6/18/2009 |
AMEC EARTH & ENVIRONMENTAL, INC. | $272,954 | Contract | : Site Survey services of 31 parcels of land at the Border Station in Van Buren Maine. The work includes the field work to research and survey the 31 parcels, to accurately define mets and bounds of each property to assist the Government in their evaluation | General Services Administration / Public Buildings Service | 6/09/2009 |
COLUMBIA CONSTRUCTION CO | $83,355,555 | Contract | : The purpose of this project is to modernize the IRS Center in Andover MA. The project consists of two phases with a combined duration of twenty eight months. Systems to be updated include mechanical, building management, and energy. A new geothermal heat | General Services Administration / Public Buildings Service | 7/21/2009 |
MAPCO, INC. | $920,486 | Contract | : Design Build Services for the Space Alteration for 2 New 7th Floor Judges Chambers | General Services Administration / Public Buildings Service | 6/25/2009 |
EXECUTIVE CONSULTANTS NETWORK | $2,475 | Contract | : Facilitation of Partnering Session | General Services Administration / Public Buildings Service | 7/31/2009 |
SCHOOLEY CALDWELL ASSOCIATES, INC | $164,430 | Contract | : The first portion of the project was to assess the building in Youngstown, Ohio with the aid of a previous recommissioning study and make final recommendation for energy conservation measures (ECM's) to implement. The second half of the project was to pr | General Services Administration / Public Buildings Service | 7/08/2009 |
G. H. FORBES ASSOCIATES ARCHITECTS, P.C. | $68,326 | Contract | : The designs may consist of but are not limited to the following: -- Building Automation System Upgrade Deliverables shall consist of: -- Construction drawings and specifications -- Design calculations -- Cost Estimates -- Recommended construction completi | General Services Administration / Public Buildings Service | 7/24/2009 |
MESSER CONSTRUCTION CO. | $44,698,067 | Contract | : The initial Project Award includes $35,500,000 for Construction Phase Services for the GS-05P-08-GBC-0005 Fire/Life Safety and Heating, Ventilation and Cooling Modernization for the 6 story, 440,000 sf Minton Capehart Federal Building in Indianapolis, In | General Services Administration / Public Buildings Service | 5/12/2009 |
TEAM FOUR INC | $424,948 | Contract | : A/E Services under ARRA for the Federal Center in St. Louis, MO Bldg. 104 VA include: new advanced metering; 1st floor re-commissioning/retro-commissioning, new high efficiency chillers to cool the building; new high efficiency chilled water; condenser w | General Services Administration / Public Buildings Service | 8/24/2010 |
TEAM FOUR INC | $65,512 | Contract | : A/E Services under ARRA Limbaugh Courthouse Mech & Arch. include: Provide HVAC modifications to the existing atrium. This work will be the base bid for the construction contract; Provide Pyramic or similar coating to the entire roof at the Courthouse; | General Services Administration / Public Buildings Service | 9/24/2009 |
PIPER-WIND ARCHITECTS, INC | $97,139 | Contract | : Development of Architectural and Engineering reports to investigate the feasibility of improving the energy efficiency of the Government occupied building 8930 Ward Parkway, Kansas City, MO. The reports include studies for window replacement on the north | General Services Administration / Public Buildings Service | 6/25/2009 |
SKANSKA USA BUILDING INC. | $48,213,357 | Contract | : The project consists of the renovation / modernization of the George C. Young Federal Building & Courthouse in Orlando, FL. The scope of work includes a complete renovation of the building's 6 floors and a replacement of the existing windows and roof. W | General Services Administration / Public Buildings Service | 7/27/2009 |
JACOBS PROJECT MANAGEMENT CO. | $478,661 | Contract | : Provide Pre-Design and Design Review Servicesfor the building system modifications to meet NARA 2009 requirements for the VA file storage space located in Building 104 of Goodfellow Federal Complex. ARRA VA AT BLDG. 104, 4300 GOODFELLOW, ST. LOUIS, MO ARR | General Services Administration / Public Buildings Service | 9/16/2009 |
GARLAND COMPANY INC, THE | $137,859 | Contract | : Remove and replace approximately 4,950 square feet of bituminous built-up roofing, add new insulation to create an R-50 insulation value when complete, and install architectural metal at all parapet and coping locations. The project shall include all low | General Services Administration / Public Buildings Service | 9/16/2009 |
PARSONS GOVERNMENT SERVICES INC. | $290,221 | Contract | : The General Services Administration is seeking to renovate the Otay Mesa Land Port of Entry in Otay, California. However, prior to commencing the modernization of the land port of entry, GSA is requiring the need of an environmental impact statement (EIS | General Services Administration / Public Buildings Service | 4/15/2009 |
EVERTON OGLESBY ARCHITECTS, PLLC | $646,205 | Contract | : Provide Architecture and Engineering commissioning expertise to conduct re-commissioning / retro-commissioning planning, identify energy conservation and water conservation, scoping, testing, investigation, evaluation, analysis, calculations, recommendati | General Services Administration / Public Buildings Service | 8/14/2009 |
THE TEMPLE GROUP INC | $41,254 | Contract | : Wissahickon Building in Philadelphia, PA- PV Roof, CM Services. Review all design submissions to ensure that all of the General contractor's scope of work performance requirements are met by the general contractors design. | General Services Administration / Public Buildings Service | 7/21/2009 |
BOYNTON, ROTHSCHILD, ROWLAND ARCHITECTS, PC | $28,678 | Contract | : Bidding and construction administration assistance for reroofing of an historic courthouse. | General Services Administration / Public Buildings Service | 9/24/2009 |
VE CSIE JV | $40,459 | Contract | : The purpose of this project is to study the boiler plant that serves the CMS complex, determine necessary replacement, upgrades, or repairs to increase the energy efficiency of the system, and to identify any other opportunities to improve the system. The | General Services Administration / Public Buildings Service | 4/30/2009 |
TRANSYSTEMS CORPORATION | $2,364,914 | Contract | : US Custom House, Philadelphia, PA - Building Envelope Repair, Architectural/Engineering Design | General Services Administration / Public Buildings Service | 4/23/2009 |
DLR GROUP INC. | $5,212,556 | Contract | : Modernization of the existing George C. Young Courthouse/Federal Building, Orlando, Florida (approximately 140,000 square feet). | General Services Administration / Public Buildings Service | 9/03/2009 |
TENG & ASSOCIATES, INC. | $83,668 | Contract | : Provide engineering and commissioning expertise for Re-Commissioning / Retro-Commissioning and Design Phase services for potential energy conservation measures. Work included meetings, site visits, calculations, reports, drawings and construction estimat | General Services Administration / Public Buildings Service | 7/28/2009 |
COLLABORATIVE DESIGN GROUP INC | $313,773 | Contract | : Project consists primarily of the repair of curtain wall gaskets, with related ancillary work, including replacement of deteriorated sealants and damaged glazing units, and repair/replacement of spandral insulation. The project is the Federal Courthouse B | General Services Administration / Public Buildings Service | 7/24/2009 |
EYP, INC. | $3,832,356 | Contract | : ARRA funding commenced with taking the architectural and engineering construction documents from 75% completion to final completion for the renovation of the Birch Bayh Federal Courthouse in Indianapolis, IN. | General Services Administration / Public Buildings Service | 9/29/2009 |
URS GROUP, INC. | $107,956 | Contract | : Provide additional design services to include Variable Air Volume boxes and building pressurization, Post Construction Award Contract Services, Construction Inspection Services and Record Documents for the ARRA Variable Air Volume project at the Dayton Fe | General Services Administration / Public Buildings Service | 7/24/2009 |
URS GROUP, INC. | $206,048 | Contract | : WORK ORDER UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) FOR RECOMISSIONING AT THE POTTER STEWART US COURTHOUSE IN CINCINNATI, OH TAS::47 4543::TAS. Design services, Post Construction Award Contract Services, Construction Inspection Services, Re | General Services Administration / Public Buildings Service | 7/24/2009 |
HARTMAN AND MAJEWSKI DESIGN GROUP, INC. | $229,723 | Contract | : Construction Management advisor services for the design and construction of the Columbus Land Port of Entry facility in Columbus, New Mexico. This project will provide increased capacity for both commercial, vehicular and pedestrian traffic, cross border | General Services Administration / Public Buildings Service | 7/24/2009 |
CLIFFORD ROSS STUDIO LLC | $364,035 | Contract | : Create stained glass art wall for Federal Courhouse in Austin, TX | General Services Administration / Public Buildings Service | 7/24/2009 |
TATE SNYDER KIMSEY ARCHITECTS, LTD. | $5,504,392 | Contract | : Modernization and Expansion of the Otay Mesa Land Port of Entry (LPOE) in San Diego, California. | General Services Administration / Public Buildings Service | 7/24/2009 |
MUTCHLER BARTRAM ARCHITECTS, P.C. | $44,684 | Contract | : Re-commissioning and Retro Commissioning of the buildling systems affecting energy use and indoor environment, including shell infiltration and heat loss. This includes major heating, cooling and HVAC equipement as well as lighting, controls and the buil | General Services Administration / Public Buildings Service | 6/30/2009 |
CTA INC. | $48,529 | Contract | : Other Architects & Engin gen-The contractor shall provide engineering and commissioning exp0ertise to conduct recommissioning/retro-commissioning planning, scoping, testing, investigation, evaluation, analysis, calculations, recommendations and report wri | General Services Administration / Public Buildings Service | 7/08/2009 |
PCL CONSTRUCTION SERVICES, INC | $58,612,383 | Contract | : The Denver Federal Center Utilities Infrastructure Project (DFC-UIP) is an upgrade of outdated water distribution services, sanitary sewer systems parking lots and roadways. New storm sewer systems are also being added in new rehabilitated roadway areas. | General Services Administration / Public Buildings Service | 5/20/2009 |
SUBSTANCE, LLC | $238,807 | Contract | : Energy performance enhancements to the Sioux City Federal Building which may include improvements to the mechancial, electrical, and enclosure systems for the building. The specific improvements will be broadly identified as part of a retro-commisioning | General Services Administration / Public Buildings Service | 9/16/2009 |
EXHIBIT ARTS LLC | $130,620 | Contract | : Cost estimator at Bannister Federal Complex in Kansas City, MO. | General Services Administration / Public Buildings Service | 7/30/2009 |
J.E. DUNN CONSTRUCTION COMPANY | $96,355,421 | Contract | : Renovations to the Richard Bolling Federal Building located in downtown Kansas City, Missouri. Renovations include: Electrical upgrades including; building transformer replacement, switchgear replacement and distribution equipment protection. Mechanical | General Services Administration / Public Buildings Service | 11/30/2009 |
BRASFIELD & GORRIE, L.L.C. | $6,950,000 | Contract | : Richard Sheppard Arnold U.S. Courthouse, Little Rock, AR. Upgrade of life-safety systems, and realign and upgrade tenant space. This is the last phase of a 3-phase renovation program and will include, but not limited to the following work: extend the new | General Services Administration / Public Buildings Service | 7/27/2009 |
ALEUT FACILITIES SUPPORT SERVICES, LLC | $1,259,877 | Contract | : Replace chillers and pumps in bldgs 15, 21, 56 and 85 on the Denver Federal Center, Denver Colorado | General Services Administration / Public Buildings Service | 9/09/2009 |
DENNIS, NELSON R | $165,374 | Contract | : leasing of office space for Army and Navy recruiting offices | General Services Administration / Public Buildings Service | 7/01/2009 |
CANNON PARKIN INC | $945,544 | Contract | : DESIGN SERVICES TO UPGRADE HVAC SYSTEMS ON FLOORS 1 SOUTH, 5, 6, AND 8 AT THE FEDERAL BUILDING, 300 NORTH LOS ANGELES STREET, LOS ANGELES, CA. | General Services Administration / Public Buildings Service | 5/28/2009 |
MANGI ENVIRONMENTAL GROUP, INC. | $62,340 | Contract | : The purpose of this statement of work is to assist the General Service Administration (GSA) in the prepartion of an Environmental Assessment (EA) for the purposed construction of a new LPOE in Van Buren, Maine. The construction program is expected to res | General Services Administration / Public Buildings Service | 6/10/2009 |
SIGNET PARTNERS, A CORPORATION | $73,622 | Contract | : Federal Center South Master Plan Update Study. Update 2001 site planning component of the Federal Center South Redevelopment Feasibility Study to provide site development concepts for a secured Federal campus supporting agencies with extraordinary securit | General Services Administration / Public Buildings Service | 5/20/2009 |
E M C ENGINEERS, INC. | $468,149 | Contract | : Perform a holistic, systematic evalution of exisiting buildings and controls to identify and implement operational and maintenance improvements, and to ensure optimal performance over time. Provide cost and savings data for capital improvements on 6 loca | General Services Administration / Public Buildings Service | 9/28/2009 |
SERA ARCHITECTS, INC. | $12,092,236 | Contract | : Architect and engineering services consisting of contract re-start activity, energy conservation analysis and reports, miscellaneous studies, energy models, construction manager as constructor (CMc) integrated delivery documentation, third party commissio | General Services Administration / Public Buildings Service | 5/01/2009 |
ONUMA, INC. | $799,998 | Contract | : Based on the preliminary facility requirements established in the first half of this project, the Project Team proceeded to generate more detailed architectural concepts and layouts. For example, finer levels of detail were examined using Room Data sheets | General Services Administration / Public Buildings Service | 6/17/2009 |
HANDY BUSINESS SOLUTIONS, LLC | $181,184 | Contract | : The Administrative Aide began her employment 2/03/09. American Recovery and Reinvestment Act exercised the option year for the Administrative Aide only. The Administrative Aide is working in full capacity providing assistance to the ARRA Office and the Di | General Services Administration / Public Buildings Service | 10/01/2010 |
PROJECT SUPPORT SERVICES, INC. | $312,218 | Contract | : Project management support to the office of Portfolio Management Division facilities management & services program division; providing operational, technical, and management support to the region in areas such as safety and health, concessions, childcare | General Services Administration / Public Buildings Service | 9/24/2009 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $3,424 | Contract | : Inspection of two artworks at the McCoy Federal Building in Jackson, MS and meeting with building construction project manager on scheduling and planning temporary removal and storage of the two artworks during construction. The project results with a pla | General Services Administration / Public Buildings Service | 9/14/2009 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $7,246 | Contract | : Inspection of a sculpture at federal building about to undergo renovation construction to determine threats to sculpture and need for protection or temporary removal and storage. | General Services Administration / Public Buildings Service | 9/16/2009 |
SMITHGROUP, INC. | $1,170,849 | Contract | : Window replacement - Fa+?ade Thermal Performance Improvement for the John F Kennedy Federal Building in Boston, Massachusetts. The work to be performed under the Contract includes updating the existing window and curtain wall replacement documents for co | General Services Administration / Public Buildings Service | 12/01/2009 |
BOVIS LEND LEASE LMB, INC. | $1,804,010 | Contract | : Provide program management activities including professional, technical, administrative and clerical support to the General Services Administration (GSA) Project Team's management of and the successful completion of the Modernization of the Emanuel Celler | General Services Administration / Public Buildings Service | 5/19/2009 |
GOODY, CLANCY & ASSOCIATES, INC. | $2,480,116 | Contract | : Architecture and engineering professional services for the Facade Repair & Slate Roof Replacement of the US Post Office and Courthouse at 271 Cadman Plaza, East, Brooklyn, New York. Specific services include the design services for upgrades to exiting si | General Services Administration / Public Buildings Service | 6/08/2009 |
HEERY INTERNATIONAL, INC. | $44,967 | Contract | : The intent of this award was to study and maximize the potential use of photovoltaic panels on the roof of the newly completed federal courthouse. An analysis of the building's structural system was made to determine that the structural framing could sup | General Services Administration / Public Buildings Service | 5/12/2009 |
ALPHA CONSTRUCTION AND ENGINEERING CORPORATION | $147,680 | Contract | : BYRD COURTHOUSE - Roof repairs were completed, including solar panels. The project is complete. | General Services Administration / Public Buildings Service | 8/05/2009 |
DANHILL CONSTRUCTION COMPANY | $578,567 | Contract | : RECOVERY ACT construction award of the restroom modernization at the Mt. Hope Federal building and Garage in Mt. Hope, WV | General Services Administration / Public Buildings Service | 9/18/2009 |
JACOBS TECHNOLOGY INC. | $4,102,836 | Contract | : Task order to assist the General Services Administration (GSA) Program Management Office (PMO) in the management and oversight of the American Reinvestment and Recovery Act (ARRA) projects under the Blanket Purchase Agreement (BPA). Management and oversig | General Services Administration / Public Buildings Service | 6/18/2009 |
ROOFING RESOURCES INC | $290,208 | Contract | : Construction Administration Services - CMS Building - Roof Restoration and PV Installation Project. RRI is providing the following professional services: Submittal Review, Construction Oversight, and Inspection Services. Building Location is 3500 Securi | General Services Administration / Public Buildings Service | 9/01/2009 |
STUDIOS ARCHITECTURE | $281,439 | Contract | : Program of Requirements awarded for the General Services Headquarters project In July 2009. The modification to the contract was approved and added on May 25, 2010. | General Services Administration / Public Buildings Service | 5/25/2010 |
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. | $19,531 | Contract | : Updated the design of HVAC system that was originally developed by Alley Poyner Macchietto in cooperation with Leo A. Daly Engineers. Service to include all necessary revisions to the drawings and specifications based on as-builts from Replace Perimeter H | General Services Administration / Public Buildings Service | 8/06/2009 |
SCHNEIDER ELECTRIC USA, INC. | $498,463 | Contract | : Advanced Metering System-Project Development and Project Management for Various Locations within Region 5, Great Lakes Region. | General Services Administration / Public Buildings Service | 7/29/2009 |
PDG INC. | $460,519 | Contract | : Architectureal & Engineering design & construction package consisting of entire core/shell, lobbies, common areas & shared spaces for United States Post Office and Courthouse (TX0081ZZ located at 601 Rosenberg St., Galveston, TX 77550). Recovery & histo | General Services Administration / Public Buildings Service | 5/14/2009 |
CADDELL & CO LLC | $252,617 | Contract | : Install Exterior Lighting. Provide all management, labor, tools, materials, and supervision necessary to install exterior lighting at Post Office Building in accordance with approved design documents. | General Services Administration / Public Buildings Service | 9/16/2009 |
APSI CONSTRUCTION MANAGEMENT | $3,297,226 | Contract | : Provide Construction Management as Agent (CMa)services for the new US Courthouse to be constructed in Austin, TX | General Services Administration / Public Buildings Service | 7/24/2009 |
GGA ARCHITECTURE, PLLC | $3,706,331 | Contract | : Provide Architectural and Engineering Services to support Phase 2 construction including onsite Construction Administration services for the Herbert C. Hoover Building Commerce Renovation Project - $1,794,711.00; Provide Architectural and Engineering Serv | General Services Administration / Public Buildings Service | 7/24/2009 |
A BERGER/HILL JOINT VENTURE | $130,845 | Contract | : Develop the following Statements of Work for the modernization of the Byron Rogers Federal Office Building consistent with the current Program Development Study: o Construction Manager as Agent (CMa) o Design-Build o Commissioning Agent (CxA) | General Services Administration / Public Buildings Service | 5/20/2009 |
M.E. GROUP, INC. | $315,143 | Contract | : Engineering and commissioning expertise to conduct re-commissioning/retro-commissioning planning, identify energy and water conservation, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, and report writing services for | General Services Administration / Public Buildings Service | 8/14/2009 |
LEO A DALY COMPANY | $717,776 | Contract | : Re/Retro Commissioning of GSA buildings in GSA Region 4 | General Services Administration / Public Buildings Service | 8/14/2009 |
BBIX, LLC | $140,958 | Contract | : The scope of work is focused on building systems affecting energy use and indoor environment, including shell infiltration and heat loss for 4 federal courthouses and buildings specifically Rudman and Cleveland FCH in Concord, NH; Burlington FB in Burling | General Services Administration / Public Buildings Service | 7/02/2009 |
HEERY INTERNATIONAL, INC. | $273,592 | Contract | : Provide engineering and commissioning expertise to conduct recommissioning / retro-commissioning planning, identify energy conservation measures, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, and report writing serv | General Services Administration / Public Buildings Service | 9/02/2009 |
FARNSWORTH GROUP, INC. | $264,443 | Contract | : The purpose of this project is to develop energy consumption baselines, offer recommendations to reduce energy usage, and eliminate comfort and building function issues. Deliverables include recommendations of building functions that increase efficiencie | General Services Administration / Public Buildings Service | 9/02/2009 |
CORNERSTONE ARCHITECTURAL GROUP, PS | $46,072 | Contract | : Provide a study to determine the condition of the Federal Center South Building's roof structural system and address potential roofing material alternatives while meeting the ARRA requirements, initial capital, sustainability, life cycle costs, good stewa | General Services Administration / Public Buildings Service | 10/07/2009 |
HDM ASSOCIATES, INC | $271,950 | Contract | : To provide a survey and concept drawings for the following issues: 1) Replace existing perimeter air induction unit with a new variable air volume system. 2) Convert the existing steam heating system to a hot water system. 3) Replace existing window sys | General Services Administration / Public Buildings Service | 4/29/2009 |
VE CSIE JV | $58,189 | Contract | : The purpose of this project is A/E design services for the replacement of the facility boiler plant with the goal of increasing energy efficiency of the system that serves the CMS complex. The result of the project is the development of plans and specif | General Services Administration / Public Buildings Service | 8/11/2009 |
JACOBS TECHNOLOGY INC. | $27,595 | Contract | : The General Services Administration (GSA) Program Management Office (PMO) commissioned a study and the developement of an action plan to guide expenditure of American Reinvestment and Recovery Act (ARRA) funds for pre-apprenticeship and apprenticeship tra | General Services Administration / Public Buildings Service | 7/02/2009 |
MUTCHLER BARTRAM ARCHITECTS, P.C. | $42,962 | Contract | : Re-commissioning and Retro Commissioning of the buildling systems affecting energy use and indoor environment, including shell infiltration and heat loss. This includes major heating, cooling and HVAC equipement as well as lighting, controls and the buil | General Services Administration / Public Buildings Service | 6/30/2009 |
SAMUEL ENGINEERING, INC. | $59,103 | Contract | : Project to analyze potential sites at the Denver Federal Center to install additional photovoltaic solar arrays. Multiple roof tops and land areas were studied. Recommendations were made to GSA according to study results. | General Services Administration / Public Buildings Service | 6/18/2009 |
MORRISON-MAIERLE INC | $13,105 | Contract | : Billings, MT Federal Courthouse: ALTA/ACSM survey with boundary amendments; Amended Subdivision Plats; topographic survey; exhibit preparation | General Services Administration / Public Buildings Service | 5/19/2009 |
VANIR CONSTRUCTION MANAGEMENT, INC. | $5,946,138 | Contract | : The Construction Management as Agent (Cma) firm shall provide professional services for overall project administration, management, and quality of the Renovation of 50 united Nations Plaza (50 UNP). All services under this contract shall be preformed unde | General Services Administration / Public Buildings Service | 8/31/2009 |
HENSEL PHELPS CONSTRUCTION CO | $23,343,026 | Contract | : The work includes demolition of some of the existing buildings and infrastructure; construction of retaining walls; import of soil, compaction and grading of soil; installation of utilities including storm and sanitary sewers, gas, electric and domestic w | General Services Administration / Public Buildings Service | 9/11/2009 |
CANNON PARKIN INC | $1,188,512 | Contract | : DESIGN SERVICES TO UPGRADE HVAC SYSTEMS ON FLOORS 1 SOUTH, 5, 6, AND 8 AT THE FEDERAL BUILDING, LOCATED AT 300 NORTH LOS ANGELES STREET, LOS ANGELES, CA. For work associated with providing pre-design through construction administration and commissioning | General Services Administration / Public Buildings Service | 5/29/2009 |
SUBSTANCE, LLC | $121,029 | Contract | : A heating/cooling load study was conducted for the Federal Courthouse in Davenport, Iowa to evaluate the mechanical system zoning in the building and suggest modifications to improve performance and address inadequacies. This study formed the scope for t | General Services Administration / Public Buildings Service | 12/01/2009 |
HOF CONSTRUCTION, INC. | $13,957,903 | Contract | : When the Federal Center was built in 1942 it was common practice to combine the sewer and storm water runoff systems. This complex was originally as the St. Louis Ordinance plant and after the transfer from the Army to the General Services Administration | General Services Administration / Public Buildings Service | 3/22/2010 |
KUBALA WASHATKO ARCHITECTS INC | $21,218 | Contract | : Architect-Engineer Services, Milwaukee, Wisconsin High Performance Green Building at the Federal Building & U.S. Courthouse | General Services Administration / Public Buildings Service | 7/23/2009 |
SCHOOLEY CALDWELL ASSOCIATES, INC | $102,762 | Contract | : The first portion of the project was to assess the building in Youngstown, Ohio with the aid of a previous recommissioning study and make final recommendation for energy conservation measures (ECM's) to implement. The second half of the project was to pr | General Services Administration / Public Buildings Service | 7/08/2009 |
SCHOOLEY CALDWELL ASSOCIATES, INC | $783,165 | Contract | : The first portion of the project was to study the Kinneary Federal Courthouse in Columbus, OH for potential Energy Conservation Measures (ECM'S). The second portion of the project is to design energy conservation measures that can be implemented into th | General Services Administration / Public Buildings Service | 7/24/2009 |
G. H. FORBES ASSOCIATES ARCHITECTS, P.C. | $24,430 | Contract | : The designs consist of the following: -- Installation of sealants at doors, windows and dissimilar materials -- Installation of insulation of existing building 1st floor overhangs along the perimeter of the building. -- Replacement of exterior doors on pe | General Services Administration / Public Buildings Service | 7/24/2009 |
42/40 ARCHITECTURE INC. | $2,495,818 | Contract | : The American Recovery and Reinvestment Act of 2009 (ARRA) has allocated funding for the design and modernization of the 10 West Jackson Federal Building, and the adjacent federally owned buildings at 18 West Jackson and 230 South State Street. The ARRA f | General Services Administration / Public Buildings Service | 7/15/2009 |
SAMUEL ENGINEERING, INC. | $183,753 | Contract | : To assist GSA in analyzing and developing a scope of work and estimate for the design/build project which will be awarded under a separate project. | General Services Administration / Public Buildings Service | 5/05/2009 |
KPFF, INC. | $154,263 | Contract | : Engineering analysis and investigation of existing building | General Services Administration / Public Buildings Service | 5/06/2009 |
M. ARTHUR GENSLER JR. & ASSOCIATES, INC. | $32,457,801 | Contract | : Gensler has been awarded a contract through the GSA for design and design-related services for the 'Recovery' project entitled 'Repairs and Alterations to the Prince Jonah Kuhio Kalanianaole Federal Building and U.S. Courthouse located at 300 Ala Moana Bo | General Services Administration / Public Buildings Service | 7/24/2009 |
ACCESS SERVICES, INC. | $2,385 | Contract | : FSC Storage Design Build | General Services Administration / Public Buildings Service | 8/07/2009 |
PERKINS + WILL, INC. | $3,167,795 | Contract | : A/E will provide Package 3 for the St. Elizabeth West Campus Project in Washington, D.C. Also, A/E will provide A/E drawing for Pakage 13, space analysis for the shared use buildings for the St. Elizabeth's Campus Project in Washington, D.C. | General Services Administration / Public Buildings Service | 6/29/2009 |
HOF CONSTRUCTION, INC. | $2,424,731 | Contract | : The Robert A. Young Building is a high rise historic brick structure approximately 1 million square foot in size, housing 3000 tenants. The existing cafeteria kitchen, dish room, servery, and dining area have become outdated, and much of the equipment is | General Services Administration / Public Buildings Service | 7/29/2009 |
ALLIANCE ROOFING LLC | $1,652,434 | Contract | : Cotter Federal Building Located at 135 High Street Hartford CT, Roofing And Intergraded Photovoltaic Project: Will consist of a Intergraded Photovoltaic & Thermopolyolifen Roofing system: Thermopolyolifen Roofing sytem will be a fully adhered and meet | General Services Administration / Public Buildings Service | 9/29/2009 |
MCC CONSTRUCTION CORPORATION | $9,333,306 | Contract | : DESIGN AND CONSTRUCTION OF A NEW LAND PORT OF ENTRY ALONG THE NORTHERN BORDER OF THE UNITED STATES IN NOONAN, NORTH DAKOTA. THIS REQUIREMENT IS FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT.' | General Services Administration / Public Buildings Service | 8/14/2009 |
C3, LLC | $2,901,461 | Contract | : Replace Windows Tulsa Federal Court House. Design Build effort to replace windows at Tulsa Federal Court House with energy efficient windows. Update the 2001 design to use new energy efficient windows now available. | General Services Administration / Public Buildings Service | 7/27/2009 |
CLARK CONSTRUCTION GROUP, LLC | $181,784,057 | Contract | : The design build scope of work includes architectural, engineering, construction, security, commissioning and other related services necessary to construct the United States Coast Guard (USCG) Headquarters Building, parking garages, and rehabilitate the c | General Services Administration / Public Buildings Service | 8/14/2009 |
H. J. LYNESS CONSTRUCTION, INC | $90,889 | Contract | : SUPPLY ALL LABOR, MATERIALS, SUPERVISION AND EQUIPMENT FOR THE LIGHTING UPGRADES AT BLD 63 OF JEFFERSONVILL FEDERAL CENTER | General Services Administration / Public Buildings Service | 9/22/2009 |
RICHARD FLEISCHMAN + PARTNERS ARCHITECTS, INC. | $3,721,075 | Contract | : Project place of performance is Cincinnati, Ohio. This report is composed of several modifications. The first modification incorporates additional design phase services for the first floor window replacement, fire and life safety code upgrades, new fire | General Services Administration / Public Buildings Service | 7/13/2009 |
TEAM FOUR INC | $136,186 | Contract | : The Cafeteria design was completed 2008, and ?shelved? due to lack of funding. The RAY building received funds under the American Recovery and Reinvestment Act of 2009, and the cafeteria was part of that scope. Because of the ?shelving?, there were some | General Services Administration / Public Buildings Service | 6/23/2009 |
GASTINGER AND WALKER ARCHITECTS INC | $114,708 | Contract | : We provided Construction Manager as Agent services for this project in Omaha Nebraska. Project is completed. | General Services Administration / Public Buildings Service | 8/17/2009 |
BOYD JONES CONSTRUCTION COMPANY | $5,319,809 | Contract | : The contract award provides for preconstruction consultation services and construction services for additions to and the renovation of portions of the North Platte Federal Building in North Platte, NE. The physical scope of work includes a new building E | General Services Administration / Public Buildings Service | 6/26/2009 |
JACOBS PROJECT MANAGEMENT CO. | $130,708 | Contract | : ARRA High Performance Green Building - Eagleton Building This project will upgrade lighting controls, Install dimming ballasts, Install occupancy sensors, Re-lamp light fixtures from 32w to 28w, Replace stairwell lighting; Install harmonic cancelation tra | General Services Administration / Public Buildings Service | 8/26/2009 |
INTEGRITY MANAGEMENT CONSULTING, INC | $91,224 | Contract | : The scope of this requirement is to provide support for the planning and estimating of construction projects and the repair and alteration projects funded by the American Recovery and Reinvestment Act (ARRA). Specifically, the team - ? Prepares initial c | General Services Administration / Public Buildings Service | 8/06/2009 |
WATSON GROUP, L.L.C., THE | $871,483 | Contract | : Serve as the primary point(s) of contact for the design and construction review of projects, in particular energy related aspects of projects. Reviews may involve energy audit reports, scoping documents, scopes of work, design drawings, design specificati | General Services Administration / Public Buildings Service | 8/27/2009 |
CTA INC. | $52,373 | Contract | : Other Architects & Engin gen-The Contractor shall provide engineering and commissioning expertise to conduct recommissioning/retro-commissioning planning, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, and report wri | General Services Administration / Public Buildings Service | 7/30/2009 |
ROYAL HAWAIIAN MOVERS, INC. | $6,342 | Contract | : Office relocations in Hilo Hawaii for US Geological Survey, Army and Navy Recruiting offices andUSDA | General Services Administration / Public Buildings Service | 10/23/2009 |
COLLIERS SEELEY INTERNATIONAL, INC. | $446,236 | Contract | : Costs for 28 months of salary/payroll costs for one employee assigned to support the Design & Construction Division within GSA Region 9. This contract has been extended through Sept 2011. | General Services Administration / Public Buildings Service | 6/09/2009 |
HILL INTERNATIONAL, INC. | $2,936,554 | Contract | : The prime construction management contract is supporting the Thomas S. Foley Courthouse modernization project. Services include: construction management; commissioning and energy modeling related to the pre-design and design phases of the project. All | General Services Administration / Public Buildings Service | 7/22/2009 |
INTEGRITY MANAGEMENT CONSULTING, INC | $555,048 | Contract | : The team provides acquisition support services to assist the Region 9, Public Building Service, Design and Construction Division of the General Services Administration. Specifically, the team supports the acquisition planning, acquisition document develo | General Services Administration / Public Buildings Service | 7/29/2009 |
INNOVATIVE TECHNICAL SOLUTIONS, INC. | $9,078,713 | Contract | : This project is for the design and construction of a new U.S. Land Port of Entry at Wild Horse, MT. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommu | General Services Administration / Public Buildings Service | 8/14/2009 |
PEPPER CONSTRUCTION GROUP LLC | $23,154,535 | Contract | : The current overall purpose of the award is to upgrade and modernize the John W. Peck Federal building's existing Heating Ventilating Air Conditioning systems, replacement of the exterior windows, and upgrading/installation of the building sprinkler syst | General Services Administration / Public Buildings Service | 9/09/2009 |
SMITHGROUP, INC. | $188,639 | Contract | : Recovery Architectural and Engineering services in support of the high performance green building: Roof replacement and energy conservation measures, project at the Land Port of Entry in Sault Sainte Marie, MI. | General Services Administration / Public Buildings Service | 7/28/2009 |
MECCON, INC. | $1,599,416 | Contract | : Dayton Federal Building - Dayton, Ohio -Balancing, Sheet Metal, Insulation, Temperature Controls,Piping Electrical and Duct Cleaning | General Services Administration / Public Buildings Service | 7/27/2009 |
ST LOUIS DESIGN & CONSTRUCTION, INC | $494,174 | Contract | : REPLACE ALL EXISTING LIGHTING AND INSTALL NEW LED LIGHTING, LOCATED AT 450 S FEDERAL PARKING FACILITY, CHICAGO, IL 60605. THE DESIRED OUTCOME OF THIS PROJECT IS TO MODERNIZE AND MAKE MORE EFFICIENT THE LIGHTING THROUGHOUT THIS FACILITY. | General Services Administration / Public Buildings Service | 7/28/2010 |
KURRASCH CONSULTING, LLC | $640,084 | Contract | : Owners Construction Representitive.Kurrasch Consulting, LLC will act as a Consultant to GSA, performing design reviews, attending project meetings,Cost estimate reviews, Schedule reviews, Developement of submittal and testing schedules, Observe mock-ups, | General Services Administration / Public Buildings Service | 9/16/2009 |
JACOBS TECHNOLOGY INC. | $276,824 | Contract | : Tenant Representative Services for the 1800 F Street project in Washington, DC. The primary responsibility will linclude but not be limited to providing coordination of important issues related to the ongoing operations and modernization of the 1800 F Str | General Services Administration / Public Buildings Service | 7/15/2009 |
PRICEWATERHOUSECOOPERS LLP | $1,858,001 | Contract | : Provide program management and reporting services to assist the GSA, PMO in meeting the goals and requirements of transparency and accountability in carrying out President Obama?s administration?s economic stimulus package under the American Recovery and | General Services Administration / Public Buildings Service | 7/06/2009 |
JACOBS PROJECT MANAGEMENT CO. | $2,142,272 | Contract | : Construction Management and Commissioning Services forRepair and Alteration Projects at Sam M. Gibbons Federal Building and Courthouse Jacobs will Commissioning Management Services for the general mechanical, electrical and plumbing upgrades during the de | General Services Administration / Public Buildings Service | 8/10/2009 |
HUITT - ZOLLARS, INC. | $403,645 | Contract | : Request for proposal development for the design build renovations at the GT Mickey Leland Federal Building, Houston, Texas | General Services Administration / Public Buildings Service | 6/01/2009 |
DODSON CONSTRUCTION LLC | $712,313 | Contract | : Energy Effiecency Upgrades | General Services Administration / Public Buildings Service | 9/02/2009 |
CCI GROUP, LLC | $3,452,661 | Contract | : The purpose of the award was to eliminate problematic roof leaks at the areas around the small basin roofs at the McCormick Federal Building, Boston, MA. | General Services Administration / Public Buildings Service | 9/24/2009 |
BBIX, LLC | $231,970 | Contract | : Provide architectural, and engineering services for Extra Field Investigation (EFI), Design and Post Contract Construction Services (Option 1) related to the evaluation of approximately 20,000 square feet of existing courtroom, office, open space and supp | General Services Administration / Public Buildings Service | 9/22/2009 |
DATTNER ARCHITECTS P.C. | $4,252,522 | Contract | : Design services and Bridging Design documents as related to the modernization of the Rodino Federal Office Building in Newark, New Jersey. Specific deliverables include bridging design drawings, performance specifications, owners program requirements and | General Services Administration / Public Buildings Service | 7/06/2009 |
GOSHOW ARCHITECTS, L.L.P. | $2,511,324 | Contract | : A/E Services for Bridging Documents for the high-performance, green, building modernization and other alteration work Clement Ruiz Nazario Courthouse and Federico Degetau Federal Office Building in Hato Rey, Puerto Rico. | General Services Administration / Public Buildings Service | 7/31/2009 |
LEND LEASE (US) CONSTRUCTION LMB INC | $8,047,237 | Contract | : The U.S. Post Office & Conrad B. Duberstein Bankruptcy Court. Brooklyn, NY. Exterior Restoration including Granite Restoration, Terra Cotta Replacement, Slate Roof Replacemenr and Window Refurbishment. | General Services Administration / Public Buildings Service | 7/15/2009 |
HDM ASSOCIATES, INC | $26,062 | Contract | : To perform post design construction administration services for restroom modernizations. Construction Administrative services consists of reviewing schedule of submittals, shop drawings, equipment lists, material samples, certifications, test data, warr | General Services Administration / Public Buildings Service | 8/14/2009 |
HDM ASSOCIATES, INC | $308,696 | Contract | : 244 Needy Road Federal Building, Martinsburg, WV. Purpose is to investigate and provide recommendations for optimizing building performance through identifying energy improvements and demand reduction strategies. A feasibility study is being generated to | General Services Administration / Public Buildings Service | 4/30/2009 |
JACOBS PROJECT MANAGEMENT CO. | $9,621,131 | Contract | : Construction Management Services (CQM) and Commissioning Services (Cx) for Social Security Administration?s (SSA) Data Center. The project includes development of Program of Requirements (POR) bridging documents for the Design-Build solicitation, design a | General Services Administration / Public Buildings Service | 6/26/2009 |
STANGER INDUSTRIES INC. | $552,556 | Contract | : Remove and replacement of boilers in Iowa City, Federal Building & U.S. Courthouse at 400 South Clinton. | General Services Administration / Public Buildings Service | 9/01/2009 |
SFS ARCHITECTURE, INC. | $219,080 | Contract | : Demolition of existing membrane roof assembly and replacement with a new high performance Cool Roof assembly on all roof levels at Robert J. Dole Courthouse. Provide construction management, construction administration, submittal review, construction insp | General Services Administration / Public Buildings Service | 5/19/2009 |
AIR WEST MECHANICAL CONSTRUCTION | $72,808 | Contract | : Install VFD on Chiller # 3 at the Federal Bldg | General Services Administration / Public Buildings Service | 9/03/2009 |
SETTY & ASSOCIATES, LTD. | $253,839 | Contract | : Purchase Order Modification PO02 issued to exercise the option for Commissioning Services and Construction Phase Services - New United States Courthouse in Austin Texas. 3/21/11:rcvd PS05 mod - increase funding by $68,507.29 to revised total of $281,614.2 | General Services Administration / Public Buildings Service | 7/25/2009 |
HERRON ENTERPRISES USA INC | $13,789 | Contract | : Environmental Consultation/Comprehensive Asbestos Building Inspection | General Services Administration / Public Buildings Service | 6/09/2009 |
TRANSYSTEMS CORPORATION | $6,473,053 | Contract | : POFF Federal Building in Roanoke, VA - ARRA, including modifications to base contract; 3 lease space Design Intent Document's and Survey; Additional Design Intent Documents scope; Additional 5,0000 Square Feet lease space Design Intent Documents; South ca | General Services Administration / Public Buildings Service | 9/30/2009 |
RAY ANGELINI INC | $5,043,940 | Contract | : The goal of this project is to provide the General Services Administration Veterans Affairs Center at 5000 Wissahickon Avenue in Philadelphia with a new photovoltaic roof that will help the building offset its electric consumption. This will be accomplis | General Services Administration / Public Buildings Service | 7/21/2009 |
STANGER INDUSTRIES INC. | $656,306 | Contract | : This award was for Recovery - Ward Parkway Federal Building Improvements at the Federal Building at 8930 Ward Parkway, Kansas City, MO. The scope for this project will require installation of high performance Heating Ventilating and Air Conditioning Comp | General Services Administration / Public Buildings Service | 9/25/2009 |
BOYD JONES CONSTRUCTION COMPANY | $1,686,332 | Contract | : The purpose of the project is to remove existing air handling units and some of the existing lighting and ceiling system and replace them with a new HVAC air handler with associated ductwork, terminal units, new ceiling and light fixtures. Project consist | General Services Administration / Public Buildings Service | 9/24/2009 |
BRAZOS ROOFING INTERNATIONAL OF SOUTH DAKOTA, INC. | $488,888 | Contract | : Construction Services for Roof Replacement Elizabeth Kee Courthouse Bluefield WV,Project was completed on budget | General Services Administration / Public Buildings Service | 9/25/2009 |
OREGON TRADES WOMEN, INC | $1,041,211 | Contract | : Oregon Tradeswomen, Incoroporated works in conjuunction with the Portland metro area's union registered construction apprenticeship programs, as well as with several majuor contrator associations to provide successful pre-apprenticeship training and place | General Services Administration / Public Buildings Service | 9/22/2009 |
COMMUNITY SERVICES AGENCY OF THE METROPOLITAN WASHINGTON COUNCIL, AFL-CIO | $1,647,660 | Contract | : Pre-apprenticeship training and job placement services for low-income Washington DC- area residents to train and place them into apprenticeship programs or into entry level jobs in construction or construction-related jobs in the Washington DC area. Case | General Services Administration / Public Buildings Service | 9/08/2009 |
SHIEL SEXTON COMPANY, INC. | $66,172,778 | Contract | : Shiel Sexton was awarded the construction management services (CMc) to exercise the construction phases services option for the renovation and moderization of the Birch Bayh Federal Building and US Courthouse. | General Services Administration / Public Buildings Service | 5/05/2009 |
TEAM FOUR INC | $2,719,222 | Contract | : RAY ARRA project is classified as a Building Modernization, requiring the project to achieve LEED Silver certification. The Robert A. Young (RAY) Federal Building, located in the downtown St. Louis Central Business District, was built in 1933 as a Termina | General Services Administration / Public Buildings Service | 6/13/2012 |
PIPER-WIND ARCHITECTS, INC | $310,642 | Contract | : Retrofit of existing Government Courthouse Building (Carlson Federal Building, Topeka, Kansas) with new energy efficient Heating, Ventilating, and Air Conditioning Equipment and controls with options to incorporate new energy efficient lighting and new r | General Services Administration / Public Buildings Service | 9/29/2009 |
SUBSTANCE, LLC | $20,735 | Contract | : A masterplan has been prepared for the Cafeteria kitchen of the Neal Smith Federal Building in Des Moines, Iowa. This masterplan report includes plan drawings, broad appliance recommendations, and estimated construction costs as well as energy performanc | General Services Administration / Public Buildings Service | 9/14/2009 |
STANGER INDUSTRIES INC. | $4,237,937 | Contract | : This award was for the ARRA-Wichita Air Handler Replacement - United States Courthouse - replacement of air handling units in the Wichita Courthouse.Install new high-efficiency hot water boilers, new off-hours chiller, Variable Air Volume and direct digit | General Services Administration / Public Buildings Service | 7/15/2009 |
ROOFING RESOURCES INC | $75,855 | Contract | : VA Building Construction Adminstrative Services, daily roof replacement monitoring and quality assurance. | General Services Administration / Public Buildings Service | 6/01/2009 |
JACOBS PROJECT MANAGEMENT CO. | $90,491 | Contract | : Construction Management (CM) Services for approximately 1-month of Pre-Construction Services and 8-months of CM Services which will include; site office and associated home office support tor contract coordination, scheduling support and CM Services inclu | General Services Administration / Public Buildings Service | 7/30/2009 |
EATON ENERGY SOLUTIONS, INC. | $259,534 | Contract | : The scope of work includes five primary elements for two locations including the Thomas F Eagleton Courthouse in St. Louis, MO and the North Platte Federal Building in North Platte, NE. The five elements are: On-site building Energy Managment Control Sys | General Services Administration / Public Buildings Service | 6/03/2009 |
AKAL SECURITY, INC | $10,000 | Contract | : Provide Security Officer Services within Federal Courthouses. | General Services Administration / Public Buildings Service | 4/01/2010 |
GENLYTE THOMAS GROUP LLC | $3,259,751 | Contract | : Recovery lighting replacement at the Phillip Burton Federal Building and the USCH, 450 Golden Gate Ave., San Francisco, CA. Furnish and install lighting fixtures. | General Services Administration / Public Buildings Service | 9/09/2009 |
TECTA AMERICA CORP. | $820,296 | Contract | : Minneapolis Federal Building Roof replacemenmt to provide new roof with multiyear warranty and improved insulation and drainage for both energy savings and structural durability. Includes removal and replacement of 41,000 SqFt of bituminus BUR and 6648 Li | General Services Administration / Public Buildings Service | 9/24/2009 |
TECTA AMERICA CORP. | $1,349,360 | Contract | : Design and Construction of a roof replacement on the administrative portions of the Federal Archives and Research Center. The contract will contain work involving, but not limited to: demolition of existing roofing; installation of sheet and tapered insu | General Services Administration / Public Buildings Service | 8/28/2009 |
MACK SCOGIN MERRILL ELAM ARCHITECTS, INC | $1,959,793 | Contract | : Construction Administration services for new U.S. Courthouse in Austin, TX. Construction Administration services last 36 months. | General Services Administration / Public Buildings Service | 7/25/2009 |
RANDOLPH CONSTRUCTION SERVICES, INC. | $15,098,680 | Contract | : This project is located just north of Norhtport Washington on the Canadian border. The project consists of the design and construction of a new two story land port of entry facility. The new facility will be approximately 9,000 square feet total. The proj | General Services Administration / Public Buildings Service | 8/14/2009 |
MCC CONSTRUCTION CORPORATION | $8,205,676 | Contract | : THIS ACTION IS FUNDED BY ARRA FOR THE DESIGN AND CONSTRUCTION OF A UNITED STATES LAND PORT OF ENTRY (LPOE) ALONG THE NORTHERN BORDER IN CHURUBUSCO, NY.' | General Services Administration / Public Buildings Service | 8/14/2009 |
SAMUEL ENGINEERING, INC. | $16,038 | Contract | : A structural analysis of six buildings at the Denver Federal Center to determine capacity to hold solar panels in preparation of future installation. | General Services Administration / Public Buildings Service | 6/08/2009 |
SAMUEL ENGINEERING, INC. | $148,318 | Contract | : To assist GSA in analyzing and developing a scope of work and estimate for the design/build project which will be awarded under separate contract. | General Services Administration / Public Buildings Service | 5/05/2009 |
P.F. MCCARTHY, INC. | $637,181 | Contract | : The original scope of work awarded was to retrofit the existing fluorescent and incandescent lighting with new LED (light Emitting Diode) Lighting in the Aberdeen, South Dakota Federal Building. The Project will require P.F. McCarthy, Inc. to open up the | General Services Administration / Public Buildings Service | 9/29/2009 |
WHITE CONSTRUCTION GROUP, LTD. | $6,000 | Contract | : Provide pre-construction estimating services to assist in establishing the Design Build Budget for the modernization of the Cesar E. Chavez Memorial Building in Denver, Colorado. These services will provide estimates for predefined comprehensive and unifo | General Services Administration / Public Buildings Service | 9/29/2009 |
HALL-WIDDOSS & COMPANY PC | $37,750 | Contract | : Real Estate Appraisal | General Services Administration / Public Buildings Service | 5/19/2009 |
CONSTRUCTORS HAWAII INC. | $6,129,808 | Contract | : Repair, alteration, and seismic upgrade to the Federal Building and U.S. Post Office at 154 Waianuenue Avenue, Hilo, Hawaii. The work includes asbestos removal work, installation of new concrete shear walls in the two wings, reconstruction of architectur | General Services Administration / Public Buildings Service | 7/24/2009 |
ARS MECHANICAL, LLC | $392,630 | Contract | : Chiller and Boiler Replacement | General Services Administration / Public Buildings Service | 9/18/2009 |
CB RICHARD ELLIS, INC. | $65,000 | Contract | : Appraisal services for US Department of State Training Facility - site to be determined | General Services Administration / Public Buildings Service | 9/29/2009 |
JACOBS TECHNOLOGY INC. | $3,132,093 | Contract | : Construction Management (Agency) Services for Renovation and Modernizationof the Birch Bayh Federal Building and US Courthouse in Indianapolis, IN Project will provide Construction Management (CM) Services forConstruction, Close Outand Tenant Coordination | General Services Administration / Public Buildings Service | 9/29/2009 |
JACOBS TECHNOLOGY INC. | $3,562,396 | Contract | : Construction Management (Agency) Services for Modernization ofU.S. Department of Interior Headquarters ARRA - DOI MODERIZATION CM SVS ARRA - DOI MODERIZATION CM SVS | General Services Administration / Public Buildings Service | 8/04/2009 |
HEERY INTERNATIONAL, INC. | $1,773,477 | Contract | : Initial scope was for pre-design services for the design and construction of new office space for the Army Corp of Engineers on the Federal Center South campus in Seattle, WA. Design and construction will be procured under a design-build procurement meth | General Services Administration / Public Buildings Service | 9/02/2009 |
URS GROUP, INC. | $5,599,735 | Contract | : RECOVERY. CONSTRUCTION MANAGEMENT SERVICES. TAS::47 4543::TAS Complete renovation of existing 450,000 SF IRS Center in Andover, MA. | General Services Administration / Public Buildings Service | 7/13/2009 |
URS GROUP, INC. | $2,407,474 | Contract | : Construction Management Assist, Energy Modeling and Commissioning Services for the Jackson Federal Building Modernization Project | General Services Administration / Public Buildings Service | 7/24/2009 |
TEAM FOUR INC | $49,892 | Contract | : The Purpose of this study is to determine if a renewable energy system is feasible considering: the RAY building and impacts to it, the climate, the life of the system, the up front (initial) costs, potential savings due to reduced energy purchases, and c | General Services Administration / Public Buildings Service | 4/22/2009 |
TENG & ASSOCIATES, INC. | $324,313 | Contract | : Dole, Ward and Witchita Courthouse. Description of Work /Purpose: To conduct onsite Retro-Commissioning, Energy Audits, Energy Analysis Calculations, Generate a list of potential ARRA funded projects validated as a 'go/no-go' based on energy payback. In a | General Services Administration / Public Buildings Service | 7/14/2009 |
TENG & ASSOCIATES, INC. | $255,983 | Contract | : IOWA CITY FEDERAL BUILDING, GRAND ISLAND FEDERAL BUILDING, AND RETRO-COMMISSIONING SERVICES ONLY FOR THE FRANK CARLSON UNITED STATES COURTHOUSE AND FEDERAL BUILDING to conduct onsite Retro-Commissioning, Energy Audits, Energy Analysis Calculations, genera | General Services Administration / Public Buildings Service | 9/28/2009 |
JOHNSON ROOFING & CONSTRUCTION, INC. | $2,541,585 | Contract | : This is a modification to the ARRA ROOF REPLACEMENT, ROMAN L HRUSKA US COURTHOUSE,OMAHA, NE. | General Services Administration / Public Buildings Service | 7/28/2009 |
LEND LEASE (US) CONSTRUCTION LMB INC | $6,948,775 | Contract | : Modernization and facade reclad of Peter W. Rodino Federal Building in Newark, NJ | General Services Administration / Public Buildings Service | 7/15/2009 |
NICHOLSON & GALLOWAY, INC | $61,746,842 | Contract | : Fa+?ade Repair and Slate Roof Replacement at the U.S. Post Office and Courthouse located at 271 Cadman Plaza East, Brooklyn, NY 11201 | General Services Administration / Public Buildings Service | 7/27/2009 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $5,232 | Contract | : Inspection of two artworks at the federal building for condition and threat from planned building renovation. The project results in a plan and price for any needed work to restore proper condition or to protect the artworks during planned building renov | General Services Administration / Public Buildings Service | 9/28/2009 |
M.E. GROUP, INC. | $1,650,077 | Contract | : Engineering and commissioning expertise to conduct re-commissioning/retro-commissioning planning, identify energy and water conservation, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, and report writing services for | General Services Administration / Public Buildings Service | 8/14/2009 |
JONATHAN LEVI ARCHITECTS LLC | $5,076,360 | Contract | : Architect/Engineer Services, Repair and Alterations, IRS Service Center, Andover, MA. | General Services Administration / Public Buildings Service | 6/02/2009 |
HDM ASSOCIATES, INC | $57,933 | Contract | : To perform post design construction administration services for bathroom modernization. Construction Administrative services consists of reviewing schedule of submittals, shop drawings, equipment lists, material samples, certifications, test data, warra | General Services Administration / Public Buildings Service | 9/29/2009 |
URS GROUP, INC. | $2,445,642 | Contract | : TAS::47 4543::TAS Provide Construction Management Design phase services for the United States Customhouse envelope and boiler replacement project located in Philadelphia, Pennsylvania. | General Services Administration / Public Buildings Service | 5/04/2009 |
OUDENS & KNOOP ARCHITECTS, P.C. | $221,802 | Contract | : The Architect/Engineer (A/E) performed all professional services as necessary to provide GSA with a Design-Build scope of work for projects at the Byrne Green Complex which included Air Handling Unit Replacement, PhotoVoltaic Array, and Vegetative Roof. A | General Services Administration / Public Buildings Service | 7/06/2009 |
PHOENIX CONTRACTING SERVICES, INC. | $619,900 | Contract | : Roof Replacement Abingdon Federal Building 1. Removal of approximately 17,700 square feet of built-up roofing system on six (6) levels, constituting all built-up roofing now in place at the Abingdon Federal Courthouse. The roofing system consists of bit | General Services Administration / Public Buildings Service | 9/21/2009 |
JACOBS TECHNOLOGY INC. | $475,918 | Contract | : Requirements and Estimating Sevices for facilities in GSA Region 10 Prepare performance based requirements packages for solicitation of Design/Build contracts for various projects. This is to include high performance Green buildings. The intent is to gath | General Services Administration / Public Buildings Service | 9/15/2009 |
W. G. YATES & SONS CONSTRUCTION COMPANY | $3,159,477 | Contract | : The purpose of this award was to incorporate field changes and add value engineered options back into the scope work. The major options included were the blue fins, pavers at the rotunda, and granite steps at the entrance. | General Services Administration / Public Buildings Service | 6/26/2009 |
SCHWARTZ/SILVER ARCHITECTS | $3,635,607 | Contract | : GOALS: The purpose of the McCoy Federal Building Modernization Project is to create a state-ofG??the art working environment for Federal tenants in Jackson, minimize future vacancies, operational efficiency and economy in building systems and provide prog | General Services Administration / Public Buildings Service | 7/29/2009 |
HANNAH & ASSOCIATES, INC. | $8,769 | Contract | : The Architect-Engineer (A/E) shall perform all professional services necessary for planning and designing of this project in accordance with the program and GSA standards. The professional services for this Work Order shall consist of, but not be limited | General Services Administration / Public Buildings Service | 7/24/2009 |
VISTARA CONSTRUCTION SERVICES INC | $1,412,454 | Contract | : The restoration project will replace the waterproofing membrane and increase the insulation of the plaza, replace the lighting systems in the below grade Post Office workroom levels with more energy efficient lighting, repair damages caused by water leaks | General Services Administration / Public Buildings Service | 7/14/2009 |
STUDIO3 DESIGN, INC. | $1,391,896 | Contract | : Owner's Construction Representative services for the Modernization of the 10W. Jackson, 18 W. Jackson, and 230 S. State Street Project, located in Chicago, IL. The contract award is for the Base Services-Design/Pre-Construction Phase, Construction Year O | General Services Administration / Public Buildings Service | 9/09/2009 |
STL ARCHITECTS, INC. | $119,880 | Contract | : Planning and designing for the recommissioning and retro-commissioning of the existing US Customs House Building in order to improve the energy efficiency and minimize the environmental impact of the existing building. This work includes a pre-design rep | General Services Administration / Public Buildings Service | 7/23/2009 |
OWP/P CANNON DESIGN, INC. | $13,280,552 | Contract | : The project utilizes American Recovery and Reinvestment Act funding to improve the energy performance, function, and aesthetic quality of the John C. Kluczynski Federal Building and US Post Office Loop Station. It is a repair and alteration project. The | General Services Administration / Public Buildings Service | 7/28/2009 |
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. | $583,192 | Contract | : Provide Pre-Design, Design, Bidding, Construction and Post-Construction Services for the building system renovations located in the North Platte Federal Building. | General Services Administration / Public Buildings Service | 5/14/2009 |
HOF CONSTRUCTION, INC. | $5,188,089 | Contract | : This project will include installing a new heating, ventilation, air conditioning and humidification system to meet the National Archives and Records Administration 2009 requirements for file storage. This will bring the facility up to standard warm lit | General Services Administration / Public Buildings Service | 9/04/2009 |
INNOVATIVE TECHNICAL SOLUTIONS, INC. | $8,030,481 | Contract | : This project is for the design and construction of a new U.S. Land Port of Entry at Scobey, MT. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommunica | General Services Administration / Public Buildings Service | 8/14/2009 |
MCC CONSTRUCTION CORPORATION | $7,666,220 | Contract | : DESIGN AND CONSTRUCTION OF A NEW LAND PORT OF ENTRY ALONG THE NORTHERN BORDER OF THE UNITED STATES IN ANTLER, NORTH DAKOTA. THIS REQUIREMENT IS FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT.' | General Services Administration / Public Buildings Service | 8/14/2009 |
GSBS, P.C. | $134,898 | Contract | : The Internal Revenue Service Center Building in Ogden UT was selected to receive a recommissioning study under the American Recovery and Reinvestment Act. The scope of this study includes the energy analysis of the facilityG??s building envelope, lighting | General Services Administration / Public Buildings Service | 7/10/2009 |
ANDREWS AND ANDERSON ARCHITECT PC | $50,304 | Contract | : To develop a statement of work for the repair and alteration of the Pierre Federal Office Building to replace the exisiting curtain wall system and repair basement water infiltration issues. There will be construction management services and the project | General Services Administration / Public Buildings Service | 7/28/2009 |
PLANT ENGINEERING CONSULTANTS INC | $73,512 | Contract | : Retro-commissioning Services for the Joseph C. O'Mahoney Federal Office Building | General Services Administration / Public Buildings Service | 6/09/2009 |
HKS, INC. | $4,990,965 | Contract | : Professional services necessary for the Programming, Planning, and Development of the design of the renovation through the Recovery Act at the 50 United Nations Plaza. The initial scope of services shall include Administrative and Design Services consist | General Services Administration / Public Buildings Service | 8/07/2009 |
ASBUILT METRON, INC. | $153,995 | Contract | : Laser Scanning Services | General Services Administration / Public Buildings Service | 5/29/2009 |
P.B.S. ENVIRONMENTAL BUILDING CONSULTANTS INC. | $2,745 | Contract | : Laboratory anlaysis for asbestos content. | General Services Administration / Public Buildings Service | 7/02/2009 |
RTKL ASSOCIATES INC. | $354,373 | Contract | : The purpose of the award was to develop a Program of Requirements (POR) for Department of Veterans Affairs (VA) personnel that currently occupy the Lafayette Building at 810 Vermont Avenue so that they could be relocated to facilitate the renovation of th | General Services Administration / Public Buildings Service | 7/22/2009 |
JACOBS PROJECT MANAGEMENT CO. | $8,573,851 | Contract | : Construction Management and Commissioning Management Services for Phases 2 and 3 of the Modernization of the US Department of Commerce Headquarters in the Herbert C. Hoover Building in Washington, DC. The Herbert C. Hoover Systems Replacement project is a | General Services Administration / Public Buildings Service | 7/24/2009 |
HEERY INTERNATIONAL, INC. | $8,871,525 | Contract | : Construction Management and Commissioning Services for the moderization of General Services Administration (GSA) Headquarters at 1800 F Street, NW, Washington, DC. The purpose is to manage the budget, schedule, and quality of the project for the GSA. | General Services Administration / Public Buildings Service | 12/24/2009 |
PERKINS + WILL, INC. | $20,631,688 | Contract | : Perkins + Will and Consultants for the second quarter performed construction observation for the adaptive reuse buildings (approximately 45% complete), security fences and campus utilities (approximately 42% complete) for St. Elizabeth's West Campus. | General Services Administration / Public Buildings Service | 6/29/2009 |
HILL INTERNATIONAL, INC. | $10,366,999 | Contract | : This prime construction management contract is supporting the Lafayette building Modernization project. The project is a full renovation by the GSA and includes over 565,000 square feet. Upon completion, the project will achieve a LEED Gold Rating, maint | General Services Administration / Public Buildings Service | 6/05/2009 |
JACOBS TECHNOLOGY INC. | $3,823,947 | Contract | : As Construction Manager as Advisor (CMa), Jacobs will be the government's on-site manager responsible for the successful renovation of the existing Hipolito F. Garcia U. S. Post Office Federal Courthouse, San Antonio, Texas. The goal of the project is to | General Services Administration / Public Buildings Service | 7/22/2009 |
URS GROUP, INC. | $169,224 | Contract | : Provide project management services of Retro-Commissioning studies for seven (7) Federal Buildings throughout Region 10. | General Services Administration / Public Buildings Service | 7/20/2009 |
MOVE MANAGEMENT CENTER, THE | $25,185 | Contract | : moving services to relocate multiple agencies | General Services Administration / Public Buildings Service | 8/07/2009 |
PDG, INC. | $38,276 | Contract | : Fa+?ade replacement materials structural study for the Micky Leland FOB (TX0298ZZ located at 1919 Smith Street, Houston, TX 77002). A project is proposed to replace the fa+?ade to improve energy efficiency and verify actual constuction conditions of the | General Services Administration / Public Buildings Service | 6/29/2009 |
MCC CONSTRUCTION CORPORATION | $8,761,608 | Contract | : DESIGN AND CONSTRUCTION OF A NEW LAND PORT OF ENTRY ALONG THE NORTHERN BORDER OF THE UNITED STATES IN MORGAN, MONTANA. THIS REQUIREMENT IS FUNDED BY TNE AMERICAN RECOVERY AND REINVESTMENT ACT.' | General Services Administration / Public Buildings Service | 8/14/2009 |
GSBS, P.C. | $138,019 | Contract | : The project requires Construction Management (CM) services on behalf of the GSA Region 8 over the course of 6 months. The CM services help assure the government that there is full value for the construction services rendered. The CM, GSBS Architects, pr | General Services Administration / Public Buildings Service | 8/25/2009 |
MUTCHLER BARTRAM ARCHITECTS, P.C. | $47,936 | Contract | : Re-commissioning and Retro Commissioning of the buildling systems affecting energy use and indoor environment, including shell infiltration and heat loss. This includes major heating, cooling and HVAC equipement as well as lighting, controls and the buil | General Services Administration / Public Buildings Service | 7/08/2009 |
CH2M HILL, INC. | $4,141,844 | Contract | : The Denver Federal Center (DFC)in Lakewood, Colorado has antiquated utilities in need of repair or rehabilitation. CH2M HILL has been working with the General Services Administration (GSA) over the past five years to design a new water distribution system | General Services Administration / Public Buildings Service | 5/21/2009 |
M. E. GROUP, INC. | $208,214 | Contract | : Recommissioning study of Building 20 & 95 at the Denver Federal Center in Lakewood, CO. A water and energy audit and balance report will be done. A savings summary of energy conservation measures will be compiled. A table which shows current ovrerall b | General Services Administration / Public Buildings Service | 6/17/2009 |
BASSETT CONSTRUCTION SERVICES | $7,202 | Contract | : Estimating and conlulting | General Services Administration / Public Buildings Service | 9/25/2009 |
DEVELOPMENT ONE, INC. | $36,510 | Contract | : The purpose of the geotechnical investigation prior to new courthouse design is to determine the character and physical properties of the soil deposits of the 2.5 acre site and their potential as foundations for structures and as material for earthwork co | General Services Administration / Public Buildings Service | 5/07/2009 |
T3W BUSINESS SOLUTIONS, INC. | $34,952 | Contract | : 2005 minimum standard detail requirements for ALTA/ACSM Land Title Surveys as adopted by American Land Title Association and National Society of Professional Surveyors. | General Services Administration / Public Buildings Service | 4/28/2009 |
MILLAN & SONS | $30,744 | Contract | : Seismic Life & Safety | General Services Administration / Public Buildings Service | 7/30/2009 |
NORRIS REALTY ADVISORS | $4,000 | Contract | : commercial real estate appraisal | General Services Administration / Public Buildings Service | 5/04/2009 |
JULIE SNOW ARCHITECTS INC | $2,880,685 | Contract | : The award is for Architectural/Engineering Bridging Design services including, but not limited to, Pre-Design Services, Design Concepts, Bridging Design-Build Services, and Contract Close our Services for the Van Buren Land Port of Entry. The project is | General Services Administration / Public Buildings Service | 8/31/2009 |
GSBS, P.C. | $125,579 | Contract | : The Wallace F. Bennett Building in Salt Lake City, UT was selected to receive a recommissioning study under the American Recovery and Reinvestment Act. The scope of this study includes the energy analysis of the facilityG??s building envelope, lighting sy | General Services Administration / Public Buildings Service | 7/20/2009 |
EVERTON OGLESBY ARCHITECTS, PLLC | $600,213 | Contract | : Recovery: Provide Commissioning Services during the construction phase and post construction phase of the project. The scope of the project includes the renovation and new construction addition to the existing Internal Revenue Services (IRS) Service Cen | General Services Administration / Public Buildings Service | 7/21/2009 |
J. E. NOVACK CONSTRUCTION CO. | $3,557,841 | Contract | : This award includes Construction Manager as Constructor (CMc) Services for the High Performance Green Building at Thomas Eagleton Federal Courthouse. CMc services for this project include attending design review meetings at the kick-off, as well as 50%, 9 | General Services Administration / Public Buildings Service | 7/15/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $16,228 | Contract | : Northern Management Services Inc shall supply and install four cartons of polardam form in the Data Center. Based on the revised scope of work, Northern Management has received a credit for not using the special order brushed grommets. Thus adjusting th | General Services Administration / Public Buildings Service | 12/14/2009 |
BAILEY EDWARD DESIGN, INC. | $104,951 | Contract | : Architecture and Engineering Services | General Services Administration / Public Buildings Service | 7/24/2009 |
BARGMANN HENDRIE & ARCHETYPE, INC. | $35,905 | Contract | : The overall purpose of the contract is to assist the GSA with the administration of a construction contract for reroofing and masonry repairs at the U.S. courthouse in Providence, RI. Our assistance assures the work described in the contract documents is | General Services Administration / Public Buildings Service | 9/17/2009 |
WATERMARK ENVIRONMENTAL, INCORPORATED | $198,029 | Contract | : Construction Inspection Services, Monitoring, Cost Estimating and Testing Services in support of the ARRA Roof Replacement and associated repairs at the US Federal Courthouse located in Providence, RI | General Services Administration / Public Buildings Service | 9/28/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $6,438 | Contract | : Perform testing of the EMS systems at the Giaimo building in New Haven, CT and the McMahon CH/FB in Bridgeport, CT, in support of the energy audits at these locations. | General Services Administration / Public Buildings Service | 9/29/2009 |
BBIX, LLC | $59,989 | Contract | : Provide architectural, and engineering services for Extra Field Investigation (EFI), Design and Post Contract Construction Services (Option 1) related to the evaluation of approximately 20,000 square feet of existing courtroom, office, open space and supp | General Services Administration / Public Buildings Service | 6/23/2009 |
GREENWOOD INDUSTRIES, INC. | $2,190,813 | Contract | : Remove and replace roofing and related trades at the Providence Federal Courthouse, Providence, RI | General Services Administration / Public Buildings Service | 9/11/2009 |
HDM ASSOCIATES, INC | $303,022 | Contract | : Robert C. Byrd Federal Building, Charleston, WV: To investigate and provide a complete contract document package that includes the following: 1) Module Photovoltaic System consisting of the installation of highly efficient single crystallian silicon enca | General Services Administration / Public Buildings Service | 6/01/2009 |
MCDONOUGH BOLYARD PECK, INC. | $166,886 | Contract | : The project includes a lobby expansion and lighting upgrades. The lobby does not adequately handle the volume of pedestrian traffic arriving at the building. The solution is to expand the main lobby with an aesthetically pleasing design. The first floo | General Services Administration / Public Buildings Service | 8/26/2009 |
OUDENS & KNOOP ARCHITECTS, P.C. | $157,391 | Contract | : AE services for renovations to the Boggs Courthouse Lobby and egress stairs for the purposes of improvements to energy, security and building functionality. Renovations have included the lobby, entry plaza, and egress stairs. | General Services Administration / Public Buildings Service | 6/17/2009 |
KUBALA WASHATKO ARCHITECTS INC | $7,294 | Contract | : Supplemental Architect-Engineer Services, Milwaukee Light Court Roof Replacement: ARRA Scope Implementation at the Federal Building & U.S. Courthoused, 517 E. Wisconsin Avenue, Milwaukee, WI | General Services Administration / Public Buildings Service | 7/23/2009 |
URS GROUP, INC. | $172,842 | Contract | : WORK ORDER UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) FOR RECOMISSIONING AT THE POTTER STEWART US COURTHOUSE IN CINCINNATI, OH TAS::47 4543::TAS. Design services, Post Construction Award Contract Services, Construction Inspection Services, Re | General Services Administration / Public Buildings Service | 7/24/2009 |
STL ARCHITECTS, INC. | $194,364 | Contract | : Planning and designing for the recommissioning and retro-commissioning of the existing Metcalfe Federal Building in order to improve the energy efficiency and minimize the environmental impact of the existing building. This work includes a pre-design rep | General Services Administration / Public Buildings Service | 7/23/2009 |
TEAM FOUR INC | $484,608 | Contract | : Eagleton Courthouse High Perf - Lighting improvement: A high-performance lighting replacement project will both decrease energy consumption and cost, and improve working conditions and productivity for building occupants. The project will include the fo | General Services Administration / Public Buildings Service | 3/03/2011 |
GASTINGER AND WALKER ARCHITECTS INC | $248,307 | Contract | : Performed Construction Management as Agent Services on Courthouse in Wichita, Kansas. Project is Complete. | General Services Administration / Public Buildings Service | 9/02/2009 |
HOF CONSTRUCTION, INC. | $26,645,547 | Contract | : The Robert A. Young (RAY) Federal Building (1,004,784 rsf, 1,131,935 gsf) stands at 21 stories tall and provides functional office space for many Federal Agencies in downtown St. Louis. The building is a 10-story concrete framed building with basement an | General Services Administration / Public Buildings Service | 3/17/2010 |
TENG & ASSOCIATES, INC. | $328,345 | Contract | : Robert A. Young Federal Building, Neal Smith Federal Building, Sioux City Courthouse: conduct onsite Retro-Commissioning, Energy Audits, Energy Analysis Calculations, Generate a list of potential ARRA funded projects validated as a 'go/no-go' based on ene | General Services Administration / Public Buildings Service | 7/27/2009 |
NOR-LAKE, INCORPORATED | $2,655 | Contract | : Two Door Advantage Freezer. Basemount Freezer for food storage, 2 door, stainless exterior, smooth aluminum interior, casters, 34 D X 55 W X 82 1/2 H, 660#, 115/60/1, 13.9 amp. | General Services Administration / Public Buildings Service | 5/14/2009 |
HEERY INTERNATIONAL, INC. | $167,267 | Contract | : Two federally owned buildings originally constructed in 1952 and 1982 in Portland, Oregon, are currently being surveyed to evaluate the HVAC, mechanical, electrical and plumbing services and equipment, to establish their age, condition and current perform | General Services Administration / Public Buildings Service | 7/21/2009 |
AMEC EARTH & ENVIRONMENTAL, INC. | $80,480 | Contract | : Prepare an Environmental Assessment (EA) to address potential environmental consequences anticipated to result from 1) redeveloping/modernizing a portion of Federal Center South (FCS) B12021 warehouse on federally-owned lands located at 4735 East Marginal | General Services Administration / Public Buildings Service | 6/23/2009 |
EATON ENERGY SOLUTIONS, INC. | $485,193 | Contract | : This award was issued in June fully funding the Commissioning for the additional Construction phase, Acceptance & Post-Occupancy phase, as well as added Leadership in Energy Environmental Design Consultation to our contract. (Jackson, MS) | General Services Administration / Public Buildings Service | 7/24/2009 |
EHS-INTERNATIONAL, INC. | $16,985 | Contract | : Soil Sampling at Federal Center South, Seattle | General Services Administration / Public Buildings Service | 9/08/2009 |
SHALOM BARANES ASSOCIATES P C | $12,769,964 | Contract | : Energy Study for silver LEED (Leadership in Energy & Environmental Design) certification for 1800 F Street, NW Modernization. Studies to include: 1. Relocation of HVAC (heating, ventilation & air conditioning) piping 2. Window replacement 3. Improve v | General Services Administration / Public Buildings Service | 7/29/2009 |
WESTLAKE, REED, LESKOSKY, LTD. | $3,831,151 | Contract | : The purpose of the award is to advance the design and documentation of Phase 1C to provide a modern state of the art office environment for the Department of State headquarters. The northern section of the Department of State headquarters building is div | General Services Administration / Public Buildings Service | 7/14/2009 |
GILBANE-GRUNLEY JV | $171,108,583 | Contract | : Phase 2 of the Herbert C Hoover Building Modernization - located in Washington, DC, worth $112,158,081 is to renovate and modernize the mechanical, electrical, and plumbing infrastructure of the building, as well as perform all site and utility work assoc | General Services Administration / Public Buildings Service | 7/22/2009 |
INTERIOR SYSTEMS, INC. | $1,318,094 | Contract | : Provided continued Budget and Program Support Services to the GSA at 1100 Pennsylvania Avenue, NW, Washington, DC. | General Services Administration / Public Buildings Service | 8/27/2009 |
WATSON GROUP, L.L.C., THE | $291,882 | Contract | : The award is to provide engineering and commissioning expertise to conduct re-commissioning / retro-commissioning planning, identify energy conservation measures, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, and re | General Services Administration / Public Buildings Service | 8/27/2009 |
JACOBS TECHNOLOGY INC. | $6,891,261 | Contract | : CM services for Clemente Ruiz Nazario Courthouse and Federico Degetau Federal Office Building The project is a High Performance Green Building Modernization. The scope of the work for the building includes the following: Redesign and replacement of HVAC s | General Services Administration / Public Buildings Service | 9/04/2009 |
IMMIXTECHNOLOGY, INC. | $92,788 | Contract | : SOFTWARE LICENSES AND MAINTENANCE | General Services Administration / Public Buildings Service | 9/29/2009 |
LAND ACQUISITIONS, INC. | $539,053 | Contract | : Professional services for the acquisition of real estate rights and interests of private property, and associated relocation assistance in accordance with all applicable federal laws and regulations including the Uniform Relocation Assistance and Real Pro | General Services Administration / Public Buildings Service | 11/25/2009 |
GOSHOW ARCHITECTS, L.L.P. | $917,352 | Contract | : Analyze and confirm specific energy conservation and renewable energy generation features to be included in the Conrad B. Duberstein U.S. Bankruptcy Courthouse, Brooklyn, New York | General Services Administration / Public Buildings Service | 11/17/2009 |
MCDONOUGH BOLYARD PECK, INC. | $505,805 | Contract | : McDonough Bolyard Peck, Inc. is to provide construction management services for all phases of the Jacob K. Javits Federal Building Plaza Reconstruction project in New York, NY from design through construction: design development, construction delivery, an | General Services Administration / Public Buildings Service | 12/28/2009 |
MCDONOUGH BOLYARD PECK, INC. | $532,972 | Contract | : The Conrad B. Duberstein U.S. Bankruptcy Courthouse is a historic structure located in the Civic Center of the Borough of Brooklyn, New York. It is a good example of Romanesque Revival architecture, it is a local historical Landmark in the City of New Yor | General Services Administration / Public Buildings Service | 12/31/2009 |
HDM ASSOCIATES, INC | $4,625,053 | Contract | : Huntington Federal Building, Huntington, WV. The project objectives are: Modernize the existing heating,ventilation, air conditioning system to a Variable Air Volume system; Incorporate photo voltaic technology on the existing roof; Replace existing windo | General Services Administration / Public Buildings Service | 10/09/2009 |
WW CONTRACTORS, INCORPORATED | $524,686 | Contract | : Contract to increase the efficency of the building automation and mechanical systems. | General Services Administration / Public Buildings Service | 12/17/2009 |
VE CSIE JV | $10,549 | Contract | : The purpose of this project is A/E support during the Pre-bidding phase for the CMS Energy Project. | General Services Administration / Public Buildings Service | 10/30/2009 |
C & R ENVIRONMENTAL ASSOCIATES, INC | $219,283 | Contract | : Garmatz Building installation of (120) bi-level stairwell light fixtures Bldg # MD1440ZZ, Fallon Building installation of (130) bi-level stairwell light fixtures and installation of emergency poser to stairwell lighting circuits Bldg # MD0055ZZ | General Services Administration / Public Buildings Service | 12/14/2009 |
MASCARO CONSTRUCTION COMPANY, L.P. | $21,668,328 | Contract | : The Project includes energy efficient renovation of the existing Huntington Federal Building. The scope of the work includes photovoltaics, new energy efficient windows,facade upgrades and a new energy efficient HVAC system. | General Services Administration / Public Buildings Service | 11/19/2009 |
URS GROUP, INC | $413,223 | Contract | : URS will oversee the installation of a new geothermal well and the installation of roof solar panels. Project located in Martinsburg, West Virginia. | General Services Administration / Public Buildings Service | 10/21/2009 |
SCHNEIDER ELECTRIC USA, INC | $107,225 | Contract | : Energy retrofit of the ATF (Alcohol, Tobacco and Firearms) Facility in Martinsburg, WV. Project is to provide and install two utility meters and all associated hardware to the data center and provide associated monitoring services. | General Services Administration / Public Buildings Service | 12/28/2009 |
WATSON TATE SAVORY LIOLLIO ARCHITECTURE, INC. | $104,877 | Contract | : Architectural and Engineering Services for Lighting Study for the Matthew Perry US Court House, Columbia, SC. The following tasks to be accomplished: Task No. 1 - Survey Existing Conditions; Task No. 2 - Lighting Conceptualization; Task No. 3 - Deleted | General Services Administration / Public Buildings Service | 12/01/2009 |
JACOBS PROJECT MANAGEMENT CO. | $949,934 | Contract | : The New Custom House in Denver, CO, is an 8-story office building containing 172,502 usable square feet with 47 outdoor parking spaces on a 2.4 acre site. This 8-story stone building was constructed in 1931 and has 5 floors above grade plus a basement, su | General Services Administration / Public Buildings Service | 10/15/2009 |
JACOBS PROJECT MANAGEMENT CO. | $1,194,502 | Contract | : Construction Management (CM) Services for the Cesar E. Chavez Memorial Building modernization includes PreDesign Phase Services to assist, review and provide technical support during the procurement process. The Construction Manager will compile and/or de | General Services Administration / Public Buildings Service | 10/15/2009 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $4,160 | Contract | : Art conservation services for sculpture. Assessment of sculpture condition at federal building. | General Services Administration / Public Buildings Service | 10/21/2009 |
PAGE CONSERVATION, INC. | $4,590 | Contract | : Conservation Assessment of Mural Painting- Autumn expansion by Yvonne Jacquette in the Margaret C. Smith Federal Building. | General Services Administration / Public Buildings Service | 10/21/2009 |
WASHINGTON GAS LIGHT COMPANY | $3,782,500 | Contract | : Washington Gas provided engineering, design and consulting services for the Central Utility and Heating Plant and associated utility systems at St. Elizabeths West Campus, Washington, DC. Honywell Building Solutions provided engineering services to Washin | General Services Administration / Public Buildings Service | 12/28/2009 |
ALABAMA POWER COMPANY | $147,279 | Contract | : Provide services for Architectural and engineering Lighting Studies for the John A Campbell Courthouse, Mobile, Alabama, based on the Request for Proposal dated 10/15/2009, tasks 1-6. Provide services for Architectural and engineering Lighting Studies fo | General Services Administration / Public Buildings Service | 12/11/2009 |
GEORGIA POWER COMPANY | $334,381 | Contract | : Provide services for Architectural and engineering Lighting Studies for the Chamblee Internal Revenue Service Annex - GA0010AE, Chamblee, Georgia, based on the Request for Proposal dated 10/15/2009, the proposal, and all revised proposals including negoti | General Services Administration / Public Buildings Service | 12/11/2009 |
TEAM FOUR INC | $56,164 | Contract | : Provide Design Services for approximately 29,000 s.f of the VA Office/Mailroom space located in building 104 of Goodfellow Federal Complex. This project will include, but not limited to, demolition, new walls and ceiling, painting, restroom upgrade, mecha | General Services Administration / Public Buildings Service | 12/16/2009 |
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. | $247,742 | Contract | : Update building systems based on an energy study prepared by Energy Management Control Engineers for the Robert Denny Buidling, Lincoln, Nebraska. The individual items studied (Energy Conservation Measure-1 througth Energy Conservation Measure-9) are sum | General Services Administration / Public Buildings Service | 10/15/2009 |
OKE-THOMAS+ASSOCIATES, INC. | $12,656,510 | Contract | : Renovated Building 110 at Goodfellow Complex, (4300 Goodfellow Blvd St. Louis, MO. ) for the Social Security Administration. The project was completed and the building turned over for use as administrative offices, storage and shell spaces for future ada | General Services Administration / Public Buildings Service | 12/14/2009 |
JOHNSON ROOFING & CONSTRUCTION, INC. | $783,682 | Contract | : Mansonry and Exterior Repairs on Federal Center Building 102E,103E,103F,105L | General Services Administration / Public Buildings Service | 12/14/2009 |
GARLAND COMPANY INC, THE | $518,253 | Contract | : A. Contractor shall implement a tear off of the existing built-up roof system and all associated components down to the top surface of existing polyurethane roof insulation. The insulation system shall be set into solid mopping of Type III hot asphalt ove | General Services Administration / Public Buildings Service | 11/30/2009 |
GARLAND COMPANY INC, THE | $184,336 | Contract | : This award supports energy conservation activities at the Rosa Parks Federal Building in Detriot, Michigan by replacing the existing roof with a modified bitumen/ white roofing system. This award will result in reduced energy consumption. Roof to be rep | General Services Administration / Public Buildings Service | 12/10/2009 |
STANGER INDUSTRIES INC. | $2,287,362 | Contract | : For the Robert Dole US Courthouse, 500 State St, Kansas City, KS project - Advance metering of all energy and water sources. * Retro-Commissioning of building systems including central plant, air handling units, variable air volume boxes, hydronic system | General Services Administration / Public Buildings Service | 12/02/2009 |
PEPPER CONSTRUCTION COMPANY OF OHIO, LLC | $1,166,930 | Contract | : The GSA has a requirement for restroom renovations and ADA upgrades. The scope of work, at the Dayton Federal building and Courthouse in Dayton Ohio, will include demolishing and renovating the Men's and Women's restroom on floors 2 through 6 with option | General Services Administration / Public Buildings Service | 12/16/2009 |
CARDINAL ROOFING, INC. | $2,080,793 | Contract | : Roof restoration for George Mahon Federal Courthouse/Post Office & Maintenance Building | General Services Administration / Public Buildings Service | 12/28/2009 |
DESIGN EDGE PC | $105,684 | Contract | : The award is for the Architectural design of a 7620 square foot maintenance building for the US Army Reserve and associated parking and site work, at the Denver Federal Center in Lakewood Colorado. Design Edge PC will provide construction documentation an | General Services Administration / Public Buildings Service | 11/20/2009 |
DESIGN EDGE PC | $144,501 | Contract | : Recommission the energy using systems of the building, targeting 30% energy savings based on previously completed recommissioning (RCx) report, dated October 30, 2009 .The RCx Report calls for the implementation of several Energy Conservation Measures (EC | General Services Administration / Public Buildings Service | 12/11/2009 |
PLATINUM ONE CONTRACTING, INC. | $1,789,189 | Contract | : Design and installation of Roof Replacements and Improvements at Romano Mazzoli Federal Bldg. and the J C Watts Federal Bldg. Recovery J C Watts Federal Building - Replacement of the deteriorated roof cover with a new TPO roof cover system for a more ene | General Services Administration / Public Buildings Service | 10/16/2009 |
PLATINUM ONE CONTRACTING, INC. | $1,659,913 | Contract | : Design and install Roof Replacement and Improvements at the U S Courthouse and Post Office Recovery - Replacement of mid-level roof cover with extensive green roofing and replacement of all other roof cover with inverted roofing membrane assembles (IRMAs) | General Services Administration / Public Buildings Service | 10/16/2009 |
SETTY & ASSOCIATES, LTD. | $913,669 | Contract | : Design services for High Performance Green Building-Limited Scope (HPGB-LS). Building tune-up project to include a report/study that results from the recommissioning balance/controls optimization efforts and provide minor fixes, replacements, and adjustme | General Services Administration / Public Buildings Service | 11/17/2009 |
SETTY & ASSOCIATES, LTD. | $953,753 | Contract | : Commissioning Services for the New United States Courthouse in Billings, Montana: Option Year 3 (9/29/09-9/28/2010). Purchase Order Modification PS02 dated 9/29/10-increase funding by $39,590.22, changing contract total from $809,057.41 to $848,647.63 9/2 | General Services Administration / Public Buildings Service | 12/28/2009 |
PACIFIC GAS AND ELECTRIC COMPANY | $98,560 | Contract | : Design and build engineering and documents for the USGS facility in Menlo Park. | General Services Administration / Public Buildings Service | 12/17/2009 |
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. | $2,250,575 | Contract | : U.S. courthouse upgrades, improve performace of the heating, ventilation and air conditioning systems by replacing the existing variable air volume boxes and upgrading the existing johnson controls system with new controllers as well as a new head end to | General Services Administration / Public Buildings Service | 12/31/2009 |
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. | $94,000 | Contract | : Howard St garage upgrades, replace lighting with energy efficient lighting for 5 floors. 98 fixtures.Cost outcome due to ARRA funds is 94,000. | General Services Administration / Public Buildings Service | 12/30/2009 |
EMCOR GOVERNMENT SERVICES, INC. | $10,000 | Contract | : Phase I O'Neill FB - miscellaneous work associated with the GSA move from the 9th to the 11th Floor. | General Services Administration / Public Buildings Service | 12/14/2009 |
WILSON 5 SERVICE COMPANY, INC. | $8,717 | Contract | : Testing and on-site support related to the ARRA retrocommissioning project for the Cleveland and Rudman Building Concord, NH. To bring in senior technicians for the Energy Management System and an air balancer to work with the retrocommissioning agent | General Services Administration / Public Buildings Service | 10/13/2009 |
BBIX, LLC | $40,926 | Contract | : Renovations to the first floor of the St. Albans Federal Building for tenant fit out for DOS and DS. | General Services Administration / Public Buildings Service | 10/09/2009 |
BBIX, LLC | $843,238 | Contract | : Renovation of GSA's PBS Headquarters for Region I on the 10th and 11th floors at the Thomas P. O'Neill Building. | General Services Administration / Public Buildings Service | 10/13/2009 |
OEST ASSOCIATES INC | $22,485 | Contract | : Energy Conservation Feasibility Study of the Frederick C. Murphy Federal Records Center, in Waltham MA. | General Services Administration / Public Buildings Service | 12/23/2009 |
BOARDSOURCE | $35,838 | Contract | : $35,838 for Policy Development Consultant for WAD: Putting together a governance package. End product includes: bylaws, code of conduct, mission statement, and governance guidelines. | General Services Administration / Public Buildings Service | 4/02/2009 |
PROCON CONSULTING LLC | $703,016 | Contract | : Provide Procurement Analyst Support Services in support of the Department of Homeland Security (DHS) Consolidation Program at St Elizabeths, SE, Washington, DC. Additionally, provide financial management analyst support services for the American Recovery | General Services Administration / Public Buildings Service | 11/06/2009 |
SUMMER CONSULTANTS INC | $402,536 | Contract | : Preparation of a Study Report and multiple designs for the repairs of mechanical systems within the U.S. Tax Court located in Washington, D.C. in order to address occupant temperature complaints. Includes: (1) 'High Performance Green Building Limited Sco | General Services Administration / Public Buildings Service | 11/03/2009 |
HOK GROUP, INC | $98,861 | Contract | : The functions of the Department of Education (DoED) Headquarters occupy approximately 1.7 million rentable square feet (rsf) in the Washington Metropolitan area. Since vacating the building for modernization, DoEd groups have grown and reorganized, so the | General Services Administration / Public Buildings Service | 7/16/2009 |
PROCON CONSULTING LLC | $489,372 | Contract | : This award is located at 2701 Martin Luther King Ave, SE, Washington, DC, the US Department of Homeland Security (DHS) Headquarters (HQ) Consolidation at the St. Elizabeths Campus. The purpose of this award is to provide information technology (IT) adviso | General Services Administration / Public Buildings Service | 10/01/2009 |
TTV ARCHITECTS INC | $128,061 | Contract | : Architectural and engineering lighting studies for the Sam Gibbons United States District Courthouse in Tampa, Florida | General Services Administration / Public Buildings Service | 11/30/2009 |
ENOLA CONTRACTING SERVICES INC | $765,106 | Contract | : Design/Build Thermal & Moisture Protection System Repairs at the Dyer Federal Courthouse in Miami, FL. | General Services Administration / Public Buildings Service | 12/17/2009 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $13,104 | Contract | : Art conservation services. | General Services Administration / Public Buildings Service | 11/19/2009 |
M.E. GROUP, INC. | $509,555 | Contract | : Provide Architectual and Engineering Pre-Design Survey for building tune up. The purpose of this project is to perform a detailed retro commissioning study on said facility and provide energy conservation measures to improve efficency and reduce energy an | General Services Administration / Public Buildings Service | 12/03/2009 |
M.E. GROUP, INC. | $1,493,479 | Contract | : Provide Re-commissioning and Retro-commissioning of mechanical, electrical, and plumbing Systems. Provide Architecual and Engineering Pre-Design Survey for Building Tune-Up and Lighting Replacent for the Ronald Regan and United States Secret Service Buil | General Services Administration / Public Buildings Service | 12/07/2009 |
AECOM SERVICES, INC. | $985,395 | Contract | : Commissioning Authority for the renovation of an existing historic building to Ledership in Energy and Environmental Design Gold / Platinum standards In San Francisco California. | General Services Administration / Public Buildings Service | 12/16/2009 |
LEO A DALY COMPANY | $1,031,611 | Contract | : Re/Retro Commissioning for GSA buildings in National Capital Region | General Services Administration / Public Buildings Service | 11/13/2009 |
JACOBS PROJECT MANAGEMENT CO. | $788,036 | Contract | : The contractor shall provide engineering and commissioning expertise to conduct re-commissioning/retro-commissioning planning, identify energy and water conservation, scoping, testing, investigation, evaluation, analysis, calculations, recommendations, a | General Services Administration / Public Buildings Service | 8/14/2009 |
JACOBS PROJECT MANAGEMENT CO. | $1,132,353 | Contract | : A/E Pre-Design Surveys for Building Tune Ups, Recommissioning and Retro-Commissioning of Various Building Systems at the Ariel Rios, EPA-East, EPA-West and EPA Connecting Wing Federal Buildings. Jacobs will provide engineering and commissioning expertise | General Services Administration / Public Buildings Service | 12/02/2009 |
TEC INC. | $95,131 | Contract | : PHASE I ENVIRONMENTAL SITE ASSESSMENTS, National Environmental policy act CHECKLISTS AND CULTURAL RESOURCES SCREENINGS FOR THE SOCIAL SECURITY ADMINISTRATION'S NATIONAL SUPPORT CENTER | General Services Administration / Public Buildings Service | 12/22/2009 |
PRICEWATERHOUSECOOPERS LLP | $3,089,305 | Contract | : Provide program management and reporting services to assist the General Services Administration, Public Buildings Service (PBS), Program Management Office (PMO) in meeting the goals and requirements of transparency and accountability in carrying out Presi | General Services Administration / Public Buildings Service | 12/04/2009 |
S.W. GROUP INC. | $107,642 | Contract | : SW Group, Inc. will provide all labor, material, equipment and supervision to install advanced meters at J Caleb Boggs Federal Building located in Wilmington, DE. The advanced meters collect and display data that reports water and gas usage to the main se | General Services Administration / Public Buildings Service | 10/07/2009 |
BALFOUR BEATTY CONSTRUCTION, LLC | $42,532,835 | Contract | : Provide design phase services (preconstruction) and construction phase work for the Modernization Project at the Richard H Poff Federal Building in Roanoke, VA. Significant deliverables include: curtainwall; heating, ventilating, and air conditioning upg | General Services Administration / Public Buildings Service | 11/06/2009 |
C DESIGN INC | $100,607 | Contract | : This project is to study options and make recommendations for a photovoltaic system to be located at the terry Sanford Federal Building in Raleigh, NC. The complex consists of a courtroom tower and a large postal annex. The proposed PV system will be mo | General Services Administration / Public Buildings Service | 6/30/2009 |
C DESIGN INC | $75,761 | Contract | : The relighting effort that will occur on Recovery Act projects is an unprecedented opportunity not only to improve the lighting energy efficiency in the General Services Administration buildings, but to do so in a way that is of lasting value. The Genera | General Services Administration / Public Buildings Service | 11/30/2009 |
C DESIGN INC | $94,220 | Contract | : The relighting effort that will occur on Recovery Act projects is an unprecedented opportunity not only to improve the lighting energy efficiency in the General Services Administration buildings, but to do so in a way that is of lasting value. The Gener | General Services Administration / Public Buildings Service | 11/30/2009 |
COX, ALLEN AND ASSOCIATES, ARCHITECTS, INC | $133,398 | Contract | : The purpose is to study and obtain results regarding electric energy consumption within the Romano L. Mazzoli Federal Building in Louisville, Kentucky. | General Services Administration / Public Buildings Service | 11/30/2009 |
EVERTON OGLESBY ARCHITECTS, PLLC | $119,906 | Contract | : Recovery: Scope to provide expert lighting design services to analyze existing lighting conditions and light levels and develop options and Scope of Work concept development and specifications for relighting and applying other energy saving approaches to | General Services Administration / Public Buildings Service | 12/14/2009 |
PLATINUM ONE CONTRACTING, INC. | $1,932,216 | Contract | : Design and install Roof Replacement and Improvements for the Scarlett Federal Building with an energy and environmentally conservative roof cover. Design and install roof replacements and improvements at the Gainesville Courthouse. Additional Demo of ex | General Services Administration / Public Buildings Service | 10/16/2009 |
PEPPER CONSTRUCTION GROUP LLC | $90,516,170 | Contract | : GS05P09GBC0031, Construction Manager as Constructor (CMc) Services for the Fire Alarms and Mechanical Upgrades Project at the John C. Kluczynski (JCK) Federal Building and Loop Post Office(LPO) Facility in Chicago, IL, Modification Number PS01, Exercise O | General Services Administration / Public Buildings Service | 11/19/2009 |
RELIABLE CONTRACTING GROUP, LLC | $1,118,874 | Contract | : This project includes but is not limited to the following work: Implementation of Energy Conservation Measures as recommended in the Re-Commissioning/Retro-Commissioning Report for this facility. These measures include: Replacement of existing air-cool | General Services Administration / Public Buildings Service | 12/09/2009 |
CARTER GROUP, INC., THE | $830,370 | Contract | : Provide relocation consulting and management and related services relative to the move out of government agencies from the Whipple Building, Ft. Snelling, St. Paul, MN. Work began late in the fourth quarter, 2009. Specifically, the work involves the pla | General Services Administration / Public Buildings Service | 10/26/2009 |
KPH CONSTRUCTION, CORP. | $1,109,557 | Contract | : LIGHT COURT ROOF REPLACEMENT AT US COURTHOUSE BUILDING IN MILWAUKEE, WI | General Services Administration / Public Buildings Service | 12/11/2009 |
SAF, INC. | $1,018,585 | Contract | : Rooftop air handling units, and the building temperature control. , occupancy sensing HVAC controls, additions of variable speed drives to the hot water pumps, automatic isolations valves and flue dampers to boilers, and reduction of over-pressurization o | General Services Administration / Public Buildings Service | 12/14/2009 |
JOHNSON ROOFING & CONSTRUCTION, INC. | $1,584,752 | Contract | : Replace roof on bldgs 102E,103E,104F,106, 4300 Goodfellow, St. Louis | General Services Administration / Public Buildings Service | 12/30/2009 |
JOHNSON ROOFING & CONSTRUCTION, INC. | $2,720,340 | Contract | : ARRA Roof Replacements for bldgs 105L,105F,105E,141c,108A,122B,108B, 4300 Goodfellow .ST. Louis | General Services Administration / Public Buildings Service | 12/30/2009 |
PLATINUM ONE CONTRACTING, INC. | $1,528,661 | Contract | : Design and install roof replacements and improvements of the Wilke D Ferguson Federal Building. Design and install roof replacements and improvements of the Brickell Plaza Federal Office Building. Goal for roof replacement is to provide a more energy ef | General Services Administration / Public Buildings Service | 10/26/2009 |
NATIONAL BUILDING CONTRACTORS, INC. | $264,117 | Contract | : ARRA-funded replacement of penthouse and stair enclosure roofs with vegetated roofs. | General Services Administration / Public Buildings Service | 10/16/2009 |
ASSOCIATES ROOFING & CONSTRUCTION, INC. | $863,634 | Contract | : GSA Roofing Projects-Location Tampa (Annex and Federal Building) | General Services Administration / Public Buildings Service | 10/16/2009 |
ASSOCIATES ROOFING & CONSTRUCTION, INC. | $2,427,707 | Contract | : South Carolina GSA Roofing Projects Strom Thurmond, Hollings, & Greenville Federal Buildings; performed infrared scan to document existing conditions, video scoping performed on all drains. Designed and installed new white cool roof LEED system on both fa | General Services Administration / Public Buildings Service | 11/10/2009 |
HOMELAND SECURITY CONSTRUCTION CORP | $10,091,343 | Contract | : Design Build Services for MEP Upgrade, Repair and Alteration, Sam M. Gibbons U.S. Courthouse, Tampa, Florida, Project Number VFL01233 | General Services Administration / Public Buildings Service | 12/23/2009 |
MCMONTE INC | $10,000 | Contract | : $10,000.00 CONSULTING | General Services Administration / Public Buildings Service | 10/23/2009 |
L B & B ASSOCIATES INC. | $4,601 | Contract | : Provide technical support at the Theodore Levin U.S. Courthouse and Rosa Parks Federal Building for the Functional Performance Testing of the Building Automation Systems. | General Services Administration / Public Buildings Service | 11/23/2009 |
WEGCO INCORPORATED | $5,214 | Contract | : Assist with Test | General Services Administration / Public Buildings Service | 11/25/2009 |
KUBALA WASHATKO ARCHITECTS INC | $30,496 | Contract | : Monitoring & Inspection Services for High Performance Green Building at the Kastenmeier U.S. Courthouse, Madison, Wisconsin | General Services Administration / Public Buildings Service | 12/15/2009 |
KUBALA WASHATKO ARCHITECTS INC | $46,434 | Contract | : Monitoring & Inspection Services for Light Court Roof at the U.S Federal Building & Courthouse, Milwaukee, Wisconsin | General Services Administration / Public Buildings Service | 12/15/2009 |
L B & B ASSOCIATES INC. | $1,561 | Contract | : Provide technical support at the Sault Ste Marie Land Port of Entry for the Functional Performance Testing of the Building Automation Systems. Fully completed the previous quarter. | General Services Administration / Public Buildings Service | 11/25/2009 |
ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC. | $65,115 | Contract | : The award supports energy conservation activities at the Rosa Parks Federal Building in Detroit, Michigan. These activities include replacing water-cooled air conditioning unit with an air cooled air conditioning unit, replacing weather stripping at the | General Services Administration / Public Buildings Service | 12/14/2009 |
FREDERICK CONSTRUCTION, INC. | $1,002,337 | Contract | : This project was awarded to conduct a roof replacement and energy conservation measures at the Sault Sainte Marie International Bridge Plaza. The overall outcome will be to install a new green roof system to become more green and to conserve electrical en | General Services Administration / Public Buildings Service | 12/14/2009 |
FREDERICK CONSTRUCTION, INC. | $1,969,006 | Contract | : The overall intent of this project is to improve the building energy efficiency through the implementation of several energy conservation measures at the Federal Building in Ann Arbor, Michigan. Specifically, the building will receive lighting upgrades by | General Services Administration / Public Buildings Service | 12/03/2009 |
FREDERICK CONSTRUCTION, INC. | $862,141 | Contract | : This project was awarded to conduct building automation system upgrades at the Theodore Levin Federal Building and United States Courthouse in Detroit, Michigan. This building is a 700,000 square foot 10 story building. The scope of work for this project | General Services Administration / Public Buildings Service | 12/09/2009 |
L.D. DOCSA & ASSOCIATES, INC. | $78,747 | Contract | : Installation of ceiling insulation, insulate suspended ceiling in the first floor of the Charles Chanberlain Federal Bulding in Lansing, MI. Installation of ceiling and wall mounted occupancey sensors in the Charles Chamberlain Federal Building in Lansin | General Services Administration / Public Buildings Service | 12/14/2009 |
MADISON SERVICES, INC. | $2,713,206 | Contract | : Implement a number of different upgrades at both vision and spandrel areas of the curtain wall system. In spandrel areas replace the gaskets at both the interior and exterior surfaces, along with the installation of new insulation and additional insulati | General Services Administration / Public Buildings Service | 11/18/2009 |
SG CONSTRUCTION SERVICES, L.L.C. | $56,919 | Contract | : Low Flow Toilets and No Flow Urinals were installed at the Federal Building in Madison Wisconsin. | General Services Administration / Public Buildings Service | 12/23/2009 |
MADISON SERVICES, INC. | $1,784,411 | Contract | : Project Scope of Work includes automating control for 634 Variable Air Volume terminal units from pneumatic to Direct Digital Control. Upgrade includes the removal of existing pneumatic devices and installing a complete auotmated control system to operate | General Services Administration / Public Buildings Service | 11/25/2009 |
MADISON SERVICES, INC. | $671,766 | Contract | : Modify existing Supply and Return Air Handling Units to include the installation of fan speed controllers in addition to motor upgrades and fan blower components to economizer, or free cooling operation. Work also includes recommissioning air terminal uni | General Services Administration / Public Buildings Service | 11/25/2009 |
BROCK CONSTRUCTION INC | $1,959,277 | Contract | : The award consists of providing preconstruction services for Heating,Ventilation, and Air Conditioning upgrades including replacing the Chiller, upgrades to the Building Automation System and Lutron Lighting upgrades at the Hammond Federal Courthouse loca | General Services Administration / Public Buildings Service | 11/25/2009 |
MERIDIAN MANAGEMENT CORP | $3,437 | Contract | : Recommission Energy Management System at the Potter Stewart Courthouse. | General Services Administration / Public Buildings Service | 11/25/2009 |
COST, PLANNING AND MANAGEMENT INTERNATIONAL, INC. | $1,484,080 | Contract | : Owner's Construction Representative for Bishop Henry Whipple Federal Building Mechanical Electrical and Plumbing Replacement project in Fort Snelling, Minnesota. Owner's Construction Representative will assist the General Services Administration in ensuri | General Services Administration / Public Buildings Service | 12/17/2009 |
CHARPIE CONSTRUCTION COMPANY, INC. | $1,338,595 | Contract | : The Chicago Federal Center Loop Station Post Office located at 211 S. Clark Street, Chicago, Illinois, has been designated to turn this federal building structure into high performance green buildings and move forward towards energy independence. The ove | General Services Administration / Public Buildings Service | 11/25/2009 |
RYAN COMPANIES US, INC. | $148,351,480 | Contract | : The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w | General Services Administration / Public Buildings Service | 11/13/2009 |
DCK NORTH AMERICA, LLC | $109,233,035 | Contract | : Anthony J. Celebrezze Federal Building Facade Recladding and Roof Replacement - Construction Manager as Constructor (CMc) Pre-construction Services and Construction Option (Cleveland, Ohio) | General Services Administration / Public Buildings Service | 12/03/2009 |
M. A. MORTENSON COMPANY | $23,411,916 | Contract | : Renovation of three buildings for GSA in Chicago | General Services Administration / Public Buildings Service | 11/12/2009 |
BERGLUND CONSTRUCTION COMPANY | $24,840,102 | Contract | : 2009 Lighting and Building Systems replacement and facade restoration project at joseph P Kinneary courthouse in Columbus, Ohio. | General Services Administration / Public Buildings Service | 12/15/2009 |
SHIEL SEXTON COMPANY, INC. | $24,029,232 | Contract | : Photovaltaic Roof and Department of Defence (DoD) Security Requirements/Parking/Common Area Upgrades Major General Emmett J. Bean Center Indianapolis, IN | General Services Administration / Public Buildings Service | 11/13/2009 |
CLARK CONSTRUCTION GROUP, LLC | $19,805,001 | Contract | : As the Construction Manager as Contractor (CMc) for this project, the overall purpose is to provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and M | General Services Administration / Public Buildings Service | 11/05/2009 |
ALLEY POYNER MACCHIETTO ARCHITECTURE, P.C. | $45,614 | Contract | : Updated the design of Heating, Ventilation, and Air Conditioning system that was originally developed by Alley Poyner Macchietto in cooperation with Leo A. Daly Engineers. Service to include all necessary revisions to the drawings and specifications based | General Services Administration / Public Buildings Service | 12/18/2009 |
GASTINGER AND WALKER ARCHITECTS INC | $132,071 | Contract | : Dole Courthouse, Kansas City, Kansas We provided Construction Manager as Agent services. Work is 100% complete. | General Services Administration / Public Buildings Service | 12/01/2009 |
SUBSTANCE, LLC | $12,684 | Contract | : Contract award was for consulting services, specifically reviewing contractor submittals and shop drawings associated with replacing the boiler at the Iowa City Federal Building. | General Services Administration / Public Buildings Service | 10/28/2009 |
ED A. WILSON INC. | $43,923 | Contract | : FURNISHED & INSTALLED THREE SOLAR PANELS TO SUPPLEMENT HOT WATER SUPPLY FOR FEDERAL COURTHOUSE (awarded an additional 11,437.77 on 3/4/10) | General Services Administration / Public Buildings Service | 3/04/2010 |
MASON ARCHITECTS, INC. | $62,911 | Contract | : The contract was for architectural and engineering services required to make structural improvements to an historic building to prevent future seismic damage, to repair previous earthquake damage, and make ADA improvements. | General Services Administration / Public Buildings Service | 12/15/2009 |
INTERACTIVE RESOURCES, INC | $76,807 | Contract | : Site survey, working drawings, post construction contract services, record documents, and light measurements for LED (light emitting diodes) parking lot lighting project at the Laguna Niguel Federal Building, Laguna Niguel, California. | General Services Administration / Public Buildings Service | 12/16/2009 |
INTERACTIVE RESOURCES, INC | $358,584 | Contract | : Design of cafeteria at the North Los Angeles Federal Building. | General Services Administration / Public Buildings Service | 12/03/2009 |
F.H. PASCHEN, S.N. NIELSEN & ASSOCIATES LLC | $164,914 | Contract | : The overall intent of this project is to achieve the re-commissioning and retro-commissioning goals set forth by ARRA(American Recovery and Reinvestment Act) for the Howard M. Metzenbaum USCH (United States Courthouse). Without force and effect upon the | General Services Administration / Public Buildings Service | 12/15/2009 |
F.H. PASCHEN, S.N. NIELSEN & ASSOCIATES LLC | $378,576 | Contract | : The overall intent of this project is to reduce energy demand, reduce operation and maintenance costs, improve building system control and occupant comfort by upgrading the existing BAS(Building Automation System) system and the recommissioning of all exi | General Services Administration / Public Buildings Service | 12/14/2009 |
F.H. PASCHEN, S.N. NIELSEN & ASSOCIATES LLC | $442,127 | Contract | : RECOMMISIONING & ECM Youngstown, OH Work awarded under this delivery or | General Services Administration / Public Buildings Service | 12/16/2009 |
TOWN CENTER CONSTRUCTION, L.L.C. | $838,210 | Contract | : Installing a daylight harvesting system for 32 light fixtures and four (4) chandeliers. | General Services Administration / Public Buildings Service | 12/08/2009 |
INTEGRATED BULDING SOLUTIONS | $3,105 | Contract | : During an audit the assistance of Integrated Building Solutions to navigate the building temperature control system. | General Services Administration / Public Buildings Service | 11/30/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $3,033 | Contract | : Northern Management Services, Inc's Builiding Engineer to provide support for Functional Performance Testing of the Building Automation Systems (BAS) by the Sub Contractor BAS Operator at the Robert W. Kastenmeier Federal Courthouse located at 120 N Henr | General Services Administration / Public Buildings Service | 11/24/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $4,184 | Contract | : Bas contractor (Johnson Controls) will assist Tishman sub with building tune up during business hours at the Carl B Stokes Federal Building & US Courthouse, 801 W Superior Avenue, Cleveland, OH. | General Services Administration / Public Buildings Service | 11/30/2009 |
NORTHERN MANAGEMENT SERVICES, INC. | $1,564 | Contract | : BAS contractor (Johnson Controls) will assist Tishman sub with building tune up during business hours at the Howard M. Metzenbaum US Courthouse, 201 Superior Avenue, Cleveland, OH. | General Services Administration / Public Buildings Service | 12/01/2009 |
WILSON 5 SERVICE COMPANY, INC. | $2,998 | Contract | : Provide engineering support for Functional Perfoamance Testing of Building Automations System | General Services Administration / Public Buildings Service | 11/18/2009 |
WILSON 5 SERVICE COMPANY, INC. | $5,699 | Contract | : Service for RRCX funtional performance testiong on the TAC- I/NET FACS | General Services Administration / Public Buildings Service | 12/02/2009 |
WESTON EID INC | $93,980 | Contract | : A/E Services to provide Blast Mitigation Analysis for the Robert A. Young (RAY) Building in St. Louis, Missouri. The Blast Mitigation Analysis / Window Vunerability Assessment includes: 1) Determination of the level of protection provided by the current | General Services Administration / Public Buildings Service | 12/18/2009 |
BOYD JONES CONSTRUCTION COMPANY | $2,436,568 | Contract | : The purpose of this project is to improve the energy efficiency of the Denney Federal Building in Lincoln, Nebraska. The project scope includes: control system upgrades; cooling tower replacement and installation of fan VFDs; rebuilding and upgrades to | General Services Administration / Public Buildings Service | 10/13/2009 |
ENOVITY, INC. | $58,225 | Contract | : Contractor is to provide construction management, controls programming and commissioning services of the chiller VFDs (Variable Frequency Drivers) at 450 Golden Gate Avenue, San Francisco, CA. | General Services Administration / Public Buildings Service | 12/30/2009 |
ENOVITY, INC. | $25,899 | Contract | : Bridging Documents for Additional HVAC Measures at Phillip Burton Federal Building and USCH, 450 Golden Gate Ave., San Francisco, CA | General Services Administration / Public Buildings Service | 1/15/2010 |
GOODY, CLANCY & ASSOCIATES, INC. | $495,000 | Contract | : National Operations Center macroprogramming and site coordination; central building ccordination and preliminary programming; and program of requirements for the Dept of Homeland Security. | General Services Administration / Public Buildings Service | 7/08/2009 |
TISHMAN/AECOM, A JOINT VENTURE | $20,700,899 | Contract | : Tishman/AECOM is providing Construction Management Services for the Daycare Facility, Central Utility Plant, Phase 1 B Adaptive Reuse. In addition Construction Management Services for Security and IT upgrades at Saint Elizibeth Campus in Washington DC. | General Services Administration / Public Buildings Service | 11/06/2009 |
CONCENTRIC METHODS, LLC | $150,815 | Contract | : Budget Analyst III - Provides advice and technical assistance to the ARRA program officials and managers in the development of budget requests and related supporting documentation. | General Services Administration / Public Buildings Service | 8/27/2009 |
KEY ENGINEERING GROUP, LTD. | $12,498 | Contract | : Overall purpose of this study was to comply with the National Environmental Policy Act (NEPA). NEPA study for the Chicago Federal Plaza restoration project. Project deliverables included preparation of an agenda (complete), meeting minutes and action it | General Services Administration / Public Buildings Service | 10/06/2009 |
GLOBAL CONSULTING INC. | $147,095 | Contract | : Provide industrial hygiene (IH) monitoring and oversight services for asbestos removal and lead paint abatement activities during renovation of the Mary Sweitzer building. conduct environmental testing and monitoring at various locations within the build | General Services Administration / Public Buildings Service | 11/05/2009 |
GOODY CLANCY HDR, LLC | $49,036,078 | Contract | : Architectural and engineering design services for the Dept of Homeland Security Consolidation Project at St Elizabeth's West Campus. | General Services Administration / Public Buildings Service | 12/15/2009 |
COMMERCIAL AG & ELECTRIC INC | $3,352 | Contract | : Provide BAS programming, Technical background support and overtime hours for the retro-commissioning project at the Joseph P. Kinneary US Courthouse, 85 Marconi Blvd. Columbus, OH. 43215 | General Services Administration / Public Buildings Service | 11/13/2009 |
RTW ENTERPRISES INC | $3,146 | Contract | : Facilities maintenance and Management | General Services Administration / Public Buildings Service | 11/19/2009 |
GILBANE BUILDING COMPANY | $1,208,180 | Contract | : Construction Management as Agent services during Design of Photovoltaic Roof and DoD Security Requirements/Parking/Common Area Upgrades and during construction of Photovoltaic Roof at the Major Emmett J. Bean Center, Indianapolis , IN 46249 | General Services Administration / Public Buildings Service | 12/02/2009 |
CB RICHARD ELLIS, INC. | $29,919 | Contract | : Title and Legal Support for real estate acquisition | General Services Administration / Public Buildings Service | 10/21/2009 |
JACOBS ENGINEERING GROUP INC. | $59,901 | Contract | : Develop a Storm Water Site Master Plan with sustainable strategies for the entire Federal Center campus at 4300 Goodfellow in St. Louis MO. The site includes 62 acres of land and 12 significant buildings. The workis to include, but not limited to:a. Inves | General Services Administration / Public Buildings Service | 11/04/2009 |
GARLAND COMPANY INC, THE | $35,952 | Contract | : 1. Test for asbestos in or under roof (current roof may have been laid over an older roofing system). DUE: Two weeks after award of contract. 2. Specifications and schematic design for roof replacement. Documents must be sufficient to fully describe | General Services Administration / Public Buildings Service | 12/30/2009 |
J. R. CONKEY & ASSOCIATES, INC. | $1,800,000 | Contract | : Provide photovoltaic roof, associated parts and installation services. Roof remove / replace, Photovoltaic mono and multi crystalline silicon cell panels, complete balance of system. Photovoltaic on sloped roof only. Location of project is the P | General Services Administration / Public Buildings Service | 10/15/2009 |
CENTRAL TRANSPORTATION SYSTEMS, INC | $208,061 | Contract | : The contractor will be required to provide relocation services at the San Antonio Hipolito F. Garcia U.S. Post Office-U.S. Courthouse Building, San Antonio, Texas. The move will be accomplished in several phases biginning January 9, 2010 and extending thr | General Services Administration / Public Buildings Service | 12/10/2009 |
JACOBS PROJECT MANAGEMENT CO. | $4,284,999 | Contract | : The program provides for capital construction projects to replace facilities at a number of the 43 Bureau of Customs and Border Protection-owned Land Ports of Entry, and Renovation and Alteration projects at the remaining Bureau of Customs and Border Prot | General Services Administration / Public Buildings Service | 4/16/2009 |
CADDELL & CO LLC | $590,976 | Contract | : Replace and relocate two mezzanine Air Handler Units in the Post Office Building, Oklahoma City, OK. Provide all design, management, labor, tools, material and supervision necessary to successfully complete the project. | General Services Administration / Public Buildings Service | 12/21/2009 |
SWINERTON BUILDERS | $81,254,370 | Contract | : Contract No. GS09P09KTC0103, *Recovery*Construction Manager as constructor (CMc) Services for Repair and Alteration of the PJKK U. S. Courthouse (Part 1), 300 Ala Moana Boulevard, Honolulu, Hawaii Base award amount of $300,000.00 for Pre-Construction Ser | General Services Administration / Public Buildings Service | 11/20/2009 |
ACM SYSTEMS, INC. | $25,261 | Contract | : Install lighting controls for the basement of the West Los Angeles Federal Building. | General Services Administration / Public Buildings Service | 8/24/2009 |
ACM SYSTEMS, INC. | $15,146 | Contract | : Install lighting controls for the cafeteria at the West Los Angeles Federal Building. | General Services Administration / Public Buildings Service | 8/24/2009 |
SAMUEL ENGINEERING, INC. | $11,765 | Contract | : Compile exisitng as-built drawings and site plans to display the ground areas being proposed for ground mounted PV panels. Also display the parking areas being proposed for ground mounted PV panels. Also display the parking areas of Buildings 25, 53, and | General Services Administration / Public Buildings Service | 11/04/2009 |
ANDERSON HALLAS ARCHITECTS, PC | $360,912 | Contract | : The purpose of this project is to implement Energy Conservation Measures at the David Skaggs Research Center in Boulder, Colorado as identified in the Recommissioning report that was created by Andrews & Anderson Architects and Enabled Energy Incorporated | General Services Administration / Public Buildings Service | 12/07/2009 |
CENTERRE E LIGHT A JOINT VENTURE | $17,754,057 | Contract | : Design build project at the Denver Federal Center. This project includes roof replacement and design and install of building integrated Photo Voltaic panels on buildings 20, 56 and 810. These panels prevent the emission of thousands of pounds of C02 per | General Services Administration / Public Buildings Service | 12/15/2009 |
M. A. MORTENSON COMPANY | $67,511,499 | Contract | : Design and construction of a new 146,000 square-feet federalcourthouse by the General Services Administration (GSA) in Billings, MT. The five-story courthouse is expected to be completed in late 2012. | General Services Administration / Public Buildings Service | 12/23/2009 |
URS GROUP, INC. | $8,367,060 | Contract | : TAS::47 4543::TAS CONSTRUCTION MANAGEMENT SERVICES FOR THE MODERNIZATION OF THE BYRON G. ROGERS FEDERAL OFFICE BUILDING. | General Services Administration / Public Buildings Service | 12/28/2009 |
BUILDING SYSTEMS DESIGN INC | $4,895 | Contract | : Specification Software | General Services Administration / Public Buildings Service | 11/17/2009 |
NORTHSTAR PROJECT MANAGEMENT, LLC | $9,908 | Contract | : Design-Build Consulting | General Services Administration / Public Buildings Service | 11/02/2009 |
LUKMIRE PARTNERSHIP, INC., THE | $219,668 | Contract | : The purpose of the project is to determine if 4 federal buildings can be made more energy efficient by installing Photovoltaics or installing a new vegetated roof over either a new or existing roof on the following buildings: Housing and Urban Development | General Services Administration / Public Buildings Service | 10/23/2009 |
PECK, PECK AND ASSOCIATES, INC. | $140,154 | Contract | : Design Analysis for re-roofing of the Ronald Reagan Building, Internal Revenue Service Building and the Winder Building | General Services Administration / Public Buildings Service | 11/13/2009 |
VANIR CONSTRUCTION MANAGEMENT, INC. | $2,934,070 | Contract | : The Construction Management as Agent (Cma) firm shall provide professional services for overall project administration, management, and quality of the design and construction for the Expansion & Modernization of the Mariposa Land Port of Entry. All servic | General Services Administration / Public Buildings Service | 12/01/2009 |
INTERACTIVE RESOURCES, INC | $9,444 | Contract | : Phase I Environmental Assessment. | General Services Administration / Public Buildings Service | 4/23/2009 |
HATHAWAY DINWIDDIE CONSTRUCTION COMPANY | $109,508,892 | Contract | : The renovation of the Federal Building at 50 United Nations Plaza will include siemic structural upgrade, hazardous material abatement, roof replacement, implementing sustainable feautres to achieve LEED certification; refurbishing of historic exterior wi | General Services Administration / Public Buildings Service | 12/17/2009 |
GILBANE BUILDING COMPANY | $25,324,679 | Contract | : Provide design and construction of a new U.S. Federal Courthouse in Bakersfield, CA, inclusive of labor, material, equipment, and incidentals. | General Services Administration / Public Buildings Service | 11/20/2009 |
ACM SYSTEMS, INC. | $15,146 | Contract | : Install lighting controls at the Post Office of the West Los Angeles Federal Building. | General Services Administration / Public Buildings Service | 8/24/2009 |