Kenai Peninsula County, Alaska, funds by Interior, Department of
Listing $9,145,436.71 in stimulus funds from Interior, Department of for Kenai Peninsula
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
NORTH STAR PAVING & CONSTRUCTION INC | $5,327,717 | Replace WWTF & Rehabilitate Collection System at Denali National Park & Preserve | National Park Service | 4/26/2010 |
CHUGACHMIUT | $700,000 | Forests and Woodlands Resource Management Fuels Project: This funding is to convert waste biomass from hazardous fuel reduction treatments into wood chips from upto 750 acres on the Kenai Peninsula Alaska | Indian Affairs (Assistant Secretary) | 9/15/2009 |
REDOUBT INDUSTRIES INC | $423,521 |
Kenai Visitor Center HVAC Rehab. Base Bid ($56,935.50): The base bid shall consist of the contractor performing a site reconnaissance and preparing a work plan and cost proposal. Contractors work plan and proposal shall consist of the following: 1).
This spending item is part of a $682,908 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/18/2009 |
AMIGO LLC | $251,670 | Skilak Loop Mechanical Vegitation Treatment - purpose of this project is to mechanically treat(hydro-ax) approximately 123 acres of forested land in the Kenai Wildlife Refuge, to improve habitat conditions for wildlife and increase opportunities for wildl | U.S. Fish and Wildlife Service | 1/13/2010 |
East Road Services Inc | $249,454 | Highway Planning and Construction construction project to develop borrow pitfor the Flat island road project | Indian Affairs (Assistant Secretary) | 6/17/2010 |
NATIVE VILLAGE OF TYONEK | $228,376 | Tyonek Access Road - Provide Design services associated with the access road | Indian Affairs (Assistant Secretary) | 6/07/2010 |
NATIVE VILLAGE OF TYONEK | $228,376 | Highway Planning and Construction To provide Project Development and Design to realign and install culvert on Route 2400, including grade and drain as well as maintenance activities. | Indian Affairs (Assistant Secretary) | 4/09/2010 |
PATHFINDER AVIATION INC | $149,243 | USGS Funding for AVO (Alaska Volcano Observatory) work throughout Alaska. | Office of Policy, Management and Budget/Chief Financial Officer | 6/29/2010 |
NORTH STAR PAVING & CONSTRUCTION INC | $148,900 | Rainbow Lake Campground Rehab: 1.Design a disabled campground at Ranbow Lake. 2. Rehab campground to provide ADA compliant rout to outhouse including area resurfacing. 3. Paint interior and exterior of 72 square foot concrete outhouse and replace do | U.S. Fish and Wildlife Service | 1/10/2010 |
MARITIME HELICOPTERS, INC. | $126,796 | Flying USGS geologists to unprepared landing sites in the vicinity of OKMOK Volcano area, to perform maintenance on geophysical sites from June 26 to July 20 2010 | Office of Policy, Management and Budget/Chief Financial Officer | 6/28/2010 |
SELDOVIA VILLAGE TRIBE | $110,811 | Highway Planning and Construction Barabara Heights Subdivision | Indian Affairs (Assistant Secretary) | 8/17/2010 |
SELDOVIA VILLAGE TRIBE | $110,811 | Barabara Heights Subdivision | Indian Affairs (Assistant Secretary) | 8/18/2010 |
THE KENAI WATERSHED FORUM INC | $107,692 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. Wetland Inventory for Priority Matanuska-Susitna Watershed Areas | U.S. Fish and Wildlife Service | 8/06/2009 |
GLACIER ELECTRIC CONSTRUCTION, INC. | $98,500 | Design and install solar powered pumps at Skilak Lake on KNWR. | U.S. Fish and Wildlife Service | 4/29/2010 |
GLACIER ELECTRIC CONSTRUCTION, INC. | $97,940 | Kenai National Wildlife Refuge Parking Lot Lighting | U.S. Fish and Wildlife Service | 8/24/2009 |
KENAITZE INDIAN TRIBE | $92,768 | Highway Planning and Construction Fencing project on Tribally-owned land located in Kenai, Alaska, to protect fleet of transit vehicles from potential vandalism. The project includes survey, minimal design, environmental clearances, and site work. Preventive maintenance covers Kenaitze In | Indian Affairs (Assistant Secretary) | 5/24/2010 |
GLACIER ELECTRIC CONSTRUCTION, INC. | $88,075 | Install security gates and fencing at KNWR on Ski Hill Road, Soldotna, Alaska. | U.S. Fish and Wildlife Service | 6/29/2010 |
NORTH STAR PAVING & CONSTRUCTION INC | $72,366 | US Fish & Wildlife Striping and Asphalt Maintenance Project: 0001 - Crack seal approximately 3800 LF of of cracks at the Kenai National Wildlife Refuge headquarters and shop near Soldotna, Alaska. 0002 - Use infra-Red (or equivalent) equipment to repai | U.S. Fish and Wildlife Service | 9/03/2010 |
GLACIER ELECTRIC CONSTRUCTION, INC. | $62,445 |
Kenai Visitor Center HVAC Rehab. Base Bid ($56,935.50): The base bid shall consist of the contractor performing a site reconnaissance and preparing a work plan and cost proposal. Contractors work plan and proposal shall consist of the following: 1).
This spending item is part of a $682,908 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/18/2009 |
KENAI, CITY OF | $62,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. Award Title: Protect Sensitive Dune & Tidal Wetland Habitat at the Mouth of the Kenai River in Alaska Project. Description: Purpose is to protect approximately 150 acres of sensitive dune habitat along the mouth of the Kenai Riverer, ensure critical dune ha... Show more | U.S. Fish and Wildlife Service | 9/15/2009 |
ILIAMNA LAKE CONTRACTORS, LLC | $60,000 | Highway Planning and Construction Project E01264A1-Design for Main and School Road, Phase 1. | Indian Affairs (Assistant Secretary) | 4/08/2010 |
Donovan Drywall & Painting | $55,785 |
Kenai Visitor Center HVAC Rehab. Base Bid ($56,935.50): The base bid shall consist of the contractor performing a site reconnaissance and preparing a work plan and cost proposal. Contractors work plan and proposal shall consist of the following: 1).
This spending item is part of a $682,908 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/18/2009 |
THE KENAI WATERSHED FORUM INC | $45,000 | Recovery Act Funds - Habitat Enhancement, Restoration and Improvement. Reed Canary Grass Treatment | U.S. Fish and Wildlife Service | 8/14/2009 |
PORT GRAHAM VILLAGE COUNCIL | $44,626 | Design of Project No./ID No.E01396A1 | Indian Affairs (Assistant Secretary) | 4/01/2010 |
PORT GRAHAM VILLAGE COUNCIL | $44,626 | Highway Planning and Construction Design of Projec#E01396A1 | Indian Affairs (Assistant Secretary) | 4/01/2010 |
PORT GRAHAM VILLAGE COUNCIL | $44,626 | Highway Planning and Construction environmental services for windy bay road. | Indian Affairs (Assistant Secretary) | 4/01/2010 |
Systemshouse, Inc. | $43,660 |
Kenai Visitor Center HVAC Rehab. Base Bid ($56,935.50): The base bid shall consist of the contractor performing a site reconnaissance and preparing a work plan and cost proposal. Contractors work plan and proposal shall consist of the following: 1).
This spending item is part of a $682,908 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/18/2009 |
Merwin Enterprizes | $40,905 |
Kenai Visitor Center HVAC Rehab. Base Bid ($56,935.50): The base bid shall consist of the contractor performing a site reconnaissance and preparing a work plan and cost proposal. Contractors work plan and proposal shall consist of the following: 1).
This spending item is part of a $682,908 allocation.
See details
|
U.S. Fish and Wildlife Service | 12/18/2009 |
H O C SERVICES INC | $8,600 | vessel transportation to Sud Island | U.S. Fish and Wildlife Service | 4/27/2010 |
PATHFINDER AVIATION INC | $8,355 | Helicopter Services for Alaska Volcano Observatory studies. | National Business Center | 9/22/2009 |
NOMAD SHELTER INC. | $4,740 | rental contract | U.S. Fish and Wildlife Service | 6/12/2009 |
PATHFINDER AVIATION INC | $4,504 | Helicopter Services for Alaska Volcano Observatory studies. Awarded by DOI-NBC using USGS funds. | National Business Center | 12/31/2009 |
ALECKSON FABRICATION | $2,550 | built 3 woodstoves for FWS Kenai National Wildlife Refuge | U.S. Fish and Wildlife Service | 5/12/2009 |
NANWALEK IRA COUNSIL INC | $0 |
Highway Planning and Construction construction project to develop borrow pitfor the Flat island road project
This spending item is part of a $217,236 allocation.
See details
|
Indian Affairs (Assistant Secretary) | 6/17/2010 |