Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Kootenai County, Idaho, funds by Interior, Department of

Listing $631,965.18 in stimulus funds from Interior, Department of for Kootenai

Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Description Federal Dept./Agency Date
TRIUNE CONSTRUCTION LLC $224,920 civil construction. Developed a lake side Day use recreation area with fully handicap accessable functions such as parking, restroom facility, BBQ area, picnic tables,boat docks. Bureau of Land Management 4/02/2010
MARINE CO., INC. $94,900 Killarney Picnic Site & Popcorn Dock and Comfort Stations Replacement. Removal of existing wood docks, wood piling, gangways, and replacement with Contractor designed and furnished docks, concrete bulkheads, aluminum gangways, steel pilings, and floating Bureau of Land Management 3/25/2010
NORTH IDAHO MARITIME, LLC $85,225 Killarney Lake Boat Dock Replacement Bureau of Land Management 8/31/2009
CHIPMASTERS INC $78,356 Road Maintenance_Indian Roads Repair and sealing of cracks in the existing asphalt cement pavement (ACP), application of 2-shot BST chip seal surfacing. Work is to be performed on Pow Wow Park Road,one access road to the Dance Arena, and the Arena Loop Road.
This spending item is part of a $80,559 allocation. See details
Indian Affairs (Assistant Secretary) 3/11/2010
MARINE CO., INC. $40,835 Furnish labor, equipment, supplies and materials to remove/replace the existing boat launch ramp at the Killarney Lake Recreation Site. Demolish and remove the existing concrete ramp and replace with a new design as shown in the plans and specifications. Bureau of Land Management 4/02/2010
CXT INCORPORATED $34,999 HUCKLEBERRY CG TOILET REPLACEMENT. Bureau of Land Management 3/17/2010
ACCELERATED CONSTRUCTION & EXCAVATING LLC $33,000 Furnishing labor, equipment, supplies, and materials to remove/replace the existing boat launch ramp at the Killarney Lake Recreation Site. Demolish and remove the existing concrete ramp and replace with a new design as shown in the plans and specificati
This spending item is part of a $40,835 allocation. See details
Bureau of Land Management 4/02/2010
ROMTEC, INC. $20,378 PREFABRICATED TOILET WITHOUT VAULT FOR COEUR D'ALENE FIELD OFFICE Bureau of Land Management 12/15/2009
CXT INCORPORATED $11,516 PRECAST VAULT TOILET, BLUE CREEK BAY Bureau of Land Management 12/15/2009
MARINE CO., INC. $7,835 Furnishing labor, equipment, supplies, and materials to remove/replace the existing boat launch ramp at the Killarney Lake Recreation Site. Demolish and remove the existing concrete ramp and replace with a new design as shown in the plans and specificati
This spending item is part of a $40,835 allocation. See details
Bureau of Land Management 4/02/2010