Baltimore (City) County, Md., funds by Interior, Department of
Listing $5,178,823.88 in stimulus funds from Interior, Department of for Baltimore (City)
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
ELLICOTT DREDGES, LLC | $2,868,363 |
Purchase of a Hydraulic Dredge -YUMA
This spending item is part of a $4,094,400 allocation.
See details
|
Bureau of Reclamation | 6/29/2010 |
BIOHABITATS, INC. | $910,093 | NPS Jean Lafitte invasive plant removal and hydrologic reconnection of former wetland areas. This project involves the removal of invasive Chinese Tallow from side-spoils associated with oil and gas production access channels. | National Park Service | 5/14/2010 |
Ash Equipment Co., Inc. | $327,438 |
The Contractor shall furnish labor, equipment and material to repair existing reinforced concrete spillway inlet floor slab, gate structure, and piers at Glen Elder Dam Spillway, located at Glen Elder, Kansas
This spending item is part of a $2,325,024 allocation.
See details
|
Bureau of Reclamation | 5/03/2010 |
WORCESTER EISENBRANDT, INC. | $275,000 |
Rehabilitate Arlington House, Outbuildings and Grounds, Phase 2a and 2b GWMP-150123.
This spending item is part of a $3,170,578 allocation.
See details
|
National Park Service | 5/13/2010 |
ADVANCED FIRE PROTECTION SYSTEMS, LLC | $252,310 | Fire Suppression and Fire Alarm at Ft McHenry National Monument | National Park Service | 2/24/2010 |
HORD, COPLAN, MACHT INC | $92,458 |
Design Services for Predesign through Schematic Design to restore the District of Columbia War Memorial
This spending item is part of a $341,926 allocation.
See details
|
National Park Service | 7/21/2009 |
HORD, COPLAN, MACHT INC | $73,833 |
This contract is to produce Bridging Documents for the DC War Memorial restoration. Tasks include the refinement and packaging the design drawings (Design Development Level) and Specifications into a bid package to be bid upon by Design-Build Contractors.
This spending item is part of a $192,340 allocation.
See details
|
National Park Service | 3/09/2010 |
FLOURA TEETER LANDSCAPE ARCHITECTS, INC. | $65,325 |
Provide architectural and engineering design services related to major renovations to the Gabrielson Lab building, the Coburn Lab Annex building, the Propagation lab shop building, the Propagation Lab building, and the Quanrantine building, together with
This spending item is part of a $3,636,965 allocation.
See details
|
Geological Survey | 5/26/2010 |
FLOURA TEETER LANDSCAPE ARCHITECTS, INC. | $65,325 |
Provide architectural and engineering design services related to major renovations to the Gabrielson Lab building, the Coburn Lab Annex building, the Propagation lab shop building, the Propagation Lab building, and the Quanrantine building, together with
This spending item is part of a $3,636,965 allocation.
See details
|
Geological Survey | 5/24/2010 |
HORD, COPLAN, MACHT INC | $52,775 |
This contract is to produce Construction Administration Services for the DC War Memorial restoration.
This spending item is part of a $130,139 allocation.
See details
|
National Park Service | 5/13/2010 |
EBA ENGINEERING, INC. | $49,592 |
Provide architectural and engineering design services related to major renovations to the Gabrielson Lab building, the Coburn Lab Annex building, the Propagation lab shop building, the Propagation Lab building, and the Quanrantine building, together with
This spending item is part of a $3,636,965 allocation.
See details
|
Geological Survey | 5/26/2010 |
EBA ENGINEERING, INC. | $49,592 |
Provide architectural and engineering design services related to major renovations to the Gabrielson Lab building, the Coburn Lab Annex building, the Propagation lab shop building, the Propagation Lab building, and the Quanrantine building, together with
This spending item is part of a $3,636,965 allocation.
See details
|
Geological Survey | 5/24/2010 |
Rwe, LLC | $44,500 |
Provide architectural and engineering design services related to major renovations to the Gabrielson Lab building, the Coburn Lab Annex building, the Propagation lab shop building, the Propagation Lab building, and the Quanrantine building, together with
This spending item is part of a $3,636,965 allocation.
See details
|
Geological Survey | 5/26/2010 |
Rwe, LLC | $44,500 |
Provide architectural and engineering design services related to major renovations to the Gabrielson Lab building, the Coburn Lab Annex building, the Propagation lab shop building, the Propagation Lab building, and the Quanrantine building, together with
This spending item is part of a $3,636,965 allocation.
See details
|
Geological Survey | 5/24/2010 |
Atelier Ten USA LLC | $5,900 |
The project will provide for visitor access and appreciation improvements to make the Nuttallburg town site and historic district visitor ready. Following the now completed short-term stabilization work on the Nuttall Mine Structures, a portion of this p
This spending item is part of a $190,754 allocation.
See details
|
National Park Service | 8/07/2009 |
PIERAN LLC | $1,820 |
Planning, documentation, ongoing development and national rollout of the Indian Health Service Personal Health Record. Major deliverables are: Ongoing development of the IHS PHR application (inclusive of National deployment version) Software Documentation
This spending item is part of a $1,904,199 allocation.
See details
|
Office of Policy, Management and Budget/Chief Financial Officer | 9/29/2010 |
PIERAN LLC | $1 |
Planning, documentation, ongoing development and national rollout of the Indian Health Service Personal Health Record. Major deliverables are: Ongoing development of the IHS PHR application (inclusive of National deployment version) Software Documentation
This spending item is part of a $1,904,199 allocation.
See details
|
Office of Policy, Management and Budget/Chief Financial Officer | 9/29/2010 |