Hennepin County, Minn., funds by General Services Administration
Listing $182,758,411.97 in stimulus funds from General Services Administration for Hennepin
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
RYAN COMPANIES US, INC. | $122,756,998 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
HAMMEL, GREEN AND ABRAHAMSON, INC. | $13,506,451 |
Provide architectural and engineering services for the modernization of the Whipple Building at Fort Snelling, Minnesota. The building has over 617,000 gross square feet. The facility has a basement, ground level and first through sixth floors. The bui
This spending item is part of a $14,242,017 allocation.
See details
|
Public Buildings Service | 6/30/2009 |
DUKE REALTY LIMITED PARTNERSHIP | $5,129,366 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
OLYMPIATECH ELECTRICAL CONTRACTORS, INC. | $3,274,216 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
A C.H. COAKLEY & CO INC | $3,202,029 | Fort Snelling Minnesota Whipple Federal Building Modernization Relocation using ARRA funds to support this project. | Public Buildings Service | 8/31/2010 |
INSCAPE CORPORATION | $2,813,336 | The scope of work for the proposed project includes furniture, HVAC, plumbing, electrical (green) and life safety improvements to a 41 year old building. This project will deliver a high performing green building with energy savings by designing and const | General Services Administration | 4/30/2012 |
SKYLINE FIRE PROTECTION, INC. | $2,377,000 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
APOGEE ENTERPRISES, INC. | $2,245,256 |
The purpose of the Pierre Federal Building project is to modernize the building by replacing the existing curtain wall system, mitigate water infiltration issues and repair stone soffit panel connections while updating the architectural appeal of the buil
This spending item is part of a $7,655,673 allocation.
See details
|
Public Buildings Service | 3/19/2010 |
W. L. HALL CO. | $2,158,009 |
Implement a number of different upgrades at both vision and spandrel areas of the curtain wall system. In spandrel areas replace the gaskets at both the interior and exterior surfaces, along with the installation of new insulation and additional insulati
This spending item is part of a $2,713,206 allocation.
See details
|
Public Buildings Service | 11/18/2009 |
MINUTI-OGLE CO., INC. | $1,491,271 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
SATELLITE SHELTERS, INC. | $1,474,209 |
Construction of the new Mariposa Land Port of Entry at Nogales, Arizona. This project will expand the capacity of the new existing port operations. The current port will remain in operation as the new buildings and facilities are brought on line in phases
This spending item is part of a $130,901,718 allocation.
See details
|
Public Buildings Service | 3/18/2010 |
COST, PLANNING AND MANAGEMENT INTERNATIONAL, INC. | $1,457,780 |
Owner's Construction Representative for Bishop Henry Whipple Federal Building Mechanical Electrical and Plumbing Replacement project in Fort Snelling, Minnesota. Owner's Construction Representative will assist the General Services Administration in ensuri
This spending item is part of a $1,484,080 allocation.
See details
|
Public Buildings Service | 12/17/2009 |
STEELCASE INC. | $1,349,618 |
The purpose of this award is to provide modular systems office furnishings, installation and project management services for the relocation of US Fish and Wildlife Service. Our mission is to support the design principles that encourage adaptability as a
This spending item is part of a $1,457,673 allocation.
See details
|
General Services Administration | 9/15/2010 |
DECO, INC. | $1,335,701 |
Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s
This spending item is part of a $146,117,823 allocation.
See details
|
Public Buildings Service | 2/17/2010 |
M. A. MORTENSON COMPANY | $1,250,399 |
The work covered by this contract was awarded to our company on March 23, 2010. The first phase work scope included only Construction Manager as Constructor Preconstruction services for the Tenant Improvement in the existing Federal Office Building locat
This spending item is part of a $3,074,743 allocation.
See details
|
Public Buildings Service | 3/23/2010 |
Nasseff Mechanical Contractors | $1,155,815 |
REPLACE HEATING AND COOLING SYSTEMS, REPLACEMENT AND/OR MODIFICATION OF SELECTED AHU'S, LIGHTING/ELECTRICAL UPGRADES AND INSTALLATION OF VARIOUS SYSTEMS COMPONENTS FOR USE AS PART OF FUTURE TENANT HVAC INSTALLATIONS. MINOR WALL/CEILING CONSTRUCTION AND P
This spending item is part of a $1,822,747 allocation.
See details
|
Public Buildings Service | 3/11/2010 |
ACOUSTICS ASSOCIATES, INC. | $879,062 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
TECTA AMERICA CORP. | $853,280 | Re roofing for the base bid and option 1 at the Minneapolis Federal courthouse to include reroofing of Section L under the base bid and roof sections D, F, G, and H under Option 1. reroofing includes all labor, materials, equipment and supervision necessa | Public Buildings Service | 3/29/2010 |
LIESCH ASSOCIATES, INC. | $853,020 |
Architect and Engineer Construction Management of Independent Testing Agency Services for the Mechanical Electrcal Pluming (MEP) Replacement at the Bishop H. Whipple Federal Building in Fort Snelling, Minnesota.
This spending item is part of a $1,072,340 allocation.
See details
|
Public Buildings Service | 4/07/2011 |
CARTER GROUP, INC., THE | $830,370 | Provide relocation consulting and management and related services relative to the move out of government agencies from the Whipple Building, Ft. Snelling, St. Paul, MN. Work began late in the fourth quarter, 2009. Specifically, the work involves the pla | Public Buildings Service | 10/26/2009 |
TECTA AMERICA CORP. | $760,269 |
Minneapolis Federal Building Roof replacemenmt to provide new roof with multiyear warranty and improved insulation and drainage for both energy savings and structural durability. Includes removal and replacement of 41,000 SqFt of bituminus BUR and 6648 Li
This spending item is part of a $820,296 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
VEIT & COMPANY, INC. | $700,000 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
KNOLL, INC. | $666,334 | Manufacturer and delivery of Knoll Office furniture for Minneapolis, MN using ARA Funds. Includes office furniture delivery, installation, lease, and removal at end of lease term. | Public Buildings Service | 8/12/2010 |
OLYMPIC COMPANIES, INC. | $664,085 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
EGAN COMPANY | $660,000 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
SONUS INTERIORS, INC. | $557,480 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
Contract Hardware Co., Inc. | $474,366 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
EGAN COMPANY | $440,995 |
Recovery - building improvements / alterations - federal building and Post Office - Fargo, North Dakota. The desired outcome of the project is to improve the efficiency of the Heating, Cooling, Ventilation, and Air Conditioning (HVAC) equipment in the bu
This spending item is part of a $3,512,961 allocation.
See details
|
Public Buildings Service | 2/26/2010 |
DDG INC | $414,280 | The scope of work for the proposed project includes Furniture, HVAC, plumbing, electrical (green), and life safety improvements to a 41 year old buidling. This project will deliver a high performing green building with energy savings by designing and con | General Services Administration | 5/19/2011 |
MADISON SERVICES, INC. | $403,898 |
Implement a number of different upgrades at both vision and spandrel areas of the curtain wall system. In spandrel areas replace the gaskets at both the interior and exterior surfaces, along with the installation of new insulation and additional insulati
This spending item is part of a $2,713,206 allocation.
See details
|
Public Buildings Service | 11/18/2009 |
HANSON STRUCTURAL PRECAST MIDWEST, INC. | $401,771 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
KIMBALL INTERNATIONAL, INC. | $394,276 | The scope of work for the proposed project includes Furniture, HVAC, plumbing, electrical (green), and life safety improvements to a 41 year old buidling for VA Benefits Administration in St. Paul, MN. This project will deliver a high performing green bu | General Services Administration | 10/21/2011 |
VIKING AUTOMATIC SPRINKLER COMPANY | $317,500 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
MADISON SERVICES, INC. | $314,645 |
REPLACE HEATING AND COOLING SYSTEMS, REPLACEMENT AND/OR MODIFICATION OF SELECTED AHU'S, LIGHTING/ELECTRICAL UPGRADES AND INSTALLATION OF VARIOUS SYSTEMS COMPONENTS FOR USE AS PART OF FUTURE TENANT HVAC INSTALLATIONS. MINOR WALL/CEILING CONSTRUCTION AND P
This spending item is part of a $1,822,747 allocation.
See details
|
Public Buildings Service | 3/11/2010 |
M & N STRUCTURES, INC. | $295,676 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
AMANO MCGANN, INC. | $269,450 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
SUMMIT FIRE PROTECTION CO. | $228,550 |
Provide architectural and engineering services for the modernization of the Whipple Building at Fort Snelling, Minnesota. The building has over 617,000 gross square feet. The facility has a basement, ground level and first through sixth floors. The bui
This spending item is part of a $14,242,017 allocation.
See details
|
Public Buildings Service | 6/30/2009 |
SPACESAVER STORAGE SYSTEMS, INC. | $226,154 | Purpose: Consolidated storage location for Regional Veteran Benefits, home loans, compensation, pension, educational and rehabilitation files. Scope: Consolidate benefit, home loan, compensation, pension and files from several sites including Kansas City | General Services Administration | 7/20/2011 |
KODET ARCHITECTURAL GROUP LTD | $219,320 |
Architect and Engineer Construction Management of Independent Testing Agency Services for the Mechanical Electrcal Pluming (MEP) Replacement at the Bishop H. Whipple Federal Building in Fort Snelling, Minnesota.
This spending item is part of a $1,072,340 allocation.
See details
|
Public Buildings Service | 4/07/2011 |
HANSON STRUCTURAL PRECAST MIDWEST, INC. | $208,211 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
AARON CARLSON CORPORATION | $203,059 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
Siewert Cabinet and Fixture Mfg., Inc. | $201,115 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
SWANSON & YOUNGDALE, INC | $182,120 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
GARLAND COMPANY INC, THE | $174,053 |
A. Contractor shall implement a tear off of the existing built-up roof system and all associated components down to the top surface of existing polyurethane roof insulation. The insulation system shall be set into solid mopping of Type III hot asphalt ove
This spending item is part of a $518,253 allocation.
See details
|
Public Buildings Service | 11/30/2009 |
Muska Electric Co. | $166,808 |
REPLACE HEATING AND COOLING SYSTEMS, REPLACEMENT AND/OR MODIFICATION OF SELECTED AHU'S, LIGHTING/ELECTRICAL UPGRADES AND INSTALLATION OF VARIOUS SYSTEMS COMPONENTS FOR USE AS PART OF FUTURE TENANT HVAC INSTALLATIONS. MINOR WALL/CEILING CONSTRUCTION AND P
This spending item is part of a $1,822,747 allocation.
See details
|
Public Buildings Service | 3/11/2010 |
COLLABORATIVE DESIGN GROUP INC | $160,312 |
Project consists primarily of the repair of curtain wall gaskets, with related ancillary work, including replacement of deteriorated sealants and damaged glazing units, and repair/replacement of spandral insulation. The project is the Federal Courthouse B
This spending item is part of a $313,773 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
NATURAL ENVIRONMENT CORP | $155,089 |
REPLACE HEATING AND COOLING SYSTEMS, REPLACEMENT AND/OR MODIFICATION OF SELECTED AHU'S, LIGHTING/ELECTRICAL UPGRADES AND INSTALLATION OF VARIOUS SYSTEMS COMPONENTS FOR USE AS PART OF FUTURE TENANT HVAC INSTALLATIONS. MINOR WALL/CEILING CONSTRUCTION AND P
This spending item is part of a $1,822,747 allocation.
See details
|
Public Buildings Service | 3/11/2010 |
INSTITUTE FOR ENVIRONMENTAL ASSESSMENT, INC. | $149,075 |
Provide architectural and engineering services for the modernization of the Whipple Building at Fort Snelling, Minnesota. The building has over 617,000 gross square feet. The facility has a basement, ground level and first through sixth floors. The bui
This spending item is part of a $14,242,017 allocation.
See details
|
Public Buildings Service | 6/30/2009 |
STATES MANUFACTURING CORPORATION | $149,006 |
Chevron Energy Solutions is providing design-build construction services for the direct benefit and use of the United States Government through a procurement contract subject to the Federal Acquisition Regulation. The agreement is not a grant, cooperative
This spending item is part of a $12,194,385 allocation.
See details
|
Public Buildings Service | 3/15/2010 |
VAST ENTERPRISES, LLC | $137,333 |
Chevron Energy Solutions is providing design-build construction services for the direct benefit and use of the United States Government through a procurement contract subject to the Federal Acquisition Regulation. The agreement is not a grant, cooperative
This spending item is part of a $12,194,385 allocation.
See details
|
Public Buildings Service | 3/15/2010 |
NORTHSTAR IMAGING SERVICES, INCORPORATED | $120,133 |
Provide architectural and engineering services for the modernization of the Whipple Building at Fort Snelling, Minnesota. The building has over 617,000 gross square feet. The facility has a basement, ground level and first through sixth floors. The bui
This spending item is part of a $14,242,017 allocation.
See details
|
Public Buildings Service | 6/30/2009 |
A & K Equipment Company, Inc. | $108,217 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
General Office Products Company | $108,055 |
The purpose of this award is to provide modular systems office furnishings, installation and project management services for the relocation of US Fish and Wildlife Service. Our mission is to support the design principles that encourage adaptability as a
This spending item is part of a $1,457,673 allocation.
See details
|
General Services Administration | 9/15/2010 |
ROBERT RIPPE & ASSOCIATES, INC | $95,520 |
Provide architectural and engineering services for the modernization of the Whipple Building at Fort Snelling, Minnesota. The building has over 617,000 gross square feet. The facility has a basement, ground level and first through sixth floors. The bui
This spending item is part of a $14,242,017 allocation.
See details
|
Public Buildings Service | 6/30/2009 |
GRAEBEL COMPANIES, INC. | $95,045 | Awarded the contract for furniture storage for the Bishop Henry Wipple Federal Building in Ft Snelling, MN. | Public Buildings Service | 7/23/2010 |
VOSON PLUMBING, INC | $92,020 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
Interstate Power Systems | $91,208 |
Provide 5 Compressed Natural Gas Heavy Duty Transit Buses to be used for public transportation in Springfield, VA. Outcome: This contract will result in 5 high-quality, accurately built buses being delivered on time to the property. Other Items included
This spending item is part of a $2,227,671 allocation.
See details
|
General Services Administration | 9/24/2009 |
LE JEUNE STEEL COMPANY | $88,930 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
W. L. HALL CO. | $85,745 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
Verzieg Consulting And Management Services LLC | $84,500 |
Provide architectural and engineering services for the modernization of the Whipple Building at Fort Snelling, Minnesota. The building has over 617,000 gross square feet. The facility has a basement, ground level and first through sixth floors. The bui
This spending item is part of a $14,242,017 allocation.
See details
|
Public Buildings Service | 6/30/2009 |
API GARAGE DOOR COMPANY | $80,500 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
VAST ENTERPRISES, LLC | $79,907 |
Chevron Energy Solutions is providing design-build construction services for the direct benefit and use of the United States Government through a procurement contract subject to the Federal Acquisition Regulation. The agreement is not a grant, cooperative
This spending item is part of a $12,194,385 allocation.
See details
|
Public Buildings Service | 3/15/2010 |
GOLDEN VALLEY SUPPLY CO. | $76,696 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
APOGEE ENTERPRISES, INC. | $72,687 |
Implement a number of different upgrades at both vision and spandrel areas of the curtain wall system. In spandrel areas replace the gaskets at both the interior and exterior surfaces, along with the installation of new insulation and additional insulati
This spending item is part of a $2,713,206 allocation.
See details
|
Public Buildings Service | 11/18/2009 |
NATURAL ENVIRONMENT CORP | $70,000 |
Implement a number of different upgrades at both vision and spandrel areas of the curtain wall system. In spandrel areas replace the gaskets at both the interior and exterior surfaces, along with the installation of new insulation and additional insulati
This spending item is part of a $2,713,206 allocation.
See details
|
Public Buildings Service | 11/18/2009 |
ABSOLUTE COMMERCIAL FLOORING INC | $63,584 |
The work covered by this contract was awarded to our company on March 23, 2010. The first phase work scope included only Construction Manager as Constructor Preconstruction services for the Tenant Improvement in the existing Federal Office Building locat
This spending item is part of a $3,074,743 allocation.
See details
|
Public Buildings Service | 3/23/2010 |
MIDWEST SPECIALTY MAINTEN | $60,600 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
MEYER CONTRACTING INC. | $52,180 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
ST. CROIX RECREATION COMPANY, INC. | $50,780 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
FINISH LINE FLOORS MINNESOTA, LLC | $38,816 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
SWANSON & YOUNGDALE, INC | $37,956 |
The work covered by this contract was awarded to our company on March 23, 2010. The first phase work scope included only Construction Manager as Constructor Preconstruction services for the Tenant Improvement in the existing Federal Office Building locat
This spending item is part of a $3,074,743 allocation.
See details
|
Public Buildings Service | 3/23/2010 |
RANI ENGINEERING, INC. | $33,050 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
COLLABORATIVE DESIGN GROUP INC | $28,728 |
Project involves working with Government hired contractor (CMc - Construction Manager as contractor) and their mechanical sub-contractors to review previously designed mechanical system for the purpose of identifying potential modification opportunities t
This spending item is part of a $74,328 allocation.
See details
|
Public Buildings Service | 3/12/2010 |
GRAYBAR ELECTRIC COMPANY, INC. | $27,667 |
Chevron Energy Solutions is providing design-build construction services for the direct benefit and use of the United States Government through a procurement contract subject to the Federal Acquisition Regulation. The agreement is not a grant, cooperative
This spending item is part of a $12,194,385 allocation.
See details
|
Public Buildings Service | 3/15/2010 |
COLLABORATIVE DESIGN GROUP INC | $22,680 | Project involves Management and Observation of roofing renovation projects at four (4) locations in the state of Minnesota. Projects range from approximately 2,500 square feet to over 40,000 square feet in size. Management and Observation activities inclu | Public Buildings Service | 3/02/2010 |
Lbp Mechanical Inc | $21,989 |
Minneapolis Federal Building Roof replacemenmt to provide new roof with multiyear warranty and improved insulation and drainage for both energy savings and structural durability. Includes removal and replacement of 41,000 SqFt of bituminus BUR and 6648 Li
This spending item is part of a $820,296 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
ENVIROBATE, INC. | $21,800 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
SPACESAVER STORAGE SYSTEMS, INC. | $20,780 | High density four post shelving to be purchased and installed in rooms 3601, 3652, 4238, 6633, 6904 and B934 at VBA, 1 Federal Drive, Fort Snelling, MN. The project includes product purchase and installation. Project is less than 50% completed. Jobs creat | General Services Administration | 4/11/2012 |
HORWITZ, INC. | $20,691 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
TWO BUFFALO CONSTRUCTION SUPPLIES INC | $19,743 |
Minneapolis Federal Building Roof replacemenmt to provide new roof with multiyear warranty and improved insulation and drainage for both energy savings and structural durability. Includes removal and replacement of 41,000 SqFt of bituminus BUR and 6648 Li
This spending item is part of a $820,296 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
FENCE STORE, INC, THE | $18,995 |
The lease in Bloomington, MN was awarded for approximately 224,000 square feet, the purpose of which is to house numerous federal agencies while the Whipple Federal Building is undergoing renovation. The award amount of $10,297,264.56 is intended to cove
This spending item is part of a $11,633,930 allocation.
See details
|
Public Buildings Service | 8/10/2010 |
Vickerman Construction, LLC | $18,295 |
Minneapolis Federal Building Roof replacemenmt to provide new roof with multiyear warranty and improved insulation and drainage for both energy savings and structural durability. Includes removal and replacement of 41,000 SqFt of bituminus BUR and 6648 Li
This spending item is part of a $820,296 allocation.
See details
|
Public Buildings Service | 9/24/2009 |
Nasseff Mechanical Contractors | $17,500 |
REPLACE HEATING AND COOLING SYSTEMS, REPLACEMENT AND/OR MODIFICATION OF SELECTED AHU'S, LIGHTING/ELECTRICAL UPGRADES AND INSTALLATION OF VARIOUS SYSTEMS COMPONENTS FOR USE AS PART OF FUTURE TENANT HVAC INSTALLATIONS. MINOR WALL/CEILING CONSTRUCTION AND P
This spending item is part of a $1,822,747 allocation.
See details
|
Public Buildings Service | 3/11/2010 |
Faithful & Gould, Inc. | $15,849 |
We will provide construction management/project management for the Fargo, North Dakota Federal Building and Post Office and the Bismarck, North Dakota Federal Building and Post Office. In this quarter, the project was supported by American Recovery and R
This spending item is part of a $221,851 allocation.
See details
|
Public Buildings Service | 3/30/2010 |
ELLIOTT CONTRACTING CORPORATION | $14,045 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
HORWITZ, INC. | $13,750 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
Brin Glass Company | $13,719 |
The work covered by this contract was awarded to our company on March 23, 2010. The first phase work scope included only Construction Manager as Constructor Preconstruction services for the Tenant Improvement in the existing Federal Office Building locat
This spending item is part of a $3,074,743 allocation.
See details
|
Public Buildings Service | 3/23/2010 |
ECODEEP, LLC | $13,000 |
Provide architectural and engineering services for the modernization of the Whipple Building at Fort Snelling, Minnesota. The building has over 617,000 gross square feet. The facility has a basement, ground level and first through sixth floors. The bui
This spending item is part of a $14,242,017 allocation.
See details
|
Public Buildings Service | 6/30/2009 |
SIMPLEXGRINNELL LP | $10,735 |
REPLACE HEATING AND COOLING SYSTEMS, REPLACEMENT AND/OR MODIFICATION OF SELECTED AHU'S, LIGHTING/ELECTRICAL UPGRADES AND INSTALLATION OF VARIOUS SYSTEMS COMPONENTS FOR USE AS PART OF FUTURE TENANT HVAC INSTALLATIONS. MINOR WALL/CEILING CONSTRUCTION AND P
This spending item is part of a $1,822,747 allocation.
See details
|
Public Buildings Service | 3/11/2010 |
BENTZ,THOMPSON, RIETOW INC | $10,388 |
Provide architectural and engineering services for the modernization of the Whipple Building at Fort Snelling, Minnesota. The building has over 617,000 gross square feet. The facility has a basement, ground level and first through sixth floors. The bui
This spending item is part of a $14,242,017 allocation.
See details
|
Public Buildings Service | 6/30/2009 |
RANI ENGINEERING, INC. | $9,950 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
Bartley Sales Company, Inc. | $7,538 |
The work covered by this contract was awarded to our company on March 23, 2010. The first phase work scope included only Construction Manager as Constructor Preconstruction services for the Tenant Improvement in the existing Federal Office Building locat
This spending item is part of a $3,074,743 allocation.
See details
|
Public Buildings Service | 3/23/2010 |
WISS, JANNEY, ELSTNER ASSOCIATES, INC. | $7,307 |
Implement a number of different upgrades at both vision and spandrel areas of the curtain wall system. In spandrel areas replace the gaskets at both the interior and exterior surfaces, along with the installation of new insulation and additional insulati
This spending item is part of a $2,713,206 allocation.
See details
|
Public Buildings Service | 11/18/2009 |
COLLABORATIVE DESIGN GROUP INC | $6,709 | The project involves management and observation of roofing renovation project. Project is approximately 30,000 square feet in size. Management and observation activities include review of shop drawings, attendance at pre-construction meeting, and site vis | Public Buildings Service | 3/29/2010 |
WECSYS LLC | $6,326 | Supplies 87 EA High output 18W Flourescent desk lamp, Part # ELE7522BK, made by LECTRIX INC. This is chedule to be shipped May 02, 2011 | Public Buildings Service | 9/15/2010 |
HALDEMAN-HOMME, INC | $5,700 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
RTW ENTERPRISES INC | $3,146 | Facilities maintenance and Management | Public Buildings Service | 11/19/2009 |
ACOUSTICS ASSOCIATES, INC. | $3,103 |
The Bishop Henry Whipple Recovery & Reinvestment Act (ARRA) Renovations & Alterations Project is to infuse ARRA funding into the local Minneapolis/St Paul, Minnesota economy by funding needed mechanical, electrical, fire protection & plumbing renovation w
This spending item is part of a $148,351,480 allocation.
See details
|
Public Buildings Service | 11/13/2009 |
Engineering, Energy and the Environment, LLC | $1,215 |
Project consists primarily of the repair of curtain wall gaskets, with related ancillary work, including replacement of deteriorated sealants and damaged glazing units, and repair/replacement of spandral insulation. The project is the Federal Courthouse B
This spending item is part of a $313,773 allocation.
See details
|
Public Buildings Service | 7/24/2009 |
HYDES GROUP, INC. | $1,215 |
REPLACE HEATING AND COOLING SYSTEMS, REPLACEMENT AND/OR MODIFICATION OF SELECTED AHU'S, LIGHTING/ELECTRICAL UPGRADES AND INSTALLATION OF VARIOUS SYSTEMS COMPONENTS FOR USE AS PART OF FUTURE TENANT HVAC INSTALLATIONS. MINOR WALL/CEILING CONSTRUCTION AND P
This spending item is part of a $1,822,747 allocation.
See details
|
Public Buildings Service | 3/11/2010 |
HYDES GROUP, INC. | $655 |
Implement a number of different upgrades at both vision and spandrel areas of the curtain wall system. In spandrel areas replace the gaskets at both the interior and exterior surfaces, along with the installation of new insulation and additional insulati
This spending item is part of a $2,713,206 allocation.
See details
|
Public Buildings Service | 11/18/2009 |
Hilmerson Construction Safety Svcs | $650 |
Implement a number of different upgrades at both vision and spandrel areas of the curtain wall system. In spandrel areas replace the gaskets at both the interior and exterior surfaces, along with the installation of new insulation and additional insulati
This spending item is part of a $2,713,206 allocation.
See details
|
Public Buildings Service | 11/18/2009 |