Warren County, Miss., funds by Interior, Department of
Listing $3,148,644.56 in stimulus funds from Interior, Department of for Warren
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
SCHNABEL FOUNDATION COMPANY INC | $1,694,205 | Stablization of Mint Springs Bluff at the Vicksburg Military Park in Vicksburg, MS. The repair involves installing a soil nail wall with a permanent reinforced 8 inch facing. The overall scope includes the installation of a 18 inch DIP drainage pipe, rein | National Park Service | 4/26/2010 |
FORDICE CONSTRUCTION COMPANY | $420,962 |
Perform renovations to the Historic Shirley House at Vicksburg National Military Park.
This spending item is part of a $760,080 allocation.
See details
|
National Park Service | 3/25/2010 |
ATKINS NORTH AMERICA, INC | $164,985 | CM Services for Vicksburg National Military Park; Historic Shirley House | National Park Service | 4/14/2010 |
ERGON TERMINALING, INC. | $152,995 | Repaired 160 linear feet of concrete drain, overlaid 66,000 square feet of SC-1 M-DOT approved asphalt mixture, re-paved parking lot area in front on maintenance shop (11,000 square feet), & installed 30 linear feet of bitumunous wedge sloping from 2 to 8 | National Park Service | 9/25/2009 |
HDR ENGINEERING, INC. | $150,008 | Stabilization of Mint Springs Bluff to stop further damage to Vickburg National Military Cememtary | National Park Service | 8/18/2009 |
ATKINS NORTH AMERICA, INC | $117,958 | CM Services Mint Springs Bluff Stabilization Vicksburg National Military Park | National Park Service | 4/30/2010 |
RIVERSIDE CONSTRUCTION CO., INC. | $114,416 |
Construction of (3) Visitor Contact Stations (Bald Knob NWR, Big Lake NWR and Wapanocca NWR) and construction of (1) Shop Building at Big Lake NWR, Arkansas.
This spending item is part of a $2,925,148 allocation.
See details
|
U.S. Fish and Wildlife Service | 3/30/2010 |
HARTRAMPF, INC. | $103,764 | Architectural Services to modify the Construction Documents for the Rehabilitation of the Historic Shirley House, Vicksburg National Military Park | National Park Service | 7/14/2009 |
Pratt Construction Co | $69,097 |
Perform renovations to the Historic Shirley House at Vicksburg National Military Park.
This spending item is part of a $760,080 allocation.
See details
|
National Park Service | 3/25/2010 |
CENTRAL ASPHALT CO INC | $50,915 |
Perform renovations to the Historic Shirley House at Vicksburg National Military Park.
This spending item is part of a $760,080 allocation.
See details
|
National Park Service | 3/25/2010 |
HARTRAMPF, INC. | $46,923 | Construction Phase services for Rehabilitation of Historic Shirley House at Vicksburg NMP | National Park Service | 4/16/2010 |
WESLEY B JONES ELECTRICAL INC | $39,854 |
Perform renovations to the Historic Shirley House at Vicksburg National Military Park.
This spending item is part of a $760,080 allocation.
See details
|
National Park Service | 3/25/2010 |
Jessie Benard Construction | $16,824 |
Perform renovations to the Historic Shirley House at Vicksburg National Military Park.
This spending item is part of a $760,080 allocation.
See details
|
National Park Service | 3/25/2010 |
Adam Rogers Masonry | $5,740 |
Perform renovations to the Historic Shirley House at Vicksburg National Military Park.
This spending item is part of a $760,080 allocation.
See details
|
National Park Service | 3/25/2010 |