Big Horn County, Mont., funds by Interior, Department of
Listing $10,536,124.10 in stimulus funds from Interior, Department of for Big Horn
Note: For some programs where states do not report where money will be distributed across the state, we do not have the allocation for individual counties. Those programs include: Medicaid, unemployment benefits and food stamps. Those amounts are included in the totals for where the state agency receiving that money is located.
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Description | Federal Dept./Agency | Date |
---|---|---|---|---|
CROW TRIBE OF INDIANS | $3,007,005 | Highway Planning and Construction Estimated project cost is $3,007,005. This project is 44.1 miles long. There is a considerable amount of crack sealing to be completed on this project as well as substantial repair to the aged right-of-way fencing. The safety improvement portion of the | Indian Affairs (Assistant Secretary) | 8/31/2009 |
CROW TRIBE OF INDIANS | $1,800,680 | Road Maintenance_Indian Roads Estimated project cost is $1,800,680. The Road Repair and Restoration project is 19.1 miles in length, and consists of a rehabilition of the paved surface and safety improvemetns along the entire road corridor. The safety improvement portion of the proj | Indian Affairs (Assistant Secretary) | 8/31/2009 |
CROW TRIBE OF INDIANS | $1,510,000 | Indian Housing Assistance For the Crow Tribe Housing Program project to build up to fifteen (15) homes during fiscal year 2010 and 2011 for HIP eligible recipients. | Indian Affairs (Assistant Secretary) | 11/23/2009 |
CROW TRIBE OF INDIANS | $1,510,000 | Indian Housing Assistance For the Crow Tribe Housing Program project to build up to fifteen (15) homes during fiscal year 2010 and 2011 for HIP eligible recipients. | Indian Affairs (Assistant Secretary) | 11/23/2009 |
CROW TRIBE OF INDIANS | $557,385 | Road Maintenance_Indian Roads Estimated project cost is $557,385. This Road Repair and Restoration project is 6.2 miles in length, and consists of 1.3 miles of paved surface and 4.9 miles of gravel surface. The project incorporates a rehabilitation of the paved surface, the gravel su | Indian Affairs (Assistant Secretary) | 8/31/2009 |
IMPERIAL ROOF SYSTEMS CO. | $390,755 | Busby School Roof Replacement | Indian Affairs (Assistant Secretary) | 2/11/2010 |
CROW TRIBE OF INDIANS | $347,769 | Highway Planning and Construction Estimated project cost is $347,769. The project is 4.8 miles long and consists of a rehabilition of the paved surface and safety improvements along the entire road corridor. The safety improvement portion of the project is phase I and will include remov | Indian Affairs (Assistant Secretary) | 8/31/2009 |
LANDSCAPES UNLIMITED, L.L.C. | $346,435 | Contract No. R10PC60R15 was awarded to Landscapes Unliminted LLC on March 25, 2010. The work to be performed includes the following: 1) cofferdam instalaltion and dewatering, 2) furnish and install 48diameter manhole irrigation intake structure, 3) furn | Bureau of Reclamation | 3/25/2010 |
NORTHERN CHEYENNE TRIBE | $232,900 | Title I Grants to Local Educational Agencies, Recovery Act Title I--A Improve teaching and learning for students most at risk of failing to meet state academic achievement standards. This grant's purpose is to supplement and provide additional curriculum materials in math and reading, provide additioional instructi... Show more | Indian Affairs (Assistant Secretary) | 10/28/2009 |
CROW TRIBE OF INDIANS | $171,411 | Highway Planning and Construction Estimated project cost is $171,411. This project is 1.9 miles in length and consists of rehabilitation of the paved surface. Work will include removal of any obstructions in the right-of-way, repair right-of-way fence, clean and repair drainage structur | Indian Affairs (Assistant Secretary) | 8/31/2009 |
CROW TRIBE OF INDIANS | $144,496 | Highway Planning and Construction estimated project cost is $144,496. The 1.9 mile long project consists of a rehabilitation of the paved surface and safety improvements along the entire road corridor. The safety improvement protino of the project is phase I and will include removal of | Indian Affairs (Assistant Secretary) | 8/31/2009 |
BIG HORN SAND & GRAVEL, LLC | $131,714 | 3/8 aggregate delivered to Lame Deer, Montana | Indian Affairs (Assistant Secretary) | 3/02/2010 |
BIG HORN SAND & GRAVEL, LLC | $131,714 | 3/8 Aggregate | Indian Affairs (Assistant Secretary) | 3/02/2010 |
CROW TRIBE OF INDIANS | $74,586 | Highway Planning and Construction Estimated Project cost is $74,586. The project is 0.9 miles long and consists of rehabilitation of the paved surface and safety improvements along the enire road corridor. The safety improvement portino of the project is phase I and will include removal | Indian Affairs (Assistant Secretary) | 8/31/2009 |
CROW TRIBE OF INDIANS | $71,943 | Road Maintenance_Indian Roads Estimated project cost is $71,943.00. This multi-route Road/Bridge Repair and Restoration project includes route and bridge assessments on each BIA-owned route on the Crow IRR system in order to identify those activities required to assure that an Accept | Indian Affairs (Assistant Secretary) | 1/20/2010 |
CROW TRIBE OF INDIANS | $55,211 | Highway Planning and Construction Estimated project cost is $55,211. This 0.8 mile project consists of rehabilitation of the paved surface and safety improvements along the entire road corridor. The safety improvement portion of the project is phase I and will include removal of any obst | Indian Affairs (Assistant Secretary) | 8/31/2009 |
CROW TRIBE OF INDIANS | $52,120 | Highway Planning and Construction Estimated project cost is $52,120. The project is 0.7 miles in length and consists of rehabiliation of the paved surface repair of curb, gutter and sidewalks, and safety improvements within the road corridor. The safety improvement portion of the projec | Indian Affairs (Assistant Secretary) | 8/31/2009 |